This document is a Solicitation for Parking Lot Paving, Access Road Paving, and Parking Space Line Striping at Hodges Village Dam in Oxford, MA, issued by the U.S. Army Corps of Engineers - New England District. The work consists of furnishing equipment, materials, labor, and transportation for the specified paving and striping services. This is a request for offers, with the solicitation requirements and contract documents available online through SAM.gov. The procurement is set-aside for small business vendors, with the applicable NAICS code of 237310 and a $45 Million size standard. All offerors must have an active SAM.gov registration to be considered. The solicitation does not provide any award dates, pricing terms, or information about incumbents.

View the file

Other files

File Type Posted
Amendment W912WJ24Q0156-0002.pdf PDF
Amendment W912WJ24Q0156-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ24Q0156 08-Aug-2024 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

SEE SCHEDULE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ] FOB

DESTINATION

[ ] OTHER X

(See Schedule)

28-Aug-2024(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

9783188255ANN M ADLEY

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ24Q0156

Section B - Supplies or Services and Prices

INSTRUCTIONS TO VENDORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

ALT I FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO ANN MURPHY ADLEY AT (978) 318-8255 or

ANN.M.ADLEY@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT WHICH

CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE ATTENTION OF ANN

MURPHY ADLEY THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING

DOCUMENT IN ALL CASES.

** QUOTES CAN BE E-MAILED TO ANN MURPHY ADLEY AT ANN.M.ADLEY@USACE.ARMY.MIL.

NOTE 1: In accordance with FAR Part 28.101-1(c), the Contractor will NOT be required to provide a Bid Guarantee.

NOTE 2: In accordance with FAR Part 28.102-2(b), the Contractor will be required to provide the following payment protections for all construction contracts at or above $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is $150,000.00 or above. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 3: In accordance with FAR Part 28.102-2(c), the Contractor will be required to provide one of the following payment protections for all construction contracts $35,000.00 or above, but not exceeding$150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 4:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company name:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business Unique Entity Identifier (UEI): _______________________________

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful Contractor will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work. NO FIELD

WORK WILL COMMENCE UNTIL ALL REQUIRED SUBMITTALS ARE APPROVED.

POTENTIAL VENDORS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS

PRICE ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

BID SCHEDULE

PARKING LOT PAVING, ACCESS ROAD PAVING,

AND PARKING SPACE LINE STRIPING

HODGES VILLAGE DAM

OXFORD, MA

BID SCHEDULE

ITEM UNIT TOTAL

1. Reclaim/repave parking lots, expand Basin Office parking lot and parking space striping

JOB

2. Option Task: Asphalt reclaim/repave of access road

JOB

TOTAL

Section C - Descriptions and Specifications

STATEMENT OF WORK

PARKING LOT PAVING, ACCESS ROAD PAVING,

AND PARKING SPACE LINE STRIPING

HODGES VILLAGE DAM

OXFORD, MA

STATEMENT OF WORK

I. GENERAL

1. Summary:

The Contractor shall provide all materials, equipment, and labor required to reclaim and repave the Hodges Village Dam public parking lot, expand and pave the basin office parking lot, parking space line striping in public parking lot, and option task of asphalt reclaim and repave of access road. See attached map for square footage information, and photos for more information. All work shall be completed in accordance with the following Statement of Work.

*Note: This work requires the following submittals prior to commencement of work:

ENG Form 6293 (Accident Prevention Plan Worksheet) ENG Form 6282 (Site Safety and Health Officer Designation Letter) Appropriate Licenses and Certifications First Aid and CPR Certificates Activity Hazard Analysis (AHA) Material Specification Sheets

2. Location:

Hodges Village Dam is located at 30 Howarth Rd. Oxford, MA 01507

3. Site Visits:

The project areas are open to the public at any time. Interested vendors can inspect the existing conditions of the work area at any time. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.

Site visit is scheduled for: Tuesday, August 13, 2024 at 9:00 am Eastern

30 Howarth Road, Oxford, MA 01507

After contract award, the Technical Point of Contact (TPOC) for this project is Project Manager Nicole Giles: (978) 318-8411 (Office line) or via email at Nicole.C.Giles@usace.army.mil.

4. Schedule:

The period of performance shall be completed no later than 90 days after Notice to Proceed. The project area will be open to the Contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the TPOC. No work shall be done on weekends or Government holidays.

All preconstruction submittals shall be submitted within 30 days of Notice to Proceed. The government reserves up to 21 days for review and acceptance on each submittal/ resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the government in an acceptable form within 14 days of the government’s response, unless additional time is granted by the government in writing. No field work may proceed prior to the acceptance of preconstruction submittals.

5. Safety Requirements

a) General: All work shall be conducted in accordance with the U.S. Army Corps of

Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1- 1%20_EFFECTIVE%2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b) Accident Prevention Plan: The Contractor shall prepare a site-specific Accident

Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work:

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6293_2023Aug31.

pdf

A preparatory meeting shall be conducted by the prime Contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.

c) Activity Hazard Analysis: An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6.

A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines.

The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_2023Aug24.

pdf

d) Site Safety and Health Officer (SSHO) Requirements: Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385- 1-1, Chapter 2-3.b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the prime Contractor’s SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6282_2023Aug28.

pdf

e) First-Aid and CPR Personnel Requirements: For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR.

When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency. Minimum First Aid and CPR qualifications are outlined in EM 385-1- 1, Chapter 3-3.

f) Additional Personnel Requirements: Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the definable features of work for this project.

g) Accident Reporting: All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident:

https://www.publications.usace.army.mil/Portals/76/Publications/EngineerForms/E ng_Form_3394_2021Aug.pdf

Employee Exposure Data: The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

6. Preconstruction Conference:

Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-Construction Conference”. The Contractor’s Project Manager and Quality Control Personnel will be physically present to attend this meeting.

The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the Contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during the Preconstruction Conference:

a) Authority of the TPOC

b) Contractor’s Safety Program (including sub-contractors)

c) Accident Prevention Plan

d) Activity Hazard Analysis

e) Work Plan

f) Daily Safety Meetings (Documented on NED Form 251)

g) Accident Reporting (ENG Form 3394)

h) Correspondence, Communication and Administrative Procedures.

i) Invoice and payment

j) Material Specifications

7. Permits:

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

8. Security:

The Contractor will comply with all established security policies at the

Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent work in an area. The Contractor shall be given at least 24-hour notice of any such closure.

9. Payment:

Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice and a completed, signed US Army Corps of Engineers ENG93 form to the TPOC.

The invoice shall include the invoice date, contract number, dates of work, description of work, quantities, process, and total amount due per line item.

For jobs greater than 30 days the Contractor may request progress payments.

All invoices may be mailed to:

U.S. Army Corps of Engineers 48 Old Oxford Rd Charlton, MA 01507 or sent via email to Nicole.C.Giles@usace.army.mil

10. Damage to Government and Private Property:

The Contractor shall be responsible for restoring any government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the TPOC immediately of damage to government and private property and injury to any person resulting from the firms’ operation.

11. Point of Contact Requirements:

The Contractor shall provide a telephone number and a point of contact for discussion of any contractual matters to the TPOC.

12. Contractor’s Personnel:

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified work properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note: At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the

Contractor’s employees strictly comply with Code of Federal Regulations Title

36, Chapter III, Part 327, and all Federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor’s Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit.

Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

II. TECHNICAL

1. Submittals:

Although the Government reviews submissions required by this statement of work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The Government reserves up to 21 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in acceptable form within 14 days of the Government’s response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and accepted by the Government.

a. Preconstruction Submittals: Submitted within 30 days of Notice to Proceed.

Submittals must be accepted before the commencement of any field work.

ENG Form 6293 (Accident Prevention Plan Worksheet) ENG Form 6282 (Site Safety and Health Officer Designation Letter)

Appropriate licenses and certifications First Aid and CPR Certificates Activity Hazard Analysis (AHA) Material Specification Sheets

b. Other Submittals: The documents identified below shall be prepared in accordance with the applicable standards, submitted to the TPOC for review, and accepted by the government prior to final payment:

Compaction Test Results

2. Clean-Up:

The Contractor shall practice good housekeeping to maintain a safe job site.

The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the contractor shall clean up the job site to the satisfaction of the government. All construction debris shall be disposed of off-site.

3. Government Resources:

The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the government will not provide any equipment, electrical services, telephone services, or other resources. The Government will supply those items specified below (inductive loop wire, loop sealant).

4. Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

5. Quality Assurance:

The Contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

6. Other Contracts:

The government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by government employees.

7. Environmental Protection:

Water, air, and land resources shall not be adversely impacted. The Contractor is responsible for taking all necessary steps to ensure compliance with all federal, state, and local environmental laws and regulations. The Contractor will not receive additional payment for environmental protection measures.

Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spills and evaporation. Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least 50 feet from any drainage inlets, water bodies (rivers, streams, and lakes), and environmentally sensitive areas (wetlands, vernal pools).

8. Sustainability:

All products provided by the Contractor must meet the recycled content requirements set forth by the Environmental Protection Agency. Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels.

Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.

Furthermore, the Contractor should also meet the BioPreferred Program requirements. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio based content level requirements.

9. Receiving and Storing Materials:

The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the Contractor and will not be responsible for damage to Contractor equipment or material. The use storage and staging area must be coordinated with the TPOC.

10. Existing Conditions:

a) Public Parking Lot:

i. Asphalt surface is approximately 188’ long by 80’ wide.

ii. Existing pavement exhibits numerous cracks.

iii. Parking lot has a magnetic vehicle loop in the asphalt for counting vehicle traffic.

iv. One (1) water valve shutoff even with the surface of the parking lot

v. Electrical/communication conduits run approximately 28” below the surface grade of parking lot.

b) Basin Office Parking Lot and Driveway:

i. Driveway is approximately 83’ in length by 13’ wide.

ii. Basin Office parking lot is approximately 45’ long by 35’ wide.

iii. Shows signs of extensive cracking.

c) Access Road:

i. Asphalt surface, approximately 508’ long by 21’ wide.

ii. Existing pavement exhibits extensive transverse and longitudinal cracks (see photos)

iii. A guardrail runs along the south. The distance between pavement and guardrail varies between 10” to 1’ approximately.

iv. Electromagnetic induction wire loop for vehicle traffic counter to be removed and replaced as part of this contract.

11. References:

a) Commonwealth of Massachusetts Department of Transportation Standard

Specifications for Highways and Bridges (2024)

b) American Association of State Highway and Transportation Officials

(AASHTO) Standard Specification for Emulsified Asphalt (2020)

c) ASTM International D1557 Standard Test Methods for Laboratory

Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3))

12. Product Requirements:

a) Aggregate Base Course:

i. Aggregate Base Course material shall conform to M2.01.7 of the MA

DOT specifications for Dense-Graded Crushed Stone.

b) Reclaimed Pavement Base Course:

i. Reclaimed Pavement Base Course material shall conform to the requirements of M1.09.0 of the State Specifications.

c) Hot Mix Asphalt:

i. Hot mix asphalt (HMA) for binder course and surface course shall conform to the applicable requirements of Section 460 and Section M3.06.0 of the MA DOT specifications for Hot Mix Asphalt Pavement.

ii. Hot mix asphalt job-mix formulas (JMFs) shall be obtained from a supplier regularly producing HMA under Section 460 of the MA DOT specifications.

iii. The HMA binder course shall conform to the requirements listed in Table A of Section M3.06.0 of the MA DOT specifications for HMA Base/Intermed. Course - Binder.

iv. The HMA surface course shall conform to the requirements listed in Table A of Section M3.06.0 of the MA DOT specifications for HMA Surface Course - Standard Top.

d) Tack Coat:

i. Bituminous material used for the tack coat shall be emulsified asphalt, grade RS-1 conforming to AASHTO M 140.

e) ¾ in Crushed Stone:

i. ¾ “crushed stone material shall conform to the requirements of M2.01.4 of the MA DOT specifications for ¾ “crushed stone.

f) Electromagnetic Induction Wire Loop:

i. 14-guage, 36 strand tinned copper inductive loop wire (supplied by

Government/ Cost $500)

ii. One-part polyurethane loop sealant (supplied by Government/ Cost

$112)

g) Parking Space Striping Paint:

i. Paint shall be formulated to be used on asphalt paving.

ii. Thermoplastic striping paint shall be used for durability.

iii. Parking space striping paint shall be yellow in color, RAL1023 Traffic

Yellow.

iv. Handicap parking space and symbol paint shall be Federal Standard 595B.

v. Hi-Visibility glass beads shall be placed on striping paint when still wet.

h) Topsoil:

i. Topsoil material shall conform to the requirements of M1.05.0 of the

MA DOT specifications for loam.

i) Seed mix:

i. Perennial ryegrass suitable for New England cold hardiness (Zone 6 of the USDA Plant Hardiness Map

13. Execution:

a) General:

i. All work and materials shall conform with the lines, grades, elevations, dimensions, material requirements, and testing requirements that are specified in this statement of work.

ii. The Contractor is responsible for all layout and field engineering required for the completion of this project. The government will not provide any survey services.

iii. The Contractor shall verify that the actual site conditions are consistent with the existing conditions depicted in this contract.

Discrepancies, omissions, and errors shall be reported to the TPOC prior to the start of construction.

iv. It is the Contractor’s responsibility to provide and maintain erosion prevention and sedimentation control measures as conditions require.

Erosion and sedimentation control measures shall be pre-approved by the TPOC.

v. All fill required beyond what is available from onsite excavation of existing pavement areas shall be furnished by the Contractor.

Additional fill will be selected excavated material from an approved site. All borrow removal arrangements are the responsibility of the Contractor.

vi. The Contractor shall provide protection to surrounding pavement, vegetation, structures, and utilities within the work area that are to remain in place. Damages caused by the Contractor shall be repaired or restored to original condition at the Contractor’s expense.

vii. At the completion of work, all disturbed areas and new pavement shall be smooth with sufficient slope to allow for proper drainage and no ponding. All disturbed areas not noted to receive pavement or other treatment shall receive 6“minimum of topsoil, perennial ryegrass seed, and straw blankets or another erosion control measure approved by the TPOC.

viii. The Contractor shall verify underground utility locations with the Dig Safe prior to any excavation work.

ix. New hot mix asphalt pavement shall meet other type pavements at locations shown. The existing pavement, including areas to be repaired, shall be sawcut to provide a neat vertical surface. The junction shall be neatly made to the satisfaction of the TPOC. All edges of the existing pavement shall be coated with tack coat material prior to placement of any hot mix asphalt pavement.

b) Basin Office parking lot expansion:

i. Remove grass, topsoil, roots, and stones.

ii. Prep expanded area that will be paved for base course.

iii. Parking lot length will be expanded by approximately 20’ from 45’ in length to 65’ in length.

iv. Parking lot width will be expanded by approximately 4’ from 35’ wide to

39’ wide.

v. Base course shall extend 6” beyond edge of pavement.

vi. Additional aggregate base course material may be added if necessary.

vii. Compact base course to 95% maximum density of ASTM D1557.

viii. Parking lot shall have a minimum 2% slope to allow for proper drainage.

c) Reclamation of existing pavement in public and basin office parking lots:

i. Prior to pavement reclamation work, the Contractor shall verify the locations of existing utilities. During reclamation, the Contractor shall provide protection to all utilities and structures that are to remain after demolition. Damages shall be repaired by the Contractor at no additional cost to the Government.

ii. Prior to the start of reclamation work, pull granite parking lot cubing and reset curbing so the pieces are aligned straight and level.

iii. During reclamation, protect existing asphalt and concrete surfaces that will remain post-construction.

iv. Unless otherwise specified in this contract, disposal of all demolished materials and construction debris is the responsibility of the Contractor. All demolished materials and construction debris must be disposed of offsite in accordance with all federal, state, and local laws at no additional cost to the Government.

v. All existing asphalt layers in the parking lots shall be removed in a manner that minimizes disturbance to the existing base course.

vi. Parking lot pavement shall be reclaimed and used as a component of the base course.

vii. Parking lots shall have a minimum 2% slope to allow for proper drainage.

d) Option Task to Reclaim and Repave Access Road:

i. Prior to pavement reclamation work, the Contractor shall verify the locations of existing utilities. During reclamation, the Contractor shall provide protection to all utilities and structures that are to remain after demolition. Damages shall be repaired by the Contractor at no additional cost to the Government.

ii. Remove electromagnetic induction wire loop and replace with two new Government supplied wire loops adjacent to each other (one as a spare) after reclamation. Each loop shall be 6’ X 6’ and saw cut into the base course and epoxy sealed (supplied by Government) before final paving layer. Final wiring connections will be completed by the Government and tested before paving. See attached induction loop installation guide.

iii. During reclamation, protect existing asphalt and concrete surfaces that will remain post-construction.

iv. Unless otherwise specified in this contract, disposal of all demolished materials and construction debris is the responsibility of the Contractor. All demolished materials and construction debris must be disposed of offsite in accordance with all federal, state, and local laws at no additional cost to the Government.

v. Pavement shall be crowned along the centerline of the roadway with a cross slope of 2%.

vi. Access road pavement shall be reclaimed and used as a component of the base course.

vii. ¾ “crushed stone shoulder shall be placed along southern edge of access road.

viii. Crushed stone shoulder shall extend 1’ beyond edge of pavement.

Crushed stone surface shall be 0.5” below the pavement surface.

e) Base Course for parking lots and access road:

i. Base course shall extend 6” beyond edge of pavement.

ii. Additional aggregate base course material may be added if necessary.

iii. Compact base course to 95% maximum density of ASTM D1557.

f) Hot Mix Asphalt (HMA):

i. HMA pavement shall be constructed in accordance with the specified construction methods of Section 460 of the State Specifications.

ii. The HMA binder course shall be placed and compacted in two lifts to obtain a compacted thickness of 2”.

iii. A tack coat shall be applied to the surface of the new HMA binder course and the vertical edges of existing pavement.

iv. The HMA surface course shall be placed in one layer and compacted to obtain a compacted thickness of 1.5”.

v. Compaction shall be performed in accordance with the paragraph "Compaction" under Subsection 460 of the State Specifications.

vi. New pavement shall match the grades and elevations at the existing edge of the roadway to the maximum extent possible.

g) Parking Space Line Striping:

i. Paint thirteen (13) regular perpendicular parking spaces which are 9’ x 18’ and one (1) perpendicular handicap space which is 9’ x 18’ in the public parking lot at Hodges Village Dam.

ii. Apply Hi-Visibility glass beads while paint striping is still wet.

iii. Line striping shall mirror the existing conditions pre-paving.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

Inductive Loop Guide

Introduction

An inductive loop is basically a metal detector installed in the surface of the roadway. It consists of electrical wire embedded in the roadway, which establishes a magnetic field around the wire whenever a current of electricity is passed through it. This field extends approximately 48” (detection height) above the loop. This detection height is based off of the shortest side of your loop and is typically 2/3 of that length. Example: A 6’x6’ loop will have a detection height of 48 inches. This height is measured from the top of the top most wire in the wrap (as stacked vertically). When a metal object of sufficient mass passes through that field; the amplitude, phase and frequency of the electronic circuit is changed. The electronic circuit is designed to look at one of these parameters and detect this disruption, thereby registering a vehicle (metal object) count.

The sensitivity of most vehicle detectors is such that it takes an object the size of a 5 gallon steel paint bucket passing through the center of the loop to trigger the circuitry. As a rule, most vehicles will be detected if they drive alongside one of the edges of the loop. From an installation design standpoint, you should size the loop and position it so that at least one foot of the passing vehicle body is over the loop at any time. If the loop is bigger than 5’ x 8’, opt for even more overlay. In general; center the loop in the traffic lane insuring no point of the loop is closer than 2 feet from any lane that is not being counted.

The inductive loop sensor embedded in the road is a type of radio antenna (RF Emitter). They operate at a very low power and a frequency that does not bother most other radio devices; however their function can be disrupted by strong CB radio transmissions, overhead power lines and nearby lightning strikes. The TT‐ 14/21/41/51® counters have built in RF and EMP protection for the circuits for most cases, but these anomalies, while not damaging the unit, generally cause the traffic counter to register false counts. This is generally not a significant problem except for overhead or underground AC power lines. We recommend installing counters 75 feet from 440 volt lines and 500 feet from large power lines.

Common loop sizes are:

• 6’ x 6’ (most common) or 5’ x 5’ with 3 to 4 wraps of wire

• 5’ x 8’, 5’ x 10’ and 5’ x 12’ with 3 wraps of wire

• All wires are generally 14 AWG (American Wire Gauge) multi‐strands, with insulation jacket impervious to water, sunlight, gasoline, oil and mildew

Basic Site Selection Guidelines If you are counting only one lane of a two lane road, verify that cars stay in their assigned lane and that they are ideally traveling faster than 10 Mph.

NOTE: If travel speeds are slower than 10 Mph, or in the event of a long vehicle, then you will likely need to be concerned with the setting of the time delay feature on the TT‐14/21/41/51®.

If you are installing more than 1 loop in a road, do not install them directly opposite each other. Instead, stagger them about 10’ from edge to edge so as not to cause radio frequency interference between the loops (also known as crosstalk).

The TT‐14/21/41/51® series traffic counters are single inductive loop counters with a battery life of 12 ‐ 18 months. Do not locate them more than 50’ from the loop without first consulting Diamond Traffic Products (support@diamondtraffic.com or 541‐782‐3903).

NOTE: In order to locate one of these traffic counters more than 50’ from the loops, the factory will have to make circuit modifications for the counters to work at that distance. This modification will require a larger power draw, which will result in a slight reduction of battery life.

The Pegasus®, Unicorn® and Phoenix® counter/classifiers are capable of operating 4 to 16 loops. Battery life varies from 1 to 4 weeks depending upon the number of loops being used. These counters are capable of being located several hundred feet away from the loops. They can also tolerate slower vehicles, and vehicles stopped over the loop for a short period of time (about 45 to 90 seconds).

Directional Traffic

If you have a two lane road where vehicles TRAVEL in their assigned lanes, you can install a separate loop in each lane and obtain count data for each lane. You will need to connect each loop to its own traffic counter, or to a traffic counter that has two or more loop detector channels.

For assistance in selecting the proper counter, contact Diamond Traffic Products at support@diamondtraffic.com or 541‐782‐3903.

If you have a narrow road where traffic traveling in both directions drives down the center of the roadway, you can only get a TOTAL combined traffic count unless you install two or more loops and the appropriate traffic counter.

If directional information is required, you will need a unit that can monitor multiple loops. The Pegasus, Unicorn or Phoenix field units are best situated to give you directional information when 2 loops are installed in the same lane of travel. These units can also provide classification by length.

Install the traffic counter at the side of the road, but avoid drainage ditches and wet areas. Give thought as to how you are going to protect the traffic counter from flood water, snow, vandalism and theft. Most agencies at permanent sites where there is no pedestrian traffic, locate counters in a recess in the ground that cannot be observed by passing vehicles. You can dig a 2 or 3 foot deep hole and fill it halfway or better with coarse rocks for drainage and install a simple wood or metal frame/wall on top of the rock to keep dirt and debris from sifting into the recessed well. Cover the recessed well with boards or plywood to complete the installation.

For increased concealment, these wells are typically located behind a tree or bush.

If visibility is not of a concern, then one of our security boxes on a 4” diameter, 4’ long steel post could be installed. The security post is typically anchored in 2’ of concrete and extends 2’ above ground. The aluminum security box is bolted to the top of the post. If you are in a location where pedestrians will likely spot the counter, or flooding is an issue; we recommend using this lockable security box. See our catalog or website (www.diamondtraffic.com) for security boxes and cabinets that we offer.

Paved Road Loops

Paved road loops must be installed by cutting a square or rectangular slot in the roadway to receive the loop wire (See Diagram 1 – Slot Cuts). The slot typically measures 1/4 inch (4mm) in width and is cut to a depth of 1 1/2 to 2 inches (4 – 5 cm) deep.

Diagram 1 – Slot Cuts

If the pavement thickness is very shallow, opt for the 1 1/2 inch deep slot.

Because the 90 degree corners of these inductive loops have a sharp inside edge that will damage the loop wire insulation, you will need to cut a 45 degree slash cut across each corner. This cut should start about 12 inches (30 cm) back from the corner to prevent the small triangular piece of pavement in the center of the corner cuts from breaking out.

Once your saw cuts have been made, clean out any mud and debris from inside, and around each of the cuts.

Garden hose water pressure is sufficient. You may then use compressed air to blow excess water and any remaining debris out of each slot.

If air is not available, rags and paint stirring sticks can be used to dry the slot, as the slot must be dry before wire installation.

NOTE: Do not forget to cut the slot for the “Home Run” lead wire to the edge of the pavement. In other words you will need to cut a slot for each loop that leads from the loop to the pavement edge and over to the traffic counter. One slot per loop is sufficient.

When all slots are dry and clean, commence laying loop wire. Start at the point where the counter will be installed. Run the wire to and through the lead‐in slot to the corner of the loop. Continue to lay the wire around the loop slots; clock‐wise or counter‐clockwise will not matter as long as you are consistent through the loop. Lay in three or four passes around the loop saw cut. Exiting the loop perimeter, twist both loop wires together four to eight times per linear foot from the edge of the loop to the counter location. Refer to the above diagram for further clarification.

The portion of the wire that is outside the pavement transitioning to the traffic counter location should be protected with plastic PVC pipe (1/2 or 3/4 inch). This adds an additional layer of protection for the loop wire.

Connect the two loop wires to the loop input pairs of your loop harness using solder and seal the joints between loop wire and the loop harness to prevent corrosion. The use of electrical wire nuts is not recommended.

Refer to your unit’s instruction manual for any specific color pair combination.

NOTE: Failure to properly solder these will eventually cause counting problems due to oxidation.

Seal the open slot in the roadway with the appropriate sealant for the pavement type; crack sealant, epoxy loop sealant, or a variety of other sealants. Our recommendation is Pro Seal 6006 Loop Sealant. DO NOT USE HOT TAR, and hard setting epoxies should not be used with asphalt.

Dirt and Gravel Loops

The 14 gauge wire used in paved road installation does not have a sufficient insulation jacket to withstand the sharp rocks and gravel. Therefore, inductive loops in unpaved roads are constructed using 14‐gauge, 3 or 4 conductor direct buried UF cable. This is readily available at most local hardware or building supply stores. We also stock it here at Diamond Traffic Products as a service to our customers.

To install an inductive loop in an unpaved road, you generally must install a loop that covers the roadway from side to side, to within four feet of each edge. Without lane assignment markings, drivers on dirt and gravel roads typically will drive on the right, left and/or in the middle of these roads. If you need directional counts, consider installing two loops as diagrammed in the ‘Directional Traffic’ section.

For example, whether you’re collecting ‘Combined Count’ or ‘Directional’ data; if your road is 25 feet wide, your loop should measure 5’ x 17’

Having decided upon the loop size, cut two lengths as follows: Add together the lengths of the four loop sides, the length of the lead‐in (home run) and 5 – 6 additional feet as spare.

Splice the wires as shown in Diagram 2 – Loop Installation. Stagger your joints as the finished insulated joint will be thick and bulky. SOLDER YOUR JOINTS. You can use the 3m Scotch® 2200 vinyl splice kit, however it is big, rigid and expensive. Two layers of shrink tube, wrapped with several wraps of electrical tape, then covered with roofing tar works very well.

The loop wire in paved roads is only 1 1/2 to 2 inches below the road surface. For gravel roads, you need to consider how deep the road grader reworks the road. If the grader uses the blade only, then ten inches below the surface is sufficient. If they typically drop their rip teeth and re‐level the road, we advise that you install at a depth of 18 inches.

While it is not absolutely necessary to back fill over the loop wire with sand or soft soil, we recommend doing so to prevent potential damage caused by sharp rocks lying against the UF cable.

Diagram 1 – Slot Cuts

Diagram 2 – Loop Installation

ALLOWED INDUCTIVE LOOP ANTENNAS

The 4 Channel inductive loop detector version #2.10 was designed to operate in the FCC allowed RF Frequency for sizes and inductive values listed in chart below.

Size, shape, number of turns and induction are critical to keep in the operating frequency within the FCC allowed limits. Loop sizes and turns listed below, shown in the yellow area of the following table, will cause the detector to operate outside of the FCC legal frequency. Also, due to their small size and few turns; these loop configurations will detect vehicles poorly, if not at all. These highlighted configurations also do not meet the loop specifications required of the TT‐14/21/41/51 units.

Best practices call for a minimum of at least (3) turns. If the loop antenna is any other size than those listed below. Please contact Diamond Traffic Products for assistance: support@diamondtraffic.com or 541‐782‐3903

** Number indicates micro‐henries (µh), unless otherwise noted **

Length (ft) Width (ft) 1 Turn 2 Turns 3 Turns 4 Turns 5 Turns Detection Height

2 4 5 16 33 55 81 1.3 ft

2 6 6 22 45 75 112 1.3 ft

2 8 8 28 57 95 142 1.3 ft

4 4 7 23 47 79 118 2.6 ft

4 6 9 29 61 103 153 2.6 ft

4 8 10 36 75 126 188 2.6 ft

4 10 12 43 89 149 223 2.6 ft

4 12 14 49 102 172 257 2.6 ft

4 14 16 56 116 195 292 2.6 ft

4 16 18 62 129 218 326 2.6 ft

5 5 9 30 72 104 155 3.3 ft

5 8 11 40 83 140 209 3.3 ft

5 10 13 52 97 164 245 3.3 ft

6 6 11 37 76 129 192 4.0 ft

6 8 13 44 91 154 230 4.0 ft

6 10 14 51 106 178 267 4.0 ft

6 12 16 58 120 203 305 4.0 ft

6 14 18 65 135 228 342 4.0 ft

6 16 20 71 149 252 379 4.0 ft

6 18 22 78 164 277 416 4.0 ft

6 20 24 85 178 301 452 4.0 ft

6 22 26 92 193 326 489 4.0 ft

6 24 28 99 207 350 526 4.0 ft

8 8 15 51 107 180 270 5.3 ft

Antenna Information Users (government agencies) install the inductive loop sensor antennas in the road surface. The typical traffic counting loop will use 14 to 18 gauge; 8‐80 strand wire in loops ranging from 4 ft X 4 ft to 8 ft X 8 ft, with lead‐in wire length ranging from 25 ft to 600 ft long. The effective inductance is kept within a defined range as detailed in the Road Loop Installation Guide.

Loop inductance must be between 65µH to 500µH. The oscillation frequency will range from 88 kHz for 65µH to 29 kHz for 500µH.