Solicitation W51AA1-25-Q-0073.pdf
PDF 574 KB Posted
- Attached to
- Pest Management Services
- Solicitation number
- W51AA1-25-Q-0073
- Issued by
-
Department of the Army
About this file
This document is a federal solicitation (SF 1449) for an Integrated Pest Management (IPM) contract for Tobyhanna Army Depot (TYAD) in Pennsylvania. The contract is a firm-fixed-price (FFP) five-year service agreement with a base year and four one-year option periods, running from March 2026 to February 2031. The solicitation seeks a comprehensive pest control program covering indoor and outdoor pests, emphasizing sustainable IPM techniques that minimize economic, health, and environmental risks.
Key requirements include weekly, monthly, and quarterly inspections of multiple buildings across the depot, with services targeting roaches, rodents, mosquitoes, and other nuisance pests. The contractor must be licensed by Pennsylvania, have commercial pest control certification, and employ employees certified in specific pest control categories. Contractors must use non-chemical methods when possible, provide detailed reporting, and follow strict environmental and safety regulations. The solicitation is set aside as an unrestricted contract with a $17,500,000 size standard under NAICS code 561710. Proposals are due by 12:00 PM on October 7, 2025, with award to be determined using a best-value trade-off process evaluating technical approach, past performance, and pricing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1- Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W51AA125Q0073 17-Sep-2025
b. TELEPHONE NUMBER
5706156442
8. OFFER DUE DATE/LOCAL TIME
12:00 PM 07 Oct 2025
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W51AA19. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MARISSA C KOREA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25G1V52330085
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ACC-APG, TOBYHANNA DIVISION
TOBYHANNA ARMY DEPOT
11 HAP ARNOLD BLVD
TOBYHANNA PA 18466
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
SEE BELOW FOR SEPARATE SHIPPING INSTRUCT
XXX
XXX PA 00000
TEL: FAX:
FAX:
TEL: 570-615-7232 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$17,500,000
NAICS:
561710
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF75
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W51AA125Q0073
Section SF 1449 - CONTINUATION SHEET
ADDENDUM
1. This Solicitation, W51AA1-25-R-0073, is in accordance with FAR Part 12, Acquisition of Commercial Items and FAR Part 13, Simplified Acquisition Procedures, and therefore will utilize simplified procedures for soliciting competition, evaluation, award documentation and notification that comply with FAR 13.
2. The Army Contracting Command (ACC), APG, Tobyhanna Division, Tobyhanna, PA 18466, intends to solicit and award a firm fixed-price (FFP) service contract for these services located at Tobyhanna Army Depot, Tobyhanna PA 18466, in accordance with (IAW) the attached Performance Work Statement (PWS).
3. SITE VISIT: Visit: IAW FAR Clause 52.237-1, a single site visit will be conducted. The site visit will be held on 24 September 2025 at 10:00 AM EST. Attendance is recommended for Offerors. The meeting location will be Building 20 (Guard Shack/Security). Attendees are encouraged to arrive 15 minutes early to check in. If visitors do not possess a TYAD issued Contractor badge, they will be required to present a valid, Government issued photo I.D.to gain access to the base (vehicle registration and insurance may also be required). Information provided at each site visit, as well as answers to any general questions, shall not affect the terms and conditions of the solicitation and/or specifications. Terms remain unchanged unless the solicitation is amended in writing. Please refer to clause 52.237-1 for Site Visit information. The Subject Matter Specialist for this project is: Richard Daywood, Phone:
(570) 615-6494; Email: richard.a.daywood.civ@army.mil.
4. To receive an award, the company must have an active registration in the System for Award Management (SAM) https://www.SAM.gov with no active exclusions and have no debt subject to offset. Prospective offerors must be found to be responsible in accordance with FAR 9.1.
5. Parties interested in responding to this Request for Proposal (RFP) shall complete a standard form (SF) 1449 http://www.forms.gov, blocks 5, 12, 17a, 17b, 19 thru 24, 30a, and 30b; and 30c. The offer must be signed by a company official authorized to contractually bind the company.
6. BASIS FOR AWARD & EVALUATION CRITERIA: Award evaluation and basis for award will be performed in accordance with FAR 52.212-2, Evaluation-Commercial Items, located in the clause section of the solicitation.
Award will be Best Value to the Government using a Trade-off process for Technical, Past Performance and Price.
Offerors are cautioned that any award may not necessarily be made to the lowest offered price. Proposals shall be submitted and award made by the Government on an all or none basis. Therefore, proposals are solicited on that basis only.
7. TYPE OF CONTRACT: Any resultant award will be Firm-Fixed Price (FFP).
8. QUESTIONS: Offerors are advised to submit any questions regarding this Solicitation in writing by COB on 25 September 2025, to the contract specialist via email at marissa.c.brodi.civ@army.mil. Answers will be consolidated and posted to www.sam.gov only in the form of Questions and Answers or, if required, an Amendment to the Solicitation. Questions received after this time may not be answered.
9. PROPOSAL SUBMISSION: Proposal, along with all Proposal Requirements noted below, must be emailed to marissa.c.brodi.civ@army.mil by the closing date/time in order to be acepted.
Submission Document:
A. Contractor Proposal B. Signed SF1449 (#4 above) C. Three (3) Past Performance References (FAR 52.212-2) D. All Signed Amendments if applicable
10. Offerors shall prepare and submit their proposals and supporting documentation referencing Solicitation “W51AA1-25-R-0073” via email to: marissa.c.brodi.civ@army.mil, in accordance with the submission requirements listed in Clause 52.212-1 Instructions to Offerors and Clause 52.212-2 Evaluation of Commercial Items. As stated therein, failure to follow the instructions may render the proposal non-responsive. The Government is not responsible for any proposal that was not received in the contract specialist’s email Inbox identified above by the time and date specified for receipt of offers, to include any type of firewall delays. Offerors are advised to transmit their complete proposal in enough time to ensure it is received in the contract specialist’s email Inbox identified above by the time and date specified for receipt of proposals. Proposals or parts of proposals received after the time and date specified for receipt of proposals will be considered Late.
11. Offerors shall not submit any assumptions, terms, conditions, caveats, or exceptions with proposals. All concerns shall be addressed and resolved by submitting questions by the date specified in this RFP. No assumptions, terms, conditions, caveats, or exceptions submitted with proposals in response to RFPs will be accepted or incorporated into the awarded contract.
12. Any amendments issued to this solicitation will be synopsized in the same manner as this solicitation. All offerors are advised to acknowledge all amendments issued to the solicitation with their proposal by signing and including one copy of the amendment with their proposal.
13. The Government is not responsible for any costs incurred for contractor’s time or materials expended in preparing a proposal for this solicitation.
14. The minimum acceptable acceptance period for offers is ninety (90) days from the date specified in Block 8, on Page 1 of the SF1449.
15. Wage Rates can be found on the Service Contract Act side of WWW.SAM.GOV. The services to be performed fall under the authority of the service contract act unless otherwise exempt by the Contracting Officer. Department of Labor (DOL) Service Contract Act Wage Determination No: 2015-5797, Revision No.: 29, Dated:07/08/2025 is provided at Attachment 1 to this solicitation.
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
TYAD Integrated Pest Managment
Part 1 General Information
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide a comprehensive Integrated Pest Management (IPM) program for indoor and outdoor pests at Tobyhanna Army Depot.
1.2 Background: In accordance with DoDI 4150.07 IPM is required to prevent or control pests and disease vectors that may degrade readiness or military operations by affecting the health of personnel or that may damage structures, material, or property. Federal agencies are required to use IPM by Public Law (PL 104-170, Section 303).
1.3 Scope: The Contractor shall provide non-personal service(s). The contractor will furnish all labor, tools, materials, equipment and transportation necessary to provide a comprehensive Integrated Pest Management (IPM) program for indoor and outdoor pests at Tobyhanna Army Depot (TYAD) as required by the contract and described herein. IPM is a sustainable approach to managing pests by combining biological, cultural, mechanical and chemical tools in a way that minimizes economic, health and environmental risks. Federal agencies are mandated to use IPM by Public Law (PL 104-170, Section 303).
Service will be performed in accordance with the specifications and directions provided, and the best standard practice for this type of work. The work will be conducted under the general direction of the Environmental
Branch’s Integrated Pest Management Coordinator (IPMC) and is subject to inspection by the IPMC or designated alternate to ensure strict compliance with the terms of the contract. The contractor shall have a minimum of three years’ experience in commercial pest control.
Service must meet the performance standards contained herein and shall be in compliance with the Federal Insecticide, Fungicide and Rodenticide Act (FIFRA), as amended in 1972, the Installation Pest Management Plan, the requirements of the Department of Defense (DoD) Directive 4150.7, Army Regulation 200-1, the Pennsylvania Pesticide Control Act of 1973 as amended, and all other applicable regulations.
The contractor must be licensed by the Commonwealth of Pennsylvania and all employees who provide services on TYAD will be certified as commercial applicators by the Commonwealth of Pennsylvania in the following categories as appropriate:
Household/Health Related (category 11) Wood Destroying Pests (category 12) Public Health - Vertebrate (category 15) Public Health - Invertebrate (category 16)
Parks/Schools Pest Control (category 23)
1.4 Objectives: An IPM program should emphasize the following:
Structural and procedural modifications to reduce food, water, harborage and access used by pests.
Pesticide compounds, formulations and application methods that present the lowest potential hazard to humans and the environment.
Non-pesticide technologies such as trapping and monitoring devices.
Coordination among all facilities management programs, including facility use lessees, which has a bearing on the pest control effort.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) after date of contract award PANAPG-25-P0000 028425.
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within (10 days). If the Government has provided comments, the Contractor shall then have (10 days) to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than (10 days) prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
(a) A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team;
(b) How the Contractor will monitor work to ensure performance complies with all deliverables (etc.
timelines, deadlines, and goals);
(c) How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract’s clauses;
(d) How the Contractor will monitor and ensure staff qualifications remain current and valid including
Department of Defense (DoD) Contractor Personnel Office (DOCPER) processes/approvals throughout contract performance;
(e) How the Contractor will ensure all keys issued will remain controlled items (Paragraph 1.7 Key
Control);
(f) How the Contractor will inventory and track maintenance of all Government Provided Equipment /
Materials;
(g) How the Contractor will identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future; and
(h) How the Contractor will file and save all Quality Control related documents for the life of the contract plus 5 years.
1.5.1.1 An Analysis of Quality Control and Timeliness of Submittals (i.e. deliverables) shall be provided to the COR within na upon completion of each option period or Task Order.
1.5.1.2 The Contractor shall inform the COR of issues or potential issues that might affect the performance within na of identifying those issues. Verbal reports shall be followed up by written reports within.
1.5.2 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the acceptable quality levels (performance thresholds).
1.5.3 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest work day prior to the holiday will apply as the deadline for submittal.
1.5.3.1 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day January 1st M. L. King Memorial Day 3rd Monday in Jan Presidents Day 3rd Monday in February Memorial Day last Monday in May Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
1.5.3.2 Host Nation Holidays: (As applicable to OCONUS requirements) Work na be performed on local Host Nation holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer.
1.5.4 Operating Hours: The Government facility office hours, facility operating hours, and the Contractor support hour requirements often coincide, however, they may differ. Please refer to the following.
1.5.4.1 Government Facility Office Hours: The Government facility office hours are 0700-1630 except U.S.
Holidays identified in paragraph 1.5.3.1 above or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.5.4.2 Government Facility Operating Hours: The Government facility operating hours occur between the hours of 0700-1630. The Government facility is closed for operations during the recognized U.S. Holidays identified in paragraph 1.5.3.1 above. The Government facility may close due to local or national emergencies, administrative closings, or similar Government directed facility closings and will be communicated by the Contracting Officer to the Contractor.
1.5.4.3 Contractor Support Hours: The Contractor shall provide support between the hours of 0730-1530, Monday- Friday. The facility is closed during local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall maintain an adequate workforce at all times, for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce is essential.
1.5.4.3.1 Contractor Work Plan: na The Contractor shall prepare and maintain a Work Plan. The plan, as a minimum, shall identify regularly scheduled work (to include location, work to be completed, timeline, etc.). The Contractor’s proposed Work Plan shall be submitted to the Contracting Officer via the COR for review within na after date of contract award na. The Government will review and either accept or return their comments to the Contractor within na. The Contractor shall then have na to submit a Final Work Plan. Any proposed change to the accepted Final Work Plan is required to be resubmitted via the COR for review and acceptance by the Contracting Officer at a minimum thirty (30) days prior to implementation. The timeline noted above shall apply for review and acceptance for proposed changes.
1.5.5 Training Holidays: USAREUR or other applicable theater has historically granted military personnel training holidays as compensation for time that they spent in field training. These are typically combined with regular holiday leave schedules (for example, Christmas half days or day on day off schedules). Training holidays may affect access to military operated facilities. If scheduled work or access to facilities is required, coordination with occupants will be necessary or the work in affected facilities shall be rescheduled after the training holiday.
However, announced training holidays or exodus of military personnel may provide the Contractor with an opportunity for unrestricted access to facilities and areas. The Contractor shall take full advantage of such opportunities by planning maintenance or actions that are better accomplished when such areas are vacant.
1.5.6 Place of Performance: The work to be performed under this contract will be performed at the Tobyhanna Army Depot, Tobyhanna Pa.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: na Contractor personnel performing work under this contract must have a na at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are IAW with the DoD Contract Security Classification Specification (DD Form 254), which is currently accessible at the following link: http://www.dtic.mil/whs/directives/forms/eforms/dd0254.pdf
1.6.2 Personnel Security Clearance Requirements: na Contractor personnel performing work under this contract must have an active personnel security clearance at the na level in the Defense Information System for Security (DISS) at time of the proposal submission, and must maintain the level of security required for the life of the contract. The security requirements are IAW the DoD Contract Security Classification Specification DD Form 254.
na The Contractor shall ensure that Contractor employees and subcontractor employees performing services under this contract comply with FAR 52.204-2 Security Requirements when the employee has access to information classified “Confidential,” “Secret,” or “Top Secret.” The Contractor shall ensure the employee complies with the DoD Security Agreement (DD Form 441), and the NISPOM rule at 32 Code of Federal Regulation (CFR) Part 117, effective 24 Feb 2021. The NISPOM is the National Industrial Security Program Operating Manual to which contractors must implement and comply.
1.6.3 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas.
The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
1.6.3.1 Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log within na after contract award. The log must at a minimum contain the following information na. The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) days after any changes to the log.
1.6.3.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office within na.
1.6.3.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office within na.
1.6.3.4 Common Access Cards (CAC) and CAC Log: The Contractor shall provide the following information: Last, First and Middle Names, government issued personal identifier (e.g. Social Security Number, Federal Identification Number, or Tax Identification Number), date of birth, primary email address (this email address will be used to contact the individual) and any other necessary information required to obtain a CAC or installation access card, to the COR with (na) after award (na). The Contractor shall ensure safeguarding of Personally Identifiable Information (PII) and comply with requirements under 1.22.5.
The Contractor shall provide a CAC log within the (na) after contract award and within five (5) days after changes have been made (na) (unless circumstances require otherwise and as directed by the Contracting Officer). The COR will provide format and content for the log during the post award meeting. Note - CACs are Government property and must be accounted for.
1.6.4 Background Checks:
1.6.4.1 U.S. Citizen: Contractors that work with or teach youth under the age of 18 years are subject to U.S background checks. The Requiring Activity Manager will determine the extent of background checks required. The Contractor employee may begin performance of the contract after receiving a favorable local background check. The Contractor agrees to replace the employee should results of the background check, if required, be unfavorable as determined by the Requiring Activity Manager. The Contractor’s replacement of the employee with the unfavorable background check shall be within a timeframe provided by the Requiring Activity Manager. The Contractor shall also replace employees whose background check, during their tenure of employment, renders them with an unfavorable local or stateside background check, as determined by the Requiring Activity Manager. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each favorable background check within 10 days of receipt by the Contractor, identifying such with the appropriate contract number PANAPG-25-P-028425. The Contractor shall forward a copy to the Contracting Officer via the COR and the Requiring Activity Manager of each unfavorable background check within 10 days of receipt by the Contractor, identifying such with the appropriate contract number PANAPG-25-P-028425. When the Government awards a non-personal services contract directly to an individual, the failure of the individual to provide a favorable background check would be grounds for termination.
1.6.4.2 Local Nationals and Third Country Nationals: Local national and third country national Contractors that work with or teach youths under the age of 18 years are subject to background checks as determined by the Requiring Activity Manager. As a minimum prior to beginning performance, Contractors employing local national and third country nationals shall furnish the Contracting Officer via the COR and the Requiring Activity Manager current documents required for working on a US installation, no later than na. Forwarding correspondence from the Contractors shall identify the associated contract number.
1.6.5 Physical Security: The Contractor shall safeguard all Government equipment, information, and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program (AR 190-13.)
1.6.6 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel. Government issued access badges shall not be worn outside designated facilities where visible to the general public.
1.7 Key Control: The Contractor shall establish and implement methods of making sure all keys issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Contractor’s Security Plan and the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any incidents of lost or duplicate keys to the Contracting Officer. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the payment due to the Contractor. The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees.
The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer. The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Quality Control Plan.
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor's performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The following personnel are considered key personnel by the Government: na. The Contractor shall provide a Program/Contract Manager who shall be responsible for the performance of the work. The name of this person and an Alternate Program/Contract Manager, who shall act for the Contractor when the Program/Contract Manager is absent, along with a Curriculum Vitae (CV) for each of these individuals, shall be provided in writing to the Contracting Officer no later than na The Contract Manager and Alternate Contract Manager shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. The Contract Manager or Alternate Contract Manager shall be available between na. Qualifications for all key personnel are listed below:
a. Contract Manager and Alternate Contract Manager: na
b. Quality Control Manager: na
c. Systems Administrator: na
d. Special Qualifications: Every contractor's employee applying pesticides must be certified as commercial applicators and licensed by the Commonwealth of Pennsylvania for each category required. Photocopies of licensing and certification for each worker will be submitted to the COR within 10 days after award and must be maintained current thereafter.
Each contractor employee will wear distinctive clothing bearing the contractor's trade name in a prominent place on the outer garment. In addition, each employee must wear a visible, contractor-furnished identification badge which will include, as a minimum, a picture of the employee, the full name and signature of the employee, the employee's identification number and the legal name under which the contractor is doing business under this contract.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties must identify themselves, to include proper marking of signature blocks in correspondence, to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
1.12.1 Contractor workspace (staging site, on-site office, desk or work area, etc.) shall contain a sign signifying the space is occupied by Contractor employee(s) to ensure that Government employees and the public know that they are not Government employees. The proposed sign shall be submitted to the Contracting Officer via the COR for review and acceptance na after contract award. Workspace sign location shall be coordinated with the COR.
Contractor employees shall identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings, and seminars. All Contractor correspondence (written, facsimile, and email display) shall include their company name. Requirements for Contractor vehicles is addressed under Part 4 paragraph 4.4.
1.12.2 Contractor Identification Badges: Contractor personnel shall be easily identifiable through the display of badges IAW Contractor Identification (AE Reg. 27-715). (For services at Child, Youth, and School Services where children are present, recommend personnel wear identification when children are present.) Each contractor employee will wear distinctive clothing bearing the contractor's trade name in a prominent place on the outer garment. In addition, each employee must wear a visible, contractor-furnished identification badge which will include, as a minimum, a picture of the employee, the full name and signature of the employee, the employee's identification number and the legal name under which the contractor is doing business under this contract.
1.13 Contractor Travel: The Contractor may be authorized travel expenses at rates no higher than the substantive provisions of the Joint Travel Regulation (JTR), IAW FAR Part 31.205-46, and the limitation of funds specified in this contract. All travel requires Government approval and authorization na prior to scheduled travel.
1.14 Other Direct Costs (ODCs): na
1.15 Data Rights: The Government has unlimited rights to all documents and materials produced under this contract. All documents and materials, to include the source codes of software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership and copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.16 Non-Disclosure Requirements: na Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. The Contractor and Contractor personnel, shall not divulge or release data or information developed, or obtained under performance of this PWS, except to authorized Government personnel or upon written approval of the Contracting Officer. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.17 Protection of Government and Contract Information: Per Public Use Notice of Limitations stated by Defense imagery Management operations Center and contained at www.dimoc.mil/resources/limitations/ , the Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any hard copy or digital marketing tools to include its company website.
1.18 Non-Disclosure Statements: The Contractor shall provide signed non-disclosure agreements to the Government no later than na prior to commencement of work under the contract. Disclosure of information by Contractor personnel may result in removal of Contractor personnel from performance under this contract.
1.19 Organizational Conflict of Interest (OCI): Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCI as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI PANAPG-25-P-028425. The Contractor’s OCI Mitigation Plan will be determined to be acceptable solely at the discretion of the Contracting Officer. In the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.20 Phase In /Phase Out Period: To minimize decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the na phase in/ phase out periods.
During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
1.21 Safety: The following provides information pertaining to Safety and Accident Prevention:
Refer to CONTRACTOR SAFETY STANDARDS FOR TYAD
1.21.1 Safety Laws and Regulations: The Contractor shall comply with FAR 52.236-13, Accident Prevention (November 1991), the references contained therein (e.g. U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1)).
The requirements under FAR 52.236-13 and specifically of the EM 385-1-1 include, but are not limited to the following:
(a) Before initiation of work at the job site, an Accident Prevention Plan, written by the Contractor for the specific work and hazards of the contract and implementing in detail the pertinent requirements of EM 385-1-1; will be reviewed for acceptance by designated Government personnel PANAPG-25-P-028425. Specific requirements for development of the Accident Prevention Plan are found in 01.A and Appendix A of EM 385-1-1. EM 385-1-1 is available online at www.usace.army.mil.
(b) Before beginning each activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or subcontractor is to perform work, activity hazard analysis (AHA) shall be prepared by the Contractor performing the work activity (See paragraph 01.a.09 of EM 385-1-1);
(c) The Contractor shall require subcontractors to submit their plan of operations showing methods they propose to use in accomplishing major phases of work;
(d) The Contractor shall discuss the plans in conferences convened by the Contracting Officer prior to starting work on each major phase of operation. Plans shall include all pertinent information such as layout of haul roads, access roads, storage areas, electrical distribution lines, methods of providing minimum exposure to overhead loads, and methods of access to work areas. The plan for accomplishing the initial work phase shall be submitted within fifteen (15) calendar days after award of the contract. Plans for subsequent major phases of work shall be submitted no later than fifteen (15) calendar days prior to initiation of work on each major phase; and
(e) In all areas where construction, demolition, alteration, building, or similar related activities take place, the Contractor shall have the following minimum personal protective clothing and equipment requirements in place for any person working on or visiting the site:
(i) Short sleeve shirt;
(ii) Long trousers;
(iii) Steel-toed safety boots; and
(iv) Hard hat.
1.21.1.1 In addition to other requirements for accident prevention specified in this contract, the Contractor shall comply with all Federal and State requirements governing safety and health protection on construction sites and other applicable occupational safety codes.
The Contractor shall indicate its plan for compliance considering conditions of the work described by the design, technical proposal, operational activities of the Government or others in the area of the work, identification of the coordinator, and implementation of all other accident prevention provisions of this contract. The contractor and all personnel provided by the contractor must adhere to applicable portions of the following public laws and government publications:
FEDERAL REGULATIONS AND MANUALS:
Public Law 91-190. National Environmental Policy Act of 1969.
Public Law 91-596. Occupational Safety and Health Act of 1970.
Public Law 92-516. Federal Insecticide, Fungicide and Rodenticide Act, as amended, of 1972.
Public Law 93-205. Endangered Species Act of 1973.
Public Law 94-580. Resource Conservation and Recovery Act of 1976.
Public Law 104-170. Food Quality Protection Act of 1996.
Executive Order 11643, Environmental Safeguards, 8 Feb 72.
Executive Order, 11752, Prevention, Control and Abatement of Environmental Pollution at Federal Installations, 17 Dec 73.
Department of Defense Directive 500.7, Standards of Conduct.
Department of Defense Instruction 4150.7, 22 Apr 96 Department of Defense Plan 4150.7-P, DoD Plan for the Certification of Pesticide Applicators, September 1996.
Department of Defense Manual 4150.7-M, DoD Pest Management Training and Certification, April 1997.
Armed Forces Pest Management Board Technical Information Memorandum No. 14, Protective Equipment for Pest Management Personnel, 1992. See: http://www.afpmb.org/pubs/tims/tim14.pdf Armed Forces Pest Management Board Technical Information Memorandum No. 15, Pesticide Spill Prevention and Management, 1981.
ARMY REGULATIONS.
Army Regulation 200-1, Environmental Protection and Enhancement.
Army Regulation 385-101, Army Safety Program.
INSTALLATION REGULATIONS AND PUBLICATIONS.
Installation Pest Management Plan.
Installation Spill Contingency Plan.
Installation Spill Prevention, Control and Countermeasures Plan.
STATE REGULATIONS.
Pennsylvania Pesticide Control Act of 1973, as amended.
TECHNICAL MANUALS.
Corps of Engineers Manual EM 385-1-1, Safety and Health Requirements.
1.21.1.2 The Contractor shall complete and provide safety notifications required na and will provide documented proof to the Contracting Officer via the COR, no later than (na) that such notifications were made.
1.22 Environmental Compliance: The following provides information on Environmental Compliance.
1.22.1 Environmental Compliance Plan and Program: Refer to National Environmental Policy Act (NEPA Standards
CHEMICAL TREATMENTS. If treatments are directed or required, chemical treatments and/or control methods may be utilized only when satisfactory non-chemical methods or treatments do not exist, or when the use of non-chemical methods/treatments would not provide the degree of control required.
PESTICIDE USAGE. All pesticides must be procured, processed, handled and applied in strict accordance with the manufacturer's label which must be registered with the U.S. Environmental Protection Agency (EPA) and the Pennsylvania Department of Agriculture for enforcement of the FIFRA.
Pesticide misuse which includes use inconsistent with the label is a violation of Federal Law. In accordance with DoD policy, TYAD personnel will record and report any instances of pesticide misuse and falsification of records by contractors to the Commonwealth of Pennsylvania. Furthermore, TYAD personnel will cooperate with the Commonwealth of Pennsylvania and the U.S. EPA in any subsequent investigation or actions.
All pesticides proposed for use on the installation must be approved for use by the Pest Manager in conjunction with consultation with the IPMC, and must be registered with the U.S. EPA and Commonwealth of Pennsylvania for the intended use. The contractor will not apply any chemical pesticide or fumigant without prior written approval from the Contracting Officer for each chemical pesticide or fumigant.
Legible copies of container labels and SDS for the pesticides proposed for use will be submitted to the Pest Manager for approval prior to use/acquisition.
Pesticides that have been suspended or canceled by the U.S. EPA must be used only as described in the suspension or cancellation order and will not be used after the date indicated on that order.
Chemical measures will not be performed on or near federal or state protected or endangered species.
All pesticides must be mixed prior to entering onto government property. In addition, pesticides, pesticide mixtures and contractor equipment and supplies will not be stored overnight on the installation. Mixing operations will not be performed on the installation.
The contractor will dispose of all pesticides, pesticide contaminated residues and pesticide containers in accordance with the appropriate label directions and regulatory requirements, and may reuse rinse water from pesticide equipment and containers in follow-on pest control operations. Pesticide contaminated materials will not be disposed of on the installation. Pesticide contaminated rinse water will not be emptied into the sewer system, nor disposed of on government property.
The contractor will apply pesticides in a manner that prevents exposure of personnel, pets, wildlife, ornamental plants and grasses, bees and other non-target environmental components to toxic materials. Pesticides will not be applied outdoors during or immediately following rain, or when the threat of inclement weather exists, unless required by the application procedures. If pesticide application is creating or may pose a hazard or threat to personnel or the environment, the contractor must stop work.
“The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .