Conchas Dam Foundation Drain Cleaning
Solicitation number
W912PP-24-Q-A025
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Created On:

05 Aug 2025, 17:06 PM Central Daylight Time

Solicitation/Contract Form Continuation

Conchas Foundation Drain Cleaning

Product Service Code: J045

SUBMISSION INSTRUCTIONS

Please submit quotes to SFC Rivera, Harry at harry.j.riverareyes@usace.army.mil. The Government intends to award a Firm Fixed Price contract resulting from this solicitation to the responsible Offeror with the lowest technically acceptable price. SAM

****************Note to Offeror****************

The System for Award Management (SAM) registration (formerly CCR) should be completed prior to award of any resultant contract from the RFQ.

Failure to have this registration completed could cause delay of award or rejection of offer. To complete or update a SAM registration, go to www.sam.gov. Please provide the following information with quote:

UEI Number: ______________________ Federal Tax ID Number: ______________________ CAGE Code: ______________________

W912PP25QA025

Continuation of Supplies or Services and Prices/Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

The Contractor shall supply all labor, materials, equipment, shop facilities, supervision, tools, and any other items necessary to complete Foundation Drain Cleaning at Conchas Dam, In accordance with the Performance Work Statement

(PWS).

Product Service Code: J045 Pricing Arrangement: Firm Fixed Price

1 Job

Continuation of Description

This is a non-personal services contract to complete Foundation Drain Cleaning (Weir Drains) at Conchas Dam Project.

The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary contractor who, in turn is responsible to the Government.

The Contractor shall supply all labor, materials, equipment, shop facilities, supervision, tools, and any other items necessary to complete a detailed Foundation Drain Cleaning at Conchas Dam, as described on the Performance Work Statement (PWS). The Contractor shall verify all existing conditions, sizes, and quantities prior to start of work.

Requirements Contractor shall supply all labor, materials, equipment, shop facilities, supervision, tools, and any other items necessary to complete a detailed Foundation Drain Cleaning at Conchas Dam, as listed below.

PERFORMANCE WORK STATEMENT (PWS)

FY25 Conchas Dam Foundation Drain Cleaning

PART 1

GENERAL INFORMATION

1.0 General: This is a non-personal services contract to complete Foundation Drain Cleaning (Weir Drains) at Conchas Dam Project. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: In accordance with these specifications, the Contractor shall supply all labor, materials, equipment, shop facilities, supervision, tools, and any other items necessary to complete the herein detailed Foundation Drain Cleaning at Conchas Dam, as listed below.

The Contractor shall verify all existing conditions, sizes, and quantities prior to start of work.

1.2 Background: The Conchas Dam was built between 1935 and 1939, measuring 1,250 feet long and 200 feet high. Nine pipes, each 100 foot long of 12-inch diameter steel pipe drains with a slope of 3.5%, with the point of origin within a gutter in the Dam Operating Gallery and discharges on the downstream face of the Dam into the Stilling Basin. Each drainage pipe is approximately 14 foot above the water level in the Stilling Basin. History indicates that approximately every ten (10) years, the mineralization deposits and debris build up significantly and prevent proper drainage, as intended.

Water at Conchas Dam is highly mineralized, and deposits must be removed on a periodic basis. The last cleaning of the foundation drains occurred in 2014, with the two end pipes (1 and 9) being cleaned, in a similar manner to the prior cleaning. In 2004, all nine pipes were cleaned using a Vac-tor truck, similar to what is used for cleaning sewer lines. A grinding/cutting head jet propelled by high pressured water was used to clean/grind mineralized/calcium deposits. Access to drainpipe discharge ends was by use of a pontoon boat. The pontoon boat was nosed up to the fact of the Dam below each drainpipe and anchored to the face of the Dam. A ladder was anchored to the boat and to the face of the Dam, and the person on the ladder had to wear rain gear, a body harness, PFD, and had to be anchored to the face of the Dam for safety.

1.3 Objectives: The Contracts goals are as follows:

1.3.1 The Contractor shall provide all materials, tools, parts, equipment, labor, transportation, supervision, and other items to complete cleaning of the nine (9) Foundation Drains.

1.3.2 The Contractor shall provide a video documenting the inside of each drainpipe, nine (9) drainpipes in total, to the extent possible before any work is done to ascertain the existing condition of each of the drainpipes.

1.3.3 The Contractor shall provide a video documenting the inside of each drainpipe, nine (9) drainpipes in total, to the extent possible after the cleaning has taken place.

1.4 Scope: The Contractor shall prepare video footage of the inside of each drainpipe (before cleaning), complete the cleaning of the foundation drains, and provide video footage of the inside of each drainpipe (after cleaning). The Contractor shall provide all properly licensed equipment operators or skilled professionals required to complete the tasks herein.

1.5 Period of Performance: The period of performance shall be for 180 days from the date of Contract Award.

1.6 General Information:

1.6.1 Place of Performance: The work to be performed under this contract will be performed at Conchas Dam Project, office located at 287 Bell Ranch Rd, Conchas Dam, NM 88416, which is 32 miles northwest of Tucumcari, NM and 77 miles south of Las Vegas, NM.

1.6.2 Type of Contract: The Government will award a Firm, Fixed-Price Contract. One Final Payment to the Contractor of the fully contract amount will be made upon proper completion, acceptance, and approval of the contract work by the Contracting Officer Representative (COR) and/or the Lake Manager or other designated Government Representative. The Contractor will submit an invoice payment request to the Lake Manager for processing by the Army Finance Center upon certification of final testing and the warranty certificate.

1.6.3 Hours of Operation: The Contractor is responsible for conducting business between the hours of 0730 and 1600 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor must always maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.4 Recognized Holidays: The Contractor wis not required to perform services on the following recognized holidays:

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Christmas Day Independence Day

1.6.5 Quality Control: The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

The Contractor’s QCP is the means by which they assure themselves that their work complies with the requirement of the contract. The QCP shall be delivered within 30 days after contract award. Three copies of a comprehensive written QCP shall be submitted to the Contracting Officer (KO) and Contracting Officer Representative (COR) within 5 working days when changes are made thereafter.

After acceptance of the quality control plan the Contractor shall receive the contracting officer’s acceptance in writing of any proposed change to his QC system. The Contractor will not be required to have a separate Quality Control Manager (QCM) on-site during all work; while quality control and required reporting remain the sole responsibility of the Contractor, the Government will accept a superintendent or foreman as a representative of, and reporting directly to, the contractor’s QCM at the discretion of the Contractor, and subject to approval by the COR. The Contractor retains all liability for ensuring reporting accuracy. The QCM shall observe work at the site at a minimum of once per week during work performance.

1.6.6 Quality Assurance: The Government shall evaluate the contractor’s performance and compliance to the defined requirements within this contract.

1.6.7 Security Requirements:

1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.6.7.1.1 General Security Requirements and Guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements.

Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)).

Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance of the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles re subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable PRA plans and procedures – this includes identifying mission essential and no-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

1.6.7.1.2 Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the

RA.

1.6.7.1.3 Pre-screen Candidates Using E-Verify: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/eligible candidates shall be provided to the COR no later than three business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.

1.6.7.2 Key Control: The contractor shall establish and implement methods of making sure all keys/key cards issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the contractor by the Government shall be duplicated. The contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.2.1 In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the final payment due the contractor.

In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the final payment due the contractor.

1.6.7.2.2 The contractor shall prohibit the use of Government issued keys/key cards by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.2.3 Lock Combination: The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s Quality Control Plan.

1.5.7.2.4 Buddy Locks: Government will assist contract with establishing combination and padlock access. Where possible, combination and padlock access will be “buddy locked” with contract provided and controlled combination or padlocks. Contractor will not lock an area in a manner that limits or stops Government access to any government property or facility. All contractor locks not installed as a deliverable item within the execution of this contract must be removed upon completion of work.

1.6.8 Special Qualifications: The Contractor is responsible for ensuring that all employees possess the required certifications, licensure, safety equipment, etc.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.6.10 Key Personnel: The follow personnel are considered key personnel by the Government:

1.6.10.1 Contracting Officer: The Contracting Officer (KO) has the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The KO may assign certain authorized representatives of the contracting officer to act within the limits of their authority as delegated by the contracting officer. See contract documentation for KO information.

1.6.10.2 Contracting Officer’s Representative (COR): A COR will not be assigned to this contract. Instead, Lake Manager will coordinate with the KO in place of a COR.

1.6.10.3 Government Representative(s): The Government Representative(s) monitor(s) all technical aspects of the contract and assist(s) in contract administration and will perform the following: assure(s) that the Contractor executes the technical requirements of the contract, perform(s) inspections necessary in connection with contract performance; maintain(s) written and oral communications with the Contractor concerning aspects of the contract (issue written interpretations of technical requirements including Government drawings, designs, specifications), monitors Contractor’s performance, notifies both the Contracting Officer and Contractor of any deficiencies, coordinates availability of Government furnished property, and coordinate site entry of Contractor personnel.

The Government Representative(s) is/are not authorized to change any of the terms and conditions of the contract.

The Government Representatives located at the Conchas Dam Project Office are:

Lake Manager: The Conchas Lake Manager is responsible for the Adobe Belle Renovation Project location and may visit the work area to observe operations. The Lake Manager is not authorized to change any of the terms and conditions of the contract

Jonathan Hicks, Lake Manager, Jonathan.T.Hicks@usace.army.mil, Office: (575) 868-2221;

Maintenance Manager and Maintenance Staff: The Conchas Dam Maintenance Manager and maintenance staff are responsible for upkeep and repair activities at the Adobe Belle Renovation Project location and may visit the work area to observe operations. The Maintenance Manager and maintenance staff have no authority in this contract and are not authorized to change any, make judgment on, or enforce any of the terms or conditions of the contract.

mailto:Jonathan.T.Hicks@usace.army.mil

Charles (Chuck) Oswick, Maintenance Supervisor, Charles.E.Oswick@usace.army.mil, Office: (575) 868-2221;

Project Assistant: The Conchas Dam Project Assist is responsible for coordinating activities at the Adobe Belle Renovation Project location and may visit the work area to observe operations.

The Project Assistant has no authority in this contract and is not authorized to change any, make judgment on, or enforce any of the terms or conditions of the contract.

Christine Green, Project Assistant, Christine.D.Green@usace.army.mil, Office: (575) 868-2221; will serve as the primary Point of Contact or site-specific activities.

1.6.11 Identification of Contractor Employees: The Contractor shall provide a Contract Manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the Contractor when the manager is absent shall be designated in writing to the Contracting Officer. The Contract Manager or alternate shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between 0730 and 1600 Monday thru Friday except Federal holidays or when the Government facility is closed for administrative reasons. Qualifications for all key personnel are listed below.

All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contract personnel will not be required to obtain and/or wear badges during the performance of the work outlined in this PWS.

1.6.12 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose.

This right does not abrogate any other Government rights.

1.6.13 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

mailto:Charles.E.Oswick@usace.army.mil mailto:Christine.D.Green@usace.army.mil

1.6.14 Safety:

1.6.14.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385- 1-1 and OSHA Requirements: The Contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 in effect on the date of the contract award. EM 385-1-1 and its changes are available at https://www.publications.usace.army.mil/USACE- Publications/Engineer-Manuals/. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.

1.6.14.2 Zero Accident Goal: The Albuquerque District, in its continual pursuit of excellence in safety has established a goal of zero accidents. To attain this goal, it will be necessary for contractor management to set the expectation that worker injury is unacceptable and to create a culture where employees at all levels accept ownership of their safety performance.

1.6.14.3 Hazardous or Toxic Conditions: If the Contractor encounters any possible hazardous or toxic conditions, the POC must be notified immediately for appropriate action.

1.6.14.4 Contractor Accident Prevention Plan: Submit the Accident Prevention Plan (APP) for review and acceptance by the Government. A competent person must prepare the written site-specific APP. Prepare the APP in accordance with the EM 385-1-1 and the ENG Form 6293.

The APP is a written site-specific Safety and Occupational Health (SOH) plan that documents project, contract, and job-specific potential hazards in the workplace, and the company policies, controls, and work practices that will be used to minimize those hazards. Upon contractor approval, the plan must be submitted to the KO for review and acceptance prior to the performance of any work. No contract work can begin without a KO accepted APP.

1.6.15 Environmental Protection Plan: Prior to initiating any onsite work, the Contractor shall submit an Environmental Protection Plan (EPP) within 60 days after the contract award date and not less than 30 days before the Pre-Service Meeting. The purpose of the EPP is to present an overview of known or potential environmental issues that must be considered and addressed during the performance of the requirements of this PWS.

The Contractor shall revise the EPP throughout the Project to include any reporting requirements, changes in site conditions, or contract modifications that change the project scope of work in a way that could have an environmental impact. No requirement in this section will relieve the Contractor of any applicable Federal, State, and Local environmental protection laws and regulations. During the performance of the requirements of this PWS, the Contractor shall identify, implement, and submit for approval any additional requirements to be included in the EPP. A current version of the EPP shall be readily available onsite during the performance of the requirements of this PWS.

The EPP shall include, but is not limited to, the following elements:

A) General Overview and Purpose: A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as stormwater pollution prevention plan, spill control plan, solid waste management plan, wastewater management plan, air pollution control plan, contaminant prevention plan, pesticide management plan, traffic control plan, etc.

https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/ https://www.publications.usace.army.mil/USACE-Publications/Engineer-Manuals/

B) Duties: The duties and level of authority assigned to the person(s) on the job site who will oversee environmental compliance, such as who is responsible for adherence to the EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the site (if applicable), and who is responsible for training the Contractor’s environmental protection personnel.

C) Procedures: Standard and project-specific operating procedures that will be used to effectively manage and protect the environment on the project site.

D) Communication: Describe the communication and training procedures that will be used to convey environmental management requirements to Contractor employees and subcontractors.

E) Contact Information: Emergency contact information (office phone number, cell phone number, and email address) for responsible Contractor personnel.

F) Maps and Plans: Develop maps and plans that document the locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess oil or other hazardous material, if applicable. Delineation of all activities in each portion of the area and identify the areas of limited use or nonuse.

G) Stormwater Management and Control: The Contractor shall describe the current ground cover and erodibility of soils onsite. Temporary and permanent measures and structural practices to minimize surface water runoff and the subsequent mobilization of sediment during and following performance of the requirements of this PWS. The description should include effective selection, implementation, and maintenance of Best Management Practices (BMPs).

H) Protection of the Environment from Waste Derived from Contractor Operations: Describe practices to control and the disposal of solid, sanitary, and hazardous waste. At a minimum, include the following:

list of the types of hazardous wastes expected to be generated, procedures to ensure a written waste determination is made for appropriate wastes that are to be generated; sampling/analysis plan, including laboratory method(s) that will be used for waste determinations and copies of relevant laboratory certifications; methods and proposed locations for hazardous waste accumulation/storage (that is, in tanks or containers); management procedures for storage, labeling, transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted); management procedures and regulatory documentation ensuring disposal of hazardous waste complies with Land Disposal Restrictions;

management procedures for recyclable hazardous materials such as lead-acid batteries, used oil, and similar; used oil management procedures in accordance with 40 CFR 279; hazardous waste minimizing procedures; plans for the disposal of hazardous waste by permitted facilities; and procedures to be employed to ensure required employee training records are maintained.

I) Prevention of Releases to the Environment: Describe procedures to prevent releases to the environment. Include a process of notifications in the event of a release to the environment.

J) Regulatory Notification and Permits: List what notifications and permit applications must be made.

Some permits require many days to obtain. Demonstrate that those permits have been obtained or applied for by including copies of applicable environmental permits. The EPP will not be approved until the permits have been obtained.

K) Air Pollution/Engineering Processes: Identify planned air pollution-generating processes and management control measures (including, but not limited to, spray painting, abrasive blasting, demolition, material handling, fugitive dust, and fugitive remissions). Log hours of operations and track quantities of materials used.

L) Compliant Materials: Provide the Government a list of and SDSs for all hazardous materials proposed for use onsite. Materials must be compliant with all Clean Air Act regulations for emissions including solvent and volatile organic compound contents, and applicable National Emission Standards for Hazardous Air Pollutants requirements. The Government may alter or limit use of specific materials as need to meet installation permit requirements for emissions.

M) Spill Control Plan: The Contractor shall provide a Spill Control Plan, which shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations.

The Spill Control Plan supplements the requirements of EM-385-1-1. This plan shall include as a minimum:

• Name of Reporting Individual: The name of the individual who will report any spills or hazardous substance releases and who will follow-up with complete documentation. This individual shall immediately notify the Contracting Officer and Government Representative(s) in addition to the legally required Federal, State, and Local reporting channels (including National Response Center 1-800-424-8802) if a reportable quantity is released to the environment. The plan shall contain a list of the required reporting channels and telephone numbers.

• Name and Qualifications of Responsible Individual: The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.

• Training Requirements: Training requirements for Contractor’s personnel and methods of accomplishing the training.

• List of Materials and Equipment: A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified. All materials used on this project shall be new, of proper type and grade, of USA manufacture, as herein specified and shall be subject to approval. Rejected materials shall be promptly removed by the Contractor from the project site, properly disposed of, and replaced in a timely manner with acceptable materials at no additional expense to the Government.

• List of Suppliers: The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.

• Disposal Process: Disposal of all project waste shall be off-site and in accordance with all Federal, State, Regional, and Local laws and regulations.

PART 2

DEFINITIONS & ACRONYMS

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.

2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.1.6 Government: The term Government is used in this PWS to describe the U.S. Army Corps of Engineers Project and District Offices.

2.1.7 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS.

When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.8 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.9 Quality Assurance (QA): The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.

2.1.10 Quality Control (QC): All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 Site Safety and Health Officer (SSHO): This contract will allow the Contractor to utilize the foreman or superintendent to act as the Site Safety and Health Officer provided he or she meets all requirements laid out in the EM 385 1-1 Safety and Health Manual, Section 01.A.17. This person and all qualifications shall be established through submittal and approval by the USACE Safety Office. The manual will available free online through USACE.

2.1.12 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.13 Waters of the United States (WOTUS): The bodies of water subject to federal regulation under the Clean Water Act.

2.1.14 Work Day: The number of hours per day the contractor provides services in accordance with the contract.

2.1.15 Work Week: Monday through Friday, unless specified otherwise.

2.2 Acronyms:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation AT Antiterrorism CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf CUI Controlled Unclassified Information DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense EPP Environmental Protection Plan FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer NCIC-III National Crime Information Center-Interstate Identification Index NPDES National Pollutant Discharge Elimination System OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs OPSEC Operation Security PIPO Phase In/Phase Out PFD Personal Floatation Device POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QC Quality Control QCP Quality Control Program TE Technical Exhibit TSDB Terrorist Screening Database USACE U.S. Army Corps of Engineers

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.0 Government Furnished Items and Services:

3.1 Services: The Government will provide a site visit, if requested by the Contractor. The Government will also provide guidance and progress meetings, as necessary.

3.2 Facilities: The Government will provide the Contractor with any necessary keys or combinations to locks to access Conchas Dam Project areas in which the Contractor will require access upon the Contractor’s arrival for the performance of services and check in at the Visitor Center. Keys and lock combinations must be returned to the POC/COR upon completion of the work described in this PWS.

3.3 Utilities: The Government will make available and allow the Contractor the use of utilities and water for the tasks outlined in this PWS. If utilities are furnished, the following is required: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: The Government will not provide any equipment for performance of this contract.

3.5 Materials: The Government will provide utilities and water, maps to the area, office and work cell phone numbers for key personnel on the project, and work email addresses for all personnel for this contract.

3.6 Storage/Staging Area: The Contractor shall be supplied with a storage/staging area to be approved by the Contracting Officer or other Government Representative. The Contractor shall be responsible for keeping the area neat and shall not allow the accumulation of trash or debris.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0 Contractor Furnished Items and Responsibilities:

4.1 General: The contractor shall furnish all supplies, equipment, materials, parts, transportation, supervision, and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: A Security Facility Clearance is not necessary for this contract.

4.3 Materials: The contractor shall furnish all personnel, equipment, supplies, services, transportation, tools, materials, supervision, and other items (personal and non-personal) for services required to meet the requirements in this PWS.

4.4 Equipment: The contractor shall provide all necessary equipment to meet the requirements in this PWS.

4.5 Government Safety Requirements: The contractor shall submit their written Accident Prevention Program to the Contracting Officer for evaluation and acceptance. The plan must be submitted and approved before any on-site work begins. The plan must include an acceptable spill plan.

4.6 Service Contract Reporting (SCR): Not Required.

PART 5

SPECIFIC TASKS

5.0 Specific Tasks: The Contractor shall furnish all personnel, equipment, supplies, services, transportation, tools, materials, supervision, and other items (personal and non-personal) for services required to meet the requirements in Part 1 General portion of this PWS.

5.1 Task 1, Initial Kick-Off Meeting and Project Management Plan: The Contractor shall attend a project kick-off meeting and site visit within 14 days of contract award to discuss task requirements and expectations and formulate a proposed project schedule.

The Contractor shall develop and maintain a detailed Project Management Plan (PMP) for all tasks under the PWS. The PMP, based on the schedule prepared as part of the Contractor proposal, shall specify, schedule, and manage technical approach, and resources required for the planning, execution, and completion of each task’s performance objectives. The first draft of the PMP shall be due within 30 calendar days of the project kick off meeting. The draft PMP and subsequent revision shall be subject to Army review and approval through the Government Representative. The final PMP shall be due within 21 calendar days of receipt of Army comments. The Army will review and comment on the document. All comments shall be addressed. Once the contractor has addressed comments, the Contractor shall submit the Final PMP.

5.2 Task 2, Facility Renovations: The Contractor shall provide all materials, tools, equipment, labor, transportation, supervision, and other items to complete the cleaning of the Foundation Drains:

5.2.1 Provide Video Footage Before Work: The Contractor shall provide video footage on a

CD documenting the inside of each drainpipe, nine (9) drainpipes in total, to the extent possible before any work is done to ascertain the existing condition of all drainpipes.

5.2.2 Clean Foundation Drains: The Contractor shall clean nine (9) drainpipes, each 100’ long of 12” diameter steel drainpipe for removal of mineralization deposits and debris in each drainpipe. Each 12” diameter pipe drain has a 3.5% slope, originating in the Dam Operating Gallery and discharging on the downstream face of the Dam approximately 14 foot above the water in the Stilling Basin. Access to the drainpipe discharge ends will be by pontoon or flat platform boat only. The pontoon or flat platform boat will nose to the face of the Dam below each drainpipe and anchored to the face of the Dam. Any ladder used must be anchored to the boat and to the face of the Dam, and any individual on the ladder must be equipped with rain gear, a body harness, personal floatation device (PFD), and must be anchored to the face of the Dam for safety.

5.2.3 Provide Video Footage After Work: The Contractor shall provide video footage on a

CD documenting the inside of each drainpipe, nine (9) drainpipes in total, after the cleaning has occurred.

PART 6

APPLICABLE PUBLICATIONS

6.0 Applicable Publications (Current Editions): The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.

6.1 Federal:

Section 106: National Historic Preservation Act of 1966

CFR TITLE 33 CHAP 2 Part 230 Procedures for Implementing NEPA

CFR TITLE 33 CHAP 2 Part 328 Definitions of Waters of the United States

CFR TITLE 36 CHAP 8 Part 800 Subpart A Subsection 800.2 Participants in the Section 106 Process

CFR TITLE 40 CHAP 1 Subchapter J Part 355 Emergency Planning and Notification

Federal Acquisition Regulation Subpart 42.5 Post Award Orientation

42 USC Subsection 4321 National Environmental Policy Act (NEPA) of 1969

6.2 Department of Defense:

EM 385-1-1 Safety and Health Requirements Manual

ER 200-2-2 Procedures for Implementing NEPA

ER 1130-2-540 Environmental Stewardship Operations and Maintenance Policies

UFGS 01 33 00 Submittal Procedures

PART 7

ATTACHMENT/TECHNICAL EXHIBIT LISTING

7.0 Attachments and Technical Exhibit List:

7.1 Technical Exhibit 1: Performance Requirements

7.2 Technical Exhibit 2: Deliverables Schedule

7.3 Attachment 1: Adobe Belle Unit Identification

TECHNICAL EXHIBIT 1

Performance Requirements Summary The Contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum satisfactory levels of service required for each requirement. These thresholds are critical to mission success.

Performance Objective (The Service required—usually a shall statement)

Standard Performance Threshold (This is the maximum error rate.

It could possibly be “Zero deviation from standard”)

Method of Surveillance

Task # 1.

Project Management Plan and schedule and attend a Kick-Off Meeting after award and prior to performing the requirements of this

PWS.

The Contractor scheduled and attended a Kick-Off Meeting prior to performing the requirements of this PWS.

The minimum acceptable level of service shall be USACE acceptance and approval of the

PMP.

The POC shall provide a detailed report after the Pre- Service Meeting identifying the attendees of the meeting, discussions, issues, resolutions, etc.

Task # 2 Provide Video Footage Before Work

The Contractor shall complete all performance of any requirements within this PWS, pursuant to Section 5.2.1

Zero deviation from Standard.

Approval and acceptance as determined by the Government Representative.

Task # 3 Clean Foundation Drains

The Contractor shall complete all performance of any requirements within this PWS, pursuant to Section 5.2.2

Zero deviation from Standard.

Approval and acceptance as determined by the Government Representative.

Task # 4 Provide Video Footage After Work

The Contractor shall complete all performance of any requirements within this PWS, pursuant to Section 5.4

Zero deviation from Standard.

Approval and acceptance as determined by the Government…