SEE ADDENDUM

(No Collect Calls)

W912WJ23Q0085 02-May-2023

b. TELEPHONE NUMBER

9783188255

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 12 May 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912WJ9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANN M ADLEY

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 978-318-8159 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$9,500,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF77

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912WJ23Q0085

Section SF 1449 - CONTINUATION SHEET

INSTRUCTIONS TO VENDORS

PLEASE DIRECT QUESTIONS TO ANN MURPHY ADLEY AT (978) 318-8255 OR

ANN.M.ADLEY@USACE.ARMY.MIL. THE SOLICITATION AND RESULTING CONTRACT SHALL BE

THE GOVERNING DOCUMENT IN ALL CASES.

** QUOTES CAN BE E-MAILED TO ANN MURPHY ADLEY AT ANN.M.ADLEY@USACE.ARMY.MIL.

THE BID SCHEDULE MUST BE COMPLETED AND SUBMITTED FOR A QUOTE TO BE

CONSIDERED COMPLETE.

In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit a quote (formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA)). Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

Provide Unique Entity Identifier (UEI): ___________________________ Provide CAGE code: ____________________________ Provide TAX ID: __________________________ Per FAR Part 52.212-3 Alt I, the Contractor is required to complete the On-line Representations and Certifications Application (www.SAM.gov) and paragraph (b) if applicable.

POTENTIAL VENDORS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS

PRICE ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

SECURITY REQUIREMENTS

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract.

The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures –this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

BID SCHEDULE

BOUNDARY LINE INSPECTION AND MAINTENANCE

U.S. ARMY CORPS OF ENGINEERS

HOPKINTON-EVERETT LAKES

PERFORMANCE WORK STATEMENT

MAY 2023

Bid Schedule

ITEM UNIT QTY TOTAL

001 Hopkinton Dam (BASE) Boundary Line Clearing Boundary Line Marking Documentation and Reporting

Job

002 Drew Lake (OPTION 1)

Brush Clearing & Painting Lines

Documentation and Reporting

Job

003 Everett Dam (OPTION 2)

Brush Clearing & Painting Lines

Documentation and Reporting

TOTAL:

U.S. ARMY CORPS OF ENGINEERS

HOPKINTON-EVERETT LAKES

PERFORMANCE WORK STATEMENT

MAY 2023

I. General:

1. Scope – Furnish all materials, equipment, and labor to perform boundary line inspection, boundary line clearing, boundary line paint marking, as well as documentation and reporting of conditions for sections of the administrative boundary lines at the Hopkinton-Everett Lakes Project. The Hopkinton-Everett Lakes Project consists of property containing two dams (Hopkinton Dam and Everett Dam) and a lake with a man-made canal situated between the two lakes (Drew Lake / Canal #2). The portion of boundary line requiring service at the Hopkinton Dam is approximately 10.7 miles in length. In addition, the Government may exercise two optional sections of administrative boundary lines for service. The first option section would include the boundary line surrounding Drew Lake / Canal #2, which is approximately 5.9 miles in length. The second option section would include a portion of the boundary line at the Everett Dam, which is approximately 1.7 miles in length.

2. Location(s) – The Hopkinton-Everett Lakes project is managed from the Hopkinton-Everett Lakes Project Office, which is located in Hopkinton, New Hampshire at:

Hopkinton-Everett Lakes

2097 Maple Street Hopkinton, New Hampshire, 03229

a. Hopkinton Dam Boundary Sections (BASE): Located within the Town of Hopkinton, NH.

b. Drew Lake Boundary Sections (Option 1): Located within the Towns of Hopkinton and Weare, NH.

c. Everett Dam Boundary Sections (Option 2): Located within the Towns of Dunbarton and Weare, NH.

3. Site Visit – Contact the Technical Point of Contact (TPOC), Environmental Protection

Specialist, Joshua Levesque at 978-318-8304 or Joshua.S.Levesque@usace.army.mil to arrange a site visit.

4. Schedule – The period of performance shall be from Contract Award to November 30, 2023.

The Pre-Work Conference shall be completed within 14 days of Contract Award. All submittals to include safety and product submittals shall be submitted, reviewed, and accepted within 30 days of Contract Award. Work shall be performed Monday through Friday 7:00 AM to 4:30 PM unless otherwise approved in advance by the TPOC. No work shall be done on weekends or Government holidays, unless otherwise approved in advance by the TPOC.

NOTE: The Hopkinton Dam boundary section will be awarded as BASE.

*The Drew Lake boundary section will be considered OPTION 1 and the Everett Dam boundary section will be considered OPTION 2. *

* The Drew Lake and/or Everett Dam boundary section(s) will only be included if the OPTION(s) is exercised.

5. Safety Requirements – All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

a. Abbreviated Accident Prevention Plan:

The Contractor shall prepare an Abbreviated Accident Prevention Plan (AAPP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable AAPP template is available upon request.

However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.

A preparatory meeting shall be conducted by the prime contractor to discuss the AAPP contents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

b. Activity Hazard Analysis:

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work.

The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

COVID-19 NOTE: As part of the AAPP and AHA’s, include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:

Procedures for periodic sanitation inspections.

Procedures for disinfecting project sites in accordance with Centers for

Disease Control and Prevention (CDC) guidelines.

Site specific measures to practice social distancing while working on the project.

Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.

A list of Personal Protective Equipment to be used in accordance with

CDC and state guidelines.

c. Emergency Response:

Emergency procedures shall be documented in the AAPP and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.

d. Required Personnel:

The Contractor shall designate one employee as the site’s Competent Person (CP) who is responsible for ensuring a safe environment for all employees. The CP shall be present at the project site and report to the contractor’s upper management. The CP is required to have related construction and/or service experience.

When emergency medical services are not accessible within five (5) minutes of the work location and there are two (2) or more workers onsite, at least two (2) employees shall be trained in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.

e. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.

The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.

6. Flooding – Both Hopkinton and Everett Dams are primarily Flood Risk Management

Projects. Occasional retention of floodwaters may inundate portions of the dam property or access roads in the areas covered by this contract. The TPOC will notify the Contractor as areas are closed as a result of floodwaters. When flooding ends and waters recede, the TPOC will notify the Contractor as areas reopen and services may resume.

7. Pre-Work Conference – Prior to the start of any work, the TPOC will schedule and conduct a “Pre-Work Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor’s Safety Program (including sub-contractors).

iii. Abbreviated Accident Prevention Plan and Activity Hazard Analysis

iv. Safety Meetings (Documented on NED Form 251)

v. Accident Reporting (ENG Form 3394)

vi. Safety Data Sheet (SDS) requirements

vii. Contractor’s Equipment

viii. Correspondence, Communication, Security and Administrative Procedures.

ix. Invoice and payment.

8. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security – The contractor will comply with all established security policies at the USACE Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.

10. Payment – The contractor shall furnish the TPOC with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

NOTE: Final Payment may be held until the Contractor has returned any and all issued keys/cards and Government provided resources and data to the TPOC at the completion of work. Any and all keys/cards and Government provided resources and data are required to be physically handed to the TPOC, or if mailed, the Contractor assumes all responsibility for loss (which may include the cost of rekeying the applicable project).

All invoices may be mailed to:

U.S. Army Corps of Engineers Merrimack River Basin

2097 Maple Street Contoocook, New Hampshire 03229

Or emailed to Joshua.S.Levesque@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary – Furnish all materials, equipment, and labor to perform boundary line inspection, boundary line clearing, boundary line paint marking, as well as documentation and reporting of conditions for sections of the administrative boundary lines at the Hopkinton-Everett Lakes Project. The Hopkinton-Everett Lakes Project consists of property containing two dams (Hopkinton Dam and Everett Dam) and a lake with a man-made canal situated between the two lakes (Drew Lake / Canal #2). The portion of boundary line requiring service at the Hopkinton Dam (BASE) is approximately 10.7 miles in length. In addition, the Government may exercise two optional sections of administrative boundary lines for service. The first (OPTION #1) section would include the boundary line surrounding Drew Lake / Canal #2, which is approximately 5.9 miles in length. The second (OPTION #2) section would include a portion of the boundary line at the Everett Dam, which is approximately 1.7 miles in length.

2. Submittals – Although the Government reviews submissions for technical data/information required by this Performance Work Statement, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government within 30 days of Contract Award.

a. Submittals must be accepted before the commencement of any field activities.

Abbreviated Accident Prevention Plan Activity Hazard Analysis Product Data Sheet(s): For Blue Marking paint type and color Safety Data Sheets (SDS) – For all chemicals and/or products used on-site.

b. Submittals required prior to final payment

Documentation and Reporting (Photographs and associated field data) – Photographs with details to potential encroachments, monument conditions and field notes.

3. References – All work shall be in conformance with:

a. U.S Army Corps of Engineers

i. EP 1130-2-540 Environmental Stewardship and Maintenance Guidance and

Procedures, Chap 2.

ii. EM-385-1-1 Safety and Health Requirements Manual, U.S. Army Engineering

Manual.

b. Code of Federal Regulations

i. Title 36 – Parks, Forests, and Public Property; Chapter III, Part 327 – U.S.

Army Corps of Engineers, Department of the Army.

c. Other appropriate federal, state, and local codes and regulations.

4. Other Contracts – The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

5. Preferred Sequence for Work Schedules – The TPOC shall provide the Contractor with a preferred sequence, or order, of work. (Note: The Contractor must provide sufficient personnel and equipment to accomplish services stated in the contract). The Contractor will then be required to submit a work schedule for each service, and approximate times for beginning and ending of each required service listed. Any proposed change to an accepted schedule must be submitted in writing, coordinated, and accepted by the TPOC in advance of actual schedule changes.

6. Clean Up and Waste Disposal – The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the TPOC. All waste material will be disposed of offsite in accordance with all federal, state, and local regulations.

7. Environmental Protection – Containers for excess and/ or waste materials, rubbish, etc.

shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis when working onsite. Water, air, and land resources shall not be adversely impacted during the course of the work. The contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.

8. Sustainability - The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.

9. Personal Protective Equipment - It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

10. Government Resources –The contractor shall supply his own means of communication

(telephone). There is not a restroom available at the contract site, and there is no access to potable water at the contract site. The contractor would have to provide these resources or have an acceptable alternative plan for these resources. The Government shall supply the following to the Contractor for use during the performance of this work:

a. Boundary Surveyed Maps with monument bearings and distances.

b. Any Key Control to provide vehicle access to service roads and authorized trails if needed to facilitate access for work locations.

NOTE: All Government provided materials, including access controls (keys), any hard copies of maps/data, and any digital data provided on external storage media shall be returned, to the TPOC, at the completion of the contract and prior to submitting Final Payment.

11. Damage to Government and Private Property – The contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the contractor’s operation. The contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation.

Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

12. Contractor’s Personnel –

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note: At least one of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the contractor’s employees strictly comply with Code of Federal Regulations Title 36, Chapter III, Part 327, and all federal, state, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other contractors

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor’s Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible.

No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

13. Quality Assurance – The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

14. Inspections-

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - Upon the completion of each service requirement, the

Contractor will perform an inspection of all areas under this contract to ensure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections - The TPOC may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the TPOC. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract.

This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

d. Government Inspections - The Government will monitor the Contractor’s service performance and make deductions accordingly.

15. Receiving and Storing Materials – The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the contractor and will not be responsible for damage to the contractor’s equipment or materials.

16. Omissions – This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Part 2 Equipment:

1. Condition of Equipment– All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, U.S. Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

2. Type of Equipment -

a. Boundary Clearing and Monument Locating: Navigational tools and equipment may be necessary to locate bearings and distances within the boundary line. A forester’s staff compass, or a sighting compass will be the lowest survey grade of instrument allowed to identify the boundary line. Brush clearing tools such as machetes, pruning saws, axes, loppers, and powered brush cutters are types of equipment that may be used to clear the boundary line. Motorized all-terrain vehicles are NOT authorized for use to accomplish the work specified in this contract. Metal detectors may be required to locate monuments that are not readily visible.

b. Boundary Marking: Boundary marking may be accomplished by use of paint brush, forestry marking paint gun, aerosol paint can, or approved method by the TPOC.

c. Documenting: Equipment used for documenting shall include a digital camera, GPS unit, field notebook and writing implements.

3. Equipment Storage – No Government space or facilities shall be provided under this contract.

Part 3 Materials and Supplies:

1. Provided by Government –

a. Boundary Maps and Data. Contractor shall be provided Boundary Survey Maps showing distances and bearings between monuments.

b. Government furnished supplies are the property of USACE and shall be returned in full upon the completion of work.

2. Provided by Contractor –

a. Boundary Marking Paint: The boundary marking paint shall be a blue oil-based paint designed to provide a 6-year service life visible at a minimum of 20 feet when applied to live tree bark. The Contractor shall provide submittals of the paint type and color to the TPOC for review prior to ordering.

b. Approved paint application materials and supplies.

c. Documentation and Reporting materials needed based on the requirements listed in Part 4

Service Requirements.

Part 4 Service Requirements:

1. General: Boundary lines are maintained lines of site to ensure abutters and visitors are aware of federal boundary lines on USACE projects. Maintenance of these lines requires routine clearing, painting, signing, reporting broken or missing monuments, and reporting encroachments (documenting via digital photographs). Services performed under this contract shall be based on boundary surveyed data as indicated on maps provided to the Contractor by USACE.

NOTE: Some boundary lines may proceed on a curved line with a specified radius between corner monuments. Some boundary corner monuments may be indicated as “Tie” lines or monuments, and the Contractor shall be familiar with properly reading survey maps and coordinates to properly maintain and mark these unique features of the boundary line.

a. Boundary Line Clearing:

i. The Contractor shall clear and maintain a four-foot (4’) wide by six-foot (6’) high line of sight by cutting all branches and trees three inches or less in diameter at breast height (DBH), and any brush intruding into this “line of sight” zone.

ii. All stumps shall be cut as close to the ground as conditions allow and no higher than three inches (3”) above the ground.

iii. Branches shall be cut back to the branch collar of the tree or shrub. To avoid tearing the bark on the main stem of the tree or shrub, branches may require starting the cut from the underside of the branch.

iv. Clearing is not required where the boundary is defined by roads, streams, or bodies of water.

v. Clearing is required along fencing and stone walls that define the boundary line.

vi. All cuttings shall be disposed onto USACE property and not left on abutters property, in trees, or piled on the ground within the “line of sight” zone.

vii. Cuttings will be spread out into the wooded area on USACE property at a minimum of ten-feet (10’) from the “line of sight” zone and shall not be piled higher than two-feet (2’) in height above the ground.

viii. A forester’s staff compass, or a sighting compass shall be the lowest order of instrumentation allowed for running the bounds between monuments.

b. Boundary Line Marking:

i. Paint markings shall be approximately five feet (5’) above the ground, with a blue spot at least four inches (4”) wide and six inches (6”) tall. See Exhibit 1.

ii. Paint Markings shall be made on USACE property and face the adjacent property unless the line goes directly through a tree where a “Center Blaze” marking shall be applied. See Exhibits 1 and 2.

iii. Paint and all supplies will be supplied by the Contractor.

iv. Painted trees shall be on USACE property. The painted tress may be on the boundary line (Line Trees = Center Blaze); on or within two feet (2’) of the boundary line (Quarter Blaze Trees = Quarter Blaze) or no more than four feet (4’) from the boundary line (Face Blaze Trees = Face Blaze). See Exhibits 1 and 2.

v. Line trees receiving a “Center Blaze” shall be marked on each side of the tree to represent the boundary line proceeding through the tree. See Exhibits 1 and 2.

vi. Quarter Blaze Trees receiving a “Quarter Blaze” shall be marked on the front “quarter sides” of the tree, resulting in two blazes on the single tree. See Exhibit 2.

vii. Where possible up to three (3) trees (Corner Trees) at each boundary corner (monument) will receive three (3) markings (Tri-Blaze), each one at least four inches (4”) wide and six inches (6”) tall. These markings shall be arranged vertically along the tree stem (See Exhibit 1).

viii. Paint markings for trees less than four inches (4”) DBH, shall coincide with tree diameter at DBH.

ix. Trees shall be painted as necessary to provide a blaze visible from each to the next at an interval not to exceed seventy-five feet (75’).

x. Boundary monuments (some metal, some concrete, some PVC, some on rocks, and all with bronze or metal survey discs) will receive a blue paint marking around the monument if room allows. The blue paint SHALL NOT cover the bronze or metal survey disc. See Exhibit 1.

c. Documentation and Reporting:

i. Fallen Trees: The Contractor shall document and report the location (latitude and longitude) and between which monuments, and size of any fallen trees on the boundary line that cannot be removed by hand.

ii. Encroachments: Any encroachment or suspected encroachment and any missing or broken boundary monuments observed shall be immediately reported to the Project Manager or TPOC. The Contractor shall also document and record the location (latitude and longitude) and between which monuments of any suspected encroachment and provide digital photos in .jpeg format that document the extent of the potential encroachment. An encroachment is defined the USACE Real Estate Encroachment Action Handbook as: any “unauthorized placement of improvements on (USACE) property by a non-Army party. An encroachment has occurred when the structure or improvement extends over, across, in, or upon lands in which the Government owns a real estate interest which would prohibit such, and the structure or improvement has not been approved. Structure or improvement means a permanent or semi-permanent facility, such as a habitable dwelling, building, fence, deck, porch, barn, outhouse, permanent storage building, road, pond, leach field and septic tank, utility line, levee, excavation, placement of fill material, oil, and gas well, mine entrance and tunnel. Also, unauthorized removal of government-owned real property components of economic value such as timber, sand, gravel, or embedded stone” is considered an encroachment. Any damage or disturbed USACE boundary lines such as to tree markings, fencing, stonewalls, or monuments, and any erosion caused by an abutter’s activity, or other form of destruction of Government property is considered an encroachment. All data collected for any encroachment shall be submitted to the TPOC.

iii. Monuments: The Contractor shall visually inspect and take digital photos in .jpeg format, of existing monuments and provide the TPOC a list of conditions of all monuments on site along with the corresponding photographs. The

Contractor shall make note of any missing or damaged monuments. Notes about the monument shall be written to include the physical condition of the monument itself (i.e., condition of disc, presence of monument, condition of any fiberglass posts, blue paint etc.) and submitted to the TPOC electronically by email.

NOTE: The Contractor shall be responsible for locating each monument, which may require the use of a metal detector for those monuments not immediately visible and/or by running bearings and distances from last known monuments in either direction of the boundary line back to a missing monument.

2. Restrictions:

a. Contractors SHALL NOT enter private property to access boundary locations without written permissions from the TPOC and landowner. All ingress and egress to and from the specified area(s) shall be through USACE property.

b. The Contractor SHALL NOT attempt to resolve any encroachments.

c. Monument Inspections and Documentation shall not occur during snow cover conditions.

d. Maps and data provided are for official use only and may not be shared.

3. Qualified Personnel:

a. Boundary Line Maintenance Work - To produce reliable results, the field crew must be composed by personnel who have the experience to properly implement a boundary line maintenance plan.

i. The Contractor must be familiar with boundary line inspections.

ii. The Contractor personnel must be familiar with reading and navigating from a survey map to properly conduct a boundary line inspection and services described herein.

iii. The personnel conducting the field work shall have three (3) years prior experience in conducting boundary line inspections and be able to locate and identify project monuments and potential encroachments.

4. Service Tasks:

a. Task 1 – Hopkinton Dam (BASE):

i. The service area is located between monument numbers (See Hopkinton Dam Area MAP #1 & #2) H-137 to H-160 approximately 10,840 feet, and H-480 to H-497 & H-511 to H-563 approximately 38,970 feet, and H-65 to H-82 approximately 6,750 feet.

a. Service Requirements (Hopkinton):

Boundary Line Clearing - approximately 56,560 feet (10.7 miles).

Boundary Line Marking - approximately 56,560 feet (same as above).

Documentation and Reporting – Approximately 120 Monuments

b. Task 2 – Drew Lake (OPTION 1):

i. The service area is located between monument numbers (See Drew Lake Area

MAP #3)

H-001 to H-036 approximately 13,400 feet, and H-585 to H-614 approximately 17,740 feet.

a. Service Requirements (Drew Lake):

Boundary Line Clearing - approximately 31,140 feet (5.9 miles).

Boundary Line Marking - approximately 31,140 feet (same as above).

Documentation and Reporting – Approximately 68 Monuments

c. Task 3 – Everett Dam (OPTION 2):

i. The service area is located between monument numbers (See Everett Dam Area

MAP #4)

E-101 to E-113 approximately 9,380 feet

a. Service Requirements (Everett):

Boundary Line Clearing - approximately 9,380 feet (1.7 miles).

Boundary Line Marking - approximately 9,380 feet (same as above).

Documentation and Reporting – Approximately 13 Monuments

Part 5 Service Locations:

1. Location:

The areas for the boundary line inspection and maintenance are located along the administrative lines located at the Hopkinton-Everett Lakes Project.

Hopkinton-Everett Lakes 2097 Maple Street Hopkinton, New Hampshire, 03229

a. Hopkinton Dam Boundary Sections (BASE): Located within the Town of Hopkinton, NH. (See Area Map #1, #2 and Road Maps #5 and #6)

b. Drew Lake Boundary Sections (Option 1): Located within the Towns of Hopkinton and Weare, NH. (See Area Map #3 and Road Map #6)

Everett Dam Boundary Sections (Option 2): Located within the Towns of Dunbarton and Weare, NH. (See Area Map #4 and Road Map #7)

ATTACHMENTS

PLEASE REFER TO MAPS AND EXHIBITS WITHIN THE SOLICITATION FOR ADDITIONAL

INFORMATION

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

U.S. ARMY CORPS OF ENGINEERS

HOPKINTON-EVERETT LAKES

Performance Work Statement

HOPKINTON DAM AREA MAP #1

MAP 1: Hopkinton Dam Area Map

HOPKINTON-EVERETT LAKES

HOPKINTON DAM AREA MAP #2

MAP 2: Hopkinton Dike Area Map

HOPKINTON-EVERETT LAKES

DREW LAKE AREA MAP #3

MAP 3: Drew Lake Area Map

HOPKINTON-EVERETT LAKES

EVERETT DAM AREA MAP #4

MAP 4: Everett Dam Area Map

HOPKINTON-EVERETT LAKES

HOPKINTON DAM AREA ROAD MAP #1

MAP 5: Hopkinton Dam Area Road Map

HOPKINTON-EVERETT LAKES

HOPKINTON DAM AND DREW LAKE ROAD MAP #2

MAP 6: Hopkinton Dam and Drew Lake Area Road Map

HOPKINTON-EVERETT LAKES

EVERETT DAM AREA ROAD MAP #3

MAP 7: Everett Dam Area Road Map

HOPKINTON-EVERETT LAKES

INFORMATIONAL DIAGRAM

Exhibit 1: Blaze Placement and Size with Orientation of USACE Boundary Line.

HOPKINTON-EVERETT LAKES

INFORMATIONAL DIAGRAM

Exhibit 2: Trees to be Blazed/Marked with Orientation of USACE Boundary Line.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and

Video Surveillance Services or Equipment

NOV 2021

52.212-1 Instructions to Offerors--Commercial Products and Commercial Services

MAR 2023

52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services

DEC 2022

52.217-5 Evaluation Of Options JUL 1990 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.223-1 Biobased Product Certification MAY 2012 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.225-25 Prohibition on Contracting with Entities Engaging in Certain

Activities or Transactions Relating to Iran-- Representation and Certifications.

JUN 2020

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.242-15 Stop-Work Order AUG 1989 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

JAN 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.204-7020 NIST SP 800-171 DoD Assessment Requirements JAN 2023 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.225-7048 Export-Controlled Items JUN 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial

Services

JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT

2020)

(a) Definitions. As used in this provision, “covered telecommunications equipment or services” and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.

(c) Representations.

(1) The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.

(2) After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.

(End of provision)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (DEC 2022) ALTERNATE I (OCT 2014)

The Offeror shall complete only paragraph (b) of this provision if the Offeror has completed the annual representations and certification electronically in the System for Award Management (SAM) accessed through https://www.sam.gov. If the Offeror has not completed the annual representations and certifications electronically, the Offeror shall complete only paragraphs (c) through (v) of this provision.

(a) Definitions. As used in this provision --

"Covered telecommunications equipment or…