REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ21Q0151 16-Aug-2021 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

SEE SCHEDULE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ] FOB

DESTINATION

[ ] OTHER X

(See Schedule)

30-Aug-2021(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8256FRED E RILEY

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

Section B - Supplies or Services and Prices

INSTRUCTIONS TO OFFERORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO FRED E. RILEY AT (978) 318-8326 or

FRED.E.RILEY@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT WHICH

CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF FRED RILEY.

THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL

CASES.

**QUOTES CAN BE E-MAILED TO FRED RILEY AT FRED.E.RILEY@USACE.ARMY.MIL.

NOTE 1: In accordance with FAR Part 28.101-1(c), the Contractor will NOT be required to provide a Bid Guarantee.

NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

NOTE 3: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 4:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company names:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS PRICE

ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST BE

CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

BID SCHEDULE

WATERPROOFING AND EXTERIOR BRICK REPAIRS

FOX POINT HURRICANE BARRIER

U.S. ARMY CORPS OF ENGINEERS

Providence, Rhode Island

Statement of Work

Bid Schedule

ITEM UNIT QTY

UNIT

PRICE

TOTAL

Waterproof Barrier Exterior

Brick Repointing Repairs

Job

Job

TOTAL

Section C - Descriptions and Specifications

STATEMENT OF WORK

WATERPROOFING AND EXTERIOR BRICK REPAIRS

FOX POINT HURRICANE BARRIER

U.S. ARMY CORPS OF ENGINEERS

Providence, Rhode Island Statement of Work

I. General:

1. Scope - Provide all materials, labor, and equipment necessary to perform brick repointing repairs and apply a waterproofing sealer to the exterior brick of a pumpstation building in Providence, RI. Work includes repointing and approximately 84 linear feet of crack repairs on the south and east sides of building (See Informational Photos 6-8). The total brick area to be waterproofed is approximately 18,000 sq ft (See Figures 1-4).

2. Location - The building is located at 40 Point Street, Providence RI

02905. The building has limited access to wall areas using manlift equipment. Contractor shall determine means and methods of access to wall areas considering all the obstructions and proximity to the Providence River.

3. Site Visit - Contact the Technical Point of Contact if there are questions. The Technical Point of Contact for the project is Andrew Cattano (978-318-8329 or Andrew.M.Cattano@usace.army.mil).

4. Schedule – Work shall commence within 14 days after the

Contractor received the Notice to Proceed (NTP). The work shall be completed within 180 days from notice to proceed. The project area will be open to the contractor Monday through Friday, 7:00 AM to 3:30 PM. All work must be done during these hours unless additional hours are approved by the Technical Point of Contact. No work shall be done on weekends or Government holidays.

5. Safety Requirements - All work shall be conducted in accordance with the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, most recent edition) , and all applicable Occupational Safety and Health Administration (OSHA), federal, state, and local safety, and health requirements. A copy of EM 385-1-1 can be accessed at the project office or electronically at Headquarters USACE website under publications using the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/Engi neerManuals/EM 385- 1-1.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

a. Accident Prevention Plan:

The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include Activity Hazard Analyses (AHAs) as described in EM 385-1-1, Appendix A, Section K.

W912WJ21Q0151

A preparatory meeting shall be conducted by the prime contractor to discuss safety requirements with all workers and shall inspect all fieldwork.

Note: the contractor shall include any site specific COVID-19 protocols in accordance with Centers of Disease Control and Prevention (CDC) guidelines.

b. Activity Hazard Analysis (AHA):

An AHA shall be submitted for each phase of work. Identify specific hazards anticipated, and the control measures to eliminate or reduce each hazard to an acceptable level. The AHA shall be continuously reviewed and revised to address changing site conditions during ongoing work as needed.

c. Emergency Response:

Emergency procedures shall be documented and reviewed with workers.

Include a map with directions to the nearest hospital, emergency contact numbers, onsite First Aid/CPR responders and communication with the

TPOC.

d. Required Personnel:

The Contractor shall designate one employee as the site's Competent Person (CP) who is responsible for ensuring a safe environment for all employees. The CP shall be present at the project site. The CP is required to have related construction and/or service experience. At least one person onsite shall be trained in First Aid and CPR.

e. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor.

Any work-related recordable injuries, illnesses, and property damage accidents shall be verbally reported to the TPOC within four (4) hours of the incident. An y se rious accidents shall be immediately reported to the

TPOC.

6. Fall Protection Requirements -

a. General: The requirements of this section are applicable to contractors when their employees are working at heights above 6 feet, exposed to fall hazards, and/or using fall protection equipment. Every Contractor is responsible for establishing, implementing, and managing a fall protection program in accordance with EM 385-1-1, Section 21.

b. Submittals: A site-specific Fall Protection and Prevention Plan is required to be submitted and approved by the TPOC prior to any work being completed at heights. Plan shall address at least the following:

i. Duties and responsibilities of Competent Persons (CP)

ii. Description of the project activities

iii. Training requirements to include safe use of fall protection equipment.

iv. Anticipated hazards and fall hazard prevention and control.

v. Rescue plan and procedures.

vi. Inspection, maintenance, and storage of fall protection equipment.

vii. Incident investigation procedures.

viii. Inspection and oversight methods employed.

c. Competent Person (CP): The person designated by the Contractor to be responsible for immediate supervising, implementing and monitoring of the fall protection program. Person shall have training, knowledge and experience in fall protection and rescue systems and equipment. Person shall be capable of identifying, evaluating and addressing existing fall hazards and have authority to ensure all work complies with safety requirements. The CP shall:

i. Be onsite at all times while work at height is being performed.

ii. Have a minimum of 24 hours of documented fall protection training made up of classroom and practical hands-on components.

d. End User: Persons who are trained and authorized by the Contractor to use fall protection equipment. Shall have an understanding of workplace activities/hazards and able to follow the policy, procedures, and instructions of the Competent Person regarding the use of fall protection, rescue systems, and related equipment.

e. Personal Fall Arrest System Requirements (PFAS): All PFAS shall meet the requirements contained in ANSI Z359, Fall Protection Code, to include fall restrain and positioning systems.

7. Pre-Construction Conference - Prior to the start of any work, the Technical

Point of Contact will schedule and conduct a "Pre-Construction Conference".

The Contractor's Project Manager and responsible onsite personnel shall attend this meeting. No work may be performed under this contract prior to this conference. The purpose of the conference is to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor.

Contractor and Government personnel will agree on points of contact for administration of the Contract.

In general, the Pre-Construction Conference will include topics:

i. Authority of the Technical Point of Contact and Inspectors.

ii. Contractor's Safety Program (including sub-contractors).

iii. Safety Meetings

iv. Accident Reporting

v. Correspondence, Communication, Security and Administrative Procedures.

vi. Invoice and payment.

vii. COVID-19 Procedures

8. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

9. Security- Access shall be from the Point Street entrance to the Manchester Street Power Station (Dominion Energy), through Dominion Energy's Power Station to the west side of the project. The contractor will comply with all established security policies at the Manchester Street Power Station. The Contractor shall sign in each day at the security office at the entrance to the power station. The Contractor shall meet all deliveries of materials and equipment at the security office. Potential periods of heightened security may affect access to work areas. During periods of heightened security, the Government reserves the right, at any time, to close any property and reschedule work. The Contractor shall be given at least 24-hour notice of any such closure.

10. Contractors Personnel-

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of personnel to perform the specified service properly and efficiently within the time limits specified.

11. Payment - After final inspection and acceptance by the Government, the Contractor must submit a final invoice and certification forms. The invoice shall include the invoice date, contract number, dates of service, work performed, quantities, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. For jobs greater than 30 days the contractor may request progress payments.

Invoices may be mailed to:

US Army Corps of Engineers Cape Cod Canal Field Office P.O. Box 1555 Buzzards Bay, MA 02532 Attn: Andrew Cattano Or Emailed to: Andrew.M.Cattano@usace.army.mil

II. Technical Requirements:

Part 1. General:

1. Summary - Provide all materials, labor, and equipment to gain access to elevated wall areas on the building and perform repointing repairs and apply the waterproofing sealer.

2. Submittals - Although the Government technically reviews submissions required by this Statement of Work, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The documents identified below must be prepared and submitted to the Technical Point of Contact for review and acceptance by the Government.

• Accident Prevention Plan (APP), including fall protection plan - Prior to the start of field work. Plan shall identify the means and methods of fall protection that will be used. Identify what equipment, ladders or cable/rope systems will be used.

• Activity Hazard Analysis (AHA}- Prior to the start of field work

• CPR and First aid Certification

• Safety Data Sheets for any products used onsite

• Waterproof product specifications

3. Clean Up and Waste Disposal-The contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the contractor shall remove any tools, equipment, and materials from the site. Any and all disturbed areas resulting from contractor activities shall be restored by the contractor to the satisfaction of the Technical Point of Contact. All waste material will be disposed of offsite in accordance with all Federal, State, and Local regulations.

4. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected / cleaned daily when working onsite. Water, air, and land resources shall not be adversely impacted during the work. The contractor will take necessary steps to ensure all Federal, State, and Local environmental regulatory requirements are met at no additional cost to the Government.

Assurance of compliance with this section by subcontractors shall be the responsibility of the contractor.

5. Sustainability & Environmentally Preferred Products - Products that are identified as "environmentally preferable", products that have a lesser or reduced effect on human health and the environment when compared with competing products that serve the same purpose, and bio-based will be selected over those which do not carry such designations. The United States Department of Agriculture (USDA) designates certain bio-based products for federal procurement and specifies minimum bio based content levels for those products.

Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred's minimum bio based content level. Visit the BioPreferred web site https://www.biopreferred.gov/BioPreferred/faces/pages/ProductCategories.xhtml for the complete list of designated products and the associated minimum bio based content level requirements.

6. Personal Protective Equipment - It is the contractor' s responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

7. Government Resources - The government will supply any electricity necessary for the project work from points of existing outlets when available.

The contractor shall carefully conserve the use of electricity provided. The contractor shall supply his own means of communication (telephone). The Contractor's personnel may use the existing single bathroom facility within the pump station. Temporary restroom facilities provided by the Contractor are not required.

8. Damage to Government and Private Property- The contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the contractor' s operation. The contractor shall also be responsible for any damage to private property or injury to any person as a result of the contractor' s operation. The contractor shall notify the TPOC immediately if any damage to Government or private property or any injuries to persons occur.

Also, the Contractor shall notify the TPOC of any noted damage to Government facilities due to vandalism or trespassing.

9. Omissions -This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

10. Quality Control and Quality Assurance - The contractor is responsible for the quality control of the contract work. The contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The government has the right to inspect and test all work for quality assurance to the extent practicable at all times and at all places during the term of the contract.

11. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the contractor shall fully cooperate with other contractors and Government employees. The contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

12. Receiving and Storing Materials - The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the contractor and will not be responsible for damage to the contractor ' s equipment or materials.

Part 2. Products:

2.1. Commercial grade high quality sealer and waterproofing membrane system.

Once dry shall prevent water penetration into the existing exterior brickwork on the building. Shall meet the following requirements:

2.1.1 Water based acrylic

2.1.2 Seals brick and concrete from wind driven rain intrusion

2.1.3 Low VOC

2.1.4 Resists mold and mildew growth

2.1.5 Clear satin

2.1.6 Covered by a minimum 5-year warranty

2.2. Brick repointing materials – Repair mortar.

All products shall be new, unused and to the satisfaction of the Technical Point of Contact. Products shall be approved by the Technical Point of Contact prior to installation.

Part 3 Execution:

3.1 Contractor shall used trained and skilled labor to install appropriate fall protection means for workers to access the building wall areas. All equipment operators shall be State licensed.

3.2 Brick Repointing Repairs Contractor shall complete all brick repointing work prior to any waterproofing application.

3.2.1.1 Perform the brick repointing work in accordance with industry best management practices. Include mortar removal and brick installation to repair areas to new condition. Repointing work shall be completed by skilled personnel with experience in the masonry brick and mortar repairs.

Mortar joints shall be smooth and professional quality to match original conditions.

3.3 Sealer Preparation: Contractor shall be responsible for the preparation of building wall areas prior to waterproofing.

3.3.1 Surface must be clean and dry.

3.3.2 Remove all dirt, grease, oil, and other foreign substances from the surface by scraping, scrubbing or washing surface as necessary.

3.3.3 All surfaces not to be sealed (windows, doors, lights, etc.) shall be covered. Any overspray will be cleaned up immediately.

3.4 Sealer Application: Contractor shall provide all labor, tools, hardware, and materials to apply products to manufacturer's recommendations in conformance with state and local building codes and the following requirements:

3.4.1. Waterproof product will be applied per manufacturer’s recommendations.

ATTACHMENTS

PLEASE REFERENCE PHOTOS AND ATTACHMENTS FOR ADDITIONAL INFORMATION IN REGARDS

TO THIS SOLICITATION.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.

WAGE DETERMINATION

"General Decision Number: RI20210001 07/30/2021

Superseded General Decision Number: RI20200001

State: Rhode Island

Construction Types: Building, Heavy (Heavy and Marine) and Highway

Counties: Rhode Island Statewide.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) HEAVY, HIGHWAY AND MARINE

CONSTRUCTION PROJECTS

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/01/2021 1 01/22/2021 2 03/05/2021 3 04/09/2021 4 04/23/2021 5 06/18/2021 6 07/30/2021

ASBE0006-006 12/01/2019

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal scrapping, vacuuming, bagging & disposing of all insulation materials, whether they contain asbestos or not, from mechanical systems)..............$ 36.60 22.40

ASBE0006-008 09/01/2019

Rates Fringes

Asbestos Worker/Insulator Includes application of all insulating materials, protective coverings, coatings & finishes to all types of mechanical systems.$ 43.60 29.90

BOIL0029-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 42.42 24.92

BRRI0003-001 06/01/2020

Rates Fringes

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 42.55 28.02

BRRI0003-002 03/01/2020

Rates Fringes

Marble Setter, Terrazzo Worker & Tile Setter.............$ 40.78 28.92

BRRI0003-003 03/01/2020

Rates Fringes

Marble, Tile & Terrazzo Finisher.........................$ 34.10 27.88

CARP0330-001 01/01/2021

Rates Fringes

CARPENTER (Includes Soft Floor Layer).....................$ 39.72 28.66 Diver Tender.....................$ 40.72 28.66

DIVER............................$ 51.47 28.66

Piledriver.......................$ 39.72 28.66

WELDER...........................$ 40.72 28.66

FOOTNOTES:

When not diving or tending the diver, the diver and diver tender shall receive the piledriver rate. Diver tenders shall receive $1.00 per hour above the pile driver rate when tending the diver.

Work on free-standing stacks, concrete silos & public utility electrical power houses, which are over 35 ft. in height when constructed: $.50 per hour additional.

Work on exterior concrete shear wall gang forms, 45 ft. or more above ground elevation or on setback: $.50 per hour additional.

The designated piledriver, known as the ""monkey"": $1.00 per hour additional.

CARP1121-002 01/06/2020

Rates Fringes

MILLWRIGHT.......................$ 39.07 29.15

ELEC0099-002 06/02/2021

Rates Fringes

ELECTRICIAN......................$ 43.61 55.71%

Teledata System Installer........$ 32.71 12.57%+14.93

FOOTNOTES:

Work of a hazardous nature, or where the work height is 30

ft. or more from the floor, except when working OSHA-approved lifts: 20% per hour additional.

Work in tunnels below ground level in combined sewer outfall:

20% per hour additional.

ELEV0039-001 01/01/2021

Rates Fringes

ELEVATOR MECHANIC................$ 55.03 35.825+A+B

FOOTNOTES:

A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0057-001 12/01/2020

Rates Fringes

Operating Engineer: (power plants, sewer treatment plants, pumping stations, tunnels, caissons, piers, docks, bridges, wind turbines, subterranean & other marine and heavy construction work) GROUP 1.....................$ 42.55 27.70+a GROUP 2.....................$ 40.55 27.70+a GROUP 3.....................$ 36.17 27.70+a GROUP 4.....................$ 33.32 27.70+a GROUP 5.....................$ 39.60 27.70+a GROUP 6.....................$ 30.40 27.70+a GROUP 7.....................$ 24.40 27.70+a GROUP 8.....................$ 36.25 27.70+a GROUP 9.....................$ 40.17 27.70+a

a. BOOM LENGTHS, INCLUDING JIBS:

150 feet and over + $ 2.00 180 feet and over + $ 3.00 210 feet and over + $ 4.00 240 feet and over + $ 5.00 270 feet and over + $ 7.00 300 feet and over + $ 8.00 350 feet and over + $ 9.00 400 feet and over + $10.00

a. PAID HOLIDAYS:

New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTES:

Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks

GROUP 2: Digging machine, Ross Carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, graders, front end loader (3 yds.

and over), vibratory hammer & vacuum truck, roadheaders, forklifts, economobile type equipment, tunnel boring machines, concrete pump and on site concrete plants.

GROUP 3: Oilers on cranes.

GROUP 4: Oiler on crawler backhoe.

GROUP 5: Bulldozer, bobcats, skid steer loader, tractor, scraper, combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile-powered sweeper (3-yd. capacity), 8-ft. sweeper minimum 65 HP).

GROUP 6: Well-point installation crew.

GROUP 7: Utility Engineers and Signal Persons

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator and light plant, gas and electric driven pump and air compressor.

GROUP 9: Boat & tug operator.

ENGI0057-002 11/01/2020

Rates Fringes

Power Equipment Operator (highway construction projects; water and sewerline projects which are incidental to highway construction projects; and bridge projects that do not span water) GROUP 1....................$ 35.70 27.70+a GROUP 2....................$ 30.40 27.70+a GROUP 3....................$ 24.40 27.70+a GROUP 4....................$ 30.98 27.70+a

GROUP 5....................$ 34.68 27.70+a GROUP 6....................$ 34.30 27.70+a GROUP 7....................$ 29.95 27.70+a GROUP 8....................$ 31.33 27.70+a GROUP 9....................$ 33.28 27.70+a

a. FOOTNOTE: a. Any employee who works three days in the week in which a holiday falls shall be paid for the holiday.

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Digging machine, crane, piledriver, lighter, locomotive, derrick, hoist, boom truck, John Henry's, directional drilling machine, cold planer, reclaimer, paver, spreader, grader, front end loader (3 yds. and over), vacuum truck, test boring machine operator, veemere saw, water blaster, hydro-demolition robot, forklift, economobile, Ross Carrier, concrete pump operator and boats

GROUP 2: Well point installation crew

GROUP 3: Utlity engineers and signal persons

GROUP 4: Oiler on cranes

GROUP 5: Combination loader backhoe, front end loader (less than 3 yds.), forklift, bulldozers & scrapers and boats

GROUP 6: Roller,skid steer loaders, street sweeper

GROUP 7: Gas and electric drive heater, concrete mixer, light plant, welding machine, pump & compressor

GROUP 8: Stone crusher

GROUP 9: Mechanic & welder

ENGI0057-003 12/01/2020

BUILDING CONSTRUCTION

Rates Fringes

Power Equipment Operator GROUP 1....................$ 41.82 27.70+a GROUP 2....................$ 39.82 27.70+a GROUP 3....................$ 39.60 27.70+a GROUP 4....................$ 35.60 27.70+a GROUP 5....................$ 32.75 27.70+a GROUP 6....................$ 38.90 27.70+a

GROUP 7....................$ 38.47 27.70+a GROUP 8....................$ 35.79 27.70+a a.BOOM LENTHS, INCLUDING JIBS:

150 ft. and over: + $ 2.00 180 ft. and over: + $ 3.00 210 ft. and over: + $ 4.00 240 ft. and over: + $ 5.00 270 ft. and over: + $ 7.00 300 ft. and over: + $ 8.00 350 ft. and over: + $ 9.00 400 ft. and over: + $10.00

a. PAID HOLIDAYS: New Year's Day, President's Day, Memorial Day, July Fourth, Victory Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day & Christmas Day. a: Any employee who works 3 days in the week in which a holiday falls shall be paid for the holiday.

a. FOOTNOTE: Hazmat work: $2.00 per hour additional.

Tunnel/Shaft work: $5.00 per hour additional.

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, lighters, boom trucks and derricks.

GROUP 2: Digging machine, Ross carrier, locomotive, hoist, elevator, bidwell-type machine, shot & water blasting machine, paver, spreader, front end loader (3 yds. and over), vibratory hammer and vacuum truck

GROUP 3: Telehandler equipment, forklift, concrete pump & on-site concrete plant

GROUP 4: Fireman & oiler on cranes

GROUP 5: Oiler on crawler backhoe

GROUP 6: Bulldozer,skid steer loaders,bobcats, tractor, grader, scraper,combination loader backhoe, roller, front end loader (less than 3 yds.), street and mobile powered sweeper (3 yds. capacity), 8-ft. sweeper (minimum 65 hp)

GROUP 7: Well point installation crew

GROUP 8: Heater, concrete mixer, stone crusher, welding machine, generator for light plant, gas and electric driven pump & air compressor

* IRON0037-001 03/16/2021

IRONWORKER.......................$ 37.87 30.13

LABO0271-001 05/30/2021

BUILDING CONSTRUCTION

Rates Fringes

LABORER

GROUP 1.....................$ 33.55 26.15

GROUP 2.....................$ 33.80 26.15

GROUP 3.....................$ 34.30 26.15

GROUP 4.....................$ 34.55 26.15

GROUP 5.....................$ 35.55 26.15

LABORERS CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Mason Tender, Cement Finisher Tender, Scaffold Erector, Wrecking Laborer, Asbestos Removal [Non-Mechanical Systems]

GROUP 2: Asphalt Raker, Adzemen, Pipe Trench Bracer, Demolition Burner, Chain Saw Operator, Fence & Guard Rail Erector, Setter of Metal Forms for Roadways, Mortar Mixer, Pipelayer, Riprap & Dry Stonewall Builder, Highway Stone Spreader, Pneumatic Tool Operator, Wagon Drill Operator, Tree Trimmer, Barco-Type Jumping Tamper, Mechanical Grinder Operator

GROUP 3: Pre-Cast Floor & Roof Plank Erectors

GROUP 4: Air Track Operator, Hydraulic & Similar Self-Powered Drill, Block Paver, Rammer, Curb Setter, Powderman & Blaster

GROUP 5: Toxic Waste Remover

LABO0271-002 05/30/2021

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

LABORER

COMPRESSED AIR

Group 1....................$ 53.45 24.15 Group 2....................$ 50.98 24.15 Group 3....................$ 40.50 24.15

FREE AIR

Group 1....................$ 44.05 24.15 Group 2....................$ 43.05 24.15 Group 3....................$ 40.50 24.15

LABORER

Group 1....................$ 33.55 24.15

Group 2....................$ 33.80 24.15 Group 3....................$ 34.55 24.15 Group 4....................$ 27.05 24.15 Group 5....................$ 35.55 24.15

OPEN AIR CAISSON,

UNDERPINNING WORK AND

BORING CREW

Bottom Man.................$ 39.55 24.15 Top Man & Laborer..........$ 38.60 24.15

TEST BORING

Driller....................$ 40.00 24.15 Laborer....................$ 38.60 24.15

LABORER CLASSIFICATIONS

GROUP 1: Laborer; Carpenter tender; Cement finisher tender;

Wrecking laborer; Asbestos removers [non-mechanical systems]; Plant laborer; Driller in quarries

GROUP 2: Adzeperson; Asphalt raker; Barcotype jumping tamper; Chain saw operators; Concrete and power buggy operator; Concrete saw operator; Demolition burner; Fence and guard rail erector; Highway stone spreader; Laser beam operator; Mechanical grinder operator; Mason tender; Mortar mixer; Pneumatic tool operator; Riprap and dry stonewall builder; Scaffold erector; Setter of metal forms for roadways; Wagon drill operator; Wood chipper operator;

Pipelayer; Pipe trench bracer

GROUP 3: Air track drill operator; Hydraulic and similar powered drills; Brick paver; Block paver; Rammer and curb setter; Powderperson and blaster

GROUP 4: Flagger & signaler

GROUP 5: Toxic waste remover

LABORER - COMPRESSED AIR CLASSIFICATIONS

GROUP 1: Mucking machine operator, tunnel laborer, brake person, track person, miner, grout person, lock tender, gauge tender, miner: motor person & all others in compressed air

GROUP 2: Change house attendant, powder watchperson, top person on iron

GROUP 3: Hazardous waste work within the ""HOT"" zone

LABORER - FREE AIR CLASSIFICATIONS

GROUP 1: Grout person - pumps, brake person, track person, form mover & stripper (wood & steel), shaft laborer, laborer topside, outside motorperson, miner, conveyor operator, miner welder, heading motorperson, erecting operator, mucking machine operator, nozzle person, rodperson, safety miner, shaft & tunnel, steel & rodperson, mole nipper, concrete worker, form erector (wood, steel and all accessories), cement finisher (this type of work only), top signal person, bottom person (when heading is 50' from shaft), burner, shield operator and TBM operator

GROUP 2: Change house attendant, powder watchperson

GROUP 3: Hazardous waste work within the ""HOT"" zone

* PAIN0011-005 06/01/2021

Rates Fringes

PAINTER

Brush and Roller............$ 36.42 22.90 Epoxy, Tanks, Towers, Swing Stage & Structural Steel.......................$ 38.42 22.90 Spray, Sand & Water Blasting....................$ 39.42 22.90 Taper.......................$ 37.17 22.90 Wall Coverer................$ 36.92 22.90

* PAIN0011-006 06/01/2021

Rates Fringes

GLAZIER..........................$ 39.98 22.90

FOOTNOTES:

SWING STAGE: $1.00 per hour additional.

PAID HOLIDAYS: Labor Day & Christmas Day.

* PAIN0011-011 06/01/2021

Rates Fringes

Painter (Bridge Work)...........$ 54.00 22.90

PAIN0035-008 06/01/2011

Rates Fringes

Sign Painter.....................$ 24.79 13.72

PLAS0040-001 06/03/2019

BUILDING CONSTRUCTION

CEMENT MASON/CONCRETE FINISHER...$ 36.00 27.15

FOOTNOTE: Cement Mason: Work on free swinging scaffolds under 3 planks width and which is 20 or more feet above ground and any offset structure: $.30 per hour additional.

PLAS0040-002 07/01/2019

HEAVY AND HIGHWAY CONSTRUCTION

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 32.85 22.20

PLAS0040-003 07/01/2019

Rates Fringes

PLASTERER........................$ 37.55 27.50

PLUM0051-002 08/31/2020

Rates Fringes

Plumbers and Pipefitters.........$ 44.69 31.20

ROOF0033-004 06/01/2021

Rates Fringes

ROOFER...........................$ 39.40 29.06

SFRI0669-001 04/01/2021

Rates Fringes

SPRINKLER FITTER.................$ 47.55 26.60

SHEE0017-002 12/01/2020

Rates Fringes

Sheet Metal Worker...............$ 38.58 36.73

TEAM0251-001 05/01/2019

HEAVY AND HIGHWAY CONSTRUCTION

TRUCK DRIVER

GROUP 1....................$ 27.96 26.8525+A+B+C

GROUP 2....................$ 27.61 26.8525+A+B+C

GROUP 3....................$ 27.66 26.8525+A+B+C

GROUP 4....................$ 27.71 26.8525+A+B+C

GROUP 5....................$ 27.81 26.8525+A+B+C

GROUP 6....................$ 28.21 26.8525+A+B+C

GROUP 7....................$ 28.41 26.8525+A+B+C

GROUP 8....................$ 27.91 26.8525+A+B+C

GROUP 9....................$ 28.16 26.8525+A+B+C

GROUP 10....................$ 27.96 26.8525+A+B+C

FOOTNOTES:

A. Paid Holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day, plus Presidents' Day, Columbus Day, Veteran's Day & V-J Day, providing the employee has worked at least one day in the calendar week in which the holiday falls.

B. Employee who has been on the payroll for 1 year or more but less than 5 years and has worked 150 Days during the last year of employment shall receive 1 week's paid vacation; 5 to 10 years - 2 weeks' paid vacation; 10 or more years - 3 week's paid vacation.

C. Employees on the seniority list shall be paid a one hundred dollar ($100.00) bonus for every four hundred (400) hours worked, up to a maximum of five hundred dollars ($500.00)

All drivers working on a defined hazard material job site shall be paid a premium of $2.00 per hour over applicable rate.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Pick-up trucks, station wagons, & panel trucks

GROUP 2: Two-axle on low beds

GROUP 3: Two-axle dump truck

GROUP 4: Three-axle dump truck

GROUP 5: Four- and five-axle equipment

GROUP 6: Low-bed or boom trailer.

GROUP 7: Trailers when used on a double hook up (pulling 2 trailers)

GROUP 8: Special earth-moving equipment, under 35 tons

GROUP 9: Special earth-moving equipment, 35 tons or over

GROUP 10: Tractor trailer

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

NOV 2015

52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION 2020-O0008).

OCT 2020

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.228-2 Additional Bond Security OCT 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-

O0016)

FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds MAY 2014 52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .