REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ22Q0143 18-Aug-2022 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
SEE SCHEDULE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
07-Sep-2022(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
978-318-8324JENNIFER M SAMELA
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ22Q0143
Section B - Supplies or Services and Prices
INSTRUCTIONS TO OFFERORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or
JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT
WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE ATTENTION OF
JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE
GOVERNING DOCUMENT IN ALL CASES.
** QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT
JENNIFER.M.SAMELA@USACE.ARMY.MIL.
NOTE 1: In accordance with FAR Part 28.101-1(c), the Contractor will NOT be required to provide a Bid Guarantee.
NOTE 2: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 3: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 4:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company name:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL OFFERORS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS
PRICE ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job NBL Stop Log Replacement
FFP
Contractor shall furnish all labor, materials, and supplies necessary to remove and dispose of the wooden stop logs and replace with an aluminum stop log system at Northfield Brook Lake, Thomaston, CT in accordance with the Statement of Work.
FOB: Destination
PSC CD: Y1QA
NET AMT
0002 1 Job HNCK Stop Log Replacement
FFP
Contractor shall furnish all labor, materials, and supplies necessary to remove and dispose of the wooden stop logs and replace with an aluminum stop log system at Hancock Brook Lake, Plymouth, CT in accordance with the Statement of Work.
0003 1 Job HBL Stop Log Replacement
FFP
Contractor shall furnish all labor, materials, and supplies necessary to remove and dispose of the wooden stop logs and replace with an aluminum stop log system at Hop Brook Lake, Middlebury, CT in accordance with the Statement of Work.
Section C - Descriptions and Specifications
STATEMENT OF WORK
NRB TRI-PROJECT STOP LOG REPLACEMENT
U.S. ARMY CORPS OF ENGINEERS
NORTHFIELD BROOK LAKE, HOP BROOK LAKE AND
HANCOCK BROOK LAKE
THOMASTON, MIDDLEBURY, & PLYMOUTH, CT
I. General
1. Scope of Work - Furnish all equipment, materials, and labor to remove existing wood timber stop logs and replace with Aluminum Stop Log system at three (3) different flood control facilities in the Naugatuck River Basin, Northfield Brook Lake, Hop Brook Lake, and Hancock Brook Lake.
2. Location - The required work shall be performed at:
Northfield Brook Lake, 1550 Northfield Road, Thomaston, CT 06787 Hop Brook Lake, 4 Straits Turnpike, Middlebury, CT 06762 Hancock Brook Lake, Graystone Rd, Plymouth, CT 06782
3. Site Visit - Contact the Technical Point of Contact(TPOC) to arrange a site visit:
Brian Hornbecker Engineering Technician Naugatuck River Basin 100 Allerton Farms Road, Middlebury CT, 06762
(978) 318-8360 Email: brian.j.hornbecker@usace.army.mil
*A site visit is highly encouraged. Contractors will be responsible to self-verify all measurements and plans prior to fabrication and installation. The Government assumes no responsibility for errors in fabrication and installation if the Contractor fails to verify measurements.
4. Schedule – Work shall commence within 14 days of the issuance of Notice to Proceed, proceed diligently, and be completed within 180 days from Notice to Proceed . The projects area will be open to the Contractor Monday through Friday from 7:00 AM to 3:30 PM. All work must be done during those hours, unless additional hours are requested by the Contractor, in writing, and approved in writing by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety Requirements
a. General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b. Accident Prevention Plan:
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below in paragraph C. A non-mandatory, fillable APP template is available upon request. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A.
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
COVID 19: Procedures shall be documented in the Accident Prevention Plan and in the appropriate AHA’s to address site specific COVID-19 monitoring procedure which address at the minimum, the following items:
Contractor shall provide employees with and require them to use all required COVID- 19 related Personal Protective Equipment in accordance with the Center for Disease Control (CDC) and state guidelines.
Procedures shall be in place for periodic sanitation inspections and disinfecting of project sites and work areas in accordance with CDC guidelines.
Site specific procedures shall be in place to practice and promote appropriate social distancing while on site, when such procedures are practical.
Employees shall be trained in signs, symptoms, and protection measures in accordance with CDC guidelines.
c. Activity Hazard Analysis:
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
d. Emergency Response:
Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
e. Required Personnel:
The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.
In addition, when emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers onsite, at least 2 employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.
*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the characteristics of the project*
f. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.
6. Pre-Construction Conference:
Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Pre-Construction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Construction Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.
ii. Contractor’s Safety Program (including sub-contractors).
iii. Accident Prevention Plan and Activity Hazard Analysis (Submitted & accepted prior to start of work on site)-must be submitted with final revisions no later than 14 days after Notice to Proceed
iv. Accident Reporting (ENG Form 3394)
v. Safety Data Sheet (SDS) requirements
vi. Contractor’s Equipment
vii. Correspondence, Communication, Security and Administrative Procedures.
viii. Invoice and payment.
Work cannot begin until all safety paperwork is submitted and accepted by the Government.
7. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
8. Security - The contractor will comply with all established security policies at the project site locations. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.
9. Contractor’s Personnel:
a. Minimum Personnel Requirements The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.
b. Employee Conduct The Contractor shall be responsible for seeing that the firm’s employees strictly comply with all Federal (including CFR 36), State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.
i. Examples of unbecoming actions or conduct include but are not limited to the following:
ii. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, US Army Corps of Engineers (USACE) personnel, or other contractors
iii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other contractors.
iv. Unsafe operation of vehicles while on US Army Corps of Engineers property.
c. Removal of Contractor’s Employees The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, is incompetent, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
10. Payment - Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact.
The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the contractor may request progress payment.
All invoices to be submitted to the contact below:
Brian Hornbecker Engineering Technician Naugatuck River Basin 100 Allerton Farms Road, Middlebury CT, 06762
(978) 318-8360 Email: brian.j.hornbecker@usace.army.mil
II. Technical Requirements Part 1: General
1. Other Contracts: The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The Contractor shall not commit or permit any act, which will interfere with the performance of work by another Contractor, or by Government employees.
2. Preferred Sequence for Work Schedules: The Technical Point of Contact at each project shall provide the Contractor with a preferred sequence, or order, of work for their respective projects. (Note: The Contractor must provide sufficient personnel and equipment to accomplish this contract.) The Contractor will then be required to submit a work schedule and approximate times for beginning and ending. Any proposed change to an approved schedule must be submitted in writing, coordinated and approved by the Technical Point of Contact in advance of actual schedule changes.
3. Damage to Government and Private Property: - The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the Contractor’s actions. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the Contractors’ operation. Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the firm’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
5. Inspections
a) Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, herein.
b) General Inspection - Upon the completion of work the Contractor will inspect all areas under this contract to ensure compliance with the scope of work. The Contractor or his representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c) Equipment/Supplies Inspections - The Technical Point of Contact may inspect required equipment and, supplies at any time when in use on Government property. Equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
d) Receiving and Storing Materials - The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.
e) Cleanup - The Contractor shall practice good housekeeping to maintain a safe job site.
The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the government.
Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
e) Sustainability - The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio-based content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio-based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio-based content level requirements.
6. Submittals - Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the Government prior to the commencement of any field activities.
I. Accident Prevention Plan (APP) II. Activity Hazard Analysis (AHA)
III. Project Work Schedule IV. Installer Qualifications V. Manufacturer Qualifications
VI. First AID and CPR Certifications VII. Materials list
VIII. Shop Drawings IX. Proposed Work Plan
8. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
9. Requests for Information - Requests concerning the work of this contract after award should be directed to the Technical Point of Contact:
Brian Hornbecker Engineering Technician Naugatuck River Basin 100 Allerton Farms Road, Middlebury CT, 06762
(978) 318-8360 Email: brian.j.hornbecker@usace.army.mil
Part II: Service Requirement
1. Scope of Work to be Performed:
Northfield Brook Lake: Remove and properly dispose of twenty (20) timber stop logs from the Northfield Brook Lake inlet weir. Fabricate and install two (2) 71” W x 60”H Aluminum Grade 6061-T6 Guides, and twenty (20) 6”W x 6”H Aluminum Grade 6061-T6 Stop logs according to industry standards and manufacturers’ recommendations. Width of Stop Logs is approximate and would be based off the thickness of the guide and required grouting. Include all guides, hardware, labor, and materials for complete installation. As part of this item, the contractor will provide one (1) lifting tool, as required, that is specifically used to remove or insert the aluminum stop logs. The price for the lifting tool will be incorporated into the total quote price and not be considered as a separate item.
The new aluminum stop logs and guides will be placed within the existing recessed concrete stop log grooves and structures in accordance with manufacturers’ recommendations. The intent is to install the guides in such a manner that a recess of the concrete remains to aid in holding stop logs in place. No modification(s) to the existing structure, including, but not limited to, fully grouting the existing concrete stop log groove, may be made without prior written approval to and from the Technical Point of Contact.
Hop Brook Lake: Remove and properly dispose of thirty (30) timber stop logs from the Hop Brook Lake inlet weir. Please note that existing logs may be treated with chemicals and will need to be disposed of at an approved facility. Fabricate and install five (5) 71” W x 48”H Aluminum Grade 6061-T6 Guides, and thirty (30) 6”W x 6”H Aluminum Grade 6061-T6 Stop logs according to industry standards and manufacturers’ recommendations. Width of Stop Logs is approximate and would be based off the thickness of the guide and required grouting. Include all guides, hardware, labor, and materials for complete installation. As part of this item, the contractor will provide one (1) lifting tool, as required, that is specifically used to remove or insert the aluminum stop logs. The price for the lifting tool will be incorporated into the total quote price and not be considered as a separate item.
The new aluminum stop logs and guides will be placed within the existing recessed concrete stop log grooves and structures in accordance with manufacturers’ recommendations. The intent is to install the guides in such a manner that a recess of the concrete remains to aid in holding stop logs in place. No modification(s) to the existing structure, including, but not limited to, fully grouting the existing concrete stop log groove, may be made without prior written approval to and from the Technical Point of Contact.
Hancock Brook Lake: Remove and properly dispose of thirty-six (36) timber stop logs from the Hancock Brook Lake inlet weir. Please note that existing logs may be treated with chemicals and will need to be disposed of at an approved facility. Fabricate and install four (4) 67” W x 60”H Aluminum Grade 6061-T6 Guides, and thirty-six (36) 4” W x 4” H Aluminum Grade 6061-T6 Stop logs according to industry standards and manufacturers’ recommendations. Width of Stop Logs is approximate and would be based off the thickness of the guide and required grouting. Include all guides, hardware, labor, and materials for complete installation. As part of this item, the contractor will provide one (1) lifting tool, as required, that is specifically used to remove or insert the aluminum stop logs. The price for the lifting tool will be incorporated into the total quote price and not be considered as a separate item.
The new aluminum stop logs and guides will be placed within the existing recessed concrete stop log grooves and structures in accordance with manufacturers’ recommendations. The intent is to install the guides in such a manner that a recess of the concrete remains to aid in holding stop logs in place. No modification(s) to the existing structure, including, but not limited to, fully grouting the existing concrete stop log groove, may be made without prior written approval to and from the Technical Point of Contact.
*NOTE: All products shall be manufactured in accordance with Buy American requirements.
Products that do not meet these requirements will not be accepted and shall be replaced for products that do meet requirements at no additional cost to the Government.
Products will meet or exceed the following specifications:
Quality Assurance: The stop logs, guide frames and lifter shall be the product of a manufacturer having 5 years or more experience in the successful design and manufacture of low leakage stop logs under similar conditions. All welds shall be performed by welders with American Welding Society (AWS) certification.
Performance: Maximum allowable leakage for the stop logs shall be 0.05 gallons per minute per linear foot of wetted seal.
Technical Information: The stop log manufacturer shall be required to submit design calculations and supporting data for all logs showing stresses, loads and deflection for critical parts under design head conditions prior to commencement of work and ordering of materials.
Stop Logs: The stop logs shall be manufactured from aluminum extrusions, alloy 6061-T6. The extrusions shall have a minimum thickness of 5/16". Maximum bending stress shall not exceed 7600 psi at the maximum head. Each stop log shall be 6 inches high, identical, and designed to stack in any order. The stop logs shall have resilient lip-type seals that are attached along the sides and across the bottom with type 304 (type 316 optional) stainless steel fasteners. Any areas where stainless steel and aluminum touch (such as bolt heads) the contractor will use a marine grade polytetrafluoroethylene (PTFE), waterproof, anti-seize lubricant to further reduce any galvanic corrosion that would take place between the two different metals. Seals shall be located on the stop logs for easy inspection and easy replacement. Frame mounted seals are unacceptable. An engraved aluminum tag shall be welded to each log. Tag information shall include location and size of log.
Stop Log Guide: The stop log guide shall be constructed of extruded aluminum, alloy 6061-T6 (type 304 stainless steel, type 316 stainless steel or cast iron). The guide frames shall consist of two grooves and an invert member. The stop log groove shall be supplied with type
304 (type 316 optional) stainless steel anchor bolts for existing channel applications. The invert member shall be designed for minimum flow interference along the bottom of the channel. Any areas where stainless steel and aluminum touch (such as bolt heads) the contractor will use a marine grade PTFE, waterproof, anti-seize lubricant to further reduce any galvanic corrosion that would take place between the two different metals.
Stop Log Lifter: The lifter shall be constructed of aluminum, stainless steel, or steel with polyethylene guide bars and type 304 (type 316 optional) stainless steel fasteners. The lifter shall be capable of installing and removing all of the logs. Latching and unlatching of the logs shall be easily accomplished by personnel on the operating deck with the use of a lanyard. Any areas where stainless steel and aluminum touch (such as bolt heads) the contractor will use a marine grade PTFE, waterproof, anti-seize lubricant to further reduce any galvanic corrosion that would take place between the two different metals.
Locking Mechanism: Each set of stop logs shall have a mechanism for locking to ensure security and prevent vandalism. This mechanism will be located at the top stop log and will be secured with a padlock. The government will provide two (2) padlocks to serve this purpose.
Painting: All aluminum in contact with concrete shall be field coated by the Contractor with a heavy coat of bitumastic paint. Welds on aluminum shall be cleaned to provide a uniform finish.
All concrete surfaces which will come in contact with aluminum products will be thoroughly cleaned and properly prepared in accordance with the paint manufacturers’ recommendations.
2. Existing Conditions:
Northfield Brook Lake: There are currently two (2) sets of ten (10), 71 inches long x 6-inch x 6-inch timber stop logs in a concrete stop log groove.
Hop Brook Lake: There are currently five (5) sets of six (6), 71 inches long x 6-inch x 6-inch timber stop logs in a concrete stop log groove, held in by wood wedges.
Hancock Brook Lake: There are currently four (4) sets of nine (9), 67 inches long x 4-inch x 4-inch timber stop logs in a concrete stop log groove, held in by wood wedges.
ATTACHMENTS
PLEASE REFERENCE THE ATTACHMENTS EITHER INCLUDED IN THIS SOLICITATION OR AS A
SEPARATE FILE FOR ADDITIONAL INFORMATION.
NRB TRI-PROJECT STOP LOG REPLACEMENT
U.S. ARMY CORPS OF ENGINEERS
NORTHFIELD BROOK LAKE, HOP BROOK LAKE AND
HANCOCK BROOK LAKE
THOMASTON, MIDDLEBURY, & PLYMOUTH, CT
INFORMATIONAL PHOTOS FOR NORTHFIELD BROOK
Stop Log Wier (stop logs removed)
INFORMATIONAL PHOTOS FOR HOP BROOK
INFORMATIONAL PHOTOS FOR HOP BROOK
INFORMATIONAL PHOTOS FOR HANCOCK BROOK
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 180 dys. ANP 1 NORTHFIELD BROOK
STEVEN PATCHKOFSKY
CONN. ROUTE 254
THOMASTON CT 06787
978-318-8369
961113
0002 180 dys. ANP 1 HANCOCK BROOK
DIANA ERRICO-TOPOLSKI
4 STRAITS TURNPIKE
MIDDLEBURY CT 06762
978-318-8370
961105
0003 180 dys. ANP 1 HOP BROOK LAKE PROJECT OFFICE
DIANA ERRICO-TOPOLSKI
4 STRAITS TURNPIKE
MIDDLEBURY CT 06762
203-729-8370
961105
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures –this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
WAGE DETERMINATION
General Decision Number: CT20220019 07/08/2022
Superseded General Decision Number: CT20210019
State: Connecticut
Construction Type: Building
County: Litchfield County in Connecticut.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022
2 02/25/2022 3 04/29/2022 4 05/13/2022 5 06/03/2022 6 06/17/2022 7 07/08/2022
ASBE0033-002 06/01/2022
Rates Fringes
HEAT & FROST INSULATOR
(Includes Duct, Pipe and Mechanical Systems)..............$ 44.57 31.79
CARP0326-031 05/02/2022
Rates Fringes
CARPENTER (Includes Form Work)...$ 36.07 26.15
ELEC0488-013 06/01/2022
Rates Fringes
ELECTRICIAN......................$ 41.40 3%+31.07
* IRON0015-009 06/01/2022
Rates Fringes
IRONWORKER (Reinforcing, Structural)......................$ 39.70 38.77
LABO0665-001 04/03/2022
Rates Fringes
LABORER (Common or General)......$ 32.00 24.40
PAIN0011-021 06/01/2021
Rates Fringes
PAINTER (Brush and Roller).......$ 36.42 22.90
* ROOF0009-001 06/01/2021
Rates Fringes
ROOFER
Composition.................$ 38.90 21.85 Slate and Tile..............$ 39.40 21.85
* SHEE0038-007 07/01/2022
Rates Fringes
SHEET METAL WORKER (Including Metal Flashing)..................$ 48.77 45.19
SUCT2016-001 09/19/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.36 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: CT20220023 07/08/2022
Superseded General Decision Number: CT20210023
State: Connecticut
Construction Type: Building
County: New Haven County in Connecticut.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract.