SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W58RGZ-20-R-0058
X
2020APR02
2020MAY0205:00pm
DOA1
2020APR02 SEE SCHEDULE
W58RGZ
ARMY CONTRACTING COMMAND-REDSTONE
REDSTONE ARSENAL AL 35898-5280
MAGGIE G. BEVIS
(256)876-5209
CCAM-AL-B
MAGGIE.G.BEVIS.CIV@MAIL.MIL
1 60
X 1
X 4 X 16
X 19 X 20 X 24
X 34
X 37
X 40
X 47
X 48
X 55
X 59
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MAGGIE G. BEVIS
Buyer Office Symbol/Telephone Number: CCAM-AL-B/(256)876-5209
Type of Contract 1: Firm Fixed Price
Kind of Contract: Maintenance Contracts
*** End of Narrative A0000 ***
1. Reserved.
2. This is a five (5) year Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract pursuant to FAR 52.216-22
3. Depot Maintenance Work Requirement DMWR-1-1650-376, Revision Date: 11/24/2010, Change #1, and applicable Maintenance Engineering
Order(s) (MEOs) B1011A, B1130, B1497, B2046, B2579, B3169, B3170, B3171, and B3740 are available for the overhaul of the Accumulator, Hydraulic. This is a 100% Small Business Set-Aside
4. When Applicable, the contractor is reminded to complete the Foreign Military Sales (FMS) Customer DA FORM 2410 (Component Removal and Repair Overhaul Record), submitted with the item for repair, in accordance with DA Pamphlet 738-751 and TB-1500-341-01. Upon completion of repair, if authorized, the contractor is reminded to fill out U.S. Army DA Form 2410 and return it to the FMS customer with the repaired asset(s), along with the FMS customer version of the DA Form 2410.
5. The FMS Customer and geographical location(s) for deliveries, inspection and acceptance points are unknown at this time.
6. Subject to the availability of funds, any quantities ordered will be priced at the unit price established for the ordering period in which they are ordered. Funds shall be obligated by issuance of Delivery Orders and not by the contract itself.
7. The minimum quantity of 60 each (US quantity) shall be obligated on the first delivery order, to be issued simultaneously with the award of the contract. Any additional quantities ordered will be priced at the firm fixed price in effect during the ordering period in which they are ordered. The minimum quantity to be acquired under this contract is 60 each and the maximum quantity is 360 each.
8. The Government will not be required to obtain the contractor's signature prior to the issuance of an order.
9. Reserved.
10. The Government has segregated the estimated quantities into five ordering periods. However, this does not preclude exercising the
Government's right under FAR 52.216-19 by ordering the maximum quantity specified in FAR 52.216-19(b)(1) at any time during the five year ordering period.
Ordering Period 1 will be from date of contract award through 365 days after contract award (DACA).
Ordering Period 2 will be from 366 DACA through 730 DACA.
Ordering Period 3 will be from 731 DACA through 1,095 DACA.
Ordering Period 4 will be from 1,096 DACA through 1,460 DACA.
Ordering Period 5 will be from 1,461 DACA through 1,825 DACA.
11. Please insert your firm fixed unit prices for the 1st, 2nd, 3rd, 4th, and 5th ordering periods in the spaces provided under each
CLIN/SubCLIN.
12. Reserved
13. No Government Furnished Materials (GFM), other than the reparable assets and reusable containers, will be provided.
14. Offers shall be submitted in accordance with FAR Clause 52.215-1. Electronic submissions for proposals are authorized and is the preferred method of submission. Proposals should be emailed to maggie.g.bevis.civ@mail.mil and lindy.l.pinchon.civ@mail.mil. Facsimile submissions are not authorized. Should you choose to mail a hard copy, in addition to the preferred method, please mail to:
Army Contracting Command - Redstone Arsenal
ATTN: Maggie Bevis, CCAM-ALB
Bldg. 5303, 2nd Floor
Redstone Arsenal, AL 35898-5280
15. If any offeror chooses to hand carry their proposal, the offeror must reach the appointed location (identified as building 5300, 5300 Martin Road, Redstone Arsenal, AL 35898, Foyer) by the date and time as stated in block 9 on page 1 of the solicitation. Please be advised that Redstone Arsenal is a restricted facility and should an offeror choose to hand carry a proposal, a minimum of 72 hours
2 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
notice to the Contracting Officer is required in order to ensure access by the closing date/time of the solicitation. Any unauthorized entity must be identified as having a need, as validated by the Contracting Officer, in order to gain access to the post. The contracting office must notify the Gate personnel, who monitor post access, a minimum of 48 hours prior to an entity gaining entrance to the restricted post.
16. Reserved.
17. Reserved.
18. The contractor shall provide with their proposal a response that addresses the contractor's plan to meet all government special tooling and test equipment requirements with either:
a. Physical possession of the required tools, b. Confirmed requisitions for the required tools, c. Confirmed arrangements for subcontracting the processes requiring the special tools, or d. Specific plans describing their technical approach to develop equivalent tools.
19. Reserved.
20. The contractor is instructed to put the following words in the remarks column of the DD 250/WAWF: "Repair and Return Process D6".
21. Access to DLA FedMALL (formerly known as EMALL) is NOT authorized. ___
22. The National Defense Authorization Act for Fiscal Year 1993, Public Law 102-484, Section 326, prohibits use of Other Direct Cost
(ODC) in Department of Defense contracts awarded on or after 1 June 1993, unless appropriate authority is granted.
23. The following websites are provided for the purpose of obtaining/reviewing various Army publications and technical manuals/bulletins:
A. https: //www.logsa.army. mil/etms/online.cfm - Technical Manuals and Bulletins
B. http: //www.apd.army. mil/ - DA Pamphlets and Army Regulations
24. COMPLETE THE FOLLOWING CONTRACTOR POINT OF CONTACT INFORMATION:
NAME: _________________________________________
TELEPHONE NUMBER: _____________________________
FAX NUMBER: ___________________________________
E-MAIL ADDRESS: _______________________________
*** END OF NARRATIVE A0001 ***
3 60
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 PVA
**CLIN 0001AA IS FOR THE PRODUCT
VERIFICATION AUDIT FOR THE ACCUMULATOR,
HYDRAULIC.**
PVA CLIN 0001AA IS FOR THE FOLLOWING
ITEMS:
INPUT NSN: 1650-01-222-4316
OUTPUT NSN: 1650-01-222-4316
INPUT P/Ns: 3197170-5 AND 70651-03201-105
OUTPUT P/N: 70651-03201-105
PVA MUST BE APPROVED BEFORE OVERHAUL MAY
BEGIN.
(End of narrative A001)
0001AA PRODUCT VERIFICATION AUDIT (PVA) $ ________________________________ __________________
SERVICE REQUESTED: PVA
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN represents the Product Verification
Audit (PVA) for the UH-60 Accumulator, Hydraulic, Output NSN: 1650-01-222-4316, as shown in CLINs 0002AA and 0003AA.
This is a Firm Fixed Price CLIN.
Offeror is required to fill in a proposed firm fixed unit price for the PVA: $___________
PVA shall be in accordance with Section E, "Product Verification Audit (PVA) Statement of
Work".
PVA shall be conducted within 90 days after receipt of reparables. The Contractor shall prepare 3 assets for PVA. The Contractor is required to notify the Government Quality Office for scheduling of the PVA by email to the following address:
usarmy.redstone.ccdc-avmc.mbx.qs-contracts@mail.mil
With copy emailed to the Contract Specialist at:
4 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
maggie.g.bevis.civ@mail.mil
The Contractor will prepare and forward, through the cognizant Government Quality Element, finalized audit reports within 10 working days after completion of the PVA to both email address above.
NOTE: A copy of the cover letter for the report shall be forwarded to the Contract Specialist at:
U.S. Army Contracting Command - Redstone
Bldg 5303, 2nd Floor
ATTN: CCAM-ALB, Maggie Bevis
Redstone Arsenal, Alabama 35898-5000 or emailed to: maggie.g.bevis.civ@mail.mil
PVA requires approval prior to Government acceptance of contract deliverable assets.
Failure to pass the PVA may lead to Termination________________________________________________ for Default of the contract.____________________________
Payment Instructions: The Contractor will go_____________________ into Wide Area Work Flow (WAWF) to receive payment for the PVA. The Contractor shall use
DODAAC W58H0Z when submitting the PVA invoice in
WAWF, making it to the attention of Jeanie
Clark. The Contracting Officer will approve the
PVA invoice.
(End of narrative C001)
Deliveries or Performance _________________________
0002 ACCUMULATOR, HYDRAULIC
NSN: 1650-01-222-4316
Mfr CAGE: 78286
Mfr Part Number: 70651-03201-105
Estimated yearly quantities for CLIN 0002AA are:
Ordering Period 1: 60 each minimum qty
Ordering Period 2: 60 each estimated qty
Ordering Period 3: 60 each estimated qty
Ordering Period 4: 60 each estimated qty
Ordering Period 5: 60 each estimated qty
Funds for the ordering period 1 quantity set forth herein shall be obligated on the first delivery order, to be issued simultaneously with the award of the firm fixed price contract.
5 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative A001)
0002AA OVERHAUL ACCUMULATOR, HYDRAULIC (US QTY) $ $ ________________________________________ ______________ __________________
COMMODITY NAME: ACCUMULATOR, HYDRAULIC
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is NOT a Critical Safety Item.
(End of narrative B001)
INPUT:
NSN: 1650-01-222-4316, P/N: 3197170-5
NSN: 1650-01-222-4316, P/N: 70651-03201-105
OUTPUT:
NSN: 1650-01-222-4316, P/N: 70651-03201-105
Overhaul shall be in accordance with the
Statement of Work/Specifications - Government
Specifications.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the
Statement Of Work (SOW).
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICE:
YEAR 1- U/P $_____________ (FFP) Min Qty 60 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 60 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 60 ea
YEAR 4- U/P $_____________ (FFP) Est Qty 60 ea
YEAR 5- U/P $_____________ (FFP) Est Qty 60 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-129 & MIL-STD-2073-1 J CODES APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
6 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
LEVEL PRESERVATION: Military
LEVEL PACKING: A
For Packaging Instructions refer to Section J
Attachment 0001, M&O Packaging Instructions.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(W562RM) SU W0MC ARMY GENERAL SUPPLY
CENTRAL RECIEVING
10TH STREET AND K AVENUE
TEXARKANA,TX,75507-5000
Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.
(End of narrative F001)
0003 ACCUMULATOR, HYDRAULIC
NSN: 1650-01-222-4316
Mfr CAGE: 78286
Mfr Part Number: 70651-03201-105
Estimated yearly quantities for CLIN 0003AA are:
Ordering Period 1: 0 each minimum qty
Ordering Period 2: 15 each estimated qty
Ordering Period 3: 15 each estimated qty
Ordering Period 4: 15 each estimated qty
Ordering Period 5: 15 each estimated qty
This CLIN will be used only if a FMS Customer
Requires this item. If no FMS Customers are identified, the US Army Requirer may utilize the
FMS quantity.
(End of narrative A001)
0003AA OVERHAUL ACCUMULATOR, HYDRAULIC (FMS QTY) $ $ _________________________________________ ______________ __________________
7 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
COMMODITY NAME: ACCUMULATOR, HYDRAULIC
CLIN CONTRACT TYPE:
Firm Fixed Price
This CLIN is NOT a Critical Safety Item.
(End of narrative B001)
INPUT:
NSN: 1650-01-222-4316, P/N: 3197170-5
NSN: 1650-01-222-4316, P/N: 70651-03201-105
OUTPUT:
NSN: 1650-01-222-4316, P/N: 70651-03201-105
Overhaul shall be in accordance with the
Statement of Work/Specifications - Government
Specifications.
This Firm Fixed Price (FFP) CLIN includes mandatory parts and non-mandatory parts, labor charges, preservation, packaging, packing, marking, and data items necessary to return the unit to a serviceable condition as stated in the
Statement Of Work (SOW).
OFFEROR IS REQUIRED TO FILL IN PROPOSED UNIT
PRICE:
YEAR 1- U/P $_____________ (FFP) Min Qty 0 ea
YEAR 2- U/P $_____________ (FFP) Est Qty 15 ea
YEAR 3- U/P $_____________ (FFP) Est Qty 15 ea
YEAR 4- U/P $_____________ (FFP) Est Qty 15 ea
YEAR 5- U/P $_____________ (FFP) Est Qty 15 ea
INDIVIDUAL DELIVERY ORDERS WILL BE ISSUED FOR THIS
CLIN.
(End of narrative C001)
Packaging and Marking _____________________
PACKAGING/PACKING/SPECIFICATIONS:
IAW MIL-STD-129 & MIL-STD-2073-1 J CODES APPLY
UNIT PACK: 001 INTERMEDIATE PACK: 000
LEVEL PRESERVATION: Military
LEVEL PACKING: A
For Packaging Instructions refer to Section J
Attachment 0001, M&O Packaging Instructions.
(End of narrative D001)
8 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
FOB POINT: Origin
SHIP TO:
(W562RM) SU W0MC ARMY GENERAL SUPPLY
CENTRAL RECIEVING
10TH STREET AND K AVENUE
TEXARKANA,TX,75507-5000
Refer to the Narratives entitled "Delivery Schedule" and "Delivery of Additional Quantities" in section F for the Government's Required Delivery Schedule.
(End of narrative F001)
0004 SCRAP
0004AA SCRAP $ ______ __________________
SERVICE REQUESTED: SCRAP
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER ORDERING
PERIOD IS 1 EACH FOR PROPOSAL EVALUATION PURPOSES
ONLY.
Offeror is required to fill in the proposed firm-fixed-unit prices for ordering periods 1 to 5:
ORDERING PERIOD 1 $_____________ Est Qty 1 EA
ORDERING PERIOD 2 $_____________ Est Qty 1 EA
ORDERING PERIOD 3 $_____________ Est Qty 1 EA
ORDERING PERIOD 4 $_____________ Est Qty 1 EA
ORDERING PERIOD 5 $_____________ Est Qty 1 EA
Scrap assets from CLINs 0002AA and 0003AA shall be in accordance with Section C, entitled Statement of
Work/Specifications - Government Specifications.
Units authorized to be scrapped in accordance with
Section C shall be reflected as an increase in CLIN
9 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004AA with a corresponding decrease in quantity and funds in CLINs 0002AA and 0003AA.
In the event the Procuring Contracting Officer (PCO) determines that certain items should be scrapped, the contractor shall scrap such items at the fixed-unit price in Section B hereof and make disposition in accordance with the contractor's approved Government property procedures.
The Government may, at its discretion, replace any items scrapped by input of additional assets and said scrap quantities will not count as part of the total maximum quantity.
Scrap requires authorization by the PCO via formal modification. In no event shall the contractor scrap an item prior to receiving a contractual modification for a unit.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0005 CONTAINERS
0005AA CONTRACTOR FURNISHED CONTAINERS $ _______________________________ __________________
SERVICE REQUESTED: CONTAINERS
CLIN CONTRACT TYPE:
Firm Fixed Price
THE GOVERNMENT'S ESTIMATED QUANTITY PER ORDERING
PERIOD IS 1 EACH FOR PROPOSAL EVALUATION
PURPOSES ONLY.
Offeror is required to fill in proposed firm fixed unit prices for ordering periods 1 to 5:
ORDERING PERIOD 1 $____________ Est Qty 1 EA
ORDERING PERIOD 2 $____________ Est Qty 1 EA
ORDERING PERIOD 3 $____________ Est Qty 1 EA
ORDERING PERIOD 4 $____________ Est Qty 1 EA
10 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
ORDERING PERIOD 5 $____________ Est Qty 1 EA
The contractor shall provide the container in accordance with Section C, entitled Statement of
Work/Specifications - Government Specifications and Section J, Attachment 0001 M&O Packaging
Requirements.
NSN:1650-01-222-4316
P/N: 70651-03201-105
Supplemental Information: ZZ=8145-00-536-4925
The Government cannot determine at the time of contract award, how many of the assets to be overhauled will be received by the Contractor in unserviceable containers or received without containers.
The Contractor, IAW Section C Statement of Work, should submit a Report of Discrepancy (ROD) SF
Form 364 through the Defense Contract Management
Agency (DCMA) Quality Assurance Representative
(QAR) for verification within 7 working days to the address shown on Exhibit B, Data Item A002.
When assets are received in unserviceable containers or without containers, approval of the PCO is required before replacement containers are purchased.
This CLIN covers containers for CLINs 0002AA and
0003AA.
THIS IS A FIRM-FIXED-PRICE CLIN.
(End of narrative C001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
Deliveries or Performance _________________________
0006 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
This CLIN is "Not Separately Priced" (NSP). Pricing for data shall be included in the unit prices of
CLINs 0002AA and/or 0003AA.
The Contractor shall provide Data Items A001 - A006 in accordance with the Contract Data Requirements
List, Exhibits A-F.
(End of narrative A001)
11 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
A001 LOGISTICS PRODUCT DATA, TAMMS-A $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: DATA ITEM A001
DATA ACQUISITION DOCUMENT NUMBER: DI-SESS-81758A
Within two business days after a Government QA acceptance the contractor shall submit a copy of the
Wide Area Work Flow (WAWF) receiving reports listing each Serial Number (SN) shipped via e-mail to the address listed below. A final receiving report for each Delivery Order (DO) and or contract closeout shall be via submittal to WAWF; use DODAAC W81D17 for this CLIN.
The Requiring Office will verify final accounting of all TAMMS-A data reported against the contract/DO and verify that all TAMMS-A data has been received. Any discrepancies will be identified within 5 working days after receipt and comments provided to the contractor. The contractor shall correct errors and resubmit within 10 working days after receipt of the requiring office comments.
The contractor shall provide data based on delivery schedules/contract requirements.
TAMMS-A submittal/approval shall be via contractor/vendors use of the TAMMS-A/MCDS web portal https://tamms-a.redstone.army.mil . If the web portal is unavailable or the contractor currently does not have a TAMMS-A/MCDS account, see the Statement of
Work for additional instructions.
Commander, U.S. Army Aviation and Missile Command
ATTN: AMSAM-OPL (TAMMS-A)
(M&O) Redstone Arsenal, Alabama
35898-5230
E-mail: usarmy.redstone.amcom.mbx.immc-snrr@mail.mil
Fax; (256) 876-3574 ATTN: SNRR Staff
(End of narrative C001)
Deliveries or Performance _________________________
A002 REPORT OF SHIPPING (ITEM) AND PACKAGING _______________________________________
DISCREPANCY $ ** NSP ** ___________ __________________
SERVICE REQUESTED: DATA ITEM A002
12 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80503
FOR WRONG components received submit a Shipping
Supply Discrepancy Report (SDR).
For components received improperly packaged in containers, packaged in unserviceable containers, or packaged without containers (when a container is required), submit a packaging SDR.
When there is a packaging discrepancy and the wrong component is received submit a dual shipping and packaging SDR.
For packaging discrepancies discovered upon induction of the item to repair/overhaul (hidden discrepancies), submit the SDR form within ten (10) days of discovery of the discrepancy.
If the packaging discrepancy appears to have caused deterioration of the item, include an estimated cost to repackage the asset in Block 12 of the SF form
364.
Report by letter the number of excess reusable containers made available through scrap out of items, to addresses in block 14(A).
(End of narrative C001)
Deliveries or Performance _________________________
A003 CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT $ ** NSP ** __________________________________________________ __________________
SERVICE REQUESTED: DATA ITEM A003
DATA ACQUISITION DOCUMENT NUMBER: DI-PSSS-81995
The first report is due 5 working days after receipt of reparable item(s).
The contractor shall provide data in Microsoft Excel
Spreadsheet format to: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil.
Each monthly submission shall include balance of each
NSN on hand at the contractor's facility associated with this contract. The balance shall be verified by the contractor prior to submission.
An additonal copy shall be sent to: uarmy.uh60m-oteam@mail.mil. Both copies shall be prepared and submitted as an MS Excel file in accordance with the attached sample.
13 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative C001)
Deliveries or Performance _________________________
A004 TECHNICAL REPORT - STUDY/SERVICES - DD FORM ___________________________________________
1348-1A $ ** NSP ** _______ __________________
SERVICE REQUESTED: DATA ITEM A004
DATA ACQUISITION DOCUMENT NUMBER: DI-MISC-80508B
Contractor shall deliver the report within 5 working days of receipt of repairables.
Data shall be delivered to:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
(End of narrative C001)
Deliveries or Performance _________________________
A005 GOVT PROPERTY INVENTORY REPORT - PHYSICAL INV _____________________________________________
INSTRUCTIONS $ ** NSP ** ____________ __________________
SERVICE REQUESTED: DATA ITEM A005
DATA ACQUISITION DOCUMENT NUMBER: DI-MGMT-80441C
Report to be submitted no later than 15 days after completion of physical inventory.
Data shall be delivered to:
usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
(End of narrative C001)
Deliveries or Performance _________________________
A006 QUALITY DEFICIENCY REPORT $ ** NSP ** _________________________ __________________
14 60
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: DATA ITEM A006
DATA ACQUISITION DOCUMENT NUMBER : DI-QCIC-80736 (AS
REQUIRED)
No report is necessary unless there is a discrepancy.
Contractor shall submit NO LATER THAN 10 days after discovery of deficiency.
The Contractor shall coordinate quality deficiency with the Cognizant Government Representative.
(End of narrative C001)
Deliveries or Performance _________________________
15 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C-1 Statement of Work/Specifications Government Specifications
a. The Contractor, as an independent Contractor, and not as an agent or employee of the Government, shall furnish all services, facilities, labor, parts, materials, equipment, tools and data necessary to accomplish the inspection and Overhaul required to return the items as specified in Section B, to condition code A as defined by Army Regulation 725-50. The input/output configuration shall be as defined in Section B herein. Upon completion of the Overhaul, as applicable, the items shall be packaged as defined in Section D and
Attachment 0001 of this contract and shipped to the destination(s) specified in each individual delivery order.
b. Prior to commencement of Overhaul, the Contractor shall disassemble and inspect the item to the extent necessary to determine the total cost of such Overhaul including labor, services, parts and materials. The Contractor shall continue the Overhaul process on all end items when the total cost to Overhaul does not exceed $9,311.28. The Overhaul line items shown in section B are Firm-Fixed-Price
(FFP). The Contractor will be required to complete the Overhaul at the FFP on all end items regardless of the damage as long as the total cost to Overhaul does not exceed $9,311.28. The Contractor will be required to provide other than certified cost and pricing data and a Report of Discrepancy (ROD) signed by the DCMA QAR to the Procuring Contracting Officer (PCO) to confirm that the total cost to
Overhaul will exceed $9,311.28. This data will include at minimum material cost (80% of material cost will be supported by current vendor quotes), labor hours, labor rates, overheads, G&A(s), and profit rate. More information to support the Contractor's price may be requested by the Government. In no event will any asset be scrapped prior to an approved modification by the PCO. No additional funding except for missing parts, if approved, will be provided to the Contractor to complete the Overhaul of the end item. The Government cannot guarantee the condition or configuration of the assets sent to the Contractor for Overhaul.
c. In the event that the total contractor cost to Overhaul is determined (approved by PCO) to exceed $9,311.28, the Contractor shall scrap such items at the fixed unit price in CLIN 0004AA of Section B hereof and make disposition in accordance with (IAW) the
Contractor's approved Government property procedures. Such scrapped items shall count toward the quantities ordered hereunder. The
Government may, at its discretion, replace any items scrapped by input of additional assets, and said scrap quantities will not count as part of the total maximum quantity. Any item other than those determined to be scrapped must be overhauled at the firm fixed price in the awarded contract.
d. Overhaul shall be accomplished IAW Depot Maintenance Work Requirement (DMWR) 1-1650-376, Revision Date: 11/24/2010, Change#: 1, and
Maintenance Engineering Orders B1011A, B1130, B1497, B2406, B2579, B3169, B3170, B3171, and B3740.
e. Reserved
f. Upon receipt of the reparables, containers shall be reviewed for serviceability. Containers shall be considered serviceable unless one or more of the following conditions exist: (1) containers are structurally damaged to include functional damage to the suspension system, cracks or holes to the container hull, hull deformity to the extent the container cannot be closed (or sealed where required), or dents that will interfere with the item envelope; (2) corrosion has progressed to the point where fit, function or the life of the container is affected. Items received without containers or containers determined to be unserviceable shall be processed IAW the
Contractor's locally approved Government Property procedures. Components received improperly packaged, damaged with corrosion/deterioration or those with shipping discrepancies shall be reported IAW DI-MGMT-80503, Data Item A002 Exhibit B
g. Any Contractor paint facility which is used in the performance of this contract shall comply with the Environmental Protection Agency and Occupational Safety and Health Administration standards for painting as implemented by TM 1-1500-345-23, with change 1, Painting and
Marking of Army Aircraft.
h. Data and reports shall be submitted IAW the Contract Data Requirements List, DD Form 1423, Exhibits A-F. Data shall be packaged, packed and marked as necessary to assure safe delivery to the addressees indicated on the DD Form(s) 1423. All RODs and QDRs must be approved/signed by the DCMA QAR prior to submission.
i. Product Verification Audit (PVA): The Contractor shall conduct the PVA in accordance with PVA statement of work narrative as specified in the solicitation/contract attachment.
j. The Army Maintenance Management System - Aviation (TAMMS-A): The Contractor shall complete the forms and records as specified in DA
PAM 738-751.
k. Reserved.
l. The items the Contractor shall overhaul are identified below:
Input NSN P/N
1650-01-222-4316 3197170-5
1650-01-222-4316 70651-03201-105
Output NSN P/N
16 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
1650-01-222-4316 70651-03201-105
m. The overhaul planned quantity for 5 years is Minimum 60, Maximum 360.
Input will be 30 days after receipt of order (ARO). Output shall be as specified in the solicitation/contract schedule. Serviceable assets shall be returned to W562RM.
US Quantities
(1) 1st year qty 60 (4) 4th year qty 60
(2) 2nd year qty 60 (5) 5th year qty 60
(3) 3rd year qty 60
FMS Quantities
(1) 1st year qty 0 (4) 4th year qty 15
(2) 2nd year qty 15 (4) 5th year qty 15
(3) 3rd year qty 15
n. Inventory Transactions - The Contractor shall prepare the following reports:
1. The contractor shall prepare a Depot Maintenance Production Report IAW DI-PSSS-81995, Data Item A003 Exhibit C and Attachment
0005.
2. The contractor shall complete and maintain the DD Form 1348-1A receipt for reparables on all shipments IAW DI-MISC-80508 and DD
Form 1348-1A. The contractor shall complete the DD Form 1348-1A, Block 10 (indicates the quantity received), along with Block 22
(signature), and Block 23 (date). Printed names, name/date stamps, and initials shall not be acceptable. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located as Attachment 0007. If a DD Form 1348-1A is not delivered with the shipment, a DD Form 1348-1A is located at:
http://www.dtic.mil/whs/directives/eforms/dd13481a.pdf
The contractor shall prepare this data to include the following corresponding receipt information:
A. Document Number - (Positions 30-44)
B. National Stock Number (NSN) - (Positions 8-22)
C. Condition Code - (Position 71)
D. Unit Price - (Positions 74-80)
E. Total Price - (Block 1)
F. Actual Quantity Received - (Block 10)
G. Nomenclature - (Block 17)
H. Signature and Date - (Blocks 22 and 23)
An example of a 1348-1A filled out correctly is attached (See Attachment 0007).
If there are any questions with the above information please contact: usarmy.redstone.usamc.mbx.immc-smb-ammo@mail.mil
3. The contractor shall perform a 100% physical inventory of general supplies on an annual basis per AR 740-26, Physical Inventory
Control. The contractor shall perform a 100% phsyical inventory of missiles/ammunication on a bi-annual basis per AMCR 740-27, Ammunition Inventory and Accountability.
The contractor shall perform special inventory requests the same day as a government request is received from the responsible inventory manager.
The contractor shall prepare a physical inventory report IAW DI-MGMT-80441. Along with this report, an inventory memorandum to include count type, date performed, total count of lines, and signature shall be provided. The contractor shall ensure that the total lines inventoried correlates with lines present on count sheets.
If the phsyical inventory shows less that 97% of general supplies or less the 98% of missiles/ammunication are accounted for, the accountable Property Officer, Item Manager, or Contracting Officer is authorized to schedule a 100% physical inventory by a government official.
o. Reserved.
p. Reserved.
17 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
q. The Government reserves the right to replace any items scrapped.
r. Reserved.
s. The Contractor shall prepare the Quality Deficiency Report IAW DI-QCIC-80736, Data Item A006 , Exhibit F.
t. Reserved.
u. Shipping Containers: NSN 8145-00-536-4925 shall be utilized. If containers are not reparable of if assets are not delivered in the approved containers, the containers shall be Contractor Furnished Material. Shipment: Packaging requirements IAW instructions attached to the Solicitation/Contract, see Attachment 0001. The Contractor must use a method of shipment that provides a procedure so that the package can be tracked in case the shipment is not received by AMCOM.
v. Reserved.
*** END OF NARRATIVE C0001 ***
18 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION D - PACKAGING AND MARKING
D-1 BAR CODE MARKINGS
Bar Code Markings are required in accordance with the latest revision of MIL-STD-129 and ISO/IEC 16388 - Information Technology -
Automatic Identification and Data Capture Techniques - Bar Code Symbology Specification - Code 39.
*** END OF NARRATIVE D0001 ***
19 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION E - INSPECTION AND ACCEPTANCE
This document incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:
For FAR clauses: https://www.acquisition.gov/
For DFARS clauses: https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
If the clause requires additional or unique information, then that information is provided immediately after the clause title.
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
E-1 52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE AUG/1996
E-2 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE AUG/1996
E-3 52.246-16 RESPONSIBILITY FOR SUPPLIES APR/1984
E-4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT DEC/2014
(a) The contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2008 or equivalent; any equivalent must be approved prior to contract award.
(b) The contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
E-5 PRODUCT VERIFICATION AUDIT (PVA) STATEMENT OF WORK
Purpose: The purpose of this PVA SOW is to provide guidance to the contractor in the preparation for and execution of the PVA. The primary concept of the PVA is to validate that the contractor's overhaul processes and procedures comply with contract technical requirements. The PVA candidate(s) are used to evaluate that the contractor processes and procedures are adequate to ensure component integrity.
(a) The Contractor shall perform overhaul and present for acceptance THREE units of Lot/Item 0001AA as specified in this contract.
This clause does not supersede instructions contained in depot overhaul work requirements, commercial overhaul manuals, or other applicable documents. It does not relieve the contractor from maintaining a quality system that will assure overhauled items conform to contractual requirements. Contractors may request to delay scheduled PVAs in frequency or waive PVA requirements of selected items in cases where accumulated objective evidence indicates that a consistent quality item is being delivered. The Command's actions will be based on the overall performance history, failure impact, supply impact, length of program, and nonscheduled PVAs accomplished by the
AMRDEC Engineering Directorate (ED). Like or similar items may be grouped for these purposes provided concurrence is obtained from
AMRDEC ED. The contractor may be directed by the Contracting Officer (CO) to increase or decrease the scope of a PVA pursuant to the
"Changes" clause of the contract.
(b) The Contractor shall:
(1) With the concurrence of the cognizant government quality element and AMCOM, schedule and perform PVA as required by the terms of the contract or as otherwise required.
(2) Notify AMCOM through the cognizant government quality assurance element, with information copy to the AMRDEC ED, ATTN:
usarmy.redstone.ccdc-avmc.mbx.qs-contracts@mail.mil, of the date the PVA candidates will be available. Notification shall be provided at least 20 working days prior to the selected date if facilities are within the Continental United States. If facilities are outside the Continental United States, notification shall be provided at least 95 working days prior to the selected date to allow sufficient time for travelers to gain theater clearance.
(3) Provide technical personnel, tooling, measuring and test equipment, work area, forms, and clerical assistance, as required, to perform the PVA. If test cell or other specialized equipment is required; notification of readiness for PVA shall include the availability of these.
(c) The initial PVA will be performed on one of the first three (3) items overhauled. The PVA candidate will be selected by the AMRDEC
PVA Team Chairman at random from the three (3) tendered for acceptance to the Government. For reoccurring audits, if any, the audit candidate will be selected by the PVA Team Chairman from all completed items currently available.
20 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(d) The item selected for PVA will be inspected for adherence to preservation, packaging, packing, and marking requirements prior to removal from the shipping container. A visual inspection and functional test will be performed prior to disassembly.
(e) The PVA Team will review the shop travelers, production processes, procedures, tooling, and equipment used to overhaul the item being audited for adequacy and conformance to the contractual requirements. The PVA will include verification through objective evidence that all of the inspection, testing, measuring and diagnostic equipment used in the inspection/test of the PVA candidate are maintained in accordance with applicable calibration standards.
(f) Disassembly will be performed in an area accessible only to audit personnel. Normally, audit participation will be limited to specified production and quality assurance personnel of the contractor activity, the cognizant government Quality Assurance
Representative (QAR), and the AMRDEC PVA Team Chairman and team personnel.
(g) Visual inspection, dimensional checks (such as backlash, end clearance, running clearance, etc.) and nondestructive testing are accomplished during and after disassembly IAW applicable technical directives. Findings are recorded for comparison with historical data and conformance evaluation. A 100% inspection (or as set forth in relevant specifications) of all physical characteristics, to include but not limited to, any dimensions, certifications for materials, processes and/or procedures, as well as any other requirements which may be set forth by other applicable specifications, or in any procurement packages, technical drawings. Depot Maintenance Work
Requirements (DMWRs), Maintenance Engineering Orders (MEOs), and/or any other special/functional testing as set forth in this contract.
(h) Applicable accessories and components will be functionally tested and inspected to contractual/work specifications. The PVA team will review subcontractor certifications for testing and inspections. At the request of the PVA Team Chairman, processes (such as shotpeening, heat treating, etc.) performed by subcontractors will also be audited. Contractor shall be able to demonstrate that all testing, inspection procedures, and acceptance methods are documented in the appropriate area of the overhaul documents, and are approved and controlled by management.
(i) The PVA item shall be reassembled and functionally tested IAW applicable specifications and made ready for government aceptance including preservation, packing, packaging, marking, and update of historical records and all applicable documentation.
(j) Conduct of the PVA will be planned in a manner that adequately allows examination/audit of all procedures involved. Each step in the process shall be analyzed to determine compliance to specifications. It may not be logical or possible, due to time constraints, to track the same item throughout the PVA; therefore, at the AMRDEC PVA Team Chairman's discretion, examination of representative assemblies amy be used as evidence of compliance to specification requirements. The AMRDEC PVA Team Chairman will determine the scope and detail of the PVA process. The AMRDEC PVA Team Chairman may delegate follow-up actions to the government QAR, when it is determined to be prudent to the PVA.
(k) During the course of the PVA, the PVA Team Chairman may request progress meetings to provide status to the contractor. After the
PVA is completed, the AMRDEC PVA Team Chairman will conduct an exit critique attended by all concerned contractor personnel and the cognizant government QAR. The context of the audit findings and corrective actions will be discussed and any disputes will be resolved.
Findings, classifications, and corrective actions will be discussed and determinations made as to cause of defect established (i.e., workmanship, tooling, technical requirements, etc.). The contractor's management personnel shall take immediate action to correct and preclude recurrence of all defects attributable to failure to comply with requirements.
(l) All defects will be recorded on the AMRDEC PVA Audit Finding Record by the PVA Team. The PVA Team Chairman will provide copies of each Finding to the contractor quality assurance element and the cognizant government QAR. This will allow immediate actions to begin in the resolution of the defect. Corrective actions as well as actions taken to prevent recurrence shall also be documented on this form by the contractor. The form shall be signed, as a minimum, by the contractor's quality manager or designated representative and the AMRDEC PVA Team Chairman. Further actions outlined below pertain to specific actions required by the contractor depending on the classification of the defects.
1. Observation: In the event an observation Finding is discovered, the contractor is not required to provide a written response, but it is encouraged to do so.
2. Minor: In the event a minor defect is discovered, the following actions shall be taken:
a. The contractor shall isolate the cause of the defect and initiate corrective actions.
b. All minor defects shall require a written response addressing corrective actions taken and actions taken to prevent recurrence.
c. In the event a minor defect is a recurring deficiency, regardless of weapon system or date when original discrepancy was noted, it will be written into the report as a minor defect, but the corrective actions required below for a major defect will apply.
3. Major: In the event a major defect is discovered, the following actions shall be taken:
a. The contractor shall halt any work in progress at the responsible station until corrective action is acceptable to the PVA Chairman.
b. The contractor shall provide the QAR information reflecting the total quantity shipped, if any, and to what
21 60
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
destination pertaining to any item that could contain the identified defect.
c. The contractor shall determine impact of the defect on products previously delivered under this contract, if any, and initiate corrective action to address those units at no additional cost to AMCOM.
d. The contractor shall isolate the cause of the defect and initiate corrective actions. All findings shall require an in-depth written response outlining corrective actions to prevent recurrence.
e. The contractor shall review/revise work documents for the specified operation responsible for the defect to ascertain that they are complete, adequate, and sufficiently defined to assure that, if followed and completed by both production, maintenance and inspection personnel, they will provide objective evidence of a quality operation.
f. The contractor shall assure the cognizant QAR and the AMRDEC PVA Team Chairman that positive, effective, corrective action has been initiated that will prevent recurrence of the cited defect. This assurance can be verbal at first, however, a written report from the contractor quality element containing all corrective actions completed and actions taken to prevent recurrence shall be provided to the QAR and the AMRDEC PVA Team Chairman within 24 hours after the verbal response.
4. Critical: In the event a critical defect is discovered, the following actions shall be taken:
a. All actions outlined in paragraph 3 above shall be completed.
b. Upon request, the contractor shall provide the AMRDEC Aviation Engineering Directorate technical information necessary for the issuance of a Safety of Flight Message or Aviation Safety Action Message to the field (if necessary).
c. Government acceptance/release of product will cease immediately until corrective actions are acceptable to the contracting officer.
NOTE: Systemic quality and overhaul process discrepancies that affect the outcome of product(s) outside the scope of the PVA will require the cognizant QAR to issue a Corrective Action Request.
(m). Upon completion of the disassembly and testing portion of the selected PVA candidate, without finding any critical or major defects, the other two completed candidates will be released as PVA candidates. In the event that a critical or major defect is found in the audit candidate, the contractor shall satisfy the PVA Team Chairman that such a defect does not exist in the other 2 PVA candidates prior to acceptance, and effective corrective action has been initiated to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .