SolicitationAttachment1PerformanceWorkStatement_1232SA26Q1029.pdf

PDF 348 KB Posted

Attached to
Eye Wash Station and Emergency Shower Installation, Baton Rouge, Louisiana
Solicitation number
1232SA26Q1029
Issued by

About this file

This is a Statement of Work for laboratory equipment and supplies installation at the USDA Agricultural Research Service Honeybee Breeding, Genetics & Physiology Research facility located at 1157 Ben Hur Road, Baton Rouge, Louisiana 70820. The document was prepared by Everett Wilson on June 30, 2026.

The contractor must furnish all labor, materials, and supplies to complete two primary work components: (1) installation of a new USDA-furnished stainless-steel eyewash and safety shower unit at an exterior location between Labs 105 and 107, including water supply piping, thermostatic mixing valve, concrete slab with drainage, handrail installation, brick demolition, and system testing; and (2) replacement of the existing safety shower serving Lab 207 with a new USDA-furnished unit in the hallway outside the laboratory, including connection to existing water supply, control valve replacement, ceiling modifications, and installation of a sump pit with float switch beneath the shower. All work must comply with local, state, and federal codes, manufacturer requirements, and ARS Facilities and Design Standards (P&P 242.1). The contractor must obtain all required permits and licenses at their own expense, schedule work during normal hours (7:00 AM–5:00 PM, Monday–Friday), provide a Site-Specific Safety Plan within 14 days of award, submit detailed proposals in MS Excel and MS Word formats, and complete the project within 90 days of notice to proceed. The contractor is responsible for site inspection and verification of dimensions, daily debris removal, property damage repair, material submittals to the Research Leader and Engineering Project Manager, and coordination with the Contracting Officer's Representative. Bidders must be registered in the System for Award Management (SAM) prior to submission and should utilize bio-based products to the maximum extent possible while maintaining quality standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work

Laboratory Equipment & Supplies Installation

Honeybee Breeding, Genetics & Physiology Research

1157 Ben Hur Rd

Baton Rouge LA 70820

Prepared by:

Everett Wilson 30JUN26

STATEMENT OF WORK:

Contractor shall furnish all labor, materials, and supplies to perform the following work for U. S. Department of Agriculture, Agricultural Research Service, Honeybee Breeding, Genetics & Physiology Research, 1157 Ben Hur Rd, Baton Rouge LA 70820.

All work shall be completed in accordance with all local, state, and federal codes and regulations. All work should meet the manufacturer’s requirements for all equipment used in the project. All work shall also meet the requirements of the ARS Facilities and Design Standards (P&P 242.1). The P&P 242.1 document can be found at: http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf. All work shall be accomplished in a professional manner and in accordance with good workmanship and acceptable practice.

Contractor is responsible for inspecting the site and for determining the exact dimensions and requirements of the project with input from site personnel prior to submitting proposal and detailed cost breakdown.

Contractor shall obtain at own expense all permits, licenses, and inspections required by all local, state, and federal authorities. Contractor shall submit written specifications for all materials and supplies to be used and included in the bid.

Contractor’s working hours shall be scheduled to coincide with the normal working hours (8am-5pm) at the site. Should it be necessary to schedule working hours other than normal working hours, contractor shall arrange for access to the work area with the Contracting Officer’s Representative (COR) at the site at least three days prior to the need.

Contractor shall notify and schedule utility outages at least 24 hours in advance.

During work, contractor shall maintain a safe work area around the site of http://www.afm.ars.usda.gov/ppweb/PDF/242-01M.pdf repair and clearly mark danger areas with cones and safety tape. All unused and demolition materials shall be removed from the site by the contractor and shall not be placed in the owner’s disposal areas.

The contractor will be responsible for replacing at their cost any property damaged at the site during the construction process.

PROJECT REQUIREMENTS:

1) Provide all labor, equipment, and materials required to:

A. Labs 105 & 107 Eyewash and Safety Shower

Contractor will install a new USDA-furnished stainless-steel eyewash and safety shower unit at the designated exterior location between Labs 105 and 107. Work includes installation of all required water supply piping, fittings, valves, and connections, including a thermostatic mixing valve to provide tepid water in accordance with safety standards. Contractor will connect hot and cold-water supplies from the attic space and construct a concrete slab with proper drainage slopes to provide safe access to the unit. Additional work includes demolition of existing brick as required, installation of handrails along both sides of the adjacent ramp, and restoration of disturbed areas. Upon completion, the contractor will test the system and coordinate with the site CDSO to verify proper operation, water flow, and compliance with applicable safety requirements.

B. Lab 207 Safety Shower Replacement

Contractor will remove the existing safety shower serving Lab 207 and install a new USDA-furnished safety shower in the hallway outside the laboratory. Work includes connecting the unit to the existing water supply system, replacing the associated control valve, and modifying the ceiling as necessary to accommodate the new installation. Upon completion, the safety shower will be tested to verify proper operation, water flow, and compliance with applicable safety standards. Install a sump pit directly underneath the safety shower to collect water when shower is used. Sump pit will have a float switch and the discharge piped to nearest plumbing drain.

INSPECTIONS AND COMPLETION:

1. Upon completion of the project, contractor shall coordinate a site inspection of the work with the COR and/or other owner representatives.

2. Contractor shall remove all excess materials, debris, and equipment from the site.

Site Visit:

Bidders are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a bid is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable.

Contractor must be registered in System for Award Management, (SAM), prior to submitting a bid unless directed otherwise by ARS Contracting

Officer.

Registration can be obtained through:

https://www.sam.gov/portal/public/SAM/

Utilization of Bio-Based Products:

http://www.sam.gov/portal/public/SAM/

As required by the Farm Security and Rural Investment Act of 2002 and the Energy Policy Act of 2005 (7 U.S.C. 8102(c) (3)), the Offeror certifies, by signing this offer, that bio-based products (within categories of products listed by the United States Department of Agriculture in 7 CFR part 3201, subpart B) to be used or delivered in the performance of the contract, other than bio-based products that are not purchased by the Offeror as a direct result of this contract, will comply with the applicable specifications or other contractual requirements.

The contractor shall utilize products and material based from bio-based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use of detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to the applicable Federal Specifications and Standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at:

https://www.biopreferred.gov

Recycling.

Contractor shall make best effort to recycle any construction debris created during the contract.

Safety: The contractor will submit a Site Safety Specific Plan/Accident

Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. Contractor shall furnish a Site-Specific

Safety Plan (SSSP) and the Government shall review the SSSP prior to the beginning any construction activities. SSSP shall be in typically accepted industry format.

https://www.biopreferred.gov/

Detailed Bid: Provide all materials, labor, and equipment to fully and successfully complete the Statement of Work described in this document.

Proposal cost detail shall be in MS Excel and the work description shall be in

MS Word. Failure to submit a properly documented and detailed proposal and bid will be considered grounds for no consideration.

CONTRACTOR RESPONSIBILITY:

The project has a base bid to be performed per the following specifications:

1. Contractor will verify all dimensions and quantities of materials and existing site conditions prior to beginning work.

2. Contractor shall keep work area clean on a daily basis and take measures to control debris while work is being performed.

3. Contractor is required to manage the project and consult with the

Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.

4. Contractor will provide daily reports of work performed to the COR.

5. Contractor shall remove and dispose of all construction related materials from all work areas on a daily basis and remove these waste materials from the site on a weekly basis.

6. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.

7. Contractor must have a superintendent responsible for overseeing this project.

8. Contactor will provide their restroom facility.

Material / Submittals:

The material for the entire work shall be as specified above. Submittals on all materials used on this project shall be submitted to the Research Leader and

Engineering Project Manager as noted in this document as well as the yet to be assigned Contracting Officer for the Project. The documents detailing the material covered by the submittals will be provided electronically. Any physical sample required for site approval will be delivered to the site to the Research

Leader for consideration and approval. All documentation regarding those samples will also be submitted electronically to the Lab Personnel

Representative, COR and EPM.

Installation Procedure:

Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractor is required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No

Government equipment will be available for use by the contractor. The contractor shall be responsible for always protecting their work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.

Damage to Property:

Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.

Inspection and Acceptance:

A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.

Project Schedule:

The completion of this project shall not exceed 90 days from date of notice to proceed with the repair of the roof of the main building and then the garage taking priority. A request for time extension must be submitted to the

Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.

Work Hours:

Contractor work hours shall be Monday through Friday, seven (7) A.M. to five

(5) P.M. with the exception of Government holidays or at the discretion of the site with written approval obtained a minimum of 24 hours in advance.