STATEMENT OF NEED (SON)

21 July 2022

Project: Restroom Trailer – Readiness Training Site

1.0 Purpose: Offeror will provide and deliver (or coordinate delivery of) a durable restroom trailer capable of providing adequate accommodation standards to students for at least 12 years beyond acquisition.

2.0 Scope or Mission: Offeror will provide and deliver (or coordinate delivery of) restroom trailer commodity, meeting at least the minimum specifications outlined below. The restroom trailer will be approximately 12ft long in order to accommodate appropriate spacing of fixtures in accordance with pertinent codes. For safety while towing and in-use, torsion axles, exterior lights, an electric brake system and scissor jack stabilizers (at least 1.5x trailer weight capacity) are required. The trailer should also be constructed with a steel cage and a one-piece seamless roof. Travis AFB regularly experiences high winds up to (and exceeding) 30 MPH, necessitating durable roofing material in construction. To preserve this assets longevity, the trailers undercarriage should also be coated, and vinyl sheet flooring with marine grad sub-floor should be used. The trailer must be outfitted to allow direct integration with existing infrastructural sewer and water lines, in addition to having on-board storage tanks (equipped with dump valves) for non-potable water (≥140 gallons), and black and gray water. Commercial-grade PEX lines or similar should be used.

The trailer should provide at least two restroom stalls providing a minimum of 30 sq. ft. of functional space. Each stall should include separate doors accessible to the trailer’s exterior and must include a locking mechanism with keys provided. Each stall must also include a standard residential toilet and a sink – timed faucets on the sink are preferred, as a water conservation measure when water storage tanks are used. Each stall also requires Heating, Ventilation/Exhaust Fans, and Air Conditioning, interior lighting, and heavy duty folding stairs with guard rails leading to the exterior doors. Fiberglass or similar wall panels with poly insulation should be used to maintain efficient temperature regulation.

3.0 Period and Place of Performance: Offeror will either provide delivery service or coordinate delivery and factor any associated costs into their bid. Offeror will be expected to complete delivery of commodity within 210 days of bid acceptance.

4.0 Background: The restroom trailer will serve students conducting contingency and pre-deployment training on Travis AFB, CA. This training site serves approximately ### personnel annually, supporting over 52 units and GSUs and instructing a variety of students, from civilian contractors to 349th AMW Reservists and Naval Postgraduate School students. Port-a-johns and a portable handwash station are currently being rented through a local vendor to provide accommodations to students. This would serve as a long-term cost-saving measure as well as provide flexibility to accommodate training at other locations around the installation. The image below, is the proposed primary location for the restroom trailer. This location will allow for the trailer to be connected with the installation’s sewer and water infrastructure to alleviate the need for storage tank dumping and cleanup.

5.0 Deliverables / Schedule: {All written deliverables shall be phrased in layperson language.} Offeror is expected to deliver a proposed project plan defining the responsibilities, timeline, risks, and milestones of contract objectives no later than five business days after contract award. Offeror will provide a monthly status report documenting tasks and identified issues on the 5th of every month via email to COR.

Offeror will either provide delivery service or coordinate delivery and factor any associated costs into their bid. Offeror will be expected to complete delivery of commodity within 210 days of bid acceptance.