FRANKLIN FALLS DAM PROJ
TIA MERCER
46 GRANITE DRIVE
FRANKLIN NH 03235-0340
TEL: (978) 318-8323 FAX:
W13G86207377430001
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W912WJ22Q0099 11-Apr-2022 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this
Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. %
NOTE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
U S ARMY ENGR DISTRICT, NEW ENGLAND
696 VIRGINIA RD
CONCORD MA 01742-2751
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
27-Apr-2022(Date)
PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
978-318-8324JENNIFER M SAMELA
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W912WJ22Q0099
Section B - Supplies or Services and Prices
INSTRUCTIONS TO OFFERORS
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27
FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or
JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT
WHICH CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF
JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE
GOVERNING DOCUMENT IN ALL CASES.
**QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT
JENNIFER.M.SAMELA@USACE.ARMY.MIL.
NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.
(i) Payment Bond or
(ii) Irrevocable Letter of Credit and
(iii) Performance Bond
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.
NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.
(i) Payment bond or
(ii) Irrevocable letter of credit
A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.
**No Payment Protections Required for construction contracts less than $35,000**
NOTE 3:
QUOTATION INSTRUCTIONS:
1. If subcontractor will be used for this work, please provide company names:
2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration
(CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.
NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.
In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.
3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).
4. Provide business CAGE code: __________________________________
5. Tax Identification Number: ___________________________________
6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).
7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.
POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE
ALONE.
ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE
CONSIDERED BY THE AGENCY.
INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Install Ten (10) Emergency Battery Units
FFP
Contractor shall furnish all labor, materials, supplies, and equipment necessary to install ten (10) emergency battery units on the main floor and subfloor of the Franklin Falls Dam Gatehouse in accordance with the Statement of Work.
FOB: Destination
MILSTRIP: W13G8620737743
PURCHASE REQUEST NUMBER: W13G86207377430001
PSC CD: Y1QA
NET AMT
0002 1 Job Install One (1) LED Wall Pack
FFP
Contractor shall furnish all labor, materials, supplies, and equipment necessary to remove one (1) HID flood light and install one (1) LED wall pack at the Franklin Falls Dam Gatehouse in accordance with the Statement of Work.
FOB: Destination
MILSTRIP: W13G8620737743
0003 1 Job Install One (1) Illuminated Exit Sign
FFP
Contractor shall furnish all labor, materials, supplies, and equipment necessary to install one (1) illuminated exit sign at the Franklin Falls Dam Gatehouse in accordance with the Statement of Work.
FOB: Destination
MILSTRIP: W13G8620737743
Section C - Descriptions and Specifications
STATEMENT OF WORK
GATEHOUSE EMERGENCY LIGHTING INSTALLATION
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS DAM
FRANKLIN, NEW HAMPSHIRE
Statement of Work I. General:
1. Scope – Furnish all labor, materials, and equipment necessary to install a total of ten (10) light emitting diode (LED) emergency lighting units with battery backup in the main entry level and subfloor, one (1) illuminated exit sign, and replace one (1) existing high intensity discharge (HID) exterior wall pack with a LED wall pack. Emergency battery units shall be wired to the nearest lighting circuit ahead of any switch leg. Emergency battery units are to be installed for the purpose of safety and shall automatically come on when utility power is cut, turn off when power is returned either by generator or the utility power, and be adequately charging when in standby mode. The one LED wall pack shall be wired and equipped with a photocell sensor.
2. Location – The Franklin Falls Dam Project Office is located at 46 Granite Drive in Franklin, New Hampshire 03235.
3. Site Visit – Contact the Technical Point of Contact (TPOC) to arrange a site visit. The
Technical Point of Contact for the project is Tia Mercer (978-318-8323, 603-230-0812 or tia.m.mercer@usace.army.mil).
4. Schedule – The work shall be completed no later than 120 days from Contract award. Work shall be performed Monday through Friday 7:00 AM to 3:00 PM unless otherwise approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.
5. Safety Requirements – All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385- 1-1.pdf
Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.
a. Abbreviated Accident Prevention Plan:
The Contractor shall prepare an Abbreviated Accident Prevention Plan (AAPP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described below. A non-mandatory, fillable AAPP template is available upon request.
However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements of EM 385-1-1, Appendix A, Section K.
A preparatory meeting shall be conducted by the prime contractor to discuss the AAPP contents with all effected onsite employees. The Prime Contractor is responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.
b. Activity Hazard Analysis:
An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work.
The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.
COVID-19 NOTE: As part of the AAPP and AHAs include site specific COVID-19 monitoring procedures which address, at a minimum, the following elements:
Procedures for periodic sanitation inspections.
Procedures for disinfecting project sites in accordance with Centers for
Disease Control and Prevention (CDC) guidelines.
Site specific measures to practice social distancing while working on the project.
Employee training on the signs, symptoms, and protection measures in accordance with CDC guidelines.
A list of Personal Protective Equipment (PPE) to be used in accordance with CDC and state guidelines.
c. Emergency Response:
Emergency procedures shall be documented in the Accident Prevention Plan and will include a map with directions to the nearest hospital, emergency contact numbers, and onsite First Aid/CPR responders.
d. Required Personnel:
The Contractor shall employ a minimum of one Competent Person (CP) at each project site to function as the Site Safety and Health Officer (SSHO). The SSHO shall be present at the project site and report to the contractor’s upper management. The SSHO is required to have related construction experience and have at a minimum completed a 30 Hour OSHA training.
In addition, when emergency medical services are not accessible within five (5) minutes of the work location and there are two (2) or more workers onsite, at least two (2) employees shall have (in-person) training in First Aid and CPR. Minimum qualifications are listed in EM 385-1-1, Section 03.A.02.c.
Note: Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Statement of Work, based on the characteristics of the project
e. Accident Reporting:
All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses, and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the TPOC within four (4) hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the TPOC. ENG Form 3394 shall be completed and submitted to the TPOC within five (5) working days of the incident.
The Contractor shall compile employee work hours (including subcontractors) and forward the total hours to the TPOC no later than close of business on the 10th calendar day of the following month. The method of transmission by the prime contractor to the TPOC shall be electronically.
6. Specific Safety Section-Electrical:
a. General: All electrical work shall comply with EM 385-1-1 (Sections 11 & 12) and applicable National Electrical Safety Code (NESC), National Electric Code (NEC), National Fire Protection Association (NFPA), OSHA and USCG regulations. In the circumstance there is a discrepancy between the codes and regulations listed above, the most stringent shall apply.
b. Qualified Person: Electrical work shall be performed by a Qualified Person (QP) with verifiable credentials who are familiar with applicable code requirements. Verifiable credentials consist of State, National and/or Local Certifications or Licenses that a Master or Journeyman Electrician may hold, depending on the work being performed, and should be identified in the appropriate AHA. Journeyman/Apprentice ration shall be in accordance with State, Local and Federal requirements applicable to where the work is being performed.
c. All electrical wiring and equipment shall be a type listed by a nationally recognized testing laboratory for the specific application for which it is to be used. Appropriate PPE will be worn and/or utilized at all times and adequately match the level of associated risk.
d. Emergency Procedures and Training. Employees exposed to shock hazard and those employees responsible for taking action in case of emergency shall be trained in accordance with EM 385-1-1 Section 03.A, OSHA 29 CFR 1910.151, and NEPA 70E
110.2c. The training shall include methods to release of victims from contact with exposed energized electrical conductors or circuit parts. Employees shall be regularly instructed in methods of first aid and emergency procedures, such as approved methods of resuscitation.
e. All equipment and circuits to be worked on shall be de-energized before work is started.
Personnel shall be protected by a Hazardous Energy Control Program (HECP) and procedures in accordance with EM 385-1-1, Section 12. Positive means shall be provided for rendering controls or devices inoperative while repairs or adjustments are being made to the machines they control.
f. If work MUST be performed on an energized system, then the employer must first demonstrate that de-energizing introduces additional or increased hazards or is infeasible due to equipment design or operational limitations (i.e., testing, troubleshooting, etc.).
i. Energized work may never be performed without prior authorization. Once it has been determined that equipment must be worked on in an energized condition, an energized work permit shall be submitted to the Technical Point of Contact for acceptance. > See NFPA 70E and EM 385-1-1, Section 11.A.02.c for permit requirements.
7. Specific Safety Section-Fall Protection:
a. General:
The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1-1, Section 21.
8. Pre-Construction Conference – Prior to the start of any work, the Technical Point of
Contact will schedule and conduct a “Pre-Construction Conference”. The Contractor’s Superintendent, Quality Control Representative, and Site Safety and Health Officer (SSHO) shall attend this conference. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Construction conference the contractor shall provide the name of the project superintendent with a telephone number for project coordination.
The following is a general list of items for discussion during this Pre-Construction Conference:
i. Authority of the Technical Point of Contact and Quality Assurance Inspectors
ii. Contractor’s Safety Program (including sub-contractors)
iii. Contractor’s Initial Project Schedule
iv. Abbreviated Accident Prevention Plan and Activity Hazard Analysis to include work plan and control of anticipated hazards i.e., fall protection, electrical etc.
(Submitted & accepted prior to start of work on site)
v. Safety Meetings (Documented on NED Form 251)
vi. Accident Reporting (ENG Form 3394)
vii. Safety Data Sheet (SDS) requirements
viii. Contractor’s Equipment
ix. Correspondence, Communication, Security and Administrative Procedures.
x. Invoice and payment.
9. Permits – The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.
10. Security – The contractor will comply with all established security policies at the Franklin Falls Dam. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.
11. Payment – After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry.
For jobs greater than 30 days the contractor may request multiple payments.
All invoices may be mailed to U.S. Army Corps of Engineers
ATTN: Tia Mercer 46 Granite Drive
Franklin, NH 03235 Or emailed to tia.m.mercer@usace.army.mil
II. Technical Requirements:
Part 1 General:
1. Summary – Furnish all labor, materials, and equipment necessary to install a total of ten (10) LED emergency lighting units with battery backup in the main entry level and subfloor, one (1) illuminated exit sign, and replace one (1) existing HID exterior wall pack with a LED wall pack. Emergency battery units shall be wired to the nearest lighting circuit ahead of any switch leg. Emergency battery units are to be installed for the purpose of safety and shall automatically come on when utility power is cut, turn off when power is returned either by generator or the utility power, and be adequately charging when in standby mode. The one LED wall pack shall be wired and equipped with a photocell sensor.
2. Existing Conditions –
a. Franklin Falls Dam Gatehouse:
i. The gatehouse consists of one main level with two subfloors. The gatehouse is a large operational building and is approximately 35’ in height, 27’ wide and 118’ in length. One subfloor (Pump and Transformer Subfloor) is accessible by a stairway along the western wall of the main floor. The other subfloor (Gate Operators Subfloor) is accessible through a hatch and stationary ladder from the main floor. See Informational Plan Exhibit F.
ii. The gatehouse is accessed via service bridge. The service bridge is accessible for driving onto and is approximately 186’ X 12’- 6’’. The load ratings for this bridge limit any 2-axle truck to 20 Tons (Gross Vehicle Weight) and any 3-axle truck to 30 Tons (Gross Vehicle Weight).
iii. Access to the gatehouse shall be provided by the Franklin Falls Dam staff on days when work will be performed. This is an unstaffed building and any work to be completed will need to be scheduled with the technical point of contact (TPOC) for contractor to access this building.
3. Submittals – Although the Government reviews submissions for technical data/information required by this Statement of Work, it is emphasized that the Contractor’s work must be completed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted to the Technical Point of Contact for review and must be accepted by the Government prior to the commencement of any field activities.
Abbreviated Accident Prevention Plan– Prior to the start of field work Activity Hazard Analysis – Prior to the start of field work.
Manufacturer’s product data sheets – Prior to ordering.
Manufacturer’s cut sheets for all new and replaced materials.
Warranty information.
Trade Certificate(s) and/or License(s) allowing for such work in the State of
New Hampshire (i.e., Electrical).
Operational Test Results – Completion of field work and prior to final payment.
Associated drawings with installation of emergency lighting.
4. References – All work shall be in conformance with:
a. National Fire Protection Association (NFPA)
i. NFPA 70 – National Electric Code
ii. NFPA 101 – Life Safety Code
b. U.S. Army Corps of Engineers (USACE)
i. EM-385-1-1 2014 Safety and Health Requirements Manual, U.S. Army Engineering Manual
c. Occupational Safety and Health Administration
i. OSHA regulation 1910.36 – Exit Routes and Emergency Planning
d. Code of Federal Regulations (CFR)
i. Title 36 – Parks, Forests, and Public Property; Chapter III – Corps of
Engineers, Department of the Army.
e. Other appropriate Federal, State, and Local codes for such an installation
5. Clean Up and Waste Disposal – The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.
6. Environmental Protection – Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/ cleaned on a daily basis when working onsite. No burning is permissible. Water, air, and land resources shall not be adversely impacted during the course of the work. The contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government. Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.
7. Sustainability & Environmentally Preferred Products: As required in clause 52.223-15 Energy Efficiency in Energy-Consuming Products, https://www.acquisition.gov/sites/default/files/current/far/html/52_223_226.html#wp1 194323 the contractor shall only provide products that earn the ENERGY STAR label and meet ENERGY STAR specifications for energy efficiency. The contractor is encouraged to visit http://www.energystar.gov for complete product specifications and updated lists of qualifying products.
Furthermore, Under the Comprehensive Procurement Guidelines (CPG) program, the Environmental Protection Agency (EPA) designates products that are or can be made with recovered materials and recommends practices for buying these products. Any designated product that is being offered or supplied under this contract shall meet the minimum recommended content levels as identified under the CPG program. Visit https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program for a complete list of designated products and the associated recommended contents levels.
Offerors must be able to demonstrate that each offered products meets minimum content levels upon request.
8. Building Protection – Any involved building or structure, and all of its contents shall be protected from the elements during the duration of this contract. The contractor shall keep on site the means to quickly cover and protect all areas open to the elements during an unforeseen weather-related event that could cause damage to the building and or any of its contents during all phases of this contract.
9. Personal Protective Equipment – It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.
10. Government Resources –The government will supply any electricity necessary for the project work from points of existing outlets when available. The contractor shall carefully conserve the use of electricity provided. The contractor shall supply his own means of communication (telephone). There is a restroom and access to potable water available in the public restrooms located next to the project office.
11. Damage to Government and Private Property – The contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the contractor’s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the contractor’s operation. The contractor shall notify the Project Manager immediately of damage to Government and private property and injury to any person resulting from the contractor’s operation.
Also, the Contractor shall notify the Technical Point of Contact of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the contractor’s operation. Damaged or destroyed grass areas shall be re-planted as directed by the Technical Point of Contact, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.
12. Contractor’s Personnel –
a. Minimum Personnel Requirements – The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.
Note: At least one of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.
b. Employee Conduct – The Contractor shall be responsible for seeing that the Contractor’s employees strictly comply with Code of Federal Regulations (CFR) Title 36, Chapter III, Part 327, and all Federal, State, and Municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee/employees.
Examples of unbecoming actions or conduct include but are not limited to the following:
i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, Corps personnel, or other contractors.
ii. Recurring written and/or verbal complaints from visitors, Corps personnel, or other contractors.
iii. Unsafe operation of vehicles while on US Army Corps of Engineers property.
c. Removal of Contractor’s Employees – The Technical Point of Contact may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the Technical Point of Contact, who endangers persons or property, or whose physical or mental condition is such that it would impair the employee’s ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible. No such removal, however, will reduce the Contractor’s obligation to perform all work required under this contract, and immediate replacement will be made as required.
This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
13. Omissions – This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.
14. Quality Assurance – The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.
15. Inspections –
a. Contractor Quality Control – The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor’s organization is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.
b. General Inspection – Upon the completion of each requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Statement of Work. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. The Inspection Form (form to be provided to the Contractor at the pre-construction conference) will be submitted to the Technical Point of Contact to allow verification of results for payment. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.
c. Equipment/Supplies Inspections - The Technical Point of Contact may inspect required equipment and, supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the Technical Point of Contact. No such removal will reduce the Contractor’s obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
d. Government Inspections - The Government will monitor the Contractor’s work and make deductions accordingly.
16. Other Contracts – The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.
17. Receiving and Storing Materials – The Government shall provide a storage area and parking for contractor personnel. The Contractor will ensure the front gate is closed when entering or exiting this area during normal business hours. The Contractor is responsible for protecting any stored material until it is placed in service. The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the contractor’s equipment or materials.
Part 2 Equipment:
1. Condition of Equipment– All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.
2. Type of Equipment-
a. Motor Vehicles
b. Ladders, staging, lifts
3. Equipment Storage – The potential areas for equipment storage will be discussed during the pre-construction meeting.
Part 3 Products:
All products shall be new, unused and to the satisfaction of the Technical Point of Contact. Products shall be approved by the Technical Point of Contact prior to installation.
1. Ten (10) Emergency Battery Lighting Units.
The lighting fixtures shall have the following Specifications:
a. Fixtures shall be 12-volt self-charging and weatherproof to withstand a constant moist environment where humidity levels fluctuate throughout the year.
b. Dual Voltage Input
i. 120/277 VAC, 60Hz
ii. Line-latching
iii. Solid-state Voltage
c. Limited Charger
i. Solid-state Switching
ii. Brownout Circuit
iii. Low-Voltage Disconnect
iv. Overload/Short Circuit Protection
v. Test Switch/Power Indicator Light at Bottom of Unit for Ease of Testing
vi. Push-in AC power connectors facilitate installation
d. Battery
i. Nickel Cadmium Battery (CC3NC)
ii. Maintenance-free, long-life
iii. Full recharge time: 24 hrs. (max.)
iv. Polarized battery terminals
v. Provide a minimum of 90 minutes of emergency illumination at rated wattage
e. Housing Construction
i. All components are injection molded, color stable, high impact UL 94-5VA rated polycarbonate material
ii. Preferred designer white textured finish standard; black finish optional
iii. Components to include snap-fit construction
iv. Reinforcing ribs throughout to provide maximum strength
v. Cutouts provided in housing for surface conduit attachment
vi. Suitable for wall or ceiling mount applications
vii. Universal J-box mounting pattern
viii. Keyhole mounting slots
f. Code Compliance
i. UL 924 Listed
ii. UL Damp Location Listed (CC5.SD only)
iii. Life Safety NFPA 101
iv. NEC/OSHA
v. State and Local Codes
g. Warranty: Products must meet the following minimum warranty coverage:
i. Nickel Cadmium Battery: 15-year pro-rata
h. Head/Lamp Data
i. Two LED heads standard Glare-free lens Fully adjustable lamp housing High impact polycarbonate Matches housing finish
2. One (1) LED Wall Pack
a. Preferred Color: Dark Bronze
b. Minimum 100W
c. Shock and vibration resistant
d. Waterproof
e. Minimum 800lm
f. IP66 Waterproof
g. Minimum 4000K
h. Industry Standard Heat Dissipation
i. Bulb Type: LED, Minimum 8W; provide 1fc at 10 feet
j. Dusk to Dawn Operation
3. One (1) Illuminated Emergency Exit Sign
a. Preferred Color: White with illuminated red letters showing EXIT.
b. NiCad battery, minimum 90 minutes of emergency illumination
c. Must meet NEC and NFPA 101 Life Safety Code requirements
d. Must have the ability for Side, Wall, or Top mount options
e. Must be double – sided for side mount option
f. Manual test switch and LED light indicator
g. Hardwire and Canopy
h. UL Listed to standard 924
i. Minimum 300lm
j. Suitable for damp or wet locations
4. PVC Electrical Conduit
a. 1” Schedule 40 PVC.
b. Fittings, couplings, pull boxes, and other associated materials and hardware shall also be of PVC construction and compatible with the PVC conduit according to manufacturer’s recommendations.
5. Mounting Hardware
a. Mounting hardware shall be a one-hole mount with a standoff section for the conduit.
b. The mounting hardware shall include screws designed for mounting the hardware and conduit to a masonry brick and/or concrete surface depending on the location within the gatehouse.
c. All mounting hardware for the Schedule 40 PVC electrical conduit shall be compatible with the conduit for size and mounting requirements.
Part 4 Execution:
1. Safety Equipment: It is the contractor’s responsibility to furnish and supply personnel with the proper personal protective equipment (Hardhats, Hand Protection, Eye Protection, Fall Protection etc.) when and where necessary.
2. Demolitions:
a. Remove one (1) existing high intensity discharge (HID) wall pack located on the outside of the gatehouse above the entry door. See Informational Photo Exhibit D.
b. The Contractor shall dispose of or salvage all material removed under this section in accordance with all applicable Federal and State laws and regulations.
3. Installation:
a. Install Ten (10) Emergency Battery Unit Lighting in Main Entry Level and
Subfloor:
i. Eight (8) lights shall be installed on the main entry level (one by the generator, one by the float well, and six alternating sides in the central area).
See Informational Photo Exhibit A.
ii. Two (2) lights shall be installed on the subfloor levels. (One light shall be installed in the Gate Operators Subfloor, and one light shall be installed in the stairway to the Pump and Transformer Subfloor). See Informational Photo Exhibits B and C.
iii. All lights shall be permanently mounted on existing masonry brick or concrete walls.
iv. All appropriate supply wires / lines shall be housed in Schedule 40PVC.
Minimum size conduit shall be one (1) inch. Conduit shall be fastened to the walls using appropriate means for masonry brick or concrete.
v. New emergency battery units shall be located in such a manner as to provide the best lighting in an emergency situation when normal lighting is not functional due to power failure.
vi. Provide a sketch to Franklin Falls Dam TPOC, Tia Mercer, noting recommended locations of emergency battery units for review and acceptance prior to any installation work.
b. Install One (1) LED Wall Pack:
i. One (1) flood light shall be installed on the front of the Franklin Falls Dam
Gatehouse above the entry door. See Informational Photo Exhibit D.
ii. Light shall be mounted where existing light is currently located.
c. Install One (1) Illuminated Exit Sign:
i. One (1) illuminated exit sign shall be installed on the right side of the main gatehouse entry door inside the gatehouse. The sign shall be mounted in a manner to meet applicable codes according to manufacturer’s recommendations without interfering with the operation and swing of the steel personnel door and the large steel gatehouse door. See Informational Photo Exhibit E.
ii. The Contractor shall coordinate the location of the sign with the TPOC to discuss placement and any potential movement of existing electrical conduits and junction boxes in the preferred mounting location.
4. Operational Test:
The Contractor shall perform an Operation Test of the system at the completion of the installation of the required components.
a. All testing shall be coordinated with the Technical Point of Contact.
b. The Contractor demonstrate that the lighting units shall automatically come on when utility power is cut, turn off when power is returned, and be adequately charging when in standby mode.
c. The Contractor shall provide written documentation of the results of the performance test.
ATTACHMENTS
PLEASE REFER TO THE ATTACHMENTS INCLUDED WITH THIS SOLICITATION FOR ADDITIONAL
INFORMATION.
GATEHOUSE EMERGENCY LIGHTING INSTALLATION
U.S. ARMY CORPS OF ENGINEERS
FRANKLIN FALLS DAM
FRANKLIN, NEW HAMPSHIRE
Statement of Work
Informational Photos
Photo Exhibit A: Franklin Falls Gatehouse Main Entry Level.
FRANKLIN FALLS DAM
Photo Exhibit B: Stairway to/from the Pump and Transformer Subfloor.
FRANKLIN FALLS DAM
Photo Exhibit C: Gate Operators Subfloor level.
FRANKLIN FALLS DAM
Photo Exhibit D: Franklin Falls Gatehouse Entrance Flood Light Shown.
FRANKLIN FALLS DAM
Photo Exhibit E: Franklin Falls Gatehouse Entrance/Exit Doors.
FRANKLIN FALLS DAM
Informational Plan
Plan Exhibit F: General Plan of Franklin Falls Gatehouse.
FRANKLIN FALLS DAM
Photo Exhibit F: Franklin Falls Dam Location.
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 120 dys. ADC 1 FRANKLIN FALLS DAM PROJ
TIA MERCER
46 GRANITE DRIVE
FRANKLIN NH 03235-0340
(978) 318-8323 FOB: Destination
961403
0002 120 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
0003 120 dys. ADC 1 (SAME AS PREVIOUS LOCATION)
Section H - Special Contract Requirements
SECURITY REQUIREMENTS
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.
WAGE DETERMINATION
General Decision Number: NH20220019 03/18/2022
Superseded General Decision Number: NH20210019
State: New Hampshire
Construction Type: Building
County: Merrimack County in New Hampshire.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/18/2022 2 02/25/2022 3 03/18/2022
ASBE0006-014 09/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 40.00 32.89
ELEC0490-002 01/01/2022
Rates Fringes
ELECTRICIAN......................$ 32.05 21.66
* IRON0007-040 03/16/2022
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 29.02 24.04
LABO0668-001 12/01/2020
Rates Fringes
LABORER: Common or General......$ 21.76 20.07
PLUM0131-003 06/07/2021
Rates Fringes
PIPEFITTER.......................$ 37.00 24.40
SUNH2015-005 06/16/2017
Rates Fringes
Carpenter, Includes Drywall Finishing/Taping, Drywall Hanging and Metal Stud Installation.....................$ 26.19 9.06
CEMENT MASON/CONCRETE FINISHER...$ 23.55 7.14
IRONWORKER, REINFORCING..........$ 29.89 10.70
LABORER: Mason Tender - Brick...$ 19.60 2.73
LABORER: Mason Tender - Cement/Concrete..................$ 20.85 2.61
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 21.52 3.17
PAINTER (Brush and Roller).......$ 20.62 0.00
PLUMBER..........................$ 25.24 8.60
ROOFER...........................$ 18.87 0.00
SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 26.56 24.03
TRUCK DRIVER: Dump Truck........$ 17.43 3.60
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates.