This is a Request for Quotations (RFQ) for guardrail removal services at Mansfield Hollow Lake in Mansfield, Connecticut, issued by the U.S. Army Corps of Engineers (USACE). The solicitation number is W912WJ26QA067, with an offer due date of March 30, 2026, at 2:00 PM. The contract is designated as a women-owned small business (WOSB) set-aside for 100 percent, with a small business size standard of USD 47,000,000. Two line items are required: Item 0001 covers guardrail removal services for Guardrail Section 1 (approximately 3,900 linear feet of steel cable and wooden post guardrail), and Item 0002 covers Guardrail Section 2 (approximately 6,700 linear feet). Both items are priced on a firm fixed-price basis for one job each, with a 120-calendar-day performance period from contract award.

The Performance Work Statement specifies that contractors must provide all labor, materials, equipment, and transportation to remove approximately 10,600 linear feet of steel cable and wooden post guardrail from the 1958-era system at Mansfield Hollow Dam. Key requirements include: conducting a pre-work conference; submitting pre-work safety submittals (Accident Prevention Plan, Activity Hazard Analysis, Site Safety and Health Officer designation) within 21 days of award; performing work Monday through Friday from 7:00 AM to 3:30 PM; employing a Level 3 Site Safety and Health Officer; ensuring first aid and CPR certification for employees; backfilling post holes with clean 3/4-inch processed gravel; and properly disposing of removed materials off-site in accordance with state standards. The contractor must comply with U.S. Army Corps of Engineers EM 385-1-1 safety standards, OSHA requirements, all applicable federal/state/local regulations, and obtain necessary permits. Invoices must be submitted to the TPOC at West Thompson Lake (Mariah Deyo) for payment after final inspection and acceptance, with multiple payments permitted for jobs exceeding 30 days. The Technical Point of Contact is Park Ranger Mariah Deyo at 508-838-4163 or Mariah.E.Deyo@usace.army.mil; interested vendors are encouraged to conduct a site visit prior to quote submission.

View the file

Other files

File Type Posted
Amendment W912WJ26QA067-0001.pdf PDF
Attachments 26QA067 Revised.pdf PDF
Attachments 26QA067.pdf PDF
Solicitation Survey 26QA067.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price

Amount

0001 Contractor shall provide all labor, materials, equipment, and transportation to provide guardrail removal services for Guardrail Section 1 (approximately 3,900 linear feet long) at Mansfield Hollow Lake, Mansfield Center, CT in accordance with the Performance Work Statement.

Pricing Arrangement: Firm Fixed Price

1 Job

0002 Contractor shall provide all labor, materials, equipment, and transportation to provide guardrail removal services for Guardrail Section 2 (approximately 6,700 linear feet long) at Mansfield Hollow Lake, Mansfield Center, CT in accordance with the Performance Work Statement.

Pricing Arrangement: Firm Fixed Price

1 Job

W912WJ26QA067

Continuation of Description

INTERESTED VENDORS SHALL REVIEW THE "ADDENDUM TO 52.212-1" AND

"ADDENDUM TO EVALUATION" FOR INSTRUCTIONS AND EVALUATION CRITERIA.

VENDORS ARE RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS

ALL REQUIREMENTS. FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED

NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY SHALL BE COMPLETED IN ITS ENTIRETY

AND RETURNED WITH QUOTES. FAILURE TO DO SO MAY RESULT IN QUOTES BEING

DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

PERFORMANCE WORK STATEMENT:

GUARDRAIL REMOVAL

U.S. ARMY CORPS OF ENGINEERS

MANSFIELD HOLLOW LAKE

MANSFIELD, CT

PERFORMANCE WORK STATEMENT

I. General

1. Summary:

Furnish all equipment, materials, and labor for the removal and disposal of approximately 10,600 linear feet of steel cable and wooden post guardrail at Mansfield Hollow Dam in accordance with the following requirements and Performance Work Statement.

2. Location:

The required services shall by performed at the following location: Mansfield Hollow Dam at 141 Mansfield Hollow Road, Mansfield Center, CT 06250.

3. Site Visit:

Contact the Technical Point of Contact (TPOC), Park Ranger Mariah Deyo

(508-838-4163) or Mariah.E.Deyo@usace.army.mil to arrange a site visit. Interested vendors should conduct a site visit to confirm understanding of scope, inspect existing conditions, and familiarize themselves with the site prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.

4. Schedule:

a. The period of performance shall be 120 days from contract award.

b. All work shall be performed Monday through Friday between the hours of 7:00 AM and 3:30 PM unless otherwise approved by the TPOC. Any proposed changes to an approved schedule must be submitted to the TPOC in writing and are not finalized until approved. No work shall be done on weekends or Government holidays.

c. All pre-work safety and product submittals shall be submitted within 21 days of contract award. The Government reserves up to 21 days for review and acceptance on each submittal /resubmittal from the date of receipt. If revisions are necessary to the submittals/resubmittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 14 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of pre-work submittals.

5. Safety Requirements:

a) General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b) Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan (APP). The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meeting shall be held and documented. Records shall be available to the TPOC upon request.

c) Activity Hazard Analysis:

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aig24.pdf

d) Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3 SSHO. A Level 3 SSHO is a designated employee with collateral duty safety and occupational health (SOH) responsibilities that meets the requirements of EM 385-1-1, Chapter 2-3.b and 2-4.b.

Level 3 SSHOs must possess training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHE shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHO's on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.pdf

e) First- Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1-1. Chapter 3-3.

f) Additional Personnel Requirements:

Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Performance Work Statement, based on the definable features of work for this project.

g) Accident Reporting

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven

(7) days of an incident:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms /Eng_Form_3394_2021Aug.pdf

h) Employee Exposure Data

The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

6. Flooding:

The Mansfield Hollow Lake Project is primarily a flood risk management project. Occasional retention of floodwaters may inundate portions of the property or access roads in the areas covered by this contract. The TPOC will notify the Contractor as areas are closed as a result of floodwaters. When flooding ends and waters recede, the TPOC will notify the Contractor as areas reopen, and services may resume.

7. Pre-Work Conference:

Prior to the start of any work, the TPOC will schedule and conduct a pre-work conference. The Contractor's Project Manager and Quality Control Personnel will be physically present to attend this meeting. The Contractor shall directly oversee all work on the project, and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the pre-work conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this pre-work conference:

Authority of The TPOC and Quality Assurance Inspectors

Contractor's Safety Program (including sub-contractors)

Mandatory ENG Form 6293 (Accident Prevention Plan Worksheet)

Activity Hazard Analysis

Site Safety and Health Officer Designation Letter (ENG Form 6282)

Safety Meetings (Documented on NED Form 251)

Accident Reporting (ENG Form 3394)

Safety Data Sheet (SDS) requirements

Correspondence, Communication and Administrative Procedures

Invoice and Payment

8. Permits:

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security:

The Contractor will comply with all established security policies of the U.S. Army Corps of Engineers. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor's ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.

For the duration of the contract, the Contractor will be provided one (1) key to provide access to gates at areas being serviced. This key is to be used only for contract purposes. This key will not be utilized to provide access for any individuals not performing contract specific work.

During the contract period, the Contractor is assumed responsible for the key. At the end of the service period, the key must be returned to the TPOC.

10. Payment:

After final inspection and acceptance by the Government, the Contractor must submit an invoice to the TPOC. Contractor shall be responsible for the correction of all deficiencies at no additional cost to the Government prior to acceptance and payment of contract. The Contractor shall furnish the TPOC with one invoice at the completion of the contract, identifying the contract number, stating the services completed, identified by item number and quantity. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.

For jobs greater than 30 days the Contractor may request multiple payments. Payment shall be made for the actual services performed at the applicable contract unit price:

The invoices will be delivered to:

West Thompson Lake

ATTN: Mariah Deyo

449 Reardon Road

North Grosvenordale, CT 06255

Email: Mariah.E.Deyo@usace.army.mil

11. Damage to Government and Private Property:

The Contractor shall be responsible for restoring any Government facilities or structures damaged because of the firm's operation. The Contractor shall also be responsible for any damage to private property or injury to any person because of the firm's operations. The Contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the firms' operation.

12. Point of Contact Requirements:

The Contractor shall provide to the TPOC a telephone number and a point of contact for discussion of any contractual matters.

13. Location of Underground Facilities

Should excavation of any sort become necessary, obtain necessary digging permits prior to the start of excavation. Verify the elevations of existing pipes, utilities, or any underground obstruction in locations to be impacted by the work. For excavation work in Connecticut, call "Dig Safe" at 811. Notification shall not be earlier than 30 days prior, or later than 3 days prior, to the planned excavation.

II. Technical

1. Summary:

Furnish all equipment, materials, and labor for the removal of approximately 10,600 linear feet of existing posts and steel cable from a steel cable and wooden post guardrail at Mansfield Hollow Dam. The Contractor will be responsible for properly disposing of all removed materials.

2. Submittals:

Although the Government reviews submissions required by this performance work statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government within 14 days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

Pre-work submittals: Submitted within 21 days of contract award. Submittals must be accepted prior to the commencement of any field work.

Contractor's Safety Program (including sub-contractors)

Accident Prevention Plan Worksheet (ENG Form 6293)

Activity Hazard Analysis

SSHO Designation Letter (ENG Form 6282)

Appropriate licenses and certifications

First Aid/CPR Certifications

3. References: All work shall be in conformance with:

a. U.S. Army Corps of Engineers

i. EM 385-1-1 Safety and Health Requirements Manual, U.S. Army Engineering Manual; latest version

b. Code of Federal Regulations

i. Title 36 - Parks, Forests, and Public Property; Chapter III, Part 327 - Corps of Engineers, Department of the Army

c. Other appropriate federal, state, and local codes.

4. Existing Conditions:

The existing 1958 era guardrail systems consist of wooden posts, 3/4" galvanized steel cable rope, wire cable standoffs, and dead-man type connections lining the roadway atop the flood control dam. The roadways are approximately 10-foot-wide paved surfaces. The dam structure is earthen fill with riprap on the sloped surfaces of both sides. The area is behind locked gates but is open to the public as a walking trail. When not entering or exiting, the gates must remain closed and locked. See informational photos for more details.

a. Guardrail Section 1 has a total of approximately 390 wooden posts and is approximately 3,900 linear feet long (both sides included).

b. Guardrail Section 2 has a total of approximately 670 wooden posts and is approximately 6,700 linear feet long (both sides included).

Wooden Posts:

a. Wooden posts are approximately 6 1/2 feet tall and a minimum of 6 inches in diameter.

b. Posts are to be assumed to be pressure treated.

c. Posts are placed at a minimum of 3 feet below grade.

d. Posts are spaced approximately 10 feet apart, with dead-man type connections intermittently placed.

Steel Cable:

a. Cable is made of 3/4 inch galvanized steel rope.

b. Cable is supported on wooden posts using 5/8-inch hook bolts, hex nuts and washers.

5. Clean Up and Waste Disposal:

The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Portable toilets are allowed at the Contractor's expense. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the TPOC. All waste materials will be disposed of offsite in accordance with all federal, state, and local regulations.

6. Environmental Protection:

Containers for excess and/or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/cleaned daily when working onsite. Water, air, and land resources shall not be adversely impacted from work. Dumpsters are allowed at the Contractor's expense. The Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met at no additional cost to the Government.

Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.

7. Government Resources:

The Contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.

8. Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

9. Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

10. Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by Government employees.

11. Environmental Protection:

Containers for excess and/or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/cleaned daily. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.

12. Traffic Control

The Contractor shall be responsible for closing public access during work and ensuring public safety in affected areas to the satisfaction of the TPOC.

13. Receiving and Storing Materials:

The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the Contractor and will not be responsible for damage to Contractor equipment or material.

III. Execution

1. Preparation:

a. The Contractor shall take all appropriate measures necessary to protect the surrounding areas from damage during the execution of the work.

b. The Contractor will supply and furnish all equipment, tools and materials necessary to remove and dispose of steel cable and wooden post guardrails.

2. Guardrail Removal:

a. The Contractor shall remove the existing 1958 guardrail systems on the flood control dam (see informational photos for more details), including wooden posts, anchors and wire cable, standoffs, nuts, bolts, and other associated hardware.

b. Contractor shall remove and dispose of the existing guardrail system off site in accordance with State standards.

c. Upon removal of posts, backfill the resulting holes with clean 3/4-inch processed gravel. The gravel shall be compacted in lifts no greater than 12 inches and finished level with the surrounding grade.

d. Under no circumstances are post holes to be left open at the end of a workday.

e. Anchor connection to the dead-man shall be cut 6 inches below grade and covered with processed gravel and leveled to grade.

f. Existing wooden signs, ten instrumentation boxes and associated underground wiring, electrical wires for airport lights, and survey markers will be protected by the Contractor during the contract. Further detailed drawings of instrumentation piezometer boxes, conduit, and airport lights are attached. The Contractor shall be responsible for providing and maintaining erosion and sedimentation control measures as field conditions require at no additional expense to the Government.

NOTE: Guardrail length and quantity of posts to be removed specified above are approximate and should be verified by the contractor.

*** END OF NARRATIVE ***

Requirements Guardrail Removal Services, Mansfield Hollow Lake, Mansfield Center, CT

Product Service Code : P500 North American Industry Classification System (NAICS) : 562119

Product Service Code : P500 North American Industry Classification System (NAICS) : 562119

Continuation of Deliveries or Performance

0001 Delivery Schedule From date of lead time event to completion of performance 120 Calendar Days

Date of Award 1 JobQuantity

Address and POC Place of Performance DoDAAC: 961102 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

PROJECT MGR MANSFIELD HOLLOW LAKE, MANSFIELD HOLLOW ROAD

MANSFIELD CENTER, CT 06250 UNITED STATES

MARIAH E DEYO, DELIVER_TO_EMP_ID_NO

Email: MARIAH.E.DEYO@USACE.ARMY.MIL Telephone: 508-838-4163

0002 Delivery Schedule From date of lead time event to completion of performance 120 Calendar Days

Date of Award 1 JobQuantity

Address and POC Place of Performance DoDAAC: 961102 CountryCode: USA

CORPS OF ENGINEERS NEW ENGLAND DIST

PROJECT MGR MANSFIELD HOLLOW LAKE, MANSFIELD HOLLOW ROAD

MANSFIELD CENTER, CT 06250 UNITED STATES

MARIAH E DEYO, DELIVER_TO_EMP_ID_NO

Email: MARIAH.E.DEYO@USACE.ARMY.MIL Telephone: 508-838-4163

Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

2017-01

52.204-13 System for Award Management- Maintenance. (Deviation)

2026-02

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded.

(Deviation)

2026-02

52.212-4 Terms and Conditions-Commercial Products and Commercial Services.

(Deviation)

2026-02

52.219-6 Notice of Total Small Business Set-Aside.

(Deviation)

2026-02

52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation)

2026-02

52.222-41 Service Contract Labor Standards.

(Deviation)

2026-02

52.222-50 Combating Trafficking in Persons.

(Deviation)

2026-02

52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation)

2026-02

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.232-33 Payment by Electronic Funds Transfer- 2018-10

System for Award Management.

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2023-03

52.233-3 Protest after Award. (Deviation) 2026-02

52.233-4 Applicable Law for Breach of Contract Claim. (Deviation)

2026-02

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7004 Antiterrorism Awareness Training for Contractors.

2023-01

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-O0013

REVISION 1)

2024-05 Deviation 2024- O0013

2024-05

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

2023-01

252.204-7020 NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.223-7008 Prohibition of Hexavalent Chromium. 2023-01

252.225-7001 Buy American and Balance of 2024-02

Payments Program.

252.225-7012 Preference for Certain Domestic Commodities.

2022-04

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

252.232-7010 Levies on Contract Payments. 2006-12

252.247-7023 Transportation of Supplies by Sea. 2024-10

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.219-28 Postaward Small Business Program Rerepresentation. (Deviation)

2026-02

Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options.

However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov /document/support--table-size-standards.

(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-

(1) Was set aside for small business and has a value above the simplified acquisition threshold;

(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or

(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.

(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

(1) The Contractor represents that it is, is not a small business concern under 562119 NAICS Code assigned to contract number.W912WJ26PXXXX

(2) [Complete only if the Contractor represented itself as a small business concern in .] The Contractor represents that it is, is not, a small paragraph (g)(1) of this clause disadvantaged business concern as defined in .13 CFR 124.1001

(3) . Women-owned small business (WOSB) joint venture eligible under the WOSB Program The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique ____ entity identifier of each party to the joint venture: __.]

(4) . Economically disadvantaged women-owned small business (EDWOSB) joint venture The Contractor represents that it is, is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [ The Contractor shall enter the name and unique ____ entity identifier of each party to the joint venture: __ .]

(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under . The Contractor represents that it is, is not an SDVOSB joint venture the SDVOSB Program eligible under the SDVOSB Program that complies with the requirements of 13 CFR

128.402. [ The Contractor shall enter the name and unique entity identifier of each party ____ to the joint venture: __.]

(6) [ HUBZone joint venture eligible under the HUBZone Program. Complete only if the ] The offeror represents, as part of its offer, offeror is a HUBZone small business concern.

that It is, is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [ The Contractor shall enter the name and unique entity identifier ____ of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [ Contractor to sign ____ and date and insert authorized signer's name and title.]

(End of clause)

52.222-42 Statement of Equivalent Rates for Federal Hires.

2014-05

Statement of Equivalent Rates for Federal Hires (May 2014)

In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5332.

This Statement is for Information Only: It is not a Wage Determination

Employee Class Monetary Wage-Fringe Benefits (End of clause)

DFARS Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____

Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____ Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

Addendum to Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.204-9 Personal Identity Verification of Contractor Personnel.

2011-01

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation)

2026-02

52.222-3 Convict Labor. (Deviation) 2026-02

52.223-23 Sustainable Products. (Deviation) 2026-02

52.240-91 Security Prohibitions and Exclusions.

(Deviation)

2026-02

52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation)

DFARS Clauses Incorporated by Reference

Date

Alternate Deviation

Variation Effective Date

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.

2023-01

252.243-7001 Pricing of Contract Modifications. 1991-12

252.244-7999 Subcontracts for Commercial Products or Commercial Services.

(DEVIATION 2026-O0015)

2026-02 Deviation 2026- O0015

2026-01

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.252-2 Clauses Incorporated by Reference.

1998-02

Clauses Incorporated By Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address (es):

https://www.acquisition.gov/

(End of clause)

52.252-6 Authorized Deviations in Clauses.

2020-11

Authorized Deviations in Clauses (Nov 2020)

The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.

The use in this solicitation or contract of any (48 CFR ) clause with an (b) DFARS Chapter 2 authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

List of Contract Documents, Exhibits, or Attachments

ATTACHMENTS:

PLEASE SEE ATTACHMENTS INCLUDED SEPARATELY FOR ADDITIONAL INFORMATION.

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

WAGE DETERMINATIONS:

The Wage Determination for this project can be found at:

https://sam.gov/wage-determination/2015-4121/32

Wage Determination No.: 2015-4121

Revision No.: 32

Revised Date: 03 December 2025

*** END OF NARRATIVE ***

W912WJ26QA067

https://sam.gov/wage-determination/2015-4121/32

Solicitation Provisions

FAR Provisions Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.204-7 System for Award Management- Registration. (Deviation)

2026-02

52.212-1 Instructions to Offerors-Commercial Products and Commercial Services.

(Deviation)

DFARS Provisions Incorporated by Reference

Date

Alternate Deviation

Variation Effective Date

252.203-7005 Representation Relating to Compensation of Former DoD Officials.

2022-09

252.204-7008 Compliance with Safeguarding Covered Defense Information Controls.

2016-10

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.204-7024 Notice on the Use of the Supplier Performance Risk System.

2023-03

252.225-7055 Representation Regarding Business Operations with the Maduro Regime.

2022-05

252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region-Representation.

2023-06

DFARS Provisions Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

252.204-7016 Covered Defense Telecommunications Equipment or Services-Representation.

2019-12

COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES-

REPRESENTATION (DEC 2019)

(a) Definitions. As used in this provision, "covered defense telecommunications equipment or services" has the meaning provided in the clause 252.204-7018, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered defense telecommunications equipment or services".

(c) Representation. The Offeror represents that it [ ] does, [ ] does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.

(End of provision)

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation.

2021-05

PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES-REPRESENTATION (MAY 2021)

The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the

Government in the performance of any contract, subcontract, or other contractual instrument."

(a) Definitions. "Covered defense telecommunications equipment or services," "covered mission," "critical technology," and "substantial or essential component," as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.

(b) Prohibition. Section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.

(d) Representation. If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does" provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation:

The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .