Solicitation_W912WJ23Q0126.pdf
PDF 3 MB Posted
- Solicitation number
- W912WJ23Q0126
About this file
This solicitation requests quotations for the removal and installation of signs at five locations along the Cape Cod Canal in Bourne, Massachusetts. The U.S. Army Corps of Engineers is seeking a contractor to remove existing deteriorated signs and install new extruded aluminum speed limit and danger signs on bridge piers and a land location. The contractor must provide all labor, equipment, materials, and transportation to complete the work, which includes traffic control and disposal of debris. Quotes are due by close of business on September 7, 2023. The selected contractor must complete all work within 270 calendar days of the notice to proceed and have all required licenses, permits, and insurance. The solicitation includes specifications for the signs, installation methods, and other requirements. Prevailing wage rates according to the Service Contract Act apply.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ23Q0126-0005.pdf | ||
| Amendment W912WJ23Q0126-0004.pdf | ||
| Amendment W912WJ23Q0126-0003.pdf | ||
| Amendment W912WJ23Q0126-0002.pdf | ||
| Amendment W912WJ23Q0126-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ23Q0126 18-Aug-2023 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
SEE SCHEDULE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ] FOB
DESTINATION
[ ] OTHER X
(See Schedule)
07-Sep-2023(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
9783188255ANN M ADLEY
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ23Q0126
Section B - Supplies or Services and Prices
INSTRUCTIONS TO VENDORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
ALT I FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO ANN MURPHY ADLEY AT (978) 318-8255 or
ANN.M.ADLEY@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT WHICH
CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF ANN
MURPHYADLEY. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING
DOCUMENT IN ALL CASES.
**QUOTES CAN BE E-MAILED TO ANN MURPHY ADLEY AT ANN.M.ADLEY@USACE.ARMY.MIL.
NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 3:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company names:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE
ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
BID SCHEDULE
REMOVAL AND INSTALLATION OF SIGNS
CAPE COD CANAL
U.S. ARMY CORP OF ENGINEERS
BOURNE, MASSACHUSETTS
STATEMENT OF WORK
AUGUST 2023
Bid Schedule
ITEM UNIT QTY TOTAL
1. Contractor shall provide all labor, equipment, Job materials, and trasnportation to provide
(2) 10’ tall x 10’ wide “Speed Limit” signs and
(4) 2’ tall x 3’ wide “Danger” signs on the Bourne Bridge, Bourne, MA in accordance with the Statement of Work.
2. Contractor shall provide materials, and trasnportation to provide
(2) 10’ tall x 10’ wide “Speed Limit” signs and
(4) 2’ tall x 3’ wide “Danger” signs on the Sagamore Bridge, Bourne, MA in accordance with the Statement of Work.
3. Contractor shall provide materials, and trasnportation to provide
(1) 10’ tall x 10’ wide “Speed Limit” sign on four new treated posts in concrete foundation at Hog Island, Bourne, MA in accordance with the Statement of Work.
TOTAL
Section C - Descriptions and Specifications
STATEMENT OF WORK
REMOVAL AND INSTALLATION OF SIGNS
CAPE COD CANAL
U.S. ARMY CORP OF ENGINEERS
BOURNE, MASSACHUSETTS
STATEMENT OF WORK
AUGUST 2023
I. General
1. Scope of work
Contractor shall furnish all equipment, tools, materials, and labor to provide (5) 10’ tall x 10’ wide “Speed Limit” signs and (8) 2’ tall x 3’ wide “Danger” signs in accordance with this statement of work. The new signs will replace existing deteriorated signs and shall be placed in the same location, (4) locations on bridge piers and (1) location on land. It is expected that contractors will use aerial manlifts from the service road to reach out over the water to the signs located on the bridge piers. Contractors are responsible to assess and provide the properly sized aerial lifts to complete this work. The aerial manlifts calculated weights must include all tools, equipment, and materials in addition to the weight of personnel. Work includes demolition, removal and proper disposal or recycling of the existing signs. Work includes fencing, signage, barricades, and traffic control devices necessary to protect the general public from hazards within the work area. (See figures 1-2 and Photos 1-9).
Sign Schedule:
A. Bourne Bridge North Pier: (1) 10’x10’ - “Speed Limit” Sign, (2) 2’x3’ – “Danger” Sign B. Bourne Bridge South Pier: (1) 10’x10’ - “Speed Limit” Sign, (2) 2’x3’ – “Danger” Sign C. Sagamore Bridge North Pier: (1) 10’x10’ - “Speed Limit” Sign, (2) 2’x3’ – “Danger”
Sign D. Sagamore Bridge South Pier: (1) 10’x10’ - “Speed Limit” Sign, (2) 2’x3’ – “Danger”
Sign E. Hog Island: (1) 10’x10’ - “Speed Limit” Sign installed on (4) new 6”x6”x20’ pressure treated posts in 2’ diameter x 5’ deep concrete foundation piers.
2. Locations The work area is at (5) locations on federal property along the Cape Cod Canal: the Bourne Bridge North and South side Piers (2), the Sagamore Bridge North and South side Piers (2), and Hog Island (1). Contractor shall remove existing signs and install (1) – 10’x10’ “Speed Limit” sign and (2) “Danger Keep Off” signs at each bridge pier. All bridge piers are located over the water of the Cape Cod Canal. Contractor shall remove and install (1) – 10’x10’ “Speed Limit” sign at Hog Island.
3. Site Visit The project area is open to the public at any time. Interested vendors can inspect the existing conditions of the work area at any time. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements. A site visit is scheduled for Wednesday, August 30, 2023 at 10:00 am at the Bourne Recreation Area, 171 Sandwich Road, Buzzards Bay, MA 02532. Contact the Technical Point of Contact to confirm attendance for site visit. The Technical Point of Contact (TPOC) for the project is Travis Germano (978) 318-8550 or (Travis.J.Germano@usace.army.mil).
4. Schedule The work shall be completed within 270 days from notice to proceed. The project area will be open to the contractor Monday through Friday, with work hours form 0700-1800. All work must be done during these hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays. No onsite work shall be performed between Memorial Day to Labor Day (no summer season work).
5. Safety Requirements:
A. General: All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. Perform work in a safe manner that protects both workers and the general public from hazards. All equipment shall be in good working order with all safety features as recommended by the manufacturer. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_ 385-1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
B. Accident Prevention Plan: The Contractor shall prepare an Accident Prevention Plan
(APP) specific to the activities being performed, at a minimum it must meet the requirements of EM 385-1-1, Appendix A. It shall include Activity Hazard Analyses (AHAs) as described below.
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out. Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
C. Activity Hazard Analysis: An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
D. Fall Protection Requirements: Applicable when employees are working at heights above 6 feet. Contractor is responsible to have a fall protection program in accordance with EM 385-1-1, Section 21. A site-specific Fall Protection and Prevention Plan is a required submittal. Plan shall address at least the following:
i. Duties and responsibilities of Competent Persons (CP)
ii. Description of the project activities
iii. Training requirements to include safe use of fall protection equipment.
iv. Anticipated hazards and measures for prevention and control.
v. Rescue plan and procedures.
vi. Inspection, maintenance, and storage of fall protection equipment.
vii. Inspection and oversight methods.
The Plan shall identify a Competent Person (CP) designated by the Contractor to be responsible for site supervision and monitoring of the fall protection program. Person shall have training and experience in fall protection and PPE equipment. Person shall be capable of identifying and addressing fall hazards and have authority to ensure all work complies with safety requirements. The CP shall be onsite at all times while work at height is ongoing.
End User: Persons who are trained and authorized to use fall protection PPE, shall have an understanding of the fall hazards and able to follow the policy, procedures, and instructions of the Competent Person regarding the use of fall protection equipment.
Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restraint and positioning systems.
E. Cranes: For any crane work, a Crane Lift Plan (CLP) shall be prepared in accordance with EM 385-1-1, Section 16.H.03. All cranes shall have current inspection documents available. All operators, signal persons, and riggers shall be trained and hold valid State licenses. Provide proof of current qualifications.
F. Required Personnel: The contractor shall employ a minimum of one Competent Person
(CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be onsite at all times during construction. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.
G. Accident Reporting: All accidents and near misses shall be investigated by the contractor and reported to the Technical Point of Contact immediately.
H. Daily Reports: The contractor shall provide daily production and QC reports, employee work hours, and certified payrolls electronically to the Technical Point of Contact
6. Preconstruction Conference
Prior to the start of any work, the Contractor and Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s staff responsible for quality and safety on the job site will attend this meeting. This conference will be scheduled for a time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the requirements in terms of safety, quality, submittals, communications, inspections, and payments. Storage areas for materials, equipment and dumpsters will also be coordinated at this meeting.
7. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security
The contractor shall comply with all established security policies at the Cape Cod Canal Project. The Government reserves the right to close any property and reschedule work.
Excluding emergencies, the Contractor shall be given at least 24-hour notice of any such closure. The Contractor is responsible to secure the security gate for each access road when departing each day.
9. Contractor Conduct
The work area is located on Federal property on a service road open to the public for recreation activities. Contractor and employees must always act in a professional manner.
Alcohol and firearms are prohibited on project grounds.
10. Payment
Payment shall be made after final inspection and acceptance by the Government, the Contractor must submit an invoice, utilizing Form ENG 93, to the Technical Point of Contact. The invoice shall include the name of contractor (as per SAM registration), invoice date, contract number, description of work completed, and total amount due. For jobs greater than 30 days the contractor may request progress payments. Invoices may be emailed to:
US Army Corps of Engineers Cape Cod Canal Field Office P.O. Box 1555 Buzzards Bay, MA 02532 Attn: Travis Germano Or emailed to Travis.J.Germano@usace.army.mil
II. Technical Requirements:
Part 1 General:
Contractor’s work includes all personnel, equipment, materials, supervision, and services necessary to provide signs as described herein.
1. Requests for Information:
After Contract award, requests concerning the work of this project should be directed to the Technical Point of Contact at the Cape Cod Canal Office at (978) 318-8550 or travis.j.germano@usace.army.mil.
2. Submittals:
Contractor shall provide submittals that show pertinent details of proposed materials that allows confirmation the materials are in accordance with requirements listed in the materials section of this scope of work. Although the Government technically reviews submittals, the Contractor’s work must be prosecuted using proper internal controls and review procedures.
Contractor submittals must be reviewed and accepted by the government prior to the commencement of any field activities. Contractor shall provide required submittals to the Technical Point of Contact within 45 days of notice to proceed.
3. Required submittals include:
a. Accident Prevention Plan (APP) and Activity Hazard Analyses (AHA’s) for all fieldwork.
b. Schedule
c. Work Plan and Traffic Control Plan – Provide a site plan with description of signage, barriers, flashing barricade lights, traffic control devices and flaggers to protect the general public from hazards. Include the means and methods to control pedestrian, bike, and vehicular travel within the work areas.
d. Crane Lift Plan and Operators Qualifications (if cranes will be used)
e. For all materials to be used on the project, the contractor shall provide the following information:
(1) Manufacturer’s name
(2) Catalog number
(3) Specifications
(4) Any other information necessary to approve the materials
(5) Safety Data Sheets (SDS) shall be submitted along with the product data for any potentially hazardous materials such as adhesives and flux materials.
4. Government Resources:
The contractor is responsible for providing all resources to complete the project. The Government will not provide any equipment or services.
5. Omissions:
This scope of work may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
6. Quality Control and Quality Assurance:
The Contractor is responsible for the quality control of all work. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times during the term of the contract.
7. Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.
8. Storage and Equipment Staging Areas:
Storage and equipment staging areas shall be coordinated with TPOC. Contractor is responsible to manage all storage of materials, dumpsters, and staging inside this work area.
The contractor is responsible for receiving, unloading and movement of all materials. The contractor shall ensure that stored materials do not migrate into the waterway or onto roadways. Any materials that migrate into the waterway, roadways, sidewalks, bike paths, or recreation areas shall be cleaned up by the contractor daily. The Government is not responsible for damage or theft of contractor equipment or materials. The keys that are issued for access to areas shall be returned upon request of the Technical Point of Contact, or before final payment is made.
9. Clean Up:
The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.
Upon completing work, the contractor shall remove all surplus excavation materials, broken pavement, old pipes, old manholes, tools, equipment, and materials, etc., that are not the property of the government and shall clean up the job site to the satisfaction of the government. Contractor shall leave the entire site and areas adjacent in a neat and orderly condition. Contractor shall clean up and properly dispose of debris off-site in accordance with Federal, State and Local ordinances and regulations.
10. Sustainability:
EPA Designated: Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels.
Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
Part 2 Materials:
1. Extruded aluminum “SPEED LIMIT 10 MPH NO WAKE” sign panels and mounting frame system integrated into the sign:
a. Quantity: 5
b. Material: Aluminum Alloy 6063-T6 ASTM B221M
c. Height: 10’
d. Width: 10’
e. Thickness: 0.190”
f. Retroreflective Sheeting: Diamond Grade conform to ASTM D4956 Type XI, Background reflective white background, reflective orange border and symbol, and black lettering. Border/Symbol line Width: 7”and Letter Height: 16”. (See Photo 9)
g. Hardware: Bolts, nuts, post clips, lock and flat washers must be either aluminum alloy or stainless steel.
h. Frame: 4”x4”x1/4” Aluminum (minimum)
i. Frame Mount Anchors:
i. Concrete Anchors (Bridge Piers): ½” x 4 ½” Heavy Duty Wedge Type Expansion Anchor (Quantity: 12 Minimum/frame)
ii. “Thru Bolt” (Hog Island - Wood Posts): ½” x 8 in. Stainless Steel Hex Bolt, Nut and Washer (Quantity: 12 Minimum/frame)
2. Signposts (Hog Island Location): 6”x6”x20’ Pressure Treated Lumber (Quantity: 4)
3. Concrete (Hog Island Location):
a. Minimum 4,000 psi compressive strength at 28 days.
b. Concrete Column Piers: 24” dia. x 60” deep cylindrical footing piers below grade
4. Extruded aluminum “DANGER KEEP OFF” sign panels and mounting frame system integrated into the sign:
a. Quantity: 8
b. Material: Aluminum Alloy 6063-T6 ASTM B221M
c. Height: 2’
d. Width: 3’
e. Thickness: 0.190”
f. Retroreflective Sheeting: Diamond Grade conform to ASTM D4956 Type XI, Background color red and text color in white. Letter Height: 3”. (See Photo 4)
g. Hardware: Bolts, nuts, post clips, lock and flat washers must be either aluminum alloy or stainless steel.
h. Frame: 4”x4”x1/4” Aluminum (minimum)
i. Frame Mount Anchors:
i. Concrete Anchors (Bridge Piers): ¼” x 2” Heavy Duty Wedge Type Expansion Anchor (Quantity: 4 Minimum/frame)
Part 3 Execution
1. The contractor shall ensure that all submittals have been approved prior to onsite work and coordinate the schedule for all onsite work with the Government technical point of contact.
2. Contractor shall determine and submit a site plan for access route, storage of materials, locations of contractor provided dumpsters, and fence location.
3. The service road work areas are located at a busy park location open to the general public and it is used extensively by the public for recreational activities that occur 24 hours per day.
The service road shall remain open to pedestrians and passable for at least one vehicle throughout the construction process. Upon the completion of each workday, it is the Contractor's responsibility to ensure that the road surface is cleared of all construction activities and made safe for public use. The contractor is responsible for preventing the general public from encountering hazards associated with the work. The Contractor shall employ ample personnel and sufficient equipment to accomplish the work of this contract in the least amount of time and be sequenced to minimize impacts on the service road. Existing Park features and utilities adjacent to work areas shall be protected from damage.
4. The Canal service roads have gates to control unauthorized vehicle access. The contractor will be provided a key to open the gates at the pre-construction conference. The contractor shall return the key to the government upon completion of the field work. The contractor shall ensure any gate unlocked for access is re-secured upon entry and exit. The contractor shall comply with the 10 miles per hour speed limit for all vehicles on the service roads and shall use caution when approaching Canal visitors.
5. Work shall be performed as required by rules, regulations, codes, and laws of local, state, and federal governments. In cases where work is not specifically shown or specified, contract shall include miscellaneous items, appurtenances, devices, and materials obviously necessary for a sound, secure and complete installation.
6. Existing Conditions: Contractor shall be responsible for the protection of all existing structures, equipment, and areas from damage during construction. Any items not included in the Statement of Work that are damaged or altered during construction shall be restored to their pre-construction condition at the contractor’s expense and verified as such by the Government TPOC. Any disturbed areas outside of the sites to include the access roads and public roads shall be restored to the minimum of pre-existing conditions.
7. Utilities: Government personnel will identify known subsurface utilities, conduits and structures that are near the work area. All existing utilities shall be protected from damage.
No utilities may be interrupted unless approved by the Government TPOC. Contractor shall ensure to take safety measures to work near overhead electric and communication lines in close proximity of the work area.
8. Contractor shall coordinate the exact locations of all signs with TPOC prior to install.
9. Aerial manlifts from the service road to the sign locations on the bridge piers will be required to provide TPOC access for inspection. Boom and basket load limits specified by the manufacturer shall not be exceeded. Only authorized persons shall operate an aerial lift.
Operators of the manlift shall provide proof training.
10. Remove and Install of (2) Speed Limit and (4) Danger Signs (Bourne Bridge Piers)
The contractor shall remove and install two (2) “Speed Limit” signs. One “Speed Limit” sign is located on Northeast side of the pier (North Side of the Canal), and one “Speed Limit” sign is located on Southwest side of pier (South Side of the Canal). Contractor shall remove the existing sign, frame, and fasteners. Contractor shall flush cut the existing fasteners.
Contractor shall install the new vessel speed limit sign and frame using a minimum of (12) concrete anchors. Contractor shall attach the sign to the frame per the manufacture’s requirements. Do not field drill holes in any part of the panel. Use nylon washers between the bolt heads and sign faces on flat sheet aluminum signs. Replace any damaged sign panels at no additional cost to the Government.
Contractor shall remove and install (4) “Danger Keep Off” signs to the piers of the Bourne Bridge. Two “Danger Keep Off” signs are located on the North side of the bridge pier (North Side of the Canal) and two “Danger Keep Off” signs are located on the South side of the bridge pier (South Side of the Canal).
11. Remove and Install of (2) Speed Limit and (4) Danger Signs (Sagamore Bridge Piers)
The contractor shall remove and install two (2) “Speed Limit” signs. One “Speed Limit” sign is located on Northeast side of the pier (North Side of the Canal), and one “Speed Limit” sign is located on Southwest side of pier (South Side of the Canal). Contractor shall remove the existing sign, frame, and fasteners. Contractor shall flush cut the existing fasteners.
Contractor shall install the new vessel speed limit sign and frame using a minimum of (12) concrete anchors. Contractor shall attach the sign to the frame per the manufacture’s requirements. Do not field drill holes in any part of the panel. Use nylon washers between the bolt heads and sign faces on flat sheet aluminum signs. Replace any damaged sign panels at no additional cost to the Government.
Contractor shall remove and install (4) “Danger Keep Off” signs to the piers of the Sagamore Bridge. Two “Danger Keep Off” signs are located on the North side of the bridge pier (North Side of the Canal) and two “Danger Keep Off” signs are located on the South side of the bridge pier (South Side of the Canal).
12. Demolition and Installation of Notice signs – Hog Island Contractor shall remove existing sign, steel posts, and concrete piers. Contractor shall provide new sign on (4) 6”x6”x20’ pressure treated wood posts in 24” dia. x 60” deep cylindrical concrete footing piers below grade. Contractor shall install the new vessel speed limit sign and frame using a minimum of (12) “thru bolt” anchors. Contractor shall attach the sign to the frame per the manufacture’s requirements. Do not field drill holes in any part of the panel. Use nylon washers between the bolt heads and sign faces on flat sheet aluminum signs. Replace any damaged sign panels at no additional cost to the Government.
13. Disposal: Local regulations regarding hauling and disposal shall apply. Contractor shall dispose of all debris resulting from the construction work. Contractor shall leave the entire site of the work in a neat and orderly condition. Debris, rubbish, non-hazardous waste, and non-usable material resulting from the work under this contract shall be disposed of by the Contractor at his expense off Government property. Segregate and maximize recycling of all waste generated. Debris shall be removed and transported in such a manner that prevents damage to local roads and spillage.
14. Closeout Procedures: Contractor shall coordinate with the TPOC for the following at the completion of the project:
a. A final inspection walkthrough of the project to ensure the work is completed in accordance with the Statement of Work.
b. Warranty
c. Complete Final Payment Forms and Certifications.
ATTACHMENTS
PLEASE REFER TO THE PHOTOS/FIGURES WITHIN THIS SOLICITATION FOR ADDITIONAL
INFORMATION.
REMOVAL AND INSTALLATION OF SIGNS
Figure 1
Figure 2
Photo 1
Photo 1: Shows the typical existing conditions of the service road and the bridge piers. The photo above is of the Sagamore Bridge, the Bourne Bridge is similar.
Photo 2
Photo 2: Shows the typical existing “NOTICE SPEED LIMIT 10 MPH NO WAKE” and
“DANGER KEEP OFF” signs on the bridge pier. Please take note of the overhead power lines.
Photo 3
Photo 3: Shows the typical existing “NOTICE SPEED LIMIT 10 MPH NO WAKE” and
“DANGER KEEP OFF” signs on the bridge pier. Please take note of the overhead power lines.
Photo 4
Photo 4: Shows the typical existing “NOTICE SPEED LIMIT 10 MPH NO WAKE” and
“DANGER KEEP OFF” signs on the bridge pier.
Photo 5
Photo 5: Shows an aerial view showing the access distance from the service road to the bridge piers. The approximate distance varies from 80’-115’. Contractor shall confirm all distances and provide all means to accomplish the work.
Photo 6
Photo 6: Shows the typical existing dimensions of the Bridge piers.
Photo 7
Photo 7: Shows the typical existing “NOTICE SPEED LIMIT 10 MPH NO WAKE” on land at the Hog Island location. Contractor shall remove existing sign, steel posts, and concrete piers.
Contractor shall provide new sign on (4) 6”x6”x20’ pressure treated wood posts in 24” dia. x 60” deep cylindrical concrete footings below grade.
Photo 8
Photo 8: Shows the Hog Island access gate.
Photo 9
Photo 9: Shows the design for the new speed limit 10’ x 10’ “SPEED LIMIT 10 MPH NO
WAKE” sign panels. Contractor shall provide the sign and a frame system to mount the sign.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract.
The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures –this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
WAGE DETERMINATION
"General Decision Number: MA20230001 07/28/2023 Superseded General Decision Number: MA20220001 State: Massachusetts
Construction Type: Building
Counties: Barnstable, Bristol, Dukes, Essex, Middlesex, Nantucket, Norfolk and Suffolk Counties in Massachusetts
BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories)
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $16.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2023. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.15 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2023. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2023 1 01/13/2023 2 01/20/2023 3 01/27/2023 4 02/03/2023 5 02/17/2023 6 03/03/2023 7 03/17/2023 8 03/24/2023 9 03/31/2023 10 04/07/2023 11 04/14/2023 12 05/19/2023 13 06/16/2023 14 07/14/2023 15 07/21/2023 16 07/28/2023
ASBE0006-001 09/01/2022
Rates Fringes
Insulator/asbestos worker Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems
(ZONE A)...................$ 51.25 33.99
(ZONE B)...................$ 51.25 33.99
ZONES:
ZONE A
BARNSTABLE COUNTY (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet, Yarmouth) BRISTOL COUNTY (Easton), MIDDLESEX COUNTY, and NORFOLK COUNTY (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxborough, Holbrook, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon, Stoughton, Walpole, Wellesley, Westwood, Weymouth)
ZONE B
BARNSTABLE COUNTY (Barnstable, Bourne, Falmouth, Mashpee, Sandwich), BRISTOL COUNTY (All cities except Easton),and NORFOLK COUNTY (Bellingham, Franklin, Plainville)
ASBE0006-002 09/01/2021
BARNSTABLE (Brewster, Chatham, Dennis, Eastham, Harwich, Orleans, Provincetown, Truro, Wellfleet and Yarmouth); BRISTOL (Easton); ESSEX; MIDDLESEX; NORFOLK (Avon, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Holbrook, Hull, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Randolph, Sharon Stoughton, Walpole, Wellesley, Westwood, and Weymouth) AND SUFFOLK COUNTIES
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems whether they contain asbestos or not)....$ 40.00 33.04
ASBE0006-010 09/01/2022
BARNSTABLE (Barnstable, Bourne, Falmouth, Mashpee and Sandwich); BRISTOL (Acushnet, Attleboro city, Berkeley, Dartmouth, Dighton, Fairhaven, Fall river City, Freetown, Marion, Mansfield, New Bedford City, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Somerset, Swansea, Taunton City and Westport); DUKES; NANTUCKET; NORFOLK (Bellingham, Franklin, Plainville, and Wrentham); PLYMOUTH (Lakeville, Mattapoisett, Middleboro, Rochester and Wareham)
Insulator/asbestos worker (Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems.)....$ 51.25 33.99
BOIL0029-001 01/01/2021
Rates Fringes
BOILERMAKER......................$ 45.87 29.02
BRMA0001-008 02/01/2023
FOXBORO CHAPTER
BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) AND NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westrwood, Wrentham) COUNTIES
Bricklayer, Cement Mason, Plasterer........................$ 58.21 33.71
BRMA0001-009 02/01/2023
LOWELL CHAPTER
MIDDLESEX (Acton, Asby, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstble, Ft. Denvens, Groton, Littleton, Lowell, North Acton, Pepperell, Shirley, South Acton, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington)
Bricklayer and plasterer.........$ 58.21 33.71
BRMA0001-010 02/01/2023
LOWELL CHAPTER
MIDDLESEX (Ashland, Framingham, Holliston, Hopkinton, Hudson, Maynard, Natick, Sherbvorn, Stow); and NORFOLK (Medfield, Medway,Millis)
BRICKLAYER.......................$ 58.21 33.71
BRMA0003-001 02/01/2023
Rates Fringes
Marble & Tile Finisher...........$ 46.25 32.43 Marble, Tile & Terrazzo Workers..........................$ 60.37 34.37
TERRAZZO FINISHER................$ 59.29 34.21
BRMA0003-003 02/01/2023
BOSTON CHAPTER
MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville); NORFOLK (Brookline, Milton); and SUFFOLK
BRICKLAYER.......................$ 60.35 34.40
BRMA0003-006 02/01/2023
LYNN CHAPTER
ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuen, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield Wakefield, Wenham, West Newbury);
and MIDDLESEX (Reading, North Reading, Wakefield)
Bricklayer, cement mason and plasterer........................$ 60.35 34.40
BRMA0003-007 02/01/2023
WALTHAM CHAPTER
MIDDLESEX (Belmont, Burlington, Concord, Lexington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)
Bricklayer and plasterer.........$ 60.35 34.40
BRMA0003-008 02/01/2023
NEWTON CHAPTER
MIDDLESEX (Newton) and NORFOLK (Dover, Needham, Wellesley) plasterer........................$ 60.35 34.40
BRMA0003-009 02/01/2023
NEW BEDFORD
BARNSTABLE; BRISTOL (Acushnet, Darmouth, Farhaven, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport); DUKES; and
NANTUCKET COUNTIES
plasterer........................$ 60.35 34.40
BRMA0003-010 02/01/2023
QUINCY CHAPTER
NORFOLK COUNTY (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Soughton, Weymouth) plasterer........................$ 60.35 34.40
CARP0056-011 08/01/2022
SUFFOLK (All of County); and those areas of BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX & NORFOLK COUNTIES situated inside Boston Beltway (I-495) and North of Cape Cod Canal. ALL of
DUKES AND NANTUCKET COUNTIES
PILEDRIVERMAN....................$ 52.15 34.10
CARP0056-012 08/01/2022
The areas of BARNSTABLE, BRISTOL, and NORFOLK COUNTIES situated OUTSIDE Boston Beltway (I-495) and South of Cape Cod Canal
PILEDRIVERMAN....................$ 52.15 34.10
CARP0056-013 08/01/2022
Those areas of ESSEX and MIDDLESEX COUNTIES situated OUTSIDE Boston Beltway (I-495)
PILEDRIVERMAN....................$ 45.75 34.10
CARP0327-001 03/01/2023
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
CARPENTER........................$ 54.96 29.43
CARP0339-001 03/01/2023
BRISTOL (Attleborough, North Attleborough); ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); AND NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Sharon, Walpole, Wellesley, Westwood, Wrentham)
CARPENTER........................$ 45.12 29.43
CARP0346-003 03/01/2023
NORFOLK COUNTY (Braintree, Cohassett, Scituate, Weymouth, Quincy)
CARPENTER........................$ 45.12 29.43
CARP0624-005 09/01/2017
DUKES; NANTUCKET
Rates Fringes
CARPENTER........................$ 46.43 28.35
CARP0624-007 09/01/2017
BARNSTABLE; BRISTOL (Except Attleboro & North Attleboro); AND NORFOLK (Avon, Holbrook, Randolph, Stoughton) COUNTIES
CARPENTER........................$ 39.28 27.90
CARP1121-001 01/02/2023
SUFFOLK COUNTY
MILLWRIGHT.......................$ 46.29 31.18
CARP1121-003 01/02/2023
BARNSTABLE, BRISTOL, DUKES, ESSEX, MIDDLESEX, NANTUCKET and
NORFOLK COUNTIES
MILLWRIGHT.......................$ 40.94 31.18
CARP2168-001 03/01/2023
MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville); NORFOLK (Brookline, Dedham, Milton); and SUFFOLK
FLOOR LAYER: Carpet.............$ 51.77 29.73
CARP2168-004 03/01/2023
BRISTOL; ESSEX; MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville); Remainder of Norfolk County
FLOOR LAYER: Carpet.............$ 51.77 29.73
CARP2168-005 03/01/2023
BARNSTABALE; DUKES; AND NANTUCKET
Rates Fringes
FLOOR LAYER: Carpet.............$ 47.96 29.73
ELEC0096-001 09/04/2022
MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend)
ELECTRICIAN......................$ 45.59 30.92
Teledata System Installer........$ 34.19 29.33
ELEC0099-001 06/01/2021
BRISTOL (Attleboro, North Attleboro, Seekonk)
Rates Fringes
ELECTRICIAN......................$ 43.61 54.71%
Teledata System Installer........$ 31.21 13.1%+14.93
ELEC0103-001 03/01/2023
ESSEX; MIDDLESEX (Excluding Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend); NORFOLK (Excluding Avon, Holbrook, Plainville, Randolph, Stoughton) SUFFOLK
Teledata System Installer........$ 47.38 31.92
ELEC0103-002 03/01/2023
ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)
ELECTRICIAN......................$ 59.23 35.52
ELEC0103-004 03/01/2023
ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)
ELEC0103-005 03/01/2023
ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Frankloin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull);SUFFOLK
ELEC0104-001 08/29/2022
Rates Fringes
Line Construction:
Cableman....................$ 53.06 28.49+A Equipment Operator..........$ 45.10 25.20+A Groundman...................$ 29.18 12.10+A Lineman.....................$ 53.06 28.49+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.
ELEC0223-005 09/01/2022
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)
ELECTRICIAN......................$ 46.35 31.18%+14.50
ELEC0223-006 09/01/2022
BARNSTABLE; BRISTOL (Except Attleboro, North Attleboro, Seekonk); DUKES; NANTUCKET AND NORFOLK (Avon, Halbrook, Plainville, Randolph, Stoughton)
Teledata System Installer........$ 39.40 31.09%+14.25
ELEV0004-001 01/01/2023
Rates Fringes
ELEVATOR MECHANIC................$ 68.38 37.335+a+b
FOOTNOTE FOR ELEVATOR MECHANICS:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked.
This is the start of the file's text. The full file is on GovTribe.