REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ22Q0132 25-Jul-2022
5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
SEE SCHEDULE
IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NO TE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ] FOB
DESTINATION
[ ] OTHER X
(See Schedule)
10-Aug-2022(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
978-318-8324JENNIFER M SAMELA
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ22Q0132
Section B - Supplies or Services and Prices
INSTRUCTIONS TO OFFERORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or
JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT
WHICH CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF
JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE
GOVERNING DOCUMENT IN ALL CASES.
**QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT
JENNIFER.M.SAMELA@USACE.ARMY.MIL.
NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting
Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the
Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the
Contracting Officer within 10 days after receipt of award.
NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting
Officer within 10 days after receipt of award.
**No Payment Protections Required for construction contracts less than $35,000**
NOTE 3:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company names:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award
Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration mailto:JENNIFER.M.SAMELA@USACE.ARMY.MIL http://www.sam.gov/
(CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS
PRICE ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST
BE CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
BID SCHEDULE
Woonsocket Falls Dam Electric Motor Replacement
U.S. Army Corps of Engineers
Woonsocket Flood Reduction Project
Woonsocket, RI
Bid Schedule
Task/Item Number Unit Quantity Unit Price Each Total
Woonsocket Falls Dam Electric
Motor Replacement
-Four (4) Motor Replacements
Each 1 $ $
Total $ http://www.sam.gov/ https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update http://www.sam.gov/
Section C - Descriptions and Specifications
STATEMENT OF WORK
U.S. Army Corps of Engineers
Woonsocket Flood Reduction Project
Woonsocket, RI
Statement of Work
I. General
1. Scope
Furnish all equipment, materials, and labor for the Woonsocket Falls Dam Electric Motor
Replacement located at the Woonsocket Flood Reduction Project, Woonsocket, RI.
2. Location
The required services shall be performed at the following project site location:
121 South Main Street Woonsocket, Rhode Island.
3. Site Visit and Requests for Information
Contact the Technical Point of Contact (TPOC), Jason Monteiro (978) 318-8312 or
Jason.T.Monteiro@usace.army.mil to arrange a site visit.
4. Schedule
Contractor shall commence work within 14 days after issuance of the Notice to Proceed, prosecute work diligently, and complete all work ready for use no later than 180 days after Notice to Proceed. The project area will be open to the contractor Monday through
Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety
a) General:
All work shall be conducted in accordance with the U.S. Army Corps of Engineers
Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/E
M_385- 1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
b) Accident Prevention Plan:
mailto:Jason.T.Monteiro@usace.army.mil http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-%201-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-%201-1.pdf
The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable APP template is available upon request.
However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385- 1-1, Appendix A.
A preparatory meeting shall be conducted by the prime contractor to discuss the APP contents with all effected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
Weekly safety meetings shall be held and documented. Records shall be available to the Technical Point of Contact upon request.
c) Activity Hazard Analysis:
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
COVID-19 NOTE: As part of the APP and AHA’s, include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:
• Procedures for periodic sanitation inspections.
• Procedures for disinfecting project sites in accordance with Centers for Disease
Control (CDC) guidelines.
• Site specific measures to practice social distancing while working on the project.
• Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.
• A list of Personal Protective Equipment (PPE) to be used in accordance with CDC and state guidelines.
d) Emergency Response:
Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
e) Required Personnel:
The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The
SSHO is required to have related construction experience and have at a minimum completed a 10 Hour OSHA training.
In addition, when emergency medical services are not accessible within 5 minutes of the work location and there are 2 or more workers onsite, at least 2 employees shall have (in- person) training in First Aid and CPR. Minimum qualifications are listed in
EM 385-1-1, Section 03.A.02.c.
*Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Scope of Work, based on the characteristics of the project*
f) Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC.
ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.
6. Electrical
a) General: All electrical work shall comply with EM 385-1-1 (Sections 11 &
12) and applicable National Electrical Safety Code (NESC), National Electric Code
(NEC), National Fire Protection Association (NFPA), OSHA and USCG regulations.
In the circumstance there is a discrepancy between the codes and regulations listed above, the most stringent shall apply.
b) Qualified Person: Electrical work shall be performed by a Qualified Person (QP) with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a
Master or Journeyman Electrician may hold, depending on the work being performed, and should be identified in the appropriate AHA. Journeyman/Apprentice ration shall be in accordance with state, local and federal requirements applicable to where the work is being performed.
c) All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used. Appropriate
PPE will be worn and/or always utilized and adequately match the level of associated risk.
d) Emergency Procedures and Training. Employees exposed to shock hazard and those employees responsible for acting in case of emergency shall be trained in accordance with EM 385-1-1 Section 03.A, OSHA 29 CFR 1910.151, and NEPA 70E 110.2c.
The training shall include methods to release of victims from contact with exposed energized electrical conductors or circuit parts. Employees shall be regularly instructed in methods of first aid and emergency procedures, such as approved methods of resuscitation.
e) All equipment and circuits to be worked on shall be de-energized before work is started. Personnel shall be protected by a Hazardous Energy Control Program (HECP) and procedures in accordance with EM 385-1-1, Section 12. Positive means shall be provided for rendering controls or devices inoperative while repairs or adjustments are being made to the machines they control.
f) If work MUST be performed on an energized system, then the employer must first demonstrate that de-energizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations (i.e., testing, troubleshooting, etc.).
a. Energized work may never be performed without prior authorization. Once it has been determined that equipment must be worked on in an energized condition, an energized work permit shall be submitted to the Technical Point of Contact for acceptance. > See NFPA 70E and EM 385-1-1, Section
11.A.02.c for permit requirements.
7. Preconstruction Conference
Prior to the start of any site work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality
Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No site work may be performed under this contract prior to this conference. The purpose of the conference is to enable the
Technical Point of Contact to outline the procedures that will be followed by the
Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the
Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Preconstruction
Conference:
•Authority of the Technical Point of Contact.
•Contractor’s Safety Program (including sub-contractors).
•Accident Prevention Plan and Activity Hazard Analysis.
•Weekly Safety Meetings (Documented on NED Form 251)
•Accident Reporting (ENG Form 3394)
•Safety Data Sheet (SDS) requirements
•Correspondence, Communication and Administrative Procedures.
•Invoice and payment.
8. Permits
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable federal, state, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
9. Security
The contractor will comply with all established security policies at the Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the
Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24-hour notice of any such closure.
10. Payment
Payment shall be made on a per job basis. After final inspection and acceptance by the
Government, the Contractor must submit an invoice and a completed, signed US Army
Corps of Engineers ENG93 form to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item. For jobs greater than 30 days the contractor may request progress payment.
Invoice/Forms shall be mailed to:
US Army Corps of Engineers
518 East Hartford Ave., Uxbridge, MA 01569-1209 or emailed to Jason.T.Monteiro@usace.army.mil or faxed to the office at (508) 278-4234.
11. Damage to Government and Private Property
The Contractor shall be responsible for restoring any Government facilities or structures damaged because of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person because of the firm’s operations. The
Contractor shall notify the Technical Point of Contact immediately of damage to
Government and private property and injury to any person resulting from the firms’ operation.
12. Point of Contact Requirements mailto:Jason.T.Monteiro@usace.army.mil
The Contractor shall provide to the Technical Point of Contact a telephone number and a point of contact for discussion of any contractual matters.
II. Technical
Submittals:
Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be prosecuted using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of
Contact for review and accepted by the government prior to the commencement of any field activities.
•Product specification sheets and cut sheets for materials.
•Product specification sheets and cut sheets for all associated hardware.
•Manufacturer Warranty for any equipment and hardware.
•Accident Prevention Plan and Activity Hazard Analysis
Clean Up:
The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.
Government Resources:
The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources.
Omissions:
This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
Quality Assurance:
The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
Other Contracts:
The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and
Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.
Environmental Protection:
Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned daily. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.
Sustainability
All products provided by the contractor must meet the recycled content requirements set forth by the Environmental Protection Agency. Under the Comprehensive Procurement
Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels. Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
Receiving and Storing Materials:
The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods.
Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.
General:
Existing Conditions:
Woonsocket Falls Dam was completed in 1959. Woonsocket Falls Dam utilizes four tainter gates which are operated by electric motors. The electric motors will be replaced, and the associated gearing may need to be retrofitted to accommodate new motors.
Existing Motor Specifications:
Westinghouse 3HP, 1615 RPM, 225 Frame, 3 Phase, 60 Cycle, 208 VAC, Totally
Enclosed Fan Cooled (TEFC), Direct Drive (Informational Photo #1)
Products:
Electrical and mechanical components will meet or exceed national electrical code specifications. All electrical components will operate on existing commercial and backup generator systems.
1. Electric Motors (x4):
a. Shall be compatible with existing tainter gate mechanicals
b. Shall be operated on existing three phase electrical power
c. Shall operate four existing 50 ft. x 10.1 ft. tainter gates
d. Shall be rated for a corrosive and wet environment
e. Shall be of the totally enclosed type
f. Shall operate in temperature range of -20 to +150 degrees Fahrenheit
g. Shall have low maintenance requirements
h. Shall have heaters to prevent moisture in outdoor housing
i. Shall have manufacturer’s warranty https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-
j. Shall replace wiring from electric motor to control panel- Wiring shall meet
National Electrical Code (NEC) standards
k. Shall be rated for continuous duty
2. Electric Motor Mounting System:
a. May need to be retrofitted to accommodate new electric motor
b. Shall meet or exceed existing install standard
Execution:
Electric motor replacement shall occur in accordance with the scope of work, local, federal laws, and the National Electric Code. One electric motor shall be worked on and completed before moving to the next electric motor. Sequence of replacement will be approved by the technical point of contact.
1. Before any electric motor is taken out of service, the schedule and work must be approved by the technical point of contact.
2. Work area will be restricted to contractors and USACE Employees.
3. One electric motor will be taken out of service, work completed, tested, and accepted by TPOC before the next electric motor is worked on.
4. All items removed in this contract will be disposed of properly off site.
5. Replacement of electric motor
a. Lock out and Tag Out electric power
b. Disconnect and remove wiring at the motor and at the control panel
c. Remove electric motor
d. Install new electric motor
e. Connect motor to gearing for tainter gates, ensure a proper connection
f. Install new wiring from the motor to the control panel
g. Shall provide baseline megohm readings and efficiencies
6. Testing of electric motor with Technical Point of Contact present
a. Raise Gate from closed position to 6 feet at 1-foot increments
b. Measure and Record Amperage readings when the motor is at rest and in operation
c. Lower Gate to closed position
d. Repeat test under generator load
e. Motor shall operate to the satisfaction of the Technical Point of Contact.
Any required adjustments will be performed by the Contractor at no additional cost to the Government.
7. Repeat above steps for all four electric motors
8. Contractor is responsible for the cleanup of the site.
ATTACHMENTS
PLEASE REFER TO THE ATTACHMENTS INCLUDED WITH THIS SOLICITATION FOR ADDITIONAL
INFORMATION.
U.S. Army Corps of Engineers
Woonsocket Flood Reduction Project
Woonsocket, RI
Informational Photos
Informational Photo # 1: Existing Motor Nameplate
Informational Photo # 2: Overview of Existing Motor and Gearing Setup
Informational Photo # 3: Existing connection between electric motor and trunnion gate gearing.
Informational Photo # 4: Overview of Woonsocket Falls Dam
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical
Point of Contact NLT 5 calendar days after the completion of the training.
WAGE DETERMINATION
General Decision Number: RI20220001 06/24/2022
Superseded General Decision Number: RI20210001
State: Rhode Island
Construction Types: Building, Heavy (Heavy and Marine) and
Highway
Counties: Rhode Island Statewide.
BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE
CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $15.00 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2022. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $11.25 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date
0 01/07/2022
1 01/21/2022
2 02/18/2022
3 02/25/2022
4 04/01/2022
5 05/06/2022
6 05/27/2022
7 06/03/2022
8 06/24/2022
ASBE0006-006 06/01/2022
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging
& disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 38.30 25.55
ASBE0006-008 09/01/2021
Asbestos Worker/Insulator
Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 45.00 32.89
BOIL0029-001 01/01/2021
BOILERMAKER......................$ 45.87 29.02
BRRI0003-001 06/01/2020
Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 42.55 28.02
BRRI0003-002 03/01/2020
Marble Setter, Terrazzo
Worker & Tile Setter.............$ 40.78 28.92
BRRI0003-003 03/01/2020
Marble, Tile & Terrazzo
Finisher.........................$ 34.10 27.88
* CARP0330-001 06/05/2022
CARPENTER (Includes Soft
Floor Layer).....................$ 41.46 28.82
Diver Tender.....................$ 40.72 28.66
DIVER............................$ 53.61 28.82
Piledriver.......................$ 39.72 28.66
WELDER...........................$ 42.46 28.82
FOOTNOTES:
When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.
Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.
Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.
The designated piledriver, known as the ""monkey"": $1.00 per hour additional.
CARP1121-002 01/06/2020
MILLWRIGHT.......................$ 39.07 29.15
* ELEC0099-002 06/01/2022
ELECTRICIAN......................$ 45.86 52.71%
Teledata System Installer........$ 34.40 12.10%+15.12
Work of a hazardous nature, or where the work height is 30
ft. or more from the floor, except when working
OSHA-approved lifts: 20% per hour additional.
Work in tunnels below ground level in combined sewer outfall:
20% per hour additional.
ELEV0039-001 01/01/2022
ELEVATOR MECHANIC................$ 56.91 36.885+a+b
A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0057-001 06/01/2022
Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work)
GROUP 1.....................$ 43.55 29.25+a
GROUP 2.....................$ 41.55 29.25+a
GROUP 3.....................$ 37.17 29.25+a
GROUP 4.....................$ 34.32 29.25+a
GROUP 5.....................$ 40.60 29.25+a
GROUP 6.....................$ 31.40 29.25+a
GROUP 7.....................$ 25.40 29.25+a
GROUP 8.....................$ 37.25 29.25+a
GROUP 9.....................$ 41.17 29.25+a
a. BOOM LENGTHS, INCLUDING JIBS:
150 feet and over + $ 2.00
180 feet and over + $ 3.00
210 feet and over + $ 4.00
240 feet and over + $ 5.00
270 feet and over + $ 7.00
300 feet and over + $ 8.00
350 feet and over + $ 9.00
400 feet and over + $10.00
a. PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works
3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTES:
Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, lighters, boom trucks and derricks
GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.
and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.
GROUP 3: Oilers on cranes.
GROUP 4: Oiler on crawler backhoe.
GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).
GROUP 6: Well-point installation crew.
GROUP 7: Utility Engineers and Signal Persons
GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.
GROUP 9: Boat & tug operator.
ENGI0057-002 05/01/2022
Power Equipment Operator
(highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water)
GROUP 1....................$ 36.70 29.25+a
GROUP 2....................$ 31.40 29.25+a
GROUP 3....................$ 25.40 29.25+a
GROUP 4....................$ 31.98 29.25+a
GROUP 5....................$ 35.68 29.25+a
GROUP 6....................$ 35.30 29.25+a
GROUP 7....................$ 30.95 29.25+a
GROUP 8....................$ 32.33 29.25+a
GROUP 9....................$ 34.28 29.25+a
a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial
Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats
GROUP 2: Well point installation crew
GROUP 3: Utlity engineers and signal persons
GROUP 4: Oiler on cranes
GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats
GROUP 6: Roller,skid steer loaders, street sweeper
GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor
GROUP 8: Stone crusher
GROUP 9: Mechanic & welder
ENGI0057-003 06/01/2022
BUILDING CONSTRUCTION
Power Equipment Operator
GROUP 1....................$ 42.82 29.25+a
GROUP 2....................$ 40.82 29.25+a
GROUP 3....................$ 40.60 29.25+a
GROUP 4....................$ 36.60 29.25+a
GROUP 5....................$ 33.75 29.25+a
GROUP 6....................$ 39.90 29.25+a
GROUP 7....................$ 39.47 29.25+a
GROUP 8....................$ 36.79 29.25+a a.BOOM LENTHS, INCLUDING JIBS:
150 ft. and over: + $ 2.00
180 ft. and over: + $ 3.00
210 ft. and over: + $ 4.00
240 ft. and over: + $ 5.00
270 ft. and over: + $ 7.00
300 ft. and over: + $ 8.00
350 ft. and over: + $ 9.00
400 ft. and over: + $10.00
a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial
Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.
a. FOOTNOTE: Hazmat work: $2.00 per hour additional.
Tunnel/Shaft work: $5.00 per hour additional.
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Cranes, lighters, boom trucks and derricks.
GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck
GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant
GROUP 4: Fireman & oiler on cranes
GROUP 5: Oiler on crawler backhoe
GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)
GROUP 7: Well point installation crew
GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor
IRON0037-001 09/16/2021
IRONWORKER.......................$ 38.21 30.58
LABO0271-001 05/30/2021
LABORER
GROUP 1.....................$ 33.55 26.15
GROUP 2.....................$ 33.80 26.15
GROUP 3.....................$ 34.30 26.15
GROUP 4.....................$ 34.55 26.15
GROUP 5.....................$ 35.55 26.15
LABORERS CLASSIFICATIONS
GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement
Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]
GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail
Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone
Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder
Operator
GROUP 3: Pre-Cast Floor & Roof Plank Erectors
GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered
Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster
GROUP 5: Toxic Waste Remover
LABO0271-002 05/30/2021
HEAVY AND HIGHWAY CONSTRUCTION
LABORER
COMPRESSED AIR
Group 1....................$ 53.45 24.15
Group 2....................$ 50.98 24.15
Group 3....................$ 40.50 24.15
FREE AIR
Group 1....................$ 44.05 24.15
Group 2....................$ 43.05 24.15
Group 3....................$ 40.50 24.15
LABORER
Group 1....................$ 33.55 24.15
Group 2....................$ 33.80 24.15
Group 3....................$ 34.55 24.15
Group 4....................$ 27.05 24.15
Group 5....................$ 35.55 24.15
OPEN AIR CAISSON,
UNDERPINNING WORK AND
BORING CREW
Bottom Man.................$ 39.55 24.15
Top Man & Laborer..........$ 38.60 24.15
TEST BORING
Driller....................$ 40.00 24.15
Laborer....................$ 38.60 24.15
LABORER CLASSIFICATIONS
GROUP 1: Laborer; Carpenter tender; Cement finisher tender;
Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries
GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;
Pipelayer; Pipe trench bracer
GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster
GROUP 4: Flagger & signaler
GROUP 5: Toxic waste remover
LABORER - COMPRESSED AIR CLASSIFICATIONS
GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air
GROUP 2: Change house attendant, powder watchperson, top person on iron
GROUP 3: Hazardous waste work within the ""HOT"" zone
LABORER - FREE AIR CLASSIFICATIONS
GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator
GROUP 2: Change house attendant, powder watchperson
GROUP 3: Hazardous waste work within the ""HOT"" zone
PAIN0011-005 06/01/2021
PAINTER
Brush and Roller............$ 36.42 22.90
Epoxy, Tanks, Towers, Swing Stage & Structural
Steel.......................$ 38.42 22.90
Spray, Sand & Water
Blasting....................$ 39.42 22.90
Taper.......................$ 37.17 22.90
Wall Coverer................$ 36.92 22.90
PAIN0011-006 06/01/2021
GLAZIER..........................$ 39.98 22.90
SWING STAGE: $1.00 per hour additional.
PAID HOLIDAYS: Labor Day & Christmas Day.
* PAIN0011-011 06/01/2022
Painter (Bridge Work)...........$ 55.00 23.75
PAIN0035-008 06/01/2011
Sign Painter.....................$ 24.79 13.72
PLAS0040-001 06/03/2019
CEMENT MASON/CONCRETE FINISHER...$ 36.00 27.15
FOOTNOTE: Cement Mason: Work on free swinging scaffolds under
3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.
PLAS0040-002 07/01/2019
CEMENT MASON/CONCRETE FINISHER...$ 32.85 22.20
PLAS0040-003 07/01/2019
PLASTERER........................$ 37.55 27.50
PLUM0051-002 08/30/2021
Plumbers and Pipefitters.........$ 46.49 31.40
ROOF0033-004 12/01/2021
ROOFER...........................$ 40.40 29.06
SFRI0669-001 04/01/2022
SPRINKLER FITTER.................$ 47.55 29.38
SHEE0017-002 12/01/2020
Sheet Metal Worker...............$ 38.58 36.73
TEAM0251-001 05/01/2022
TRUCK DRIVER
GROUP 1....................$ 28.46 32.10+A+B+C
GROUP 2....................$ 28.61 $ 32.10+A+B+C
GROUP 3....................$ 28.66 $ 32.10+A+B+C
GROUP 4....................$ 28.71 $ 32.10+A+B+C
GROUP 5....................$ 28.81 $ 32.10+A+B+C
GROUP 6....................$ 29.21 $ 32.10+A+B+C
GROUP 7....................$ 29.41 $ 32.10+A+B+C
GROUP 8....................$ 28.91 $ 32.10+A+B+C
GROUP 9....................$ 29.16 $ 32.10+A+B+C
GROUP 10....................$ 28.96 $ 32.10+A+B+C
A. Paid Holidays: New Year's Day, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day and Christmas Day, plus
Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.
B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.
C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars
($500.00)
All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.
TRUCK DRIVER CLASSIFICATIONS
GROUP 1: Pick-up trucks, station wagons, & panel trucks
GROUP 2: Two-axle on low beds
GROUP 3: Two-axle dump truck
GROUP 4: Three-axle dump truck
GROUP 5: Four- and five-axle equipment
GROUP 6: Low-bed or boom trailer.
GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)
GROUP 8: Special earth-moving equipment, under 35 tons
GROUP 9: Special earth-moving equipment, 35 tons or over
GROUP 10: Tractor trailer
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination.