Solicitation W912BV22Q0007 Elk City PCMC.pdf

PDF 16 MB Posted

Attached to
Elk City Lake Kansas Project Consolidated Maintenance Contract (PCMC)
Solicitation number
w912bv22q0007
Issued by

About this file

This solicitation notice seeks proposals for a consolidated maintenance contract for Elk City Lake in Kansas. The Department of the Army Corps of Engineers Engineering District Tulsa is soliciting proposals under number w912bv22q0007 for a project consolidated maintenance contract to provide services such as mowing, trash removal, building and grounds maintenance, and repair and replacement activities at Elk City Lake. Proposals are due by the date specified in the solicitation document. The award will be a firm fixed-price contract with one base year and four option years. The selected contractor will be responsible for various operation and maintenance tasks over the five-year period to support facilities and infrastructure at the Elk City Lake project in Kansas.

View the file

Other files

File Type Posted
Amendment 0002 W912BV22Q0007.pdf PDF
Amendment 0001 W912BV22Q0007.pdf PDF
Bid Schedule Elk City PCMC 22Q0007 for Release.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BV22Q0007 08-Dec-2021

b. TELEPHONE NUMBER

918.669.7277

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 11 Jan 2022

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

CHRISTOPHER T WRIGHT

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

918-669-7436FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF135

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BV22Q0007

Section A - Solicitation/Contract Form

INSTRUCTIONS TO OFFERORS

Instructions to Offerors

Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is a responsibility item. Those without a NIST score in SPRS will be deemed NON-RESPONSIBLE and will not be eligible for award.

To obtain a NIST score: https://www.sprs.csd.disa.mil/nistsp.htm For further assistance with this requirement, visit: https://www.aptac-us.org/

EMAIL, FAX, MAIL, or HAND DELIVER YOUR DOCUMENTS

Do not include excess information, such as audio-visual materials, electronic media, CD’s, thumb drives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross-outs or strike-through marks. Submit a legible quote with no correction marks.

EMAIL

Emailed quotes must be received in a supported Adobe or Microsoft Office file format.

These formats are the only acceptable methods of submitting a quote electronically.

Cloud storage providers, google docs, web-based drop boxes, OneNote/OneDrive, URLs, web-based format, or any other virtual/web-based memory service are NOT acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to e-mail address Christopher.T.Wright@usace.army.mil and a copy to CESWT‐CT‐SS‐ Quotes@usace.army.mil. Ensure your quote is received before the due date and time.

For your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received, your quote will not be considered.

FAX or MAIL

Include a cover sheet that references the Contract Specialist – Christopher T. Wright and the solicitation number, W912BV22Q0007. Fax number is (918) 669-7436. When submitting through mail, ensure you clearly address the envelope to:

U.S. Army Corps of Engineers, Tulsa District Christopher T. Wright, CESWT-CT-E 2488 E. 81st Street Tulsa, OK 74137-4290

Clearly mark the envelope in the lower left-hand corner with the solicitation number, W912BV22Q0007. All pages should be numbered. Use only 8 ½” x 11” paper for fax or mail submissions. Do not use foldouts (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Times New Roman or

Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.

Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.

HAND DELIVER

If your submission will be hand-carried, please provide notification to the Contract Specialist, at least one working day in advance, by calling (918) 669-7277 or e-mailing Christopher.T.Wright@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider that upon arrival, visitors must go through security check points on the 16th floor of the 20-story Building. Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District Office. The Tulsa District Office is in the 20-story building of the CityPlex towers, address below:

U.S. Army Corps of Engineers, Tulsa District 2488 E. 81st Street Tulsa, OK 74137-4290

Please submit the following documents:

1) Complete a signed copy of the first page of the solicitation and all amendments, including CAGE code

2) Complete the pricing schedule. The pricing schedule is provided as a separate attachment in the form of an Excel Spreadsheet which will calculate all totals based on the unit prices entered. All calculations are rounded to two decimal places to avoid rounding errors.

3) Complete the sub-contractor data page provided in the solicitation - your quote must identify the business size and percentage of work to be completed by the prime contractor; and the business name, address, the percentage of work to be completed by the sub-contractor and business size of any sub-contractors, if applicable, based on the NAICS code identified. Offerors must clearly identify whether a sub-contractor(s) will be performing work, the percentage of work to be performed by each sub-contractor, and the socio-economic category into which each identified sub-contractor falls. (FAR 52.219-14 LIMITATIONS ON

SUBCONTRACTING (DEVIATION 2020-O0008) (MAR 2020).

4) Complete all FAR Clauses, with applicable blanks filled in from SECTIONS I, K, and L.

5) Complete the Representations and Certifications in Section K, unless already completed in the System for Awards Management at https://sam.gov/.

6) Contractor must respond to the most recent version of FAR 52.204-26 and, if applicable FAR 52.204-24. Failure to respond to the required provisions will deem your offer non-responsive and unawardable.

7) Please NOTE this solicitation requires offerors to enter a National Institute of Standards and Technology (NIST) score in the Supplier Performance Risk System (SPRS). The NIST score is a responsibility item. Those without a NIST score in SPRS will be deemed NON-RESPONSIBLE and will not be eligible for award.

Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

Quotes should be valid through 30-April-2022.

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):

For information related to amendments, and the dates set for receipt of proposals, please check https://sam.gov/.

Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page, you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.

The Solicitation Number is: W912BV22Q0007

The Bidder Inquiry Key is: H8ET3M-F628DD

The Bidder Inquiry System will be unavailable for new inquiries 10:00AM Central Time, 05-Jan-2022 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

4. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

5. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone

(Chicago). The telephone number for the Call Center is 800‐428‐HELP.

6. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

7. The point of contact for this solicitation is:

Contract Specialist: Christopher T. Wright Telephone: 918‐669‐7277 E‐mail: Christopher.T.Wright@usace.army.mil

PRE-PROPOSAL/SITE VISIT CONFERENCE

A Pre-Proposal/Site Visit Conference is scheduled for:

Site Visit Date/Time: December 16, 2021

10:00 AM Central Time

Site Visit Location: 5089 County Road 2925 Independence, KS 67301-7947

ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS

***Please note: Attendees are required to provide their own face covering to comply with mask mandates for any activities related to this Site Visit.***

The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.

In accordance with AFARS 5132.702(a)(ii)(B): “Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.”

Section B - Supplies or Services and Prices

SUBCONTRACTOR INFORMATION PAGE

SUB-CONTRACTING INFORMATION:

Self-Performing:

Name of Prime Contractor

Business Size of Prime Contractor

Percentage of Work to be Completed by Prime Contractor

Sub-Contractor (if applicable):

Name of Sub-Contractor Address

Business Size and Socio-economic

Category

Percentage of Work to be Completed by Sub-Contractor

PERFORMANCE WORK STATEMENT

Performance Work Statement

ELK CITY LAKE

KANSAS

FOR

MOWING, PARK CLEANING,

HERBICIDE APPLICATIONS, VAULT PUMPING

ORGANIZATION OF SPECIFICATIONS

This Performance Work Statement (PWS) consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.

This document contains requirements that apply to all work to be performed under the provisions of this Performance Work Statement. The appendices contain a description of the facilities to be serviced and the work to be performed.

TABLE OF CONTENTS

Para.

No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Materials and Supplies 8 Performance Requirements 9 Contractor Quality Control 10 Deductions for Deficient Work 11 Safety 12 Work Schedules 13 Contractor's Facilities 14 Reporting Defective Facilities 15 Security 16 Pre-work Conference 17 Contractor Submittals 18 Billing 19 Changes in Amount of Facilities Serviced

EXHIBITS

No. Title 1 Quality Assurance Report 2 Specifications for Contractor-Furnished Materials and Supplies 3 Performance Requirements 4 Quality Control Inspection Log 5 Example of Activity Hazard Analysis 6 Work Schedule for Park Cleaning 7 Invoice Format

APPENDICES

Appendix Title A Mowing C Cleaning of Parks D Application of Pesticides E Pumping of Sanitary Facilities

1. SCOPE OF WORK. All services required under this contract may include, but are not necessarily limited to, the following types of services: Mowing, Cleaning of Parks, Herbicide Application, and Vault Pumping, of the following Government facilities:

1.1. Mowing of public use areas, dam embankments, levees and rim dike, project boundary line and other areas on project lands.

1.2. Cleaning of park facilities such as toilets, picnic/camping sites, grounds keeping, and refuse collection and disposal.

1.3. Herbicide application of public use areas, dam embankment, and other areas on project lands.

1.4 Vault Pumping of sanitary facilities at Elk City Lake.

2. DEFINITIONS.

2.1. Contracting Officer (KO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

2.2. Contractor Officer Representative (COR). A Government employee, designated in writing, responsible for administering the contract for the Contracting Officer.

2.3. Contractor quality control (CQC) is the contractor's system of controlling the quality of services provided under the provisions of the contract.

2.4. Critical weight is a means of subjectively designating the importance of, or weighting, Performance Requirements (PRs). Three critical weights shall be used with A being used to designate the more important PRs and C the least important. Critical weights are based on the importance of each service to the integrity of the facilities being serviced, to the visiting public, to Government employees directly affected by the service, and the environment.

2.5. Deficient service is any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements (PRs) given in Exhibit 3.

2.6. Emergency work is work the contractor is required to perform immediately, normally within a few hours after a verbal request or direction is received from the Contracting Officer.

2.7. Government means the United States of America.

2.8. Performance Requirement (PR) is the Government's minimum requirement for each service provided under the contract. These requirements are stated as Performance Standards and Acceptable Performance Levels.

2.8.1. Performance standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.

2.8.2. Acceptable Performance Level (APL) is the maximum number of deficient services at which the Government will consider a service satisfactory.

2.9. Project means all Government property and easements at Elk City Lake.

2.10. Public use area (PUA) includes parks as well as overlooks, nature and hiking trails, access points, etc.

2.11. Quality is conformance with the contract specification.

2.12. Quality assurance (QA) is the procedure by which the Government determines that CQC is functioning effectively.

2.13. Regulations refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.14. A workday is any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean that work is not required by this specification on other days.

2.15 Bi-Weekly. Work to be performed every other week.

2.16 Toe of Dam – The junction of the downstream face of a dam with the ground surface. Also referred to as the downstream toe.

2.17 Heel of Dam The junction of the upstream face of a dam with the ground surface. Also known as the upstream heel.

3. REFERENCES.

3.1. Corps of Engineers Safety & Health Requirements Manual, EM 385-1-1 (30 November 2014) is hereby incorporated into this specification. The COR will furnish EM 385-1-1 to the contractor after contract award.

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.1. Execution of all work shall be in accordance with this Performance Work Statement.

4.2. The COR will notify the contractor of deficient services.

4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 1).

4.2.2. If the COR directs re-performance of work to correct deficiencies, the contractor shall initiate action to accomplish corrective work within two business days.

4.2.3. Notify the COR when corrective work is completed. Notification shall be made by completing Part IV of the QA Report. When work has been corrected, the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within the time limits specified.

5.1. Experience and skills.

5.1.1. Provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.

5.1.2. Quality control personnel shall be knowledgeable of the work they inspect, inspection procedures, and all portions of this PWS that apply to the work they inspect.

5.2. Supervision.

5.2.1. Contractor shall provide an on-site project manager who shall have full authority to direct any work required.

This on-site project manager, and alternates who shall have full authority to execute work during brief absences of the on-site project manager, shall be designated in writing. The on-site project manager or alternate shall always be on site when work is being performed. Identify, in writing, the name of the appointed on-site project manager and provide this information to the Contracting Officer and COR within 10 calendar days of contract award.

5.2.2. The contractor shall provide the COR a telephone number which the contractor's on-site project manager or representative can be reached at between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.

5.2.3. The on-site project manager shall contact the COR each day when work is being performed. This contact can be made by telephone, or via text messages.

6. EQUIPMENT. Furnish equipment necessary to accomplish all work required by this specification within the specified time limits. Equipment breakdown does not relieve the contractor of the responsibility to complete work on schedule and in accordance with the PWS.

6.1. Equipment Requirements and Inspections. Upon request, the contractor shall make any piece of equipment available to the COR for inspection; equipment shall not be used until it has passed inspection. The COR shall establish the time and location for these inspections.

All equipment used to perform work under this specification shall be in good operating and mechanical condition and comply with EM 385-1-1.

6.1.1. Tractors shall be equipped and operated in accordance with the following:

6.1.1.1. Equipped with seat belts. Seat belts shall be always worn by personnel operating tractors. Refer to subparagraph 18B.09 a & b of EM 385-1-1.

6.1.1.2. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than ¼-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 18.B.12 a of EM 385-1-1.

6.1.1.3. Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 18.B.13. of EM 385-1-1.

6.2. Mowers shall be rotary-type or flail-type and shall meet the following requirements:

6.2.1. Mowers shall be equipped with safety chains or other protective devices to prevent flying objects from injuring people or damaging property.

6.2.2. Mowers shall be equipped with slides and wheels.

6.2.3. Brush hogs shall not be used on the slopes of dikes around oxidation ponds.

6.2.4. Brush hogs shall not be used within 10 feet of facilities in improved areas.

6.2.5. All safety devices provided by the manufacturers of push and riding mowers shall function as designed.

6.3. Edger’s shall be equipped with a rotary blade in an upright position. A protective guard for the blade shall be provided.

6.4. Trucks used for hauling refuse, litter, and debris shall have a covering device to prevent the material from being blown out of the refuse bins. Bins shall be always covered when material is subject to blowing from them.

6.5. The working pressure of power washers shall not exceed 3,500 psi. The working pressure of high-pressure power washers, if used to clean facilities specified in Appendix C, shall be a minimum of 2,000 psi.

6.6. Chainsaws and hand tools used for tree maintenance shall be properly sharpened for clean cuts in accordance with ANSI Z133.1 – 9.2 “Pruning and Trimming”, and EM 385-1-1, Section 31.

6.7. All vehicles used by the contractor shall be identified with signs located on each side of the vehicle; signs may be painted, or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project. Lettering shall be at least 2 inches high. Each sign shall contain the following:

MAINTENANCE SERVICES

PROVIDED BY

(Contractor's Name)

6.8. Equipment operation.

6.8.1. Mowing equipment shall be operated in a manner that allows for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf, property, or injury to others.

6.8.2. Power operated trimming equipment shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height.

6.9. Vehicle operation and parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.

7. MATERIALS AND SUPPLIES.

7.1. Contractor furnished. Except for the items listed in subparagraph 7.2., the contractor shall furnish all materials and supplies necessary to accomplish all work required work to include to include Safety Data Sheets (SDS) shall be available onsite for all chemicals used. Refer to subparagraph 06.B.01 of EM 385-1-1 by this specification and subsequent Task Orders within specified time limits.

7.1.1. All materials and supplies shall be new and adequate quantities shall be maintained to perform the required services without interruptions. All materials and supplies are subject to review by the COR to determine compliance with this PWS.

7.1.2. List of select contractor furnished materials and supplies is given in Exhibit 2.

7.1.3. In addition, the contractor shall furnish, but not limited to, the following:

Cleaning compounds Disinfectants Glass Cleaner Wax and stripping agents Mops, brooms, etc.

Misc. Tools

7.2. Government furnished. The Government will furnish potable water necessary for park cleaning. The contractor shall be responsible for transporting water needed for cleaning to work sites that lack potable water.

8. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 3.

The contractor's performance will be evaluated using these PRs as follows:

8.1. Services provided by the contractor will be inspected for compliance with the identified Performance Standards (PStds). Services not meeting the PStds shall be considered deficient.

8.2. Acceptable Performance Levels (APLs) establish the acceptable limits for deficient services. The existence of some deficient services does not necessarily deem the contractor's performance unsatisfactory; however, this does not mean the contractor may knowingly offer deficient services. It only implies the Government recognizes defective performance occasionally happens even when QC is working satisfactorily.

8.3. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC are functioning. The results of inspections are not changed as a result of satisfactory re-performance.

Deficient services determined in this manner will be used to compute defect rates. These defect rates will be compared to APLs to determine whether the contractor’s performance is acceptable.

8.4. When QA inspections indicate the contractor’s performance is marginal or unsatisfactory, the contractor shall furnish the COR a written plan for correcting his/her CQC program within two (2) workdays. In addition, the contractor shall also furnish weekly written status reports on the implementation of this plan until such time the COR determines that performance is satisfactory; the contractor shall continue weekly status reports until the COR ceases the requirement. The COR will inform the contractor of the criteria to be used in determining marginal and unsatisfactory performance at the Pre-work Conference. The contractor will also be advised of any changes to these criteria prior to being used for evaluation.

9. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Plan to assure that all work required by this contract is completed on schedule and in accordance with the PRs given in Exhibit 3.

9.1. Results of quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 4). Furnish a copy of completed inspection logs to the COR weekly.

10. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings will be made for services that do not meet the PStds in Exhibit 3. Deductions for documented defects will be made in accordance with the following procedures:

10.1. Each service found deficient and re-performed by the contractor: No deduction.

10.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on estimates of the contractor's costs for performing the work.

10.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.

10.4. Each service found deficient and not re-performed by anyone or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's costs for performing the work.

11. SAFETY.

11.1. Accident Prevention Plan (APP). The contractor shall furnish the COR a comprehensive accident prevention plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with ref 01.A.12 EM 385-1-1. The contractor's written safety policy shall be given to all employees and posted at a prominent location in the contractor's office throughout the contract period. The Accident Prevention Plan shall include, but not be limited to the following:

11.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

11.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

11.1.3 Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

11.1.4. Procedures for treating and transporting injured persons to medical facilities.

11.1.5. Fire prevention plans.

11.1.6. Activity Hazard Analysis (AHA): AHA’s shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below; however, the contractor shall prepare additional analyses as the need arises and/or the COR requests. An Activity Hazard Analysis requested by the COR shall be submitted for approval within one (1) week of pre-work conference. An example of a AHAs given in Exhibit 5.

11.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).

11.1.6.2. Equipment operation and maintenance (for each type of equipment).

11.1.6.3. Vehicle operation and maintenance.

11.1.6.4. Mowing operations.

11.1.6.5. Tool usage.

11.2. Safety meetings. The contractor shall conduct monthly meetings to discuss safety items pertaining to ongoing work. In addition, a safety meeting shall be conducted prior to initiation of each mowing. Employees of subcontractors shall attend safety meetings. The contractor shall provide at least one-day notice of safety meetings to the COR so Corps of Engineers personnel can attend. A quarterly report of the meetings shall be furnished in writing to the COR by the 15th day following the end of each quarter. The report shall include the following information on each meeting: Date, location of meeting, names of persons attending, safety items discussed, and persons who conducted the meeting.

11.3. Safety violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the KO. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.

11.4. Personal clothing and safety apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair, i.e., no torn shirts or trousers. Personnel performing mowing/trimming work shall wear eye and ear protection, hardhats, and safety-toe shoes. Personnel shall wear additional protective apparel when required by Section 5, EM 385-1-1.

11.5. Accident reports.

11.5.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.

11.5.2. The contractor shall investigate all accidents involving contractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies, and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately and in writing on ENG Form 3394, Accident Investigation Report, within five (5) workdays’ following the accident.

11.6. Exposure reports. The contractor shall maintain an accurate record of exposure data (man- hours worked) and submit the figure in writing monthly by the 1st business day of the following month. Format will be provided be the COR.

12. CONTRACTOR'S FACILITIES. There are no facilities for storage of supplies or equipment at Elk City Lake.

12.1. If the contractor elects to operate a refuse transfer station it shall be located off Government property and shall conform to all Federal, State, and local regulations.

13. WORK SCHEDULES. The contractor is responsible for managing all work performed under this PWS. This responsibility shall include preparation of written work schedules as prescribed below. The COR's authority in reviewing these schedules is limited to assuring compliance with this specification. If the COR determines the schedules do not comply with this specification, the contractor shall immediately revise the schedules and resubmit them.

13.1. Cleaning of parks. Submit a work schedule for each crew performing park cleaning (Appendix C), using the format given in Exhibit 6.

13.1.1. The schedule shall be prepared for work to be accomplished during the period which work will be started.

Work schedules for subsequent periods shall be furnished two (2) weeks prior to the beginning of each period.

13.1.2. The contractor shall utilize these schedules for accomplishing work and shall furnish the COR a revised schedule prior to changing his mode of operation. The times given on these schedules will be used to evaluate the contractor’s performance under PR X1. Completion of all contract objectives.

14. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR each workday.

15. SECURITY.

15.1. Whenever Government personnel are not present; security gates to compounds shall remain locked except for ingress and egress of the contractor’s vehicles. All entrances to project office building shall remain locked except for ingress and egress of contractor’s employees.

15.2. The contractor shall maintain a key register (SWT Form 894) to record the assignment of all keys provided by the Government. Extra keys shall be returned to the COR. Discharged employees shall be required to return all keys. Keys shall not be duplicated. Any occurrence of lost keys shall be reported to the COR immediately. If keys are lost the contractor shall reimburse the Government for the cost of new keys and tumblers. The contractor shall also install the tumblers at no expense to the Government. Upon termination of the contract, all keys shall be returned to the Government.

16. PREWORK CONFERENCE. The COR shall conduct a Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 17 below. As a minimum, the officer of the company that signed the contract, the on-site project manager who shall represent the contractor, and the person that will directly supervise the administrative work associated with the contract shall be in attendance.

The COR shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor.

17. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the COR one (1) week prior to the Pre-work Conference. All submittals, other than copies of licenses and contracts, shall be typed and the original and one copy shall be furnished the COR. If the COR determines any of the proposed plans or schedules do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

17.1. Names of on-site project manager and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2).

17.2. CQC Plan (paragraph 9).

17.3. Accident Prevention Plan (subparagraph 11.1).

17.4. Report of Safety meetings (submit within 15 days after the end of each quarter) (subparagraph 11.2.).

17.5. Exposure reports (submit at the end of each month for all work that has been completed) (subparagraph 11.6).

17.6. Kansas permits for operation of a refuse transfer station (subparagraph 12.3).

17.7. Supplemental Work Schedules for Janitorial Work and Cleaning of Parks (submit prior to initiation of work and prior to changing schedules) (subparagraphs 13.1 and 13.2).

17.8. Certificate(s) of insurance.

17.9. Kansas permits and/or certification for application of herbicides and pesticides (Appendix A, C, and D).

17.10. Locations of refuse disposal site(s) and a copy of the contract with the operator of the site(s) (Appendix C).

17.11. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the contractor shall procure and maintain during the entire period of his performance under this contract for the following minimum insurance:

Worker’s Compensation and Employer’s Liability: Worker’s compensation and employers’ liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $ 100,000.

General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.

Automobile Liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

17.11.1 The contractor shall submit to the Contracting Officer a copy of their insurance certificate(s) one (1) week prior to the pre-work conference.

18. BILLING.

18.1. Submit one copy of invoices at the end of each month for all work that has been completed.

18.2. Invoices shall be prepared in the format in Exhibit 7.

18.3. All reports, i.e., CQC, safety meetings, exposure reports, etc., shall be submitted before an invoice will be accepted.

18.4. The invoices and supporting documents shall be delivered in person, via email or mailed to the COR, Big Hill Lake Office, 19065 Cherryvale Parkway, Cherryvale, KS 67335.

Email: allen.r.zylstra.usace.army.mil

19. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party only if either or both of the following conditions occur:

19.1. Services required under any appendix are deleted for a period of one (1) month or longer in an entire park.

19.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost that exceeds $1000. The cost of increases or decreases shall be based on estimates of the contractor's costs for performing the work.

EXHIBIT 1

QUALITY ASSURANCE REPORT

(See Section J)

EXHIBIT 2

SPECIFICATIONS FOR CONTRACTOR-FURNISHED

MATERIALS AND SUPPLIES

ITEM APPENDIX SPECIFICATION

URINAL DEODORANT CAKE C PERFUMED, COMMERCIAL QUALITY, SEPTIC TANK

SAFE.

REFUSE CONTAINER LINER C PLASTIC, 8 TO 32 GALLONS

SANITARY NAPKIN LINER C 9 X 9 INCH WAX PAPER BAG, FITS UNITED METAL

RECEPTACLE SANITARY NAPKIN DISPENSER.

TOWELS C PAPER, SINGLE PLY, MULTI-FOLD AND HIGH

ABSORBENCY, COMMERCIAL QUALITY.

TISSUE PAPER C 2-PLY PAPER, FACIAL QUALITY, SEPTIC TANK

SAFE, MINIMUM OF 500 SHEETS PER ROLL,

CONFORMING TO “SAVOY” NO. 612, GEORGIA

PACIFIC COMPANY OR EQUAL.

ODOR CONTROL

CHEMICALS FOR VAULT

TOILETS

C ORANGE FOATING VAULT TOILET DEODORIZER OR

FLOATING LIFT STATION DEGREASER, PHOENIX

ENTERPRISE, ITEM # Kall002255 (or equivalent)

AIR FRESHENERS C BOARDWALK DEODORIZING PARA WALL BLOCKS,

16OZ, PINK, CHERRY (or equivalent)

EXHIBIT 3

PERFORMANCE REQUIREMENTS

SERVICE REQUIREMENTS

PR

NO.

CRITICAL

WEIGHT

PERFORMANCE STANDARDS

APL

ALL APPENDIXES

Completion of work X 1 B Maintained and completed as set forth in the specification and contractor’s approved schedules.

10%

Safety X 2 A All work performed in accordance with EM 385-1-1 & applicable job hazard analyses.

2%

Damage to facilities X 3 A All damages caused by the contractor are reported within one (1) workday.

0%

APPENDIX A - MOWING

Improved areas A 1 A Smooth cut. 1Height of cut grass Maintained within min/max as specified. 2No uncut vegetation.

5%

Semi-Improved areas A2 B Smooth cut. 1Height of cut grass within min/max as specified. 2No uncut vegetation.

10%

Boundary Line A 3 C 1Height of cut grass within min/max as specified. 2Uncut strips of vegetation caused by wheel rollover do not exceed 100 feet/acre.

10%

Edging A 5 A Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.

5%

Trimming A 6 A Uniform cut with no scalping of grass. No damage to trees, shrubs, and structures.

5%

Clean designated areas after mowing

A 7 C No vegetation or debris left on paved surfaces.

15%

APPENDIX C – CLEANING OF PARKS

Clean interior of toilets, change houses & overlook(s)

C 1 A Clean. Floors, walls, toilet fixtures, and showers sanitary. No standing water on floors. Free of graffiti. Soap, air fresheners, & toilet tissue adequate until next cleaning day. Light bulbs operate properly.

5%

NO.

Clean exterior of toilets, change houses & overlook(s)

C 2 B Clean. Free of graffiti. Light Bulbs operate properly.

10%

Deodorize waterborne & vault toilets

C 3 B Odor-free. Orange float deodorizers.

Boardwalk deodorizing para wall blocks, 16 oz, pink, cherry (or equivalent)

10%

Monitor toilet vaults C 4 B Vaults exceeding specified limit are reported. 10%

Clean picnic shelters C 5 B Clean. Free of graffiti. No refuse, debris, or partially burned wood in fireplaces or cookers. Accumulations of ashes do not exceed an average depth of 1 inch in cookers and 3 inches in fireplaces. Light bulbs operate properly.

10%

Clean picnic & camping sites C 6 B Clean. No refuse, debris, or partially burned wood in fire rings or cookers. Accumulation of ashes does not exceed an average depth of 1 inch in cookers and 3 inches in fire rings.

10%

Clean trailer dump stations C 7 B Clean. 10%

Clean courtesy dock C 8 C Clean. 15%

Grounds keeping - PUAs & access roads

C 9 B No refuse or debris visible from a distance of 25 feet.

10%

Grounds keeping - small litter pick up

C 10 B No litter visible from a distance of 10 feet. 10%

Grounds keeping - primitive camping areas

C 11 C No refuse or debris visible from a distance of 25 feet.

15%

Grounds keeping - fishing areas C 12 B No refuse or debris visible from a distance of 25 feet.

10%

Grounds keeping - embankment road

C 13 C No refuse or debris visible from a distance of 50 feet. No dead animals.

15%

Groundskeeping – dam embankment

C14 C No refuse visible within the mowing limits. 15%

Refuse collection C 15 B Containers are not more than ¼ full & contents do not emit strong odors. Liners are odor-free & not torn.

10%

NO.

Refuse disposal (includes refuse collected under Appendix B)

C 16 A Refuse disposed at designated site. No deposition along roads.

0%

Report stinging insects & nests C 17 C All insect nests within 5 feet of facilities or on any buildings reported.

_3_

VCC

/QT

Clean refuse containers C 18 B Clean. 10%

High pressure washing C 19 B Clean. No stains or accumulations of grease.

No damage to paint on adjacent surfaces.

10%

APPENDIX D – HERBICIDE APPLICATION

Soil Sterilant D 1 B 95% kill rate within 2 weeks of application. 10%

Herbicide – Riprap areas D 2 B 95% kill rate within 2 weeks of application. 10%

Herbicide - Guardrail Areas D 3 C 95% kill rate within 2 weeks of application. 15%

Herbicide - Paved Road/Parking Areas

D 4 C 95% kill rate within 2 weeks of application. 15%

Herbicide - Riprap Edging D 5 B 95% kill rate within 2 weeks of application. 10%

Herbicide - Control Noxious Weed D 6 B 95% Kill rate within 2 weeks of application. 10%

Herbicide - All Areas D7 A No shrubs or trees killed outside application areas. Less than ¼ acre of grass killed outside application area.

0%

APPENDIX E – PUMPING OF SANITARY FACILITIES

Normal pumping of vaults E 1 B Vaults pumped to 3 inches of bottom. No dead animals in vaults.

10%

Normal Pumping of septic & holding tanks

E 2 B Tanks pumped to 3 inches of bottom. 10%

Cleanup E 3 B No evidence of spillage. 10%

Emergency pumping of vaults E 4 B Vaults pumped to 3 inches of bottom. 10%

Debris Removal E 5 B All debris removed. 10%

NO.

Disposal of waste E 6 B Waste disposed at designated site. 10%

Completion of work E 7 B Completed within time limits set forth in the specifications

10%

EXHIBIT 4

QUALITY CONTROL INSPECTION LOG

EXHIBIT 5

EXAMPLE OF ACTIVITY HAZARD ANALYSIS

EXHIBIT 6

WORK SCHEDULE FOR PARK CLEANING

EXHIBIT 7

INVOICE FORMAT

BILLING FOR PROJECT CONSOLIDATED MAINTENANCE CONTRACT (PCMC)

PROJECT: _______________________________ SHEET ___ OF __

CONTRACTOR: ____________________________ DATE: ____________

ADDRESS: _______________________________ CONTRACT NO: W912BV-__-_-____

BILLING PERIOD: _________ THRU _________ INVOICE NO: ________________

PAYMENT TERMS: ___________________________

(Payment Discount or N/A)

BID

ITEM NO. DEDUCTION AMOUNT TOTAL

PAYMENT REQUESTED: ____________

CONTRACTOR (Signature/Date)

EXHIBIT 8

Herbicide Use Form at time of application

SWT Anticipated / Actual Usage Report

APPENDIX A

MOWING

1. FACILITIES TO BE SERVICED. Dam embankments, public use areas, dikes and levees, boundary line, and other areas on project lands. An inventory of mowing areas is given in Tables A-1 and A-2, in addition to mowing maps.

2. FREQUENCIES AND TIMES OF SERVICE.

2.1. Work shall be performed between 7 a.m. and 5 p.m., from 1 April through 31 October unless approved by the

COR.

2.2. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.

3. DESCRIPTION OF WORK.

3.1. Improved Areas shall be maintained between a minimum height of 3 inches and a maximum height of 8 inches.

In addition, mow the areas described below and around facilities shown on the drawings or maps.

3.1.1. Areas adjacent to all campsites, roads and parking areas shall be mowed for a distance of 15 feet from each edge of the campsite, road, or parking area or to the tree line, whichever is closer.

3.1.2. Areas around toilets & shelters located outside the limits of improved areas shown on the attached maps shall be mowed for a distance of 15 feet from the back and sides of toilets. The area between the nearby road or parking area and the toilet shall be mowed. In addition, the area between pairs of toilets shall be mowed.

3.1.3. Areas in and around oxidation ponds shall be mowed from the edge of the water to a point 15 feet outside of the fences or 15 feet from the toe of dikes around the ponds, whichever is greater.

3.1.4 Mowing around PZs and wells. Shall be mowed from edge of road to 2’past the highest PZ or well in a straight-line running east and west along dam embankment.

3.1.5 Outfalls shall be mowed a minimum of 14’ from edge of road to outfall and back.

3.1.6 PZs in middle of dam shall be mowed to and around a minimum of 7’.

3.2. Semi-improved areas- Levees, Dikes & Dams: These areas are to be mowed with coordination with the COR prior to commencing. The areas adjacent to the lakeside/riverside heel of levees and dikes shall be mowed for a distance of 15 feet, or to the tree line, whichever is less. The area adjacent to the downstream toe of these structures being levees, dikes and dams shall be mowed for a distance of 15 feet, or to the tree line, whichever is less. The last mowing of the year the rim dike shall be mowed at 60’. All areas shall be cut at a height of 5 inches, the limits are shown on the attached maps. In addition, mow the areas and around facilities shown on the drawings.

3.2.2 Boundary line shall be mowed with coordination of the COR prior to commencing to a height of 5 inches.

Cutting of woody growth up to one (1) inch in diameter will be required. While terrain may be rough, it is suitable for operation of a brush hog. The width of the mowing on the boundary line shall be 15 feet.

3.3. Trimming.

3.3.1. Trimming shall be performed around all vertical objects protruding from the ground, to include light poles, headwalls, guardrails, trees, shrubs, barrier posts, railroad ties delineating pullouts etc. Trees/shrubs or structures shall not be damaged while trimming. All damages shall be repaired or replaced at the contractor’s expense.

3.3.2. Edging shall be accomplished along ALL concrete walkways and curbs that are flush with the ground each time areas are mowed.

3.3.3. Trimming shall be accomplished around piezometers, staff gauges, relief wells, slide gates and flap gates, concrete blocks and training walls (Levee) manholes, embankment markers upstream and downstream and guard posts located on the embankment; along the edge of the embankment riprap, and around guardrail and…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .