Solicitation W912BV23Q0021.pdf

PDF 1 MB Posted

Attached to
Chouteau / Newt Graham Oklahoma Refuse Collection Services Fort Gibson Lake, OK
Solicitation number
W912BV23Q0021
Issued by

About this file

This is a solicitation for refuse collection services at Chouteau and Newt Graham Lakes in Oklahoma. The U.S. Army Corps of Engineers, Tulsa District intends to issue solicitation W912BV23Q0021 as a 100% small business set-aside with a NAICS code of 562111 and size standard of $41.5M. The resulting contract will have one base period and four option periods exercised at the Government's discretion and awarded on a firm fixed price basis to the responsible offeror providing the most advantageous offer. Quotes are due on or about February 14, 2023. The incumbent contractor is Herringshaw Waste Management. Services include refuse collection and disposal from designated areas and facilities at monthly, biweekly, and weekly frequencies from April through October and November through March.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BV23Q0021 11-Jan-2023

b. TELEPHONE NUMBER

918.669.4916

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 14 Feb 2023

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LEROY R LEMARR

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

918-669-7436FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

X

SIZE STANDARD:

$41,500,000

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF95

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BV23Q0021

Section A - Solicitation/Contract Form

INSTRUCTIONS TO OFFERORS

Instructions to Offerors

Preparing Your Quote:

Your Quote shall consist of ONLY the following list of required items.

ADDITIONAL INFORMATION WILL NOT BE EVALUATED:

1) Submit a signed copy of the first page of the solicitation

a. Complete block 17a with your name and telephone number

b. Enter your CAGE code in the box labeled “CODE”

c. Sign block 30a (digital signatures are accepted)

d. Complete block 30b

e. Complete block 30c

f. DO NOT SUBMIT A COPY OF THE SOLICITATION IN ITS ENTIRETY

2) Submit a signed copy of all amendments issued, if any. It is your responsibility to monitor SAM.gov for amendments.

a. Complete block 15A

b. Complete block 15B (digital signatures are accepted)

c. Complete block 15C

d. DO NOT SUBMIT A COPY OF THE AMENDMENT IN ITS ENTIRETY. Only pages that require a vendor response shall be submitted.

3) Complete the pricing schedule provided with the solicitation. All items in the pricing schedule must be completed, including optional items. All items must include a dollar value.

4) Complete the subcontractor data worksheet provided with the solicitation. Your quote must identify the business size and percentage of work to be completed by the prime contractor; and the business name, address, the percentage of work to be completed by the subcontractor. Offerors shall identify the business size of any subcontractors based on the NAICS code identified. Offerors must clearly identify whether a subcontractor(s) will be performing work, the percentage of work to be performed by each subcontractor, and the socio-economic category into which each identified subcontractor falls. (FAR clause 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION 2021-O0008) (OCT 2022)). Offerors shall also provide a signed and dated Letter of Commitment from each subcontractor. The Subcontractor Letter of Commitment shall be signed by the subcontractor on the subcontractor’s own letterhead.

5) Complete the Representations and Certifications (Reps and Certs) in Section K, unless already completed and current in the System for Awards Management at https://sam.gov/. Notice: Failure to respond to provision 52.204-26 and, if applicable 52.204-24, will deem your offer non-responsive and un-awardable.

In accordance with AFARS 5132.702(a)(ii)(B): Funds are not presently available for this acquisition. No contract will be awarded until appropriated funds are made available.

Quotes shall be valid through 01-Apr-2023.

Submitting Your Quote:

MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS

Offerors shall limit their offer to include ONLY the required items listed in the Instructions to Offerors. Do not include excess information such as audio-visual materials, electronic media, CD’s, thumb drives, etc., or pages of the solicitation that do not contain information provided by the prospective offeror. As previously stated, ADDITIONAL INFORMATION WILL NOT BE EVALUATED. NO cross-outs or strike-through marks.

Submit a legible quote with no correction marks.

EMAIL

Emailed quotes are the preferred method for submission and must be received in a supported Adobe or Microsoft Office file format. Adobe or Microsoft Office file formats are the only acceptable methods of submitting a quote electronically.

a. Submit all required documents in one file. It may be helpful to reduce file sizes

b. Zip files are not recommended

c. DO NOT USE Cloud storage providers, google docs, web-based drop boxes, OneNote/OneDrive, URLs, web-based format, or any other virtual/web-based memory services are NOT acceptable methods of submitting a quote

d. Reference the solicitation number in the subject line

e. Send quotes to both of the following e-mail addresses:

Leroy.r.lemarr@usace.army.mil and Tyler.A.Hastings@usace.army.mil CESWT‐CT‐SS‐Quotes@usace.army.mil

f. Ensure your quote is received before the due date and time. For your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received, your quote will not be considered. Do not assume that quotes sent by email will be delivered or received immediately after the offeror pushes “send.” Late emails will be analyzed in accordance with FAR 52.212-1(f)(2)(i) to determine if they can be accepted for evaluation. For the purpose of this solicitation, as it relates to email submissions, the term initial point of entry to the Government infrastructure is defined as the Army Server. For the purpose of this solicitation, as it relates to email submissions, the term Government Installation designated for the receipt of offers is defined as the USACE server.

FAX

Include a cover sheet that references the Contract Specialists – LeRoy LeMarr, Tyler Hastings and the solicitation number, W912BV23Q0021. Fax to Leroy.r.lemarr@usace.army.mil and Tyler.A.Hastings@usace.army.milor

(918) 669-7436. After faxing document, please contact the contract specialist to confirm receipt.

MAIL

When submitting through mail, please notify the contract specialist and ensure you clearly address the envelope to:

U.S. Army Corps of Engineers, Tulsa District LeRoy R. LeMarr, CESWT-CT-E 2488 E. 81st Street Tulsa, OK 74137-4290

Clearly mark the envelope in the lower left-hand corner with the solicitation number, W912BV23Q0021. All pages should be numbered. Use only 8 ½” x 11” paper for fax or mail submissions. Do not use foldouts (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Times New Roman or Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.

Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.

HAND DELIVER

If your submission will be hand-carried, please provide notification to the Contract Specialist, at least one working day in advance, by calling (918) 669-7027 or e-mailing Leroy.r.lemarr@usace.army.mil as unescorted visitors are not allowed in the Contracting Division offices. Please consider that upon arrival, visitors must go through security check points on the 16th floor of the 20-story Building. Offerors can only submit their documents to a Contract Specialist or a Contracting Officer of the Tulsa District Office. The Tulsa District Office is in the 20-story building of the CityPlex towers, address below:

U.S. Army Corps of Engineers, Tulsa District 2488 E. 81st Street Tulsa, OK 74137-4290

NEED HELP:

If you need assistance with SAM, NIST or preparing your quote, please contact your local Procurement Technical Assistance Center (PTAC). You may find your PTAC here: https://www.aptac-us.org/contracting-assistance/.

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):

For information related to amendments, and the dates set for receipt of proposals, please check https://sam.gov/.

Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐ register into the system. To self‐register go to the aforementioned web page and click on the BID tab.

Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page, you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.

The Solicitation Number is: W912BV23Q0016

The Bidder Inquiry Key is: 4H52Y4-5I9BF6

The Bidder Inquiry System will be unavailable for new inquiries 2:00 PM CST, Monday, February 6, 2023, in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

4. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

5. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.

6. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

PRE-PROPOSAL/SITE VISIT CONFERENCE

A Pre-Proposal/Site Visit Conference is scheduled for:

No Pre-Proposal/Site Visit Conference is scheduled for this solicitation.

ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS

The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.

Section B - Supplies or Services and Prices

BID SCHEDULE

BID SCHEDULE

CHOUTEAU/NEWT GRAHAM LAKES, OKLAHOMA

REFUSE COLLECTION

BASE YEAR: 1 Mar 23 – 29 Feb 24

Unit Total Description Quantity Unit Price Amount

SUMMER PERIOD: 1 April-31 October Chouteau 0001 Afton Landing 7 MO $__________ $__________ 0002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 0003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

0004 Afton Landing 9 EA $__________ $__________ 0005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 0006 Afton Landing 5 MO $__________ $__________ 0007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 0008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

0009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL BASE YEAR $__________

CHOUTEAU/NEWT GRAHAM LAKES, OKLAHOMA

1ST OPTION YEAR: 1 Mar 24 – 28 Feb 25

SUMMER PERIOD: 1 April-31 October Chouteau 1001 Afton Landing 7 MO $__________ $__________ 1002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 1003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

1004 Afton Landing 9 EA $__________ $__________ 1005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 1006 Afton Landing 5 MO $__________ $__________ 1007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 1008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

1009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 1ST OPTION YEAR $__________

2ND OPTION YEAR: 1 Mar 25 – 28 Feb 26

SUMMER PERIOD: 1 April-31 October Chouteau 2001 Afton Landing 7 MO $__________ $__________ 2002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 2003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

2004 Afton Landing 9 EA $__________ $__________ 2005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 2006 Afton Landing 5 MO $__________ $__________ 2007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 2008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

2009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 2ND OPTION YEAR $__________

3RD OPTION YEAR: 1 Mar 26 – 28 Feb 27

SUMMER PERIOD: 1 April-31 October Chouteau 3001 Afton Landing 7 MO $__________ $__________ 3002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 3003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

3004 Afton Landing 9 EA $__________ $__________ 3005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 3006 Afton Landing 5 MO $__________ $__________ 3007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 3008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

3009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 3RD OPTION YEAR $__________

4TH OPTION YEAR: 1 Mar 27 – 28 Feb 28

SUMMER PERIOD: 1 April-31 October Chouteau 4001 Afton Landing 7 MO $__________ $__________ 4002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 4003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

4004 Afton Landing 9 EA $__________ $__________ 4005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 4006 Afton Landing 5 MO $__________ $__________ 4007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 4008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

4009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 4TH OPTION YEAR $__________

TOTAL BASE AND ALL OPTIONS $______________________

SUBCONTRACTING INFORMATION

SUBCONTRACTING INFORMATION:

Self-Performing:

Percentage of Work to be performed by the Offeror/Prime Contractor’s own forces:

Subcontractor(s) *** - if no subcontractor(s), write NONE:

Name of Subcontractor Address

Business Size based on NAICS Provided in the Solicitation (Small or Large)

Socio-economic Category ***

Percentage of Work to be

Completed by Sub-

Contractor

***Socio-economic categories for some small businesses include:

Women-Owned Small Business (WOSB) Economically Disabled Women-Owned Small Business (EDWOSB) HUBZone 8(a) Service-Disabled Veteran-Owned Small Business (SDVOSB)

***Offerors using a subcontractor(s) shall provide a signed and dated Letter of Commitment from each subcontractor. Offerors who fail to provide a signed and dated Letter of Commitment from each subcontractor will not be considered for award.

Section C - Descriptions and Specifications

SOW

STATEMENT OF WORK

S P E C I F I C A T I O N S

CHOUTEAU / NEWT GRAHAM OKLAHOMA

MAINTENANCE CONTRACT FOR

REFUSE COLLECTION SERVICES

ORGANIZATION OF SPECIFICATIONS

This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.

The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.

Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.

TABLE OF CONTENTS

Para.

No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Pre-work Conference 12 Contractor Submittals 13 Billing 14 Changes in Number of Facilities Serviced 15 Work Schedules 16 Required Insurance and Insurance Certificate 17 Antiterrorism and Operations Security Requirements

No. Title 1 Performance Requirements 2 Invoice Format

EXHIBITS

APPENDICES

Appendix Title A Refuse Collection Services A-1 Inventory of Dumpsters

1. SCOPE OF WORK. The work required under this specification provides for labor, supervision, dumpsters, transportation, equipment, and supplies to perform refuse collection at designated areas of Chouteau Lock and Dam Pool 17 and Newt Graham Lock and Dam Pool 18, McClellan Kerr Navigation Channel.

2. DEFINITIONS.

2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.

2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements.

2.3. Government. As used herein means the Army Corps of Engineers.

2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. Performance Standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.

2.5. Project. Herein means all Government property and easements at Chouteau Lock and Dam Pool 17 and Newt Graham Lock and Dam Pool 18, McClellan Kerr Navigation Channel.

2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.

2.7. Quality. Conformance with the contract specification.

2.8. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.

2.9. Regulations. Refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.10. Workday. Any day, Monday through Friday, exclusive of weekends and Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.

3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual, EM 385- 1-1, is hereby incorporated into this specification. EM385-1-1 is available online.

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.1. Initiation and Execution of work shall be in accordance with this specification.

4.2. Acceptance of Work. The Government shall accept Work unless the Contracting Officer’s Representative (COR) notifies the contractor of deficient services.

4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays.

4.2.2. If the COR notifies the contractor of deficient work, the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re-performed the same day. Work performed on less than a daily schedule shall be re-performed not later than the following day. Refer to paragraph 10 for deficient work not re-performed.

4.2.3. The contractor shall notify the COR when deficiencies have been corrected.

4.3. Refuse services would cease to be required during natural emergencies or disasters, such as a major flood event or tornadoes that would render the Parks or PUAs inaccessible or cause public safety to be a concern, or during a period of prolonged disruption of utility services requiring closure of either partial or entire Parks/PUAs, or in the event of a Temporary Government Shutdown which would close entire Parks/PUAs. In any event, the Contracting Officer or the COR will contact the prime contractor and provide detailed guidance as to how the contractor shall proceed, or not proceed, with park refuse collection services, depending upon the specific circumstances at that time. Services not able to be performed or not required to be performed will not be charged.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.

5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the work specified.

5.2. Supervision.

5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during their absence, shall be designated in writing.

5.2.2. The contractor shall provide the COR a local or toll- free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days’ work is being performed.

6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within specified time limits.

6.1. All equipment must be in good operating and mechanical condition and shall comply with

EM 385-1-1.

6.2. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR and the Site Manager approves use of other areas.

6.3. All refuse service vehicles shall be front, rear, or side loading and be equipped with operational back-up alarms (subparagraphs 18.B.01 and 18.B.02, EM 385-1-1).

6.4. All equipment used to perform work under this contract shall have signs indicating ownership by the contractor. Signs may be painted on equipment or magnetic signs may be attached. Magnetic signs shall not be removed at any time equipment is at the project.

6.5. All vehicles shall be properly licensed, insured, and maintained in a safe, clean condition.

All vehicle operators shall maintain a valid state driver’s license.

7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 2. The contractor's performance will be evaluated using these PRs as follows:

7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient.

7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re-performance.

8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246-4 "Inspection of Services" to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 2.

9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1.

Deductions for documented defects will be made in accordance with the following procedures:

9.1. Each service found deficient and re-performed by the contractor: No deduction.

9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.

9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.

9.4. Each service found deficient and not re-performed by anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.

10. SAFETY.

10.1. Accident Prevention Plan. I f r e q u e s t e d , the contractor shall furnish the COR an accident prevention plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:

10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

10.1.4. Procedures for treating and transporting injured persons to medical facilities.

10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently removed from this contract at the written request of the COR.

10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.

10.4. Accident Reports.

10.4.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.

10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer and the COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly. A live fillable form shall be provided for this requirement. It is imperative this form be accompanied with each monthly invoice, provided no later than the 5th of each month.

11. PRE-WORK CONFERENCE. The Contracting Officer Representative or their designee shall conduct a mandatory Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 12 below. As a minimum, the officer of the company that signed the contract and the supervisor shall represent the contractor. The Contracting Officer Representative or their designee shall establish the location, date, and time of the Pre-work Conference.

12. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished to the COR. If the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

12.1. Names of supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).

12.2. Safety Plan (subparagraph 10.1.).

12.3. Exposure reports (submit by 5th workday of each month) (subparagraph 10.5.).

12.4. Contractors’ agreement with approved disposal site. Contractor must provide copies of any updates to this agreement.

12.5. Other submittals may be required by the Government’s Safety Office such as: AT1 Operation Security Training, E-Verify, I Watch training or other requirements.

12.6. Insurance certificates (subparagraph 15.1, 15.2, and 15.3)

12.7. Work schedules (paragraph 16)

12.8. AT/OPSEC Training form provided prior to initiation of work and prior to any employee entering the facility (paragraph 17)

13. BILLING.

13.1. The contractor shall submit an original invoice at the end of each month for all completed work. Invoices must be provided by the 5th of each month

13.2. The invoice should also include any additional refuse collections that have been completed. Payment will only be made for work actually performed.

13.3. Invoices shall be prepared in the format shown at Exhibit 3.

13.4. All exposure reports shall be submitted before an invoice will be accepted.

13.5. Invoices and supporting documents shall be delivered, mailed, e-mailed or faxed to the Operations Project Manager, Fort Gibson Project Office, 8568 St. Hwy. 251A, Fort Gibson, OK

74434 and the Contracting Officer Representative.

14. CHANGES IN NUMBER OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur by the Contracting Officer.

14.1. Services required are deleted for a period of one (1) month or longer in an entire park.

14.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.

15. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of their performance under this contract the following minimum insurance:

15.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.

15.2. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.

15.3. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

16. WORK SCHEDULES. I f r e q u e s t e d , the contractor shall furnish the COR a schedule for performing all work that is required at a weekly frequency or less. A revised schedule shall be furnished the COR prior to the contractor changing his mode of operation.

17. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements.

When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training, submission of training verification, and initiation of background check through E-Verify

17.1. Training materials and verification forms will be provided within two business days of Contract Award.

17.2. Per the ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS, Jun 2015, incorporated in SECTION H, Item 2b:

17.2.1. For contractors who do not require CAC but require access to a DoD facility or installation. Proposed language: Contractor and all associated sub‐contractors’ employees shall comply with adjudication standards and procedures.

17.2.2. Contractor personnel who are intended to access Government Facilities unescorted MUST provide the following to the COR prior to attempting to access Government Facilities:

1. E-Verify compliant

2. Certificate of completion of the AT-Level 1 training.

3. Acknowledged the “See Something Say Something” program.

EXHIBIT 2

PERFORMANCE REQUIREMENTS

SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARD

APPENDIX A

Dumpster Maintenance 1 Dumpsters shall have functioning plastic lids.

Dumpsters shall have neat and uniform appearance.

Free of graffiti.

Clean Dumpsters 2 Dumpsters shall be clean. Odor control applied as necessary to correct visitor complaints.

Refuse Removal 3 Dumpsters shall be totally emptied when serviced.

Items placed outside containers within a 6-foot radius shall be picked up.

Refuse Disposal 4 All refuse disposed in approved sanitary landfill or incinerator. All applicable County, State, and Federal regulations are complied with.

EXHIBIT 3 INVOICE FORMAT

BILLING FOR MAINTENANCE CONTRACT

PROJECT:

CONTRACTOR: DATE:

ADDRESS: CONTRACT NO: W912BV-

BILLING PERIOD: THRU

INVOICE NO:

PAYMENT TERMS:

(Payment Discount or N/A)

BID ITEM

NO. AMOUNT

PAYMENT REQUESTED:

CONTRACTOR (Signature/Date)

APPENDIX A REFUSE COLLECTION

1. FACILITIES TO BE SERVICED. All park and Lock facilities listed in Table A-1.

2. FREQUENCIES AND TIMES OF SERVICES.

2.1. Seasonal Work Periods. The amount of work required varies with the seasons of the year based on need. The following work periods are established to reflect changes in inventory of facilities and/or frequency of services from season to season:

Summer Period: 1 April thru 31 October Winter Period: 1 November thru 31 March

2.2. The frequency of required service will be in accordance with Tables A-1.

2.3. An additional service may be required during holiday periods as described in paragraph 4 below.

2.4. The contractor shall begin work no earlier than 7:00 a.m. and shall complete work by 5:30 p.m.

3. DESCRIPTION OF WORK.

3.1. Dumpster Requirements.

3.1.1. The contractor shall furnish dumpsters in any combination to meet the total cubic yards listed in Table A-1; however, dumpsters shall not be smaller than 2 CY or larger than 4 CY. Exact placement and size of dumpsters shall be coordinated with the Contracting Officer's Representative.

3.1.2. Certain dumpster locations may be subject to flooding. The Government shall attempt to notify the contractor when conditions exist, however; flood events occur rapidly, and the contractor should stay proactive in monitoring lake levels and weather forecasts. It will be the responsibility of the contractor for relocating dumpsters to higher ground if necessary.

When the lake level returns to normal the contractor will return dumpsters to original locations.

3.1.3. All dumpsters shall have functioning plastic lids and shall be maintained in a neat and uniform appearance by the contractor. All dumpsters shall be prominently identified as to ownership and provider of services.

3.1.4. Cleanliness and sanitation of the vendor-owned containers will be the responsibility of the contractor and must comply with all Federal, State, and County regulations.

3.1.5. Refuse shall be emptied from refuse containers with a truck that is equipped with front-, rear-, or side-load dumping capabilities.

3.2. Refuse Collection.

3.2.1. Dumpsters shall be emptied in accordance with frequencies stated in Table A-1.

3.2.2. Household trash that is bagged and placed in or near refuse containers will be considered normal refuse and no additional payment will be made. If the refuse is scattered (more than 6 feet from dumpsters) or consists of larger refuse it shall be considered dumped material and the contractor will not be required to dispose of it. The Contracting Officer Representative will determine what items would be considered dumped material. All camper generated trash shall be included in monthly services. A monthly estimate of the total CY of refuse will be reported to the COR.

3.3. Refuse Disposal. All collected refuse, debris, and litter shall be disposed of properly off Government property in compliance with applicable regulations. Location of disposal site(s) shall be furnished the Contracting Officer Representative.

4. ADDITIONAL REFUSE COLLECTIONS.

4.1. Additional services may be required during the holiday periods of Memorial Day, Fourth of July, and Labor Day. When additional services are ordered, all dumpsters within the public use area shall be emptied completely.

5. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 2.

A-1 INVENTORY OF DUMPSTERS

CHOUTEAU/NEWT GRAHAM L&Ds

SUMMER PERIOD

Location Total 6 Cubic Yards Frequency

CHOUTEAU L&D 17

Afton Landing

Monday & Thursday

Tallahassee Loop 1 Monday & Thursday

Chouteau Lock 17 1 Monday

NEWT GRAHAM L&D 18

Bluff Landing

Monday & Thursday

Total 7

WINTER PERIOD

CHOUTEAU L&D 17

Afton Landing 1 Monday

Tallahassee Loop 1 Monday

Chouteau Lock 17 1 Monday

NEWT GRAHAM L&D 18

Bluff Landing 1 Monday

TOTALS 4

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

52.246-1 Contractor Inspection Requirements APR 1984

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

52.242-15 Stop-Work Order AUG 1989

Section G - Contract Administration Data

252.204-7006 Billing Instructions OCT 2005 252.232-7006 Wide Area WorkFlow Payment Instructions DEC 2018

CLAUSES INCORPORATED BY FULL TEXT

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.

(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

(End of clause)

Section H - Special Contract Requirements

WAGE RATES

"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5317 Daniel W. Simms Division of | Revision No.: 20 Director Wage Determinations| Date Of Last Revision: 12/27/2022

Note: Contracts subject to the Service Contract Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

|If the contract is entered into on or |Executive Order 14026 generally applies to | |after January 30, 2022, or the |the contract. | |contract is renewed or extended (e.g., |The contractor must pay all covered workers | |an option is exercised) on or after |at least $16.20 per hour (or the applicable | |January 30, 2022: |wage rate listed on this wage determination,| | |if it is higher) for all hours spent | | |performing on the contract in 2023. | |If the contract was awarded on or |Executive Order 13658 generally applies to | |between January 1, 2015 and January 29,|the contract. | |2022, and the contract is not renewed |The contractor must pay all covered workers | |or extended on or after January 30, |at least $12.15 per hour (or the applicable | |2022: |wage rate listed on this wage determination,| | |if it is higher) for all hours spent | | |performing on the contract in 2023. |

The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the Executive Orders is available at www.dol.gov/whd/govcontracts.

State: Oklahoma

Area: Oklahoma Counties of Creek, Okmulgee, Osage, Pawnee, Rogers, Tulsa, Wagoner

**Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 16.17*** 01012 - Accounting Clerk II 18.16 01013 - Accounting Clerk III 20.31 01020 - Administrative Assistant 23.31 01035 - Court Reporter 19.66 01041 - Customer Service Representative I 13.76*** 01042 - Customer Service Representative II 15.03*** 01043 - Customer Service Representative III 16.87 01051 - Data Entry Operator I 14.11***

01052 - Data Entry Operator II 15.39*** 01060 - Dispatcher, Motor Vehicle 18.29 01070 - Document Preparation Clerk 17.48 01090 - Duplicating Machine Operator 17.48 01111 - General Clerk I 13.46*** 01112 - General Clerk II 14.68*** 01113 - General Clerk III 16.83 01120 - Housing Referral Assistant 20.65 01141 - Messenger Courier 14.81*** 01191 - Order Clerk I 15.74*** 01192 - Order Clerk II 18.10 01261 - Personnel Assistant (Employment) I 16.79 01262 - Personnel Assistant (Employment) II 18.77 01263 - Personnel Assistant (Employment) III 20.92 01270 - Production Control Clerk 23.01 01290 - Rental Clerk 13.86*** 01300 - Scheduler, Maintenance 16.57 01311 - Secretary I 16.57 01312 - Secretary II 18.53 01313 - Secretary III 20.65 01320 - Service Order Dispatcher 16.35 01410 - Supply Technician 23.31 01420 - Survey Worker 17.75 01460 - Switchboard Operator/Receptionist 14.34*** 01531 - Travel Clerk I 16.38 01532 - Travel Clerk II 17.45 01533 - Travel Clerk III 18.23 01611 - Word Processor I 14.75*** 01612 - Word Processor II 16.57 01613 - Word Processor III 18.53 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 22.86 05010 - Automotive Electrician 20.01 05040 - Automotive Glass Installer 18.96 05070 - Automotive Worker 18.96 05110 - Mobile Equipment Servicer 16.65 05130 - Motor Equipment Metal Mechanic 21.07 05160 - Motor Equipment Metal Worker 18.96 05190 - Motor Vehicle Mechanic 20.04 05220 - Motor Vehicle Mechanic Helper 15.23*** 05250 - Motor Vehicle Upholstery Worker 17.69 05280 - Motor Vehicle Wrecker 18.91 05310 - Painter, Automotive 20.04 05340 - Radiator Repair Specialist 18.96 05370 - Tire Repairer 14.47*** 05400 - Transmission Repair Specialist 21.07 07000 - Food Preparation And Service Occupations 07010 - Baker 13.24*** 07041 - Cook I 12.13*** 07042 - Cook II 14.29*** 07070 - Dishwasher 11.39*** 07130 - Food Service Worker 12.30*** 07210 - Meat Cutter 13.39*** 07260 - Waiter/Waitress 9.03*** 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 18.76 09040 - Furniture Handler 11.67*** 09080 - Furniture Refinisher 18.12 09090 - Furniture Refinisher Helper 13.06*** 09110 - Furniture Repairer, Minor 15.57*** 09130 - Upholsterer 18.11 11000 - General Services And Support Occupations

11030 - Cleaner, Vehicles 13.02*** 11060 - Elevator Operator 13.02*** 11090 - Gardener 20.00 11122 - Housekeeping Aide 12.55*** 11150 - Janitor 12.55*** 11210 - Laborer, Grounds Maintenance 14.55*** 11240 - Maid or Houseman 11.15*** 11260 - Pruner 12.78*** 11270 - Tractor Operator 18.20 11330 - Trail Maintenance Worker 14.55*** 11360 - Window Cleaner 14.29*** 12000 - Health Occupations 12010 - Ambulance Driver 17.99 12011 - Breath Alcohol Technician 20.58 12012 - Certified Occupational Therapist Assistant 34.25 12015 - Certified Physical Therapist Assistant 29.05 12020 - Dental Assistant 18.27 12025 - Dental Hygienist 46.24 12030 - EKG Technician 21.69 12035 - Electroneurodiagnostic Technologist 21.69 12040 - Emergency Medical Technician 17.99 12071 - Licensed Practical Nurse I 18.39 12072 - Licensed Practical Nurse II 20.58 12073 - Licensed Practical Nurse III 22.94 12100 - Medical Assistant 15.63*** 12130 - Medical Laboratory Technician 22.59 12160 - Medical Record Clerk 17.34 12190 - Medical Record Technician 19.39 12195 - Medical Transcriptionist 19.82 12210 - Nuclear Medicine Technologist 37.40 12221 - Nursing Assistant I 11.59*** 12222 - Nursing Assistant II 13.02*** 12223 - Nursing Assistant III 14.21*** 12224 - Nursing Assistant IV 15.95*** 12235 - Optical Dispenser 14.54*** 12236 - Optical Technician 16.63 12250 - Pharmacy Technician 14.90*** 12280 - Phlebotomist 14.63*** 12305 - Radiologic Technologist 28.50 12311 - Registered Nurse I 24.52 12312 - Registered Nurse II 30.00 12313 - Registered Nurse II, Specialist 30.00 12314 - Registered Nurse III 36.29 12315 - Registered Nurse III, Anesthetist 36.29 12316 - Registered Nurse IV 43.50 12317 - Scheduler (Drug and Alcohol Testing) 25.50 12320 - Substance Abuse Treatment Counselor 24.70 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 21.04 13012 - Exhibits Specialist II 26.07 13013 - Exhibits Specialist III 31.89 13041 - Illustrator I 21.04 13042 - Illustrator II 26.07 13043 - Illustrator III 31.89 13047 - Librarian 28.87 13050 - Library Aide/Clerk 14.10*** 13054 - Library Information Technology Systems 26.07 Administrator 13058 - Library Technician 15.41*** 13061 - Media Specialist I 18.81 13062 - Media Specialist II 21.04 13063 - Media Specialist III 23.46

13071 - Photographer I 16.32 13072 - Photographer II 18.26 13073 - Photographer III 22.62 13074 - Photographer IV 27.67 13075 - Photographer V 33.48 13090 - Technical Order Library Clerk 17.70 13110 - Video Teleconference Technician 22.23 14000 - Information Technology Occupations 14041 - Computer Operator I 18.95 14042 - Computer Operator II 21.19 14043 - Computer Operator III 23.75 14044 - Computer Operator IV 26.45 14045 - Computer Operator V 29.29 14071 - Computer Programmer I (see 1) 22.27 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 18.95 14160 - Personal Computer Support Technician 28.80 14170 - System Support Specialist 34.54 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 29.55 15020 - Aircrew Training Devices Instructor (Rated) 35.76 15030 - Air Crew Training Devices Instructor (Pilot) 42.85 15050 - Computer Based Training Specialist / Instructor 29.55 15060 - Educational Technologist 29.09 15070 - Flight Instructor (Pilot) 42.85 15080 - Graphic Artist 23.46 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 42.85 15086 - Maintenance Test Pilot, Rotary Wing 42.85 15088 - Non-Maintenance Test/Co-Pilot 42.85 15090 - Technical Instructor 21.78 15095 - Technical Instructor/Course Developer 26.64 15110 - Test Proctor 17.58 15120 - Tutor 17.58 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 9.99*** 16030 - Counter Attendant 9.99*** 16040 - Dry Cleaner 12.73*** 16070 - Finisher,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .