Solicitation W912DR1920003 CA F LTP Data Inventory (14 JUN 19) FINAL.pdf
PDF 503 KB Posted
- Attached to
- FLTP Data Collection at Corps Facilities
- Opportunity number
- W912DR1920003
- Issued by
-
Department of Defense
About this file
Solicitation
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Opportunity Announcement
Funding Agency : Funding Instrument: Cooperative Agreement USACE – Institute for Water Resources Casey Building 7701 Telegraph Road Alexandria, VA 22315
Funding Opportunity No: W912DR1920003 CFDA No: 12.010 Program Title: US Army Corps of Engineers, Conservation/Recreation Interns to Perform Recreational Road Inventories
Issue Date: 13 JUN 19 Application Due Date: 27 JUN 19 Overview:
The US Army Corps of Engineers (USACE), Baltimore District, intends to enter into a single cooperative agreement with a non-profit organization that will provide expertise related to developing, verifying, and improving spatial data representing recreation and transportation facilities in the Portland, Tulsa, Ft. Worth, Vicksburg, Mobile, Wilmington, St. Louis and Louisville Districts. The Corps of Engineers will use the data collected to create a product that meets the management needs of key business lines and programs within the USACE that utilize different internal databases. This opportunity positions the USACE to be eligible for Federal Lands Transportation Program (FLTP) funding, which is used for road and parking lot maintenance improvements on Federally-owned land. The opportunity allows for one data collection manager and multiple data collection teams operating concurrently while implementing the agreement. Each data collection effort will require (1) a FLTP and Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE) compatible geodatabase containing verified project and recreation area road network polyline features and parking area polygon features for all projects mapped; (2) a layer containing verified traffic meter point locations compatible with the existing VERS database for all projects mapped; (3) layer containing bridge endpoint features for all projects mapped; (4) SDSFIE compatible geodatabase containing verified corps facilities and amenities point locations and attributes compatible for all projects mapped. See Attachments A for Projects and summary data on assets at those projects identified to be mapped. Pending Cooperative Agreement award, the USACE shall guarantee funding Tasks 1-2a, with option of funding any combination of Task 2b-9b within 150 days of award. Moreover, the USACE cannot fund Task “b” of any given district without funding Task “a” for that specific district.
The Recipient’s first effort will be an Operational Logistics and Implementation Plan with substantial involvement from CE-IWR based on alignment with the statement of objectives. This plan shall include staffing level and descriptions, position descriptions, key milestones, and situational guidance. Moreover, this task includes hiring the overall program manager within 4 weeks of award, recruit crew leaders and members within 6 weeks of award, and have initial crews working 8 weeks from award. Additional information on the tasks are provided under Section I: Funding Opportunity Description.
USACE is open to multiple crews operating concurrently but applicants’ budget estimates should be based on one crew per region. During the data collection seasons, the team leader will need to coordinate with local USACE Project staff related to the status of recreation areas.
This agreement is entered into pursuant to 33 USC 2339(a) - Assistance Programs.
Estimated Total Funding: $1,800,000 Estimated Number of Awards: 1 (one)
Contents of Full Text Announcement
I. Funding Opportunity Description V. Application Review Information II. Award Information VI. Award Administration Information III. Eligibility Information
IV. Application and Submission Information
Contact Information: Questions relating to Grants.gov including the registration process and system requirements should be directed to the Grants.gov Contact Center at 1-800-518-4726. For assistance with the requirements of this Funding Opportunity Announcement, please contact Jeffrey.may@usace.army.mil mailto:Jeffrey.may@usace.army.mil
Instructions to Applicants:
The complete funding opportunity announcement, application forms, and instructions are available for download at Grants.gov.
Applications in response to this Funding Opportunity Announcement shall be submitted by the application due date. Applications may be submitted by mail, email, or via the internet through Grants.gov.
Applicants shall have a Dun and Bradstreet Data Universal Numbering System (DUNS) number, register with the U. S. Government’s System for Award Management (SAM), and if submitting application via the internet, register with Grants.gov.
See Section IV of the Funding Opportunity Announcement for complete application submission information.
Statement of Objectives
For
Conservation/Recreation Interns to Perform Recreational Road Inventories
1.0 PURPOSE
The US Army Corps of Engineers (USACE) recreation areas receive some of the highest visitation of any areas in the federal system. In 2012, the USACE was included in the Map-21 legislation as part of the Federal Lands Transportation Program (FLTP), which was reauthorized under the Fixing America’s Surface Transportation (FAST) Act of 2015. This program provides funding for road improvement and data collection activities associated with an agency’s public transportation assets. In addition, USACE is a participant in Recreation.gov, an online reservation service for the federal agencies. In both programs, geospatial data has become a requirement. USACE has identified the need to develop, verify, and improve spatial data representing recreation and transportation facilities in USACE Water Resource Projects (Project). This information will be used to meet program requirements and to provide better information to visitors with regard to recreation on public land.
The results of this data collection effort will be used to create a product that meets the management needs of key business lines and programs within the USACE that currently use different internal databases. Additionally, this effort positions the USACE to stay eligible for FLTP funding, which is used for road and parking lot maintenance improvements. Spatial data representing the network of publically accessible roads and parking lots located on USACE fee owned property, as well as condition assessments, must be developed and maintained for use in GIS. Road network data may also be shared with local Emergency Management Agencies to advance public safety at USACE projects. The effort to verify and inventory recreation facility locations and attributes located on USACE fee owned land and managed by the USACE, will improve the spatial and descriptive accuracy of information used to manage the USACE recreation program and the information presented to current and potential visitors.
Purposes:
Collect geospatial and related attribute data for recreation and transportation assets.
Improve transportation information available to key stakeholders, such as US DOT, local DOT agencies, and local emergency services.
Improve recreation facility information available on recreation.gov or on local division, district or project websites.
Use existing data and systems where possible for source and collection of data.
1.2 Number of Crews/Interns
One overall program manager is required for this project. The recipient may use multiple crews made up of various team leader and member quantities operating concurrently with USACE approval in order to accomplish work within Period of Performance.
1.3 Tasks
Data collection will take place in the following districts and count of recreation funded Projects within that district where data collection will occur. Each data collection task will require (1) a FLTP and Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE) compatible geodatabase containing verified project and recreation area road network polyline features and parking area polygon features for all projects mapped; (2) a layer containing verified traffic meter point locations compatible with the existing VERS database for all projects mapped; (3) layer containing bridge endpoint features for all projects mapped; (4) SDSFIE compatible geodatabase containing verified corps facilities and amenities point locations and attributes compatible for all projects mapped. See Attachments A for Projects and summary data on assets at those projects identified to be mapped. Pending Cooperative Agreement award, the USACE shall guarantee funding Tasks 1-2a, with funding optional Tasks 2b-9b within 150 days of award. Moreover, the USACE cannot fund Task “b” of any given district without funding Task “a” for that specific district.
OPERATIONS & LOGISTICS
Task 1. Operations and Logistics:
Develop Operational Logistics and implementation plan with input and consultation from the USACE-Institute for Water Resources (IWR) and project manager based on alignment with this statement of objectives. This plan should include staffing level and descriptions, position descriptions, key milestones, situational guidance. Operations shall take into account all possible task options in the plan. Included in this task will be a need to inspect any existing equipment in the recipient’s possession and procure new/additional equipment as needed for all possible tasks. Expect this to be a 6 week overall effort including hiring the overall program manager within 4 weeks of award, recruit crew leaders and members within 6 weeks of award, and have initial crews working 8 weeks from the award (including time for training, relocation/training between districts, and on-site equipment testing).
Operational changes initiated by the recipient during the data collection season that potentially impact the collection procedures will be discussed and mutually agreed upon by both parties prior to communication to the data collection teams and their leaders.
DATA COLLECTION
USACE is open to multiple crews operating concurrently but estimates should be provided on a one crew per region cost. During the data collection seasons, the team leader will need to coordinate with local USACE Project staff related to the status of recreation areas. USACE areas can be impacted by high/low water conditions and since data collection tasks take place outdoors, weather can also impact delivery. The Recipient Program Manager will coordinate with the IWR Program Manager or Project Manager to coordinate rescheduled data collection as needed.
Task 2a. Portland District
Northwestern Division – Portland District – collection of linear, point and polygon data for transportation assets at 19 Projects, 85 CE managed recreation areas, 50 non-USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 2b. Portland District
Northwestern Division – Portland District – additional collection of data for recreation facilities at 19 Projects, 85 USACE managed recreation areas.
Task Option 3a. Tulsa District
Southwestern Division – Tulsa District – collection of linear, point and polygon data for transportation assets at 36 Projects, 256 USACE managed recreation areas, 279 non- USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 3b. Tulsa District
Southwestern Division – Tulsa District - additional collection of data for recreation facilities at 36 Projects, 256 USACE managed recreation areas.
Task Option 4a. Ft. Worth District Southwestern Division – Ft. Worth District – collection of linear, point and polygon data for transportation assets at 26 Projects, 181 USACE managed recreation areas, 177 non- USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 4b. Ft. Worth District
Southwestern Division – Ft. Worth District – additional collection of data for recreation facilities at 26 Projects, 181 USACE managed recreation areas.
Task Option 5a. Vicksburg District
Mississippi Valley Division – Vicksburg District –collection of linear, point and polygon data for transportation assets at 15 Projects, 196 USACE managed recreation areas, 50 non-USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 5b. Vicksburg District
Mississippi Valley Division – Vicksburg District – additional collection of data for recreation facilities at 15 Projects, 196 USACE managed recreation areas.
Task Option 6a. Mobile District
South Atlantic Division – Mobile District –collection of linear, point and polygon data for transportation assets at 11 Projects, 259 USACE managed recreation areas, 188 non- USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 6b. Mobile District
South Atlantic Division – Mobile District – additional collection of data for recreation facilities at 11 Projects, 259 USACE managed recreation areas.
Task Option 7a. Wilmington District
South Atlantic Division – Wilmington District - collection of linear, point and polygon data for transportation assets at 6 Projects, 64 USACE managed recreation areas, 65 non- USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 7b. Wilmington District
South Atlantic Division – Wilmington District - additional collection of data for recreation facilities at 6 Projects, 64 USACE managed recreation areas.
Task Option 8a. St. Louis District
Mississippi Valley Division – St. Louis District –collection of linear, point and polygon data for transportation assets at 9 Projects, 256 USACE managed recreation areas, 53 non-USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 8b. St. Louis District
Mississippi Valley Division - St. Louis District - additional collection of data for recreation facilities at 9 Projects, 256 USACE managed recreation areas.
Task Option 9a. Louisville District
Great Lakes & Ohio River Division – Louisville District –collection of linear, point and polygon data for transportation assets at 27 Projects, 85 USACE managed recreation areas, 148 non-USACE managed, and any USACE maintained "project roads" not in designated recreation areas (FLTP required transportation asset inventory).
Task Option 9b. Louisville District
Great Lakes & Ohio River Division – Louisville District- additional collection of data for recreation facilities at 27 Projects, 85 USACE managed recreation areas.
The selected districts are subject to change in the event of reductions in staff capacity or natural events that impact access to the assets
1.4 Period of Performance
Period of performance is 83 weeks. This includes the hiring of an overall program manager within 4 weeks of award, recruiting for crew leaders and members within 6 weeks of award, and crews working 67 weeks (including time for training, relocation/training between districts, and on-site equipment testing).
USACE prefers that the program manager and crew leaders serve throughout the entire data collection effort. The recipient may elect to hire new crews for each district. Length of time for each crew will vary based on the size of the district and quantity of assets to be mapped. Based in previous work of this nature, it takes an approximately one week travel to and to map/inventory an average size project.
2.0 AUTHORITY
2.1 In agreement with the above stated goals, the recipient/cooperator agrees to provide the necessary personnel, equipment, and materials required to implement, in part, the USACE’s responsibilities pursuant to Section 213(a) of the Water Resources Development Act of 2000, further amended by Section 1047(e) and located at 33 U.S.C.
2339 (a).
3.0 DESCRIPTION OF OBJECTIVES
3.1 Transportation Network Features
Roads and Parking Areas:
The nature of USACE managed roads falls into two general categories, Project roads on fee owned land outside of designated recreation areas and “area roads” in designated recreation areas within fee owned land. Centerline digitization and linear referencing of features in each category is required as part of this data collection and mapping effort.
While developing this dataset, where existing data is available, geospatial datasets will be provided. This data will need to be migrated into the data model for this project, and it may be necessary to modify existing road network polyline data that is provided. New polyline features may be initially created based on interpretation of aerial or satellite imagery however field verification using GPS is required to ensure spatial accuracy.
Parking area polygon delineations based on aerial or satellite imagery may also be initially created, with field verification performed.
Potential sources of existing road network features for reference or modification include corps project and/or district offices, TIGER/LINE files, and TeleAtlas roads geometry, among others. The user will have these provided, as well as polygon delineations for projects and recreation areas
Example sources of aerial or satellite imagery suitable for use in creating new polyline data include The National Map download platform from USGS, or orthoimagery products from the USDA NRCS Geospatial Data Gateway. Other sources of imagery maybe identified and used by the Recipient based on their knowledge and expertise.
Relational fields and attribute information associated with road network features will need to be created, and must meet required specifications set by the Department of Defense (DoD) Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE), as well as requirements from the FLTP program. USACE will provide a final SDSFIE compatible data model in Excel Format, a working draft version is attached (Attachment B).
The spatial accuracy of digitized road network and parking area features will need to be verified in the field with the use of hand held GPS units. This will require coordination with project staff and deployment to project sites with the geospatial data development team. Additionally, the accuracy of attribute information related to road network and parking area features will need to be verified with corps project staff to ensure correct feature descriptive information.
Other Transportation Features:
Vehicle Estimation and Reporting System (VERS) traffic meter locations will need to be verified as part of this transportation network mapping effort. Coordinates for meters found at project recreation areas will be provided, and must be verified using GPS in the field. For meters where the original coordinates need to be corrected, a new layer will be created with the use of the coordinates taken from the field verification. This layer will need to include all attributes of the existing dataset, including when a meter location is updated and key fields linking meters to information in existing databases. See Attachment B for the data model.
Point locations representing bridge endpoints will also be included as a type of feature in the mapped transportation network. Bridge endpoint locations may be initially determined using aerial or satellite imagery with field verification using GPS required to ensure spatial accuracy. USACE will provide a SDSFIE compatible data model in Excel Format.
3.2 Recreation Facilities and Amenities
Point locations representing USACE managed recreation facilities and amenities will be created. Recipient may use aerial or satellite imagery with field verification using GPS required to ensure spatial accuracy. Attribute data from other sources may be provided and will need to be field verified. USACE will provide a SDSFIE compatible data model in Excel Format. Any preexisting attribute data will be provided in excel format. See Attachment B for the data model.
Features provided by Recreation.gov to be verified including but not limited to trail heads, campgrounds, day use areas, multi-purpose areas, scenic viewing areas, visitor centers, water access points, marinas, and boat ramps.
Attribute data associated with these features will be provided from the USACE Operations and Maintenance Business Information Link (OMBIL) database, and will need to be joined to the spatial dataset through a relational field. As with other features included in this mapping effort, the descriptive accuracy of both existing and newly created facilities and amenities location data will need to be verified with project staff and in the field.
3.3 Conservation Projects
Not more than ten percent (10%) of the project should be dedicated to Conservation projects and activities that benefit both the recipient’s education, training, and leadership goals beyond the mapping/inventory requirements in the above tasks. This opportunity allows the crew members an expanded experience and will help participants to better understand the broad role of USACE and the work of field staff. See Attachment C for some conservation project suggestions.
3.4 Training
Providing location, housing and transportation for training is the responsibility of the recipient. The recipient will be responsible for providing technical training on GIS data collection and use of related software and equipment. USACE will provide training on specifications associated with specific elements to be mapped and attributes to be collected including interpretation of the related data models provided to the recipient.
3.5 Travel and Housing
The recipient is required to provide all lodging arrangements, recruiting, and mileage/transportation. In addition, the recipient is required to arrange travel to and from work locations for each student. Some of the USACE Projects may have campsites that can be made available to the crew while working at that site. Actual availability will have to be determined after the timing, logistics and schedule of data collection are developed. Respondents to this announcement should review the geographic distribution of projects in the selected districts (https://www.usace.army.mil/Locations.aspx, or https://geospatial-usace.opendata.arcgis.com/).
3.6 Uniforms
The recipient will provide uniforms for each participant. Due to nature of work along roadways, participants should wear long pants, closed toe shoes and high visibility apparel while collecting data. Some USACE districts may also require participants to wear an identification badge.
3.7 Funding
This work order is not to exceed $1,800,000.
4.0 QUALIFICATIONS
4.1 Minimum Qualifications:
a. Working knowledge of Geographic Information System (GIS) practice and principals in a planning or natural resource management context.
b. Familiar with and can use laptop computers.
c. Familiar with software products such as word processing, spreadsheet, presentation, relational databases and geospatial mapping.
d. Familiar with Global Positioning System (GPS) and devices or activities where GPS is utilized.
e. Must wear required uniform while on duty.
f. Must possess and maintain valid driver’s license
g. Possess good verbal and written communications skills.
h. Physical ability to navigate campground loops, swim areas and visit campsites, lift 20 lbs and carry a 20 lb. object 25 feet (position may require extended periods in the outdoors during adverse conditions such as heat, cold or rain.)
i. Ability to work as part of a team and take direction from USACE personnel.
4.2 Desired Experience (Not Mandatory)
a. Coursework, class exercises or degree in GIS, especially if in natural resources or planning context.
b. Previous paid or volunteer experience in collecting GIS or GPS data.
c. First Aid, CPR, AED training
d. Customer service or work with public (participants are likely to encounter the visiting public during data collection activities at the Projects)
e. Previous natural/environmental sciences or outdoor recreation experience as employee or volunteer.
5.0 GOVERNMENT FURNISHED MATERIALS OR PROPERTY
5.1 Facility and Office Equipment
During the period of performance, the government will not provide internet, telephone, drafting, printing, photocopying or photography equipment. Current DOD security measures mean that non Corps Computers are not allowed on the Corps network and access to USACE servers has been determined to not be required to complete this project.
Recipient will need to provide a central work location for primary internet access and other office needs.
USACE will provide a Government furnished hard drive to be used with USACE program management and participating projects to transfer data to/from the recipient. At the conclusion of the task, the hard drive will be returned to the USACE with the final deliverables and data sets.
Some USACE Projects may have guest WI-FI and temporary office space while working at that location. Should be noted that internet speeds are slower in field locations and cellular signals may be weak or nonexistent. The central work location may be the crew’s only high-speed internet access. Availability of office space and guest wi-fi will be determined after the timing, logistics and schedule of data collection are developed.
Army transportation, including fuel, will not be provided in performing data collection activities and fieldwork on the installation.
5.2 Facility: Temporary work space may be provided by the Government at each location if available. Availability of office space will be determined after the timing, logistics and schedule of data collection are developed.
5.3 Equipment:
Recipient is responsible for acquiring all equipment necessary to meet project requirements and deliverables. The following are some recommendations and/or specifications:
• Computer Hardware and Software that will allow for compatibility with ArcGIS
Online, ArcGIS Pro, and Collector for ArcGIS. ArcGIS Online subscription and ArcGIS Pro license required.
• GPS enabled Camera(s).
• GPS receivers that connect to Smartphones with ≤ 1 meter accuracy.
• WI-FI hotspots for internet access when working at Field locations with no guest
WI-FI.
• Measuring wheel
• Personal safety equipment suitable for working along roadways. Refer to USACE safety manual (EM 385-1-1) as appropriate. Link to manual -http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingR evised.aspx.
• Additional equipment as appropriate to meet project requirements and deliverables.
USACE will provide an ACE-IT approved USB hard drive. This may be used to store electronic versions of the documents and data for delivery back to USACE during and at the conclusion of this project.
Government, if available, can allow the use of government property for this work order.
Government furnished materials or property is governed by 2 C.F.R. Part 200.312 which states that a) Title to federally-owned property remains vested in the Federal government.
The non-Federal entity must submit annually an inventory listing of federally-owned property in its custody to the Federal awarding agency. Upon completion of the Federal award or when the property is no longer needed, the non-Federal entity must return the property to the Federal awarding agency for further Federal agency utilization.
6.0 PERIOD OF PERFORMANCE
6.1 83 weeks
7.0 COORDINATION
Meredith Bridgers, Federal Lands Transportation Program Manager USACE-IWR, Casey Building 7701 Telegraph Road Alexandrea, VA 22315 Tel: 703-428-8458 E-mail: Meredith.Bridgers@usace.army.mil
Zach Noordhoff USACE, Baltimore District, Operations Division, 2 Hopkins Plaza 02-G-28, Baltimore, MD 21201
ATTN: CENAB-OP-F
Tel: 410-962-6019 E-mail: Zachary.N.Noordhoff@usace.army.mil
8.0 DELIVERABLES
8.1 Logistics and Schedule
Prior to training or collecting data, recipient should provide an operational plan that includes logistics and data collection schedule for review by Meredith Bridgers, Zach Noordhoff or another designated USACE staff member for each District identified in Section 1.3 (Tasks). Moreover, an informal meeting that includes representatives from the recipient, USACE FLTP program and District operational staff to reach alignment with logistics and data collection schedule is required. Following that review, recipient may consult with Project POCs to discuss any arrangements or potential scheduling conflicts. The recipient may need to adjust the schedule based on activities occurring at a particular Project. A final schedule should be provided at least 2 weeks prior to data collection beginning at a specific Project.
8.2 Initial Data Assessment
At the conclusion of mapping approximately 10% of the assets in a district, or when the first Project is completely mapped, a data assessment should take place. This would be an informal meeting that included representatives from the recipient, USACE FLTP program and District/Project operational staff to review data to ensure that it will meet project specifications, operational needs, and be compatible with USACE systems. Date of this assessment will be determined after data collection has begun, with the location made at the USACE’s discretion.
8.3 Final Deliverables
Within 30 days of the conclusion of data collection the recipient should provide to the USACE the following items in accordance with District locations specified in 1.3 (Tasks):
• A FLTP and SDSFIE compatible geodatabase containing verified project and recreation area road network polyline features and parking area polygon features for all projects mapped.
• A layer containing verified traffic meter point locations compatible with the existing VERS database for all projects mapped.
• A layer containing bridge endpoint features for all projects mapped.
• A SDSFIE compatible geodatabase containing verified corps facilities and amenities point locations and attributes compatible for all projects mapped.
• A written report detailing the methods utilized during the mapping effort and identifying strengths and weaknesses of using and modifying existing data, and the techniques used to create new data in the absence of existing data. The report will also require feedback to be used to make recommendations for improvement if this mapping effort were to continue to include more USACE districts.
• A brief written report detailing conservation project descriptions, hours and outcomes.
All data collected by the recipient is the property of the US government. While the assets that are being mapped are public, the data may not be used or distributed by the recipient outside the scope of this work order.
8.4. Reporting Requirements. The following forms shall be utilized to meet reporting requirements:
SF-428 Tangible Personal Property Report SF-428 A – Annual Report (reporting Federally-owned property) SF-428 B – Final Report SF-428 C – Disposition Request RPSR – Real Property Status Report RPSP Attachment A – General Reporting RPSR Attachment B – Request to Acquire, Improve or Furnish
RPSR Attachment C – Disposition Request
9.0 Any resulting cooperative agreement is subject to and recipient/cooperator shall comply with 2 CFR 200.313 “Equipment”, 200.314 “Supplies”, and 200.315 “Intangible Property” which includes use of research data.
TASK 2A - FLTP TRANSPORTATION ASSETS TASK 2B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 2‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
PORTLAND 135 54.96 17.45 36.97 18.84 103 2.26 4.09 12.76 10.34 8 94 589 35 22 5 264 12 5 9 55 0
APPLEGATE LAKE OR 1 0 0 0.75 0 0 0 0 0.25 0 0 0 0 0 0 0 0 0 0 0 0 0
BIG CLIFF LAKE 1 0 0 0 0 0 0 0 0.23 0 0 0 0 0 0 0 0 0 0 0 0 0
BLUE RIVER LAKE OR 2 0 0 0.1 0 1 0 0 0.1 1 0 0 0 0 1 0 0 0 0 0 0 0
BONNEVILLE LOCK AND DAM‐LAKE
BONNEVILLE 14 7.04 0.78 9.2 1.05 44 1.26 0 3.48 2.03 2 15 0 10 1 0 30 5 0 1 10 0
COTTAGE GROVE LAKE OR 6 2.27 0.24 0 0 0 0 0 0 0.2 1 8 95 0 2 2 61 0 2 2 0 0
COUGAR LAKE OR 2 0 0 0.31 0 0 0 0 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0
DETROIT LAKE 1 1 0 0.5 0 0 0 0 0.2 1 0 1 0 0 0 0 0 0 0 0 0 0
DEXTER LAKE 5 0.67 1.5 0.5 1 0 0 0.04 0 0 0 3 0 0 0 0 0 0 0 0 1 0
DORENA LAKE OR 6 2.5 0.4 0 0 3 0.5 1.5 1.5 0.5 0 5 65 0 1 1 8 0 0 1 0 0
FALL CREEK LAKE OR 6 0.74 1.5 0.1 0 0 0 0 0.3 0.2 0 1 0 0 0 0 0 0 0 0 1 0
FERN RIDGE LAKE OR 16 2.52 0.88 0 0 0 0 0.25 0 2.24 0 8 0 1 1 0 17 0 0 0 2 0
FOSTER LAKE 8 3.17 0 3 0 1 0 0 0.2 0 0 1 0 0 1 0 20 0 0 0 1 0
GREEN PETER LAKE 7 2.93 0.21 0.1 0 1 0 0 0.4 0 0 2 0 0 0 0 0 0 0 0 2 0
HILLS CREEK LAKE 1 0 0 0.4 0 0 0 0 1 0.4 0 0 0 0 0 0 0 0 0 0 0 0
JOHN DAY LOCK AND DAM ‐ LAKE
UMATILLA 18 15.57 2.47 15.19 6.85 1 0 0 0 0 0 13 236 1 7 1 58 0 3 2 7 0
LOOKOUT POINT LAKE OR 4 0.25 1.17 0 0 0 0.4 0.5 0 4 24 0 2 0 7 0 0 0 2 0
LOST CREEK LAKE OR 21 6.5 1 2.1 1.4 25 0 0.8 0 1.4 3 22 12 17 2 1 28 7 0 2 15 0
THE DALLES LOCK AND DAM ‐ LAKE
CELILO 12 9.5 7.3 4.45 7.68 27 0.5 1.5 4.5 0.5 2 11 157 6 4 0 35 0 0 1 14 0
WILLOW CREEK LAKE 4 0.3 0 0.27 0.86 0 0 0 0 0.37 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 135 54.96 17.45 36.97 18.84 103 2.26 4.09 12.76 10.34 8 94 589 35 22 5 264 12 5 9 55 0
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐1
TASK 3A - FLTP TRANSPORTATION ASSETS TASK 3B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 3‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking
Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
TULSA 535 566.38 264.8 261.46 55.3 1501 11.7 48.02 7.28 49.11 177 642 5850 79 220 27 667 13 40 85 228 0
ARCADIA LAKE 5 10.78 0 0 0 94 0.05 0.19 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BIRCH LAKE 4 4.93 0.74 1.15 0 19 0.14 0.34 0 1 6 9 109 0 2 0 42 0 2 2 3 0
BROKEN BOW LAKE 8 15.8 8.25 0 0 36 0.25 13.25 0 0 0 0 0 0 0 0 0 0 0 0 0 0
CANTON LAKE 13 10.7 0.5 12.94 0.3 28 0 0.3 0.05 2.87 7 33 332 1 9 1 40 0 1 5 13 0
CHOUTEAU L&D‐MCCLELLAN‐KERR
ARKANSAS RIVER NAVIGATION SYSTEM 4 4.5 0.5 0 0 8 0 0 0 3 1 4 33 0 3 0 0 0 0 1 4 0
COPAN LAKE 5 5.03 2.6 4.5 3.6 33 0 0.09 0 3.6 2 16 130 3 3 0 15 0 1 2 6 0
COUNCIL GROVE LAKE 13 9.47 2.39 0 1.39 19 0 0.32 0 0 9 26 146 6 8 1 4 0 1 5 12 1
DENISON DAM ‐ LAKE TEXOMA TX AND
OK 107 92.26 86.24 0 4.89 211 2.31 12.31 0 8.94 15 51 650 4 22 2 60 0 2 3 17 22
EL DORADO LAKE 9 28.64 0.52 35.85 1.72 79 0.1 0.65 0 3.56 0 0 0 0 0 0 0 0 0 0 0 3
ELK CITY LAKE 4 7.14 2.02 3.4 1.16 19 1 1 0 0.4 1 10 35 3 1 0 2 0 0 2 3 0
EUFAULA LAKE 67 71.35 1.87 72 7 140 0 0 3 1 14 40 509 3 19 0 29 0 2 5 15 7
FALL RIVER LAKE 7 4.95 2.75 6.2 1.2 6 0 0 0.1 6 8 116 0 1 0 1 2 1 5 3 0
FORT GIBSON LAKE 37 32.45 14.58 0.5 0 86 0.23 1.3 0.57 3.5 8 34 314 1 15 2 30 0 2 3 12 8 FORT SUPPLY LAKE 5 7.99 0.8 3.27 0.44 28 2.23 0 2.53 2.3 3 13 126 1 8 7 14 0 1 2 10 0 GREAT SALT PLAINS LAKE 1 6.04 0.3 6.04 0.3 0 0.14 1.36 0.14 1.36 0 0 0 0 0 0 0 0 0 0 0 0 HEYBURN LAKE 4 3.58 1.01 3.58 1.01 15 0.05 0.02 0.05 0.02 6 13 98 1 3 0 18 0 2 2 4 0
HUGO LAKE 15 18.69 14.8 0 0 28 0.58 1.3 0 0 11 31 198 2 8 0 21 1 2 3 8 1
HULAH LAKE 7 3.54 4.34 1 8.5 7 0 0.58 0 0 1 8 34 0 5 0 12 0 0 0 1 0
JOHN REDMOND DAM AND RESERVOIR 11 6.33 53.67 10.22 0.5 16 0.33 0.2 0 1.68 10 22 117 5 6 0 2 0 0 2 6 2
KAW LAKE 16 17.4 5.75 3.35 0 62 0.5 2.1 0 0 13 39 270 3 13 0 25 2 1 3 12 6
KEYSTONE LAKE 27 29.23 9.52 12.48 2.16 111 1.38 1.45 0.12 0.22 3 36 169 6 8 2 26 0 2 5 11 0 MARION RESERVOIR 8 10.22 4.24 6.5 3 36 0.47 1.54 0 1.4 5 23 255 4 5 0 11 3 3 3 8 0
NEWT GRAHAM L&D‐MCCLELLAN‐KERR
ARKANSAS R NAVIGATION SYSTEM 4 2.7 0.12 2 0.5 3 0 0 0 1 1 3 30 0 1 3 0 0 0 1 1 0
OOLOGAH LAKE 19 13.51 12.71 0 0 54 1.1 1.07 0.57 0.66 5 24 243 2 10 2 40 0 2 5 10 1
PAT MAYSE LAKE 15 12.79 3.7 0 0 21 0 0.92 0 0 2 14 203 12 7 0 1 0 2 0 8 0
PEARSON‐SKUBITZ BIG HILL LAKE 6 5.79 1.07 1.05 0 4 0 0 0.09 0.81 4 20 146 5 4 0 0 0 0 2 5 0 PINE CREEK LAKE 9 10.95 1.9 10.95 1.9 25 0.1 2.25 0 7.25 6 32 190 2 6 0 13 2 2 3 6 0
ROBERT S KERR L&D RES & PWRHSE‐
MCCLELLAN‐KERR ARK R NAV SYS 14 9.67 12.1 9.3 10.97 30 0.48 0.64 0 0 4 11 118 1 11 0 80 0 1 5 7 1
SARDIS LAKE 7 7.2 0.2 0 0.2 31 0 2.2 0 2.5 4 18 158 2 3 3 13 2 1 3 6 0
SKIATOOK LAKE OK 11 10.37 0.67 2.47 1 15 0.15 1.03 0.05 0.09 2 15 138 2 7 1 7 0 2 2 6 2 TENKILLER FERRY LAKE 35 34.19 10.14 0 0.36 113 0 1.61 0 0 19 47 562 8 19 0 17 1 5 8 14 10
TORONTO LAKE 7 7.15 0.95 0 1.2 8 0 0 0 0.25 0 0 0 0 0 0 0 0 0 0 0 0
W D MAYO L&D‐MCCLELLAN‐KERR
ARKANSAS RVR NAVIGATION SYSTEM 4 3.49 0 2.81 0 6 0.11 0 0.11 0 0 0 5 0 3 0 2 0 0 0 0 0
WAURIKA LAKE 10 33.9 0 32.9 0 77 0 0 0 0 6 30 340 1 6 1 125 0 2 2 9 1
WEBBERS FALLS L&D & POWERHOUSE‐
MCCLELLAN‐KERR ARK R NAV SYS 8 8.45 1.35 0 0 17 0 0 0 0 3 11 76 1 4 2 15 0 0 1 7 1
WISTER LAKE 9 5.2 2.5 17 2 16 0 0 0 1.6 0 1 0 0 0 0 2 0 0 0 1 0
TOTAL 535 566.38 264.8 261.46 55.3 1501 11.7 48.02 7.28 49.11 177 642 5850 79 220 27 667 13 40 85 228 66
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐2
TASK 4A - FLTP TRANSPORTATION ASSETS TASK 4B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 4‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking
Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
FT WORTH 358 503.45 37.48 187.49 25.97 1071 23.01 29.42 27.78 30.46 90 439 4945 65 188 29 1667 3 51 62 113 38
AQUILLA LAKE 3 0.85 1.8 0 0.1 4 0 0.5 0 0.75 0 3 0 0 2 1 2 0 0 0 2 0
BARDWELL LAKE 8 28.5 1.23 28.5 1.23 33 0 0 0 0 3 10 110 5 6 0 30 0 2 0 6 1
BELTON LAKE 25 19.29 1.71 0 1 58 1.14 3.42 0 0 6 38 194 2 15 0 120 0 3 6 15 3
BENBROOK LAKE 9 33.6 0 33.6 0 127 3 1 1 1 3 16 269 4 11 0 22 1 1 2 6 1
BUFFALO BAYOU AND TRIBUTARIES 1 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0
CANYON LAKE 24 24.9 0.5 0 0 0 0.96 2.08 0 0 4 26 372 3 7 1 64 0 3 1 7 5
COOPER DAM AND JIM CHAPMAN LAKE 5 12.43 0 4.5 0 4 0.42 0.18 0 1.81 0 1 0 0 0 1 4 0 0 0 1 0
FERRELLS BRIDGE DAM ‐ LAKE O' THE
PINES 31 22.4 1.3 22.4 1.3 1 0 0 0 0 6 27 371 2 17 0 138 0 7 4 13 3
GRANGER DAM AND LAKE 6 16.22 0.22 4.49 0.35 49 1.33 1.43 0.34 3.39 2 22 134 2 5 0 129 0 2 3 5 0
GRAPEVINE LAKE 19 20.55 0.8 0 0 148 2.08 1.19 0.41 0 0 3 22 2 2 0 25 0 0 0 1 3
HORDS CREEK LAKE 3 16.2 0 16.2 0 45 0 0 0 0 7 13 151 0 8 3 8 0 4 2 1 0
JOE POOL LAKE 6 0 0 0 0 1 4 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0
LAVON LAKE 24 19.4 0.3 0 0 8 0 0 0 0 4 31 134 0 18 0 208 0 2 2 5 3
LEWISVILLE DAM AND LAKE 33 31.2 3.04 0.15 0 116 0.99 3.32 5.14 0.48 5 15 188 1 5 0 40 0 0 3 0 6
NAVARRO MILLS LAKE 8 14.37 0.3 0 0 10 0 0.2 2 0 1 22 241 0 6 4 10 0 3 2 5 1
NORTH SAN GABRIEL DAM AND LAKE
GEORGETOWN 7 9.45 0.2 0 0 2 0.6 0 0 6 0 13 251 6 3 0 41 0 0 0 2 0
O C FISHER DAM AND LAKE 5 32 0 32 0 12 0 0 8 0 1 19 71 1 2 0 56 1 0 1 0 0
PROCTOR LAKE 6 21.87 1.36 0.4 0 0 0.24 5 5 9 15 208 2 7 4 63 0 5 1 1 0
RAY ROBERTS LAKE 10 13.79 0.1 1.63 0 42 1.31 1.34 0.79 0 7 27 379 7 9 4 277 0 2 5 2 1 SAM RAYBURN DAM AND RESERVOIR 24 23.09 1 23.09 0 4 3.21 2.6 2.3 3.16 4 14 391 0 12 0 5 0 4 2 2 1
SOMERVILLE LAKE 11 27.21 2.8 5 0 89 0 4.72 2.25 2.81 3 11 273 2 4 0 0 0 0 2 2 2
STILLHOUSE HOLLOW DAM AND LAKE 9 15.53 0.64 0 2 29 1.36 2.2 0 0 3 23 73 6 5 0 83 0 3 2 7 1
TOWN BLUFF DAM AND BA STEINHAGEN
LAKE 9 21.19 1.02 0.15 0 48 0 2.31 0.35 3.2 4 12 142 3 7 7 16 1 0 3 6 0
WACO LAKE 17 20.7 1.51 2.15 1.08 62 2.3 0.3 0 0.7 3 24 192 5 9 0 129 0 3 4 10 2
WHITNEY LAKE 33 35.35 12.47 2.63 0.3 167 0.15 2.29 0.2 0.4 8 35 441 3 15 1 55 0 4 9 13 4 WRIGHT PATMAN DAM AND LAKE 22 23.36 5.18 10.6 18.61 12 0.16 0.1 1.76 7 18 338 7 13 3 142 0 3 8 1 1
TOTAL 358 503.45 37.48 187.49 25.97 1071 23.01 29.42 27.78 30.46 90 439 4945 65 188 29 1667 3 51 62 113 38
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐3
TASK 5A - FLTP TRANSPORTATION ASSETS TASK 5B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 5‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking
Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
VICKSBURG 246 248.99 100.25 152.49 155.32 666 10.46 7.88 12.23 6.92 84 299 2554 68 133 33 1455 3 39 63 149 16 ARKABUTLA LAKE 21 13.46 25.07 13.46 24.06 131 0 1.5 0 0.02 9 31 280 6 8 1 278 0 2 6 17 0 BAYOU BODCAU RESERVOIR 21 2.5 31.49 2.1 34.5 15 0 0 0 0 1 5 50 27 15 7 69 0 0 2 17 0 BLAKELY MT DAM‐LAKE OUACHITA 41 47.91 12.73 9 9 189 3.6 3.5 3 1 15 42 481 10 16 9 116 0 9 6 25 10
CADDO LAKE 1 0.5 0 0.27 0.22 0 0.25 0 0.2 0 0 0 0 0 0 0 0 0 0 0 0 0
COLUMBIA LOCK AND DAM ‐ OUACHITA
AND BLACK RIVERS 8 1.88 0.8 0 0 2 1.1 0 0 0 2 8 10 1 6 0 44 0 1 3 9 0
DEGRAY LAKE 26 41.9 2 43 20 108 1.45 0.4 2 1 6 57 589 2 12 0 220 0 8 10 14 2
ENID LAKE 18 34 2 3 21 109 0 0 2 0.6 19 49 293 6 11 5 170 0 5 14 21 0
FELSENTHAL LOCK AND DAM ‐
OUACHITA AND BLACK RIVERS 3 5.8 0.2 0 0 0 0.2 0.25 0 0 0 0 0 0 2 1 6 0 0 0 0 0
GRENADA LAKE 26 26.17 10.21 39.7 33.3 0 0.5 0.7 0.63 0.3 13 9 163 4 15 0 154 0 5 6 1 0
H. K. THATCHER LOCK AND DAM ‐
OUACHITA AND BLACK RIVERS 2 2.6 0.3 0 0 0 0.26 0 0 0 0 2 7 0 2 0 7 0 0 0 1 0
J. BENNETT JOHNSTON WATERWAY 12 10.35 2 10.35 2 7 1.7 0.95 1.4 0.7 1 19 0 2 0 4 84 0 0 3 6 0
JONESVILLE LOCK AND DAM ‐ OUACHITA
AND BLACK RIVERS 8 1.02 2.17 0 0 0 0.4 0 0 0 3 6 7 0 8 0 65 0 0 1 7 0
NARROWS DAM‐LAKE GREESON 22 34.84 2.62 27.55 1.24 17 0 0 4 24 427 6 10 1 53 1 6 7 1 3
SARDIS LAKE 36 25.16 8.66 3.16 10 88 1 0.28 3 3 11 47 247 4 28 5 189 2 3 5 30 1
WALLACE LAKE 1 0.9 0 0.9 0 0 0 0.3 0 0.3 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL 246 248.99 100.25 152.49 155.32 666 10.46 7.88 12.23 6.92 84 299 2554 68 133 33 1455 3 39 63 149 16
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐4
TASK 6A - FLTP TRANSPORTATION ASSETS TASK 6B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 6‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking
Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
MOBILE 447 403.43 62.16 157.205 7.64 823 3.45 22.93 10.65 176.53 155 461 3638 93 193 74 2137 3 53 124 224 41 ALABAMA RIVER LAKES 40 59.6 2.71 59.6 2.1 72 0 0 5.1 13.2 21 63 457 19 23 8 247 0 3 24 26 0 ALLATOONA LAKE 83 79.06 38.3 0 0 20 1 12.7 0.53 10.77 9 50 555 4 17 0 194 0 12 9 15 11
BLACK WARRIOR AND TOMBIGBEE RIVERS 35 29.03 2.61 2.47 0 37 1.34 1.89 1 0 19 38 276 7 26 7 193 0 3 11 25 1 BUFORD DAM ‐ LAKE SIDNEY LANIER 79 35.95 0 2.58 0 255 0 0 1.71 0 15 60 496 13 32 6 354 0 18 11 32 15 CARTERS DAM AND LAKE 20 13.34 0.71 12.41 0.96 25 0.52 3.42 1.48 3.89 8 28 146 9 7 3 101 0 2 4 12 1
GEORGE W ANDREWS L&D‐APALACHICOLA
CHATTAHOOCHEE & FLINT RVRS 7 10.89 0.43 11.14 0 3 0 1.82 0 2 0 3 0 0 2 0 4 0 0 0 3 0
JIM WOODRUFF L&D‐LAKE SEMINOLE‐
APALACHICOLA CHAT. & FLINT RS 37 21.83 8.22 3.175 0.28 83 0 0 0 0 6 15 106 4 11 9 37 0 0 1 13 3
OKATIBBEE LAKE 8 14 0.5 0 0 34 0 0 0 0 7 16 69 2 5 0 76 0 3 8 3 1
TENNESSEE ‐ TOMBIGBEE WATERWAY 69 44.96 7.42 17 0 212 0.14 0.24 0 140 43 79 720 12 33 33 152 1 5 31 49 2
WALTER F. GEORGE L&D‐APALACHICOLA
CHATTAHOOCHEE & FLINT RS 33 43.09 0.76 43.12 0.13 23 0.45 2.86 0 2.07 5 36 418 6 12 6 130 2 4 14 20 5 WEST POINT LAKE 36 51.68 0.5 5.71 4.17 59 0 0 0.83 4.6 22 73 395 17 25 2 649 0 3 11 26 2
TOTAL 447 403.43 62.16 157.205 7.64 823 3.45 22.93 10.65 176.53 155 461 3638 93 193 74 2137 3 53 124 224 41
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐5
TASK 7A - FLTP TRANSPORTATION ASSETS TASK 7B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 7‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking
Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
WILMINGTON 129 131.37 42.48 14.74 5.9 350 5.04 44.85 3.3 12.02 45 140 845 38 35 14 238 0 24 25 43 9 B EVERETT JORDAN DAM AND LAKE 20 27.13 3.65 1 0 42 0.81 6.4 0 0 1 3 0 3 1 1 3 0 0 1 1 1
CAPE FEAR RIVER ABOVE WILMINGTON NC 3 0.59 0.13 0 0 3 0.4 0 0 0 4 2 0 1 2 1 11 0 0 0 2 0
FALLS LAKE NC 18 19.22 2.59 0 0 60 1.23 5.91 0 0 1 4 0 4 0 2 11 0 0 1 3 1
JOHN H KERR DAM AND RESERVOIR VA
AND NC 58 60.75 35.1 0.5 5.7 183 1 28.45 0.2 10.8 19 70 427 19 17 3 119 0 13 10 21 5 PHILPOTT LAKE VA 13 9.75 0.55 11.05 0.2 14 0.6 1.55 2 0.4 7 29 223 10 8 1 50 0 6 5 4 1 W KERR SCOTT DAM AND RESERVOIR 17 13.93 0.46 2.19 0 48 1 2.54 1.1 0.82 13 32 195 1 7 6 44 0 5 8 12 1
TOTAL 129 131.37 42.48 14.74 5.9 350 5.04 44.85 3.3 12.02 45 140 845 38 35 14 238 0 24 25 43 9
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐6
TASK 8A - FLTP TRANSPORTATION ASSETS TASK 8B - ADDITIONAL RECREATION FACILITY ASSETS
TASK 8‐REC FEATURES
Count of
Corps &
Outgranted
PSAs
Corps &
Outgranted
Public
Paved Road
Miles
Corps &
Outgranted
Public
UnPaved
Road Miles
Corps
Project
Public
Paved Road
Miles
Corps
Project
Public
Unpaved
Road Miles
Corps &
Outgranted
Count of
Parking
Lots
Corps
Service
Paved Road
Miles
Corps
Service
Unpaved
Road Miles
Corps
Project
Service
Paved Road
Miles
Corps
Project
Service
Unpaved
Road Miles
Sum of
Corps
Structures
(Shelters &
Amphithea tres)
Sum of
Corps
Buildings
(Restrooms
, Visitor
Centers etc.)
Sum of
Corps
Campsites
Sum of
Corps Trails
Sum of
Corps Boat
Ramps
Sum of Corps
Fishing
Features
(cleaning stations & fishing piers)
Sum of
Corps
Individual
Picnic Sites
Sum of Corps
Group Picnic
Sites
Sum of
Corps Swim
Beaches
Sum of
Corps
Playground s
Sum of
Corps
Traffic
Counters
Sum of
Marinas
ST LOUIS 309 181.04 50.52 19.23 33.57 515 13.28 56.8 9.68 46.05 82 232 2268 81 106 35 655 93 16 74 111 19 CARLYLE LAKE IL 40 31.79 2.18 0.04 0 25 4 5.02 0 0 15 28 389 13 16 11 245 93 4 15 7 4
CLARENCE CANNON DAM & MARK TWAIN
LAKE MO 60 26.53 6.3 0.34 0 109 1.25 3.57 0.12 1.88 15 51 467 35 23 5 75 0 2 14 27 2 ILLINOIS WATERWAY IL 16 0.74 6.52 0.74 6.52 11 0 0.2 0 0.2 0 0 0 0 1 0 0 0 0 0 1 0
KASKASKIA LOCK ‐ KASKASKIA RIVER
NAVIGATION IL 2 3 0 3 0 1 1 0 1 0 1 6 15 1 2 1 8 0 0 0 1 0
LAKE SHELBYVILLE IL 68 44.01 13.77 1.21 0 186 0.74 11.32 0.66 0.22 22 59 586 10 19 13 159 0 5 15 18 3
MISSISSIPPI RIVER BETWEEN OHIO RIVER
& MISSOURI RIVER (REGULATING WORKS) 1 0 0 2.2 2.7 0 0 0 3.2 13.5 0 0 0 0 0 0 0 0 0 0 0 0
MISSISSIPPI RIVER BETWEEN MISSOURI
RIVER AND MINNEAPOLIS 44 9 10.45 9 10.45 30 4.3 23 4.3 23 3 10 10 0 17 0 26 0 0 0 24 4 REND LAKE IL 50 43.07 4.6 2 0 117 1.99 9.99 0.4 0.15 17 53 506 15 10 0 84 0 2 19 15 1 WAPPAPELLO LAKE MO 28 22.9 6.7 0.7 13.9 36 0 3.7 7.1 9 25 295 7 18 5 58 0 3 11 18 5
TOTAL 309 181.04 50.52 19.23 33.57 515 13.28 56.8 9.68 46.05 82 232 2268 81 106 35 655 93 16 74 111 19
Disclaimer: This information is accurate to the best of the USACE's knowledge. There may be some increases or decreases based on what is found in the field.
ATTACHMENT A‐7
TASK 9A - FLTP TRANSPORTATION ASSETS TASK 9B - ADDITIONAL RECREATION…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.