Solicitation W912WJ20Q0057.pdf

PDF 8 MB Posted

Attached to
Well Decommissioning, Littleville Lake, Huntington, MA
Solicitation number
W912WJ20Q0057
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LITTLEVILLE LAKE PROJ OFC

MATTHEW COLEMAN

GOSS HILL ROAD

HUNTINGTON MA 01050-9744

TEL: 978-318-8846 FAX:

W13G86918227920001

REQUEST FOR QUOTATIONS

(THIS IS NOT AN ORDER) 1

PAGE OF PAGES

1. REQUEST NO. 2. DATE ISSUED RATING

W912WJ20Q0057 13-Mar-2020 5a. ISSUED BY

8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this

Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State, and local taxes)

ITEM NO.

(a)

SUPPLIES/ SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e) (f)

SEE SCHEDULE

AMOUNT

% No. %

NOTE: Additional provisions and representations [ ] are [ ] are not attached.

13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and ZIP Code)

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

15. DATE OF

QUOTATION

16. NAME AND TITLE OF SIGNER (Type or print) (Include area code)

TELEPHONE NO.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)

PREVIOUS EDITION NOT USABLE Prescribed by GSA FAR (48 CFR) 53.215-1(a)

THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE

6. DELIVER BY (Date)

SEE SCHEDULE

AND/OR DMS REG. 1

UNDER BDSA REG. 2

4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE

REQUEST NO.

U S ARMY ENGR DISTRICT, NEW ENGLAND

696 VIRGINIA RD

CONCORD MA 01742-2751

9. DESTINATION (Consignee and address, including ZIP Code)

7. DELIVERY

[ ]X FOB

DESTINATION

[ ] OTHER

(See Schedule)

03-Apr-2020(Date)

PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.

978-318-8324JENNIFER M SAMELA

(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:

d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS

W912WJ20Q0057

Section B - Supplies or Services and Prices

INSTRUCTIONS TO OFFERORS

*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE. SEE CLAUSE 52.236-27

FOR ADDITIONAL INFORMATION.

*PLEASE DIRECT QUESTIONS TO JENNIFER M. SAMELA AT (978) 318-8324 or

JENNIFER.M.SAMELA@USACE.ARMY.MIL. ANY INFORMATION RECEIVED AT THE SITE VISIT

WHICH CONFLICTS WITH THIS SOLICITAION SHOULD BE BROUGHT TO THE ATTENTION OF

JENNIFER M. SAMELA. THE SOLICITATION AND RESULTING CONTRACT SHALL BE THE

GOVERNING DOCUMENT IN ALL CASES.

**QUOTES CAN BE E-MAILED TO JENNIFER M. SAMELA AT

JENNIFER.M.SAMELA@USACE.ARMY.MIL.

NOTE 1: In accordance with FAR Part 28.102-1(b), the Contractor will be required to provide the following payment protections for all construction contracts greater than $150,000.00.

(i) Payment Bond or

(ii) Irrevocable Letter of Credit and

(iii) Performance Bond

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

A Performance Bond shall be required if the total price of the quote is greater than $150,000.00. The penal amount of the Performance Bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall also be submitted to the Contracting Officer within 10 days after receipt of award.

NOTE 2: In accordance with FAR Part 28.102-1(c), the Contractor will be required to provide one of the following payment protections for all construction contracts greater than $35,000.00 but not greater than $150,000.00.

(i) Payment bond or

(ii) Irrevocable letter of credit

A Payment Bond or Irrevocable Letter of Credit is the SELECTED payment protection for the Government. The penal amount of bond shall be 100% of the original contract price. If the contract price increases, the Government will require an increase in the penal sum of the existing bond. This bond shall be submitted to the Contracting Officer within 10 days after receipt of award.

**No Payment Protections Required for construction contracts less than $35,000**

NOTE 3:

QUOTATION INSTRUCTIONS:

1. If subcontractor will be used for this work, please provide company names:

2. In accordance with FAR Part 52.204-7(b)(1) Contractors must be registered in the System for Award Management (SAM) database (www.SAM.gov) to submit an offer. (Formerly the Central Contractor Registration

(CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website. Please note that Google and Google Chrome are not supported browsers for SAM registration. Mozilla FireFox, Safari, and Internet Explorer are supported browsers.

NOTE: SAM.gov registration takes approximately 3 weeks (DUNS registration 1-2 business days; CAGE code validation up to 10 business days; IRS validation and overall submission 7-10 business days). It is the contractor’s responsibility to track SAM.gov registration and follow-up with required tasks.

In addition, if you are registering a new entity in SAM.gov, you must provide an original, signed notarized letter stating that you are the authorized Entity Administrator. The Entity Administrator must establish a LOGIN.GOV account using the e-mail address that will be associated with the SAM registration. See https://www.gsa.gov/about-us/organization/federal-acquisition-service/office-of-systems-management/integrated-award-environment-iae/sam-update for additional information.

3. Provide business DUNS number: _______________________________ (phone 800-333-0505 for DUNS).

4. Provide business CAGE code: __________________________________

5. Tax Identification Number: ___________________________________

6. Contractors shall provide completed FAR clause 52.204-8 (Annual Representations and Certifications) found in Section K of this solicitation with their quote, if the Contractors have not completed their annual representations and certifications electronically via the SAM website at www.sam.gov. (See Paragraph 2 above).

7. Contractors are not required to submit an Accident Prevention Plan (APP) with their quote. The successful offeror will be required to submit this document at the direction of the Technical Point of Contact. The APP must be accepted by the Government Designated Authority prior to the commencement of work.

POTENTIAL QUOTERS ARE NOTIFIED THAT THE BASIS ON WHICH AWARD WILL BE MADE IS

PRICE ALONE.

ALL RESPONSIBLE SOURCES MAY SUBMIT A RESPONSE WHICH, IF TIMELY RECEIVED, MUST

BE CONSIDERED BY THE AGENCY.

INVOICES SHALL BE SENT TO TECHNICAL POINT OF CONTACT.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job LVL Well Decommissioning

FFP

Contractor shall furnish all labor, materials, and equipment to fully decommission a former drinking water well at Littleville Lake, Huntington, MA in accordance with Statement of Work.

FOB: Destination

MILSTRIP: W13G8691822792

PURCHASE REQUEST NUMBER: W13G86918227920001

NET AMT

Section C - Descriptions and Specifications

STATEMENT OF WORK

WELL DECOMMISSIONING

U.S. ARMY CORPS OF ENGINEERS

LITTLEVILLE DAM

HUNTINGTON, MA

Statement of Work

I. General

1. Scope of work

Furnish all materials, equipment and labor to decommission a former domestic water well at Littleville Dam in Huntington, MA.

2. Location

The work site is located at 79 Littleville Road in Huntington, MA.

3. Site Visit Contact the Technical Point of Contact to arrange a site visit. The Technical Point of Contact for the project is Park Ranger Lydia Graham (978-318-8302) or (Lydia.F.Graham@usace.army.mil)

4. Schedule The work shall be completed 60 days from date of award. The project area will be open to the contractor Monday through Friday 7:00 AM to 3:30 PM and all work must be done during those hours unless additional hours are approved by the Technical Point of Contact.

No work shall be done on weekends or Government holidays.

5. Preconstruction Conference

Prior to the start of any work, the Technical Point of Contact will schedule and conduct a “Preconstruction Conference”. The Contractor’s Project Manager and Quality Control Personnel will attend this meeting. This conference will be held at the time and location agreeable to the government and contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the Technical Point of Contact to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government’s administration and inspection of contract work or obtain other pertinent information that might be required. At the Preconstruction conference the contractor shall provide to the name of the project superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Preconstruction Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor’s Safety Program (including sub-contractors).

iii. Accident Prevention Plan (Submitted & accepted prior to start of work on site)

iv. Activity Hazard Analysis (Submitted & accepted prior to start of work on site)

v. Weekly Safety Meetings (Documented on NED Form 251)

vi. Accident Reporting (ENG Form 3394)

vii. Safety Data Sheet (SDS) requirements

viii. Correspondence, Communication and Administrative Procedures.

ix. Invoice and payment.

6. Permits The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

7. Security

The contractor will comply with all established security policies at Littleville Dam. Due to periods of heightened security that may affect the access to the areas covered under this contract, areas may be subject to periodic closures, which in turn may reduce or inhibit the Contractor’s ability to access certain areas. During periods of heightened security, the Government reserves the right, at any time, to close any property or portion of property and reschedule and/or cancel any subsequent service in an area. The Contractor shall be given at least 24 hour notice of any such closure.

8. Contractor Conduct

Alcohol and firearms are prohibited on project grounds. Contractor and employees must comply with CFR 36 Rules and Regulations.

9. Payment

Payment shall be made on a per job basis. After final inspection and acceptance by the Government, the Contractor must submit an invoice to the Technical Point of Contact. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, process, and total amount due per line item.

All invoices may be mailed to:

U.S. Army Corps of Engineers C/O: Lydia Graham 49 Knightville Dam Road Huntington, Massachusetts 01050

Or Emailed to: Lydia.F.Graham@usace.army.mil

II. Technical Requirements:

Part 1 General:

Furnish all materials, equipment and labor to fill and decommission the former domestic water well located at 79 Littleville Rd, Huntington, MA 01050. All work will be in conformance with Massachusetts DEP guidelines for the decommissioning of private wells, and with Town of Huntington regulations.

Existing Conditions:

The existing well is 350 feet deep and in a casing 6 inches diameter. The casing depth is unknown. The cap is located in a concrete lined pit two feet deep. A 20 gallon pressure tank and some piping are located in the pit. The well was installed in 1962 and was last used as a water source in 1982. **NOTE: There is a wooden structure covering the well (see Information Photos). This structure will be removed by the Government prior to the start of work and shall not be included in the Contractor’s quote**

Requests for Information:

Requests concerning the work of this project should be directed to the Technical Point of Contact at the Littleville Dam Office at 978-318-8302 or Lydia.F.Graham@usace.army.mil

Submittals:

Although the Government technically reviews submissions required by this scope of work, it is emphasized that the Contractor’s work must be executed using proper internal controls and review procedures. The documents identified below must be prepared in accordance with the applicable standards, submitted for review and accepted by the government prior to the commencement of any field activities.

1. Accident Prevention Plan

2. Activity Hazard Analysis

3. First aid and CPR certifications

4. A valid Massachusetts Well Driller certification

5. Sealing Material Specifications

The following documents must be submitted for review and accepted by the government prior to the job being considered complete:

1. Well decommissioning report

Safety Requirements:

1. Accident Prevention Plan:

The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include an Activity Hazard Analysis (AHA) as described in Section 2 below.

All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385-1-1, most recent edition), and all applicable federal, state, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at Headquarters USACE website under publications using the following link:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1- 1.pdf

The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations. The Contractor shall comply with Federal Acquisition Regulation Clause No.

52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1-1, specifically Section 01.A.12 through 01.A.17 and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person. The contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project. USACE will provide a non-mandatory, fillable template APP. However, the contractor is permitted to submit their own plan, at a minimum it must meet the requirements listed in EM 385-1-1.

The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors. Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

The Contractor shall conduct a safety meeting at the project site on the first day of work, whenever a new activity or phase of work begins, or at least weekly during the progress of work.

All safety meetings shall be documented. The attached safety meeting form or a similar contractor-prepared form shall be used. Records of the safety briefings shall be submitted to the GDA weekly.

2. AHA:

An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHAs have been accepted by the GDA. A preparatory meeting shall be conducted by the contractor to discuss the AHAs contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime contractor and shall include all subcontractors and Government on-site representatives. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

3. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the GDA within 4 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident.

The Contractor shall complete the attached “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 5th calendar day of the following month. The method of transmission by the prime contractor to the GDA shall be electronically.

Clean Up:

The Contractor shall practice good housekeeping to maintain a safe job site. The contractor shall keep the work area, including any storage areas, free from the accumulation of waste materials.

Upon completing work in an area the contractor shall remove any tools, equipment, and materials that are not the property of the government. Upon completion of work, the Contractor shall clean up the job site to the satisfaction of the Government.

Government Resources:

The contractor is responsible for providing all materials to complete the project. Unless specified in the contract, the Government will not provide any equipment, telephone services or other resources. The contractor may use the restroom at the Knightville Dam Office but must proceed directly to and from the restroom.

Omissions:

This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, state, or federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Quality Assurance:

The contractor is responsible for the quality control of the contract work. The government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract. The contractor shall follow the Private Well Guidelines published in 2008 by the Massachusetts Department of Environmental Protection, available online at http://www.mass.gov/eea/docs/dep/water/laws/i-thru-z/prwellgd.pdf

Other Contracts:

The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other Contractors and Government employees. The contractor shall not commit or permit any act, which will interfere with the performance of work by another contractor, or by Government employees.

Environmental Protection:

Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the contractor at the site, and the site will be inspected/cleaned on a daily basis. No burning is permissible.

Water, air and land resources shall not be adversely impacted during the course of the work.

Contractor will take necessary steps to ensure all federal, state, and local environmental regulatory requirements are met.

Receiving and Storing Materials:

The contractor is responsible for protecting any stored material until it is placed in service. The contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive material or supplies for the contractor and will not be responsible for damage to contractor equipment or material.

Damage to Government or Private Property:

The Contractor shall be responsible for restoring any Government facilities or structures damaged as a result of the firm’s operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the firm’s operations. The Contractor shall notify the Technical Point of Contact immediately of damage to Government and private property and injury to any person resulting from the firms’ operation.

Part 2 Execution:

1. Contractor shall remove existing tank, piping, and well cap.

2. The well shall be filled, sealed, and decommissioned in accordance with Massachusetts DEP and Town of Huntington guidelines and regulations.

3. Well pit shall be backfilled and graded to match surrounding ground surface.

ATTACHMENTS

PLEASE REFER TO THE ATTACHMENTS INCLUDED AT THE END OF THIS SOLICITATION FOR

ADDITIONAL INFORMATION.

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 60 dys. ADC 1 LITTLEVILLE LAKE PROJ OFC

MATTHEW COLEMAN

GOSS HILL ROAD

HUNTINGTON MA 01050-9744

978-318-8846 FOB: Destination

961305

Section H - Special Contract Requirements

SECURITY REQUIREMENTS

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the Technical Point of Contact NLT 5 calendar days after the completion of the training.

WAGE DETERMINATION

General Decision Number: MA20200004 03/13/2020

Superseded General Decision Number: MA20190004

State: Massachusetts

Construction Type: Residential

Counties: Barnstable, Berkshire, Bristol, Essex, Hampden, Hampshire, Middlesex, Norfolk, Plymouth, Suffolk and Worcester Counties in Massachusetts.

RESIDENTIAL CONSTRUCTION PROJECTS (including single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/14/2020 2 03/13/2020

BRMA0001-026 02/01/2019

LOWELL CHAPTER

MIDDLESEX COUNTY (Acton, Asby, Ashland, Ayer, Bedford, Billerica, Boxboro, Carlisle, Chemsford, Dracut, Dunstable, Framingham, Ft. Devens, Groton, Holliston, Hopkinton, Hudson, Littleton, Lowell, Maynard, Natick, North Acton, Pepperell, Sherborn, Shirley, South Acton, Stow, Tewksbury, Townsend, Tyngsboro, West Acton, Westford, Wilmington) NORFOLK (Medfield, Medway, Mills) WORCESTER (Ashbumham, Athol, Fitchburg, Gardner, Harvard, Hopedale, Hubbardston, Lancaster, Leominster, Luneburg, Milford, Petersham, Phillipston, Princeton, Royalston, Southboro, Sterling, Templeton, Westminster, Winchendon)

Rates Fringes

Bricklayer, Plasterer, Stonemason.......................$ 51.41 31.09

BRMA0001-027 02/01/2019

SPRINGFIELD/PITTSFIELD CHAPTER

BERKSHIRE, HAMPDEN, HAMPSHIRE, WORCESTER (Warren) COUNTIES

Bricklayer, Plasterers, Stonemasons, Tile Layers.........$ 41.96 29.80

BRMA0001-028 02/01/2019

FOXBORO CHAPTER

BRISTOL (Attleboro, Berkley, Dighton, Mansfield, North

Attleboro, Norton, Raynham, Rehoboth, Seekonk, Taunton) NORFOLK (Bellingham, Canton, Dedham, Foxboro, Franklin, Norfolk, Norwood, Plainville, Sharon, Walpole, Westwood, Wrenhtham) PLYMOUTH (Lakeville)

BRICKLAYER.......................$ 51.41 31.09

BRMA0001-029 02/01/2019

WORCESTER CHAPTER

(Auburn, Barre, Blackstone, Berlin, Bolton, Boylston, Brookfield, Charlton, Clinton, Douglas, Dudley, Grafton, hardwick, Holden, Leicester, Mendon, Millbury, Millville, New Braintree, Northboro, Northbridge, Oakham, Oxford, Paxton, Rutland, Shrewbury, Southbridge, Spencer, Sturbridge, Sutton, Upton, Uxbridge, Webster, Westboro, West Boylston, Worcester)

Bricklayer, Plasterer, Stonemason.......................$ 51.41 31.09

BRMA0003-026 02/01/2019

BOSTON CHAPTER

MIDDLESEX (Arlington, Cambridge, Everett, Malden, Medford, Melrose, Somerville) NORFOLK (Brookline, Milton) SUFFOLK

BRICKLAYER.......................$ 53.55 31.88

BRMA0003-027 02/01/2019

LYNN CHAPTER

ESSEX (Amesbury, Andover, Beverly, Boxford, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipsewich, Lawrence, Lynn, Lynnfield, Manchester, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salisbury, Salem, Saugus, Swampscott, Topsfield, Wakefield, Wenham, West Newbury) MIDDLESEX (Reading, North Reading, Wakefield)

Bricklayer, Plasterer............$ 53.55 31.88

BRMA0003-028 02/01/2019

NEWTON CHAPTER

MIDDLESEX (Newton); NORFOLK (Dover, Needham, Wellesley)

BRMA0003-029 02/01/2019

NEW BEDFORD CHAPTER

BARNSTABLE, BRISTOL (Acushnet, Darmouth, Fairhave, Fall River, Freetown, New Bedford, Somerset, Swansea, Westport) PLYMOUTH (Marion, Mattapoisett, Rochester, Wareham)

BRICKLAYER.......................$ 53.55 31.88

BRMA0003-030 02/01/2019

QUINCY CHAPTER

NORFOLK (Avon, Braintree, Cohasset, Holbrook, Quincy, Randolph, Stoughton, Weymouth) PLYMOUTH (Abington, Bridgewater, Brockton, Carver, Duxbury, East Bridgewater, Halifax, hanover, Hanson, Hingham, Hull, Kingston, Marshfield, Middleboro, Norwell, Pembroke, Plymouth, Rockland, Scituate, West Bridgewater, Whitman)

BRMA0003-031 02/01/2019

WALTHAM CHAPTER

MIDDLESEX (Belmont, Burlington, Concord, Lixington, Lincoln, Stoneham, Sudbury, Waltham, Watertown, Wayland, Weston, Winchester, Woburn)

BRMA0003-032 08/01/2018

BARNSTABLE, BRISTOL, SUFFOLK AND WORCESTER

Rates Fringes

Tile Layer.......................$ 40.40 31.52

CARP0108-012 09/04/2017

BERKSHIRE, HAMPDEN, HAMPSHIRE AND WORCESTER (Gilbertville, Hardwick, Warren, West Brookfield)

Carpenters (Including Drywall Hanging & Acoustical Ceiling Installation)....................$ 35.56 23.76

CARP0327-003 09/01/2019

MIDDLESEX (Belmont, Cambridge, Everett, Malden, Medford, Somerville) NORFOLK (Brookline, Dedham, Milton) and SUFFOLK

Hanging & Acoustical Ceiling Installation)....................$ 49.79 29.30

CARP0336-008 09/01/2019

WORCESTER COUNTY

(except Gilbertville, Hardwick, Warren, West Brookfield)

Hanging & Acoustical Ceiling Installation)....................$ 41.90 29.00

CARP0339-003 09/01/2019

BRISTOL (Attleborough, North Attleborough) ESSEX, MIDDLESEX (Except Belmont, Cambridge, Everett, Malden, Medford, Somerville) NORFOLK (Bellingham, Canton, Foxboro, Franklin, Medfield, Medway, Millis, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Wrentham) and PLYMOUTH (Duxbury, Hanover, Hingham, Hull, Marshfield, Norwell, Pembroke, Rockland and Scituate)

Hanging & Acoustical Ceiling Installation)....................$ 41.90 29.00

CARP0624-008 09/01/2017

BARNSTABLE, BRISTOL (Except Attleboro and North Attleboro) AND PLYMOUTH (Bridgewater, Brockton, Kingston, Lakeville, Middleboro, Plymouth, South Hanover, Whitman)

Hanging & Acoustical Ceiling Installation)....................$ 39.28 27.90

CARP0723-001 10/01/2019

ZONE 2: BARNSTABLE, BERKSHIRE, BRISTOL, ESSEX, HAMPDEN,

HAMPSHIRE, PLYMOUTH, WORCESTER COUNTIES AND PART OF MIDDLESEX,

NORFOLK AND SUFFOLK COUNTIES

(All other cities and towns in Massachusetts + Chelsea & Winthrop)

CARPENTER (New Wood Frame

Construction not exceeding 4 stories including basement) Wood framing, siding and exterior trim work..........$ 26.62 16.81 All other carpentry work on wood frame projects......$ 26.62 16.81

CARP0723-002 10/01/2019

ZONE 1: MIDDLESEX, NORFOLK AND SUFFOLK COUNTIES (Consists of Boston, Islands of Boston Harbor, Brookline, Cambridge, Dedham, Malden, Medford and Somerville)

Carpenters (New Wood Frame Construction not exceeding 4 stories including basement) Wood framing, siding and exterior trim work..........$ 31.64 16.81 All other carpentry work on wood frame projects......$ 31.64 16.81

* ELEC0007-008 12/29/2019

HAMPDEN (Except Chester and Holyoke); HAMPSHIRE (Belchertown, Ware)

ELECTRICIAN......................$ 43.41 24.20

* ELEC0007-009 12/29/2019

BERKSHIRE; HAMPDEN (Chester, Holyoke); HAMPSHIRE (Except Belchertown, Ware)

ELECTRICIAN......................$ 43.41 24.20

Teledata System Installer (Berkshire County)...............$ 43.41 24.20

ELEC0096-004 07/01/2019

MIDDLESEX (Ashby, Ashland, Ayer, Ft. Devens, Groton, Hopkinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend);

WORCESTER (Except Warren)

ELECTRICIAN......................$ 44.07 11%+22.53

Teledata System Installer........$ 30.10 25.32

ELEC0096-005 07/01/2019

WORCESTER (Warren)

Rates Fringes

ELECTRICIAN......................$ 44.07 11%+22.53

ELEC0099-005 06/01/2017

BRISTOL (North & South Attleboro, Seekonk)

Rates Fringes

ELECTRICIAN......................$ 28.56 6.3%+13.91

ELEC0103-002 09/01/2019

ESSEX (Amesbury, Andover, Boxford, Georgetown, Groveland, Haverhill, Lawrence, Merrimac, Methuen, Newbury, Newburyport, North Andover, Rowley, Salisbury, West Newbury); MIDDLESEX (Bedford, Billerica, Boxboro, Burlington, Carlisle, Chelmsford, Dracut, Dunstable littleton, Lowell, North Reading, Tewksbury, Tyngsboro, Westford, Wilmington)

ELECTRICIAN......................$ 53.01 32.74

ELEC0103-004 09/01/2019

ESSEX (Beverly, Danvers, Essex, Gloucester, Hamilton, Ipswich, Manchester, Marblehead, Middleton, Peabody, Rockport, Salem, Topsfield, Wenham)

ELEC0103-010 09/01/2019

ESSEX (Lynn, Lynnfield, Nahant, Saugus, Swampscott); MIDDLESEX (Acton, Arlington, Belmont, Cambridge, Concord, Everett, Framingham, Holliston, Lexington, Lincoln, Malden, Maynard, Medford, Melrose, Natick, Newton, Reading, Sherborn, Somerville, Stoneham, Sudbury, Wakefield, Waltham, Watertown, Wayland, Weston, Winchester, Woburn); NORFOLK (Bellingham, Braintree, Brookline, Canton, Coahasset, Dedham, Dover, Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham and Hull); SUFFOLK

Teledata System Installer (ESSEX; MIDDLESEX {Excluding Ashby, Ashland, Ayer, Ft.

Devens, Groton, Hokinton, Hudson, Marlboro, Pepperell, Shirley, Stow, Townsend};

NORFOLK {Excluding Avon, Holbrook, Plainville, Randolph, Stoughton}; SUFFOLK)...$ 39.76 30.46

* ELEC0223-011 03/01/2020

BARNSTABLE, BRISTOL (Except Attleboro, North Attleboro, Seekonk); NORFOLK (Avon, Halbrook, Randolph, Sloughton);

PLYMOUTH (Except Hingham and Hull Townships)

ELECTRICIAN......................$ 42.87 31.18%+12.15

Teledata System Installer (PLYMOUTH COUNTY (except Townships of Hingham and Hull))...........................$ 36.27 31.09%+11.90

ELEV0004-003 01/01/2019

BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK AND SUFFOLK

Rates Fringes

ELEVATOR MECHANIC................$ 59.47 34.125+a+b

FOOTNOTE FOR ELEVATOR MECHANICS

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ELEV0041-007 01/01/2020

BERKSHIRE, HAMPDEN AND HAMPSHIRE

Rates Fringes

ELEVATOR MECHANIC................$ 54.85 34.765+a+b

FOOTNOTE:

a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.

b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.

ENGI0004-017 12/01/2019

BARNSTABLE; BRISTOL; ESSEX; MIDDLESEX, NORFOLK; PLYMOUTH;

SUFFOLK; and WORCESTER (Remainder of County)

Power Equipment Operator:

Excavators & Loaders.............$ 48.73 29.25+A

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Labor Day, Memorial day, Independence Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day.

ENGI0004-018 12/01/2019

WORCESTER (Athol, Barre, Brookfield, East Brookfield, hardwick, New Braintree, North Brookfield, Oakham, Petersham, Phllipston, Royalston, Struthbridge, Templeton, Warren, West Brookfield, Winchendon)

Power Equipment Operator:

Excavators & Loaders.............$ 48.73 29.25+A

FOOTNOTES:

a. New Year's Day, Washington's Birthday, Memborial Day, Independence Day, Labor Day, Patriots Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day.

ENGI0098-012 12/01/2016

BERKSHIRE; HAMPDEN and HAMPSHIRE COUNTIES

Rates Fringes

Power Equipment Operator:

Excavators & Loaders.............$ 33.68 23.96+A

FOOTNOTE:

a. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day

LABO0022-014 06/01/2018

Rates Fringes

Laborers: Mason Tender, Stone/Stucco.....................$ 33.25 22.92

LABO0473-003 06/01/2018

BERKSHIRE, HAMPSHIRE (Chesterfield, Cummington, Goshen, Middlefield, Plainfield and Worthington)

Stone/Stucco.....................$ 26.40 20.75

LABO0596-007 06/04/2018

HAMPDEN, HAMPSHIRE (except Chesterfield, Cummington, Goshen, Middlefield, Plainfield and Worthington)

Stone/Stucco.....................$ 31.25 22.19

PAIN0035-016 01/01/2019

BERKSHIRE, HAMPDEN, AND HAMPSHIRE COUNTIES

Rates Fringes

PAINTER (DRYWALL FINISHING

ONLY)............................$ 32.33 26.35

PAIN0035-017 01/01/2019

BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, PLYMOUTH,

SUFFOLK, AND WORCESTER COUNTIES

PAINTER (DRYWALL FINISHING

ONLY)............................$ 39.86 30.25

PLAS0534-006 01/01/2019

MIDDLESEX; NORFOLK AND SUFFOLK COUNTIES

PLASTERER........................$ 42.00 36.21

* PLUM0004-006 03/01/2020

MIDDLESEX (Ashby, Ayer-West of Greenville branch of Boston and Maine Railroad, Ft. Devens, Groton, Shirley, Townsend) WORCESTER (except Hopedale and Southboro)

Plumbers, Pipefitters (including HVAC work)............$ 45.41 26.56

PLUM0012-008 03/01/2019

ESSEX(Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence,Manchester, Marblehead, Merrimac, Methuem, Middleton, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Topsfieild, Wenham, West Newbury)

PLUMBER..........................$ 52.61 29.93

PLUM0012-009 03/01/2019

ESSEX(Lynn, Lynnfield, Nahant, Saugus, and Swampscott);

MIDDLESEX (Acton, Arlington, Ashland, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlisle, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Waltham, Watertown, Wayland, Westford, Wilmington, Winchester, Wobrun); NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medfield, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth, Wrentham); PLYMOUTH (Hingham, Hull, Scituate); SUFFOLK;

WORCESTER (Hopedale and Southboro)

PLUMBER..........................$ 56.69 29.93

PLUM0051-006 09/01/2018

BARNSABLE; BRISTOL; PLYMOUTH (Except Hingham, Hull, Scituate)

Rates Fringes

Plumbers, Pipefitters (including HVAC work)............$ 42.04 29.91

PLUM0104-005 09/17/2019

BERKSHIRE (Becket, Otis, Sandisfield); HAMPDEN; HAMPSHIRE

Rates Fringes

Plumbers, Pipefitters (including HVAC work)............$ 41.21 25.90

FOOTNOTE FOR PLUMBERS & STEAMFITTERS:

A. Paid holidays: Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer.

PLUM0104-011 09/17/2019

BERKSHIRE (Except Becket, Otis, Sandisfield)

Rates Fringes

Plumbers, Pipefitters (including HVAC work)............$ 41.21 25.90

FOOTNOTE FOR PLUMBERS & STEAMFITTERS:

A. Paid holidays: Independence Day and Labor Day, provided the employee has been employed seven days prior to the holiday by the same employer.

PLUM0537-006 09/01/2016

ESSEX (Ames, Andover, Beverly, Boxford, Byfield, Danvers, Essex, Georgetown, Gloucester, Groveland, Hamilton, Haverhill, Ipswich, Lawrence, Lynn, Lynnfield, Manchester, Marblehead, Merrimac, Methuem, Middleton, Nahant, Newbury, Newburyport, North Andover, Peabody, Rockport, Rowley, Salem, Salisbury, Saugus, Swampscott,Topsfield, Wenham, West Newbury); MIDDLESEX (Acton, Arlington, Ashford, Ayer-except west of Greenville Branch of Boston & Maine Rail Road, Bedford, Belmont, Billerica, Boxboro, Burlington, Cambridge, Carlise, Chelmsford, Concord, Dracut, Dunstable, Everett, Framingham, Hudson, Holliiston, Hopkinton, Lexington, Lincoln, Littleton, Lowell, Malden, Marlboro, Maynard, Medford, Melrose, Natick, Newton, North Reading, Pepperell, Reading, Sherborn, Somerville, Stoneham, Stow, Sudbury, Tewksbury, Tyngsboro, Wakefield, Watham, Watertown, Wayland, Westford, Wilmington, Winchester and Woburn), NORFOLK (Bellingham, Braintree, Brookline, Canton, Cohasset, Dedham, Dover, Foxboro, Franklin, Medford, Medway, Millis, Milton, Needham, Norfolk, Norwood, Plainville, Quincy, Sharon, Walpole, Wellesley, Westwood, Weymouth and Wrentham); PLYMOUTH (Hingham, Hull, Scituate);

SUFFOLK; WORCHESTER (Hopedale and Southboro)

Pipefitter including HVAC work...$ 50.19 29.76

ROOF0033-006 08/01/2019

BARNSTABLE, BRISTOL, ESSEX, MIDDLESEX, NORFOLK, SUFFOLK,

WORCESTER

Roofer, Waterproofers/Caulkers...$ 44.64 28.38

ROOF0248-004 07/16/2019

BERKSHIRE, HAMPDEN, HAMPSHIRE

Rates Fringes

Roofer, Waterproofers/Caulkers...$ 32.16 26.50 ROOFER: Slate & Tile Roof.......$ 32.66 27.00

SHEE0017-004 10/01/2015

WORCESTER (Harvard, Lancaster)

Rates Fringes

Sheet metal worker...............$ 35.60 30.05

SHEE0017-010 10/01/2015

BARNSTABLE, BRISTOL (Acushnet, Dartmouth, Dighton, Fairhaven, Fall River, Freetown, New Bedford, Rehoboth, Seekonk, Somerset, Swansea, Westport); PLYMOUTH (Marion, Mattapoisett, Rochester, Wareham)

Sheet Metal Worker...............$ 35.60 30.05

SHEE0017-011 10/01/2015

BRISTOL (Attleboro, Berkley, Easton, Mansfield, North Attleboro, Norton, Raynham, Taunton); ESSEX; MIDDLESEX;

NORFOLK; PLYMOUTH (Except Marion Mattapoisett, Rochester, Wareham); SUFFOLK

Sheet Metal Worker...............$ 35.60 30.05

SHEE0063-002 01/01/2016

WORCESTER (Except Harvard & Lancaster)

Rates Fringes

Sheet metal worker...............$ 31.57 28.12

SHEE0063-004 01/01/2016

BERKSHIRE, HAMPDEN AND HAMPSHIRE COUNTIES

Sheet metal worker...............$ 31.57 28.12

SUMA2003-001 01/08/2003

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 39.38

FLOOR LAYER: Carpet.............$ 31.96

LABORER

Unskilled...................$ 18.73 6.33

PAINTER

Brush & Roller, excluding drywall finishing...........$ 30.86

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section I - Contract Clauses

CLAUSES INCORPORATED BY REFERENCE

52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-19 Incorporation by Reference of Representations and

Certifications.

DEC 2014

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment.

DEC 2019

52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION 2019-O0003).

JAN 2019

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records AUG 2018 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-27 Affirmative Action Compliance Requirements for

Construction

APR 2015

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

AUG 2011

52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

DEC 2013

52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed

Price) (Short Form)

APR 1984

52.249-10 Default (Fixed-Price Construction) APR 1984

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

SEP 2011

252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7000 Disclosure Of Information OCT 2016 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber

Incident Reporting

DEC 2019

252.204-7015 Notice of Authorized Disclosure of Information for Litigation…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .