Solicitation_-_W15QKN26QA122_Professional_Appearance.pdf
PDF 6 MB Posted
- Solicitation number
- W15QKN26QA122
- Issued by
- Kings County, New York
About this file
This is a sealed bid solicitation (IFB) issued by the U.S. Army Garrison Fort Hamilton (W15QKN26QA122) for commercial construction services to renovate common areas at the Single Soldier Unaccompanied Personnel Housing (UPH), Building 209, located in Brooklyn, New York. The project encompasses complete renovation of common areas requiring the contractor to furnish all labor, equipment, tools, materials, supervision, and transportation. Key tasks include removal and installation of HVAC equipment, extensive interior surface preparation and painting, fixture installation, and related work as detailed in Statement of Work DPW00004-6J. A mandatory site visit is scheduled for June 18, 2026, at 09:00 AM EDT at Building 209, Fort Hamilton. Quotes are due by June 30, 2026, at 4:00 PM local time and must be submitted electronically to the Contract Specialist and Contracting Officer. The contract type is Firm-Fixed-Price (FFP), with the performance period defined as 120 calendar days from receipt of the Notice to Proceed. The contractor must begin performance within 10 calendar days of award and complete all work within 120 calendar days after receiving the NTP.
This solicitation is set aside 100 percent for small business concerns under NAICS code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45,000,000. The estimated project price ranges between $100,000 and $250,000. A bid guarantee equal to 20 percent of the bid price (or $3,000,000, whichever is less) is required in accordance with FAR 52.228-1, and performance and payment bonds equal to 100 percent of the contract price are required if the final award value exceeds $150,000. The Government will evaluate proposals using a Lowest Price, Technically Acceptable (LPTA) source selection method, with evaluation based on technical acceptability and price. Proposed labor rates must comply with the Davis-Bacon Act wage determination provided in the solicitation. Liquidated damages are assessed at $59.14 per calendar day for contract delays. Contractor payment shall be made electronically through the Wide Area WorkFlow (WAWF) system. All offers must remain valid for 120 calendar days from the quote due date. The solicitation is subject to the availability of funds in accordance with FAR 52.232-18.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section A - Solicitation/Contract Form
Renovate Common Areas in Barracks, Bldg 209, Fort HamiltonInstrument Name:
Product Service Code : Z2AZ
INSTRUCTIONS TO OFFERORS
SOLICITATION NO. W15QKN26QA122
*** THIS REQUIREMENT IS SET-ASIDE 100% FOR SMALL BUSINESS ***
*** THIS REQUIREMENT IS SUBJECT TO THE AVAILABILITY OF FUNDS IN ACCORDANCE
WITH FAR 52.232-18 ***
This requirement is being solicited utilizing the procedures set forth in FAR Part 12, Acquisition of Commercial Products and Commercial Services, and FAR Part 36, Construction Contracts.
1. Purpose and Project Estimate:
(a) Purpose: The purpose of this solicitation is to procure commercial construction services for the Renovation of Common Areas at the Single Soldier Unaccompanied Personnel Housing (UPH), Building 209, Fort Hamilton, NY, in support of the U.S. Army Garrison Fort Hamilton. The Contractor shall provide all plant, labor, equipment, tools, materials, supervision, and transportation to accomplish the work described in the Statement of Work (SOW) DPW00004-6J.
(b) Project Estimate: For strategic planning and bonding capacity verification, the estimated price range for this project is between $100,000 and $250,000.
2. Contract Type, Period of Performance, and Administration Sequence:
(a) Contract Type: The Government intends to award a single, Firm-Fixed-Price (FFP) Purchase Order.
(b) Period of Performance Definition: To establish a measurable and defensible timeline, the term "90 working days after the Pre-Construction meeting" as stated in Section 5 of the SOW is contractually defined as exactly 120 calendar days from receipt of the Notice to Proceed (NTP).
This conversion provides a clear calendar baseline for contractor planning and project scheduling.
(c) Execution and Administration Sequence: Contract performance and post-award milestones shall be administered in the following sequence (Award, Bond, NTP, and Pre-Construction Meeting):
1. Contract Award: Purchase Order issued.
W15QKN26QA122
2. Bonding: Contractor submits Performance (SF 25) and Payment (SF 25A) Bonds within 10 calendar days of award, in accordance with FAR 52.228-15.
3. Notice to Proceed (NTP): Upon approval of bonds, the Government will issue the written NTP, which officially starts the 120-calendar-day PoP clock.
4. Pre-Construction Conference: The Government will schedule the Pre-Construction Conference to occur within 10 days of the Notice to Proceed.
5. Contractor Delay Mitigation: If the contractor fails to submit acceptable bonds or delays the coordination of post-award timelines, the Government reserves the right to issue the NTP unilaterally to initiate the PoP clock and protect the garrison's project schedule.
3. System for Award Management (SAM):
The Offeror must be registered and active in SAM (https://www.sam.gov/) with no active exclusions to be eligible for award.
4. Additional Instructions:
See FAR clause 52.212-1, "Instructions to Offerors - Commercial Products and Commercial Services" and the addendum to this provision herein.
5. Evaluation Criteria:
See FAR clause 52.212-2, "Evaluation - Commercial Products and Commercial Services" and the addendum herein. The Government will use the Lowest Price, Technically Acceptable (LPTA) source selection process.
6. Site Visit and Field Verification (Pre-Award "Submittals"):
(a) A site visit is highly encouraged. In accordance with Section 3 of SOW DPW00004-6J, which requires that "Onsite inspection shall be performed prior to submittals, to verify measurements and field conditions," the term "submittals" is contractually defined as the submission of pre-award quotes.
(b) Offerors are required to verify all physical dimensions, quantities, and building conditions (including the 110 window screens, 160 L.F. of vinyl cove base, and 1,000 VLF of mortar joints) during the scheduled site visit. Submission of a quote constitutes formal acknowledgment that the offeror has verified all measurements. No post-award claims for differing site conditions or dimensional errors will be entertained.
Scheduled Site Visit: 18 June 2026 at 09:00 AM EDT (Eastern Daylight Time)
Site Visit Address: Building 209, Fort Hamilton, Brooklyn, NY 11252.
Required Document(s) in order to obtain a visitor's pass: See Attachment 0004 "AIE PASS FORM1"; fill out the required information within the table and submit with your Site Visit request e-mail (including your completed Attachment 0004) at least 48 hours prior to the scheduled site visit date and time to ALL of the following Points of Contact (POCs):
Drew Cavosi, Construction Control Representative
Email: drew.m.cavosi.civ@army.mil | Phone: (718) 630-4991
7. Bond Requirements:
(a) Bid Guarantee: In accordance with FAR 52.228-1, a Bid Guarantee shall be submitted with your quote. Failure to provide a Bid Guarantee will deem your quote non-compliant and ineligible for award.
(b) Performance and Payment Bonds: If the final award value exceeds $150,000, the apparent successful awardee shall furnish a Performance Bond (SF 25) and a Payment Bond (SF 25A) equal to 100% of the contract price within 10 calendar days after award, in accordance with FAR 52.228-15. For awards between $35,000 and $150,000, Alternative Payment Protections shall be provided in accordance with FAR 52.228-13.
8. Questions:
Questions regarding this solicitation shall be submitted in writing via e-mail no later than 6.23.2026 to the Contract Specialist, Nelia Shyshak, at nelia.shyshak.civ@army.mil and the Contracting Officer, Edward Sherwood, at Edward.l.sherwood4@army.mil.
9. Completing a Quote for Submittal:
(a) Submission Deadline and Method: Quotes are due no later than 6.30.2026. All quotes must be submitted via electronic mail (e-mail) to the Contract Specialist, Nelia Shyshak, at nelia.shyshak.
civ@army.mil and the Contracting Officer, Edward Sherwood, at Edward.l.sherwood4@army.mil.
(b) Required Documents for Submission:
Submission Volume
Itemized Requirements
Regulatory & SOW Compliance
Volume I:
Technical Proposal
Technical Approach &
A brief narrative demonstrating the offeror's technical approach to executing the tasks in SOW DPW00004- 6J. To be technically acceptable, the narrative must explicitly: (1) Confirm compliance with FAR 52.219-14
SOW
Compliance Affirmation
(Limitations on Subcontracting); (2) Certify that refrigerant removal and disposal will be executed by EPA Section 608 certified technicians using certified recovery equipment per SOW Section 2; (3) Confirm the use of exact brand-name items (Bosch heat pumps, Johnsonite vinyl base, Benjamin Moore paint) or request approval for equal products in accordance with FAR 52.211-6 (Brand Name or Equal) by submitting supporting product literature; and (4) Acknowledge and commit to meeting all SOW Section 7 security and training timelines (AT Level I, I WATCH, OPSEC).
Volume II:
Price Proposal
Contractor Cost Breakdown (Attachment 0003) & Signed SF
A detailed, itemized cost breakdown including Labor (categories, hourly rates, and hours compliant with the Davis-Bacon Wage Determination in Attachment 0002), Materials, and Equipment. Overhead, G&A, and Profit must be clearly and separately identified. Offerors must also complete and submit the pricing for all CLINs on the solicitation form.
Volume III:
Administrative Documents
Bid Guarantee
(FAR 52.228-
1) & SAM
Registration
A completed Bid Guarantee in the amount of 20% of the bid price or $3,000,000, whichever is less, in accordance with FAR 52.228-1 (submitted as a scan of the bid bond). Offeror must have an active SAM registration with no active exclusions.
(c) Failure to provide any information required by these instructions may result in the offeror's quote being determined non-compliant and ineligible for award.
10. Offer Validity:
All offers shall remain valid for 120 calendar days from the quote due date.
11. Attachments:
Attachment 0001 - SOW DPW00004-6J
Attachment 0002 - Applicable Davis-Bacon Act Wage Determination
Attachment 0003 - Contractor Cost Breakdown Form
Attachment 0004 - AIE PASS FORM1
ADDENDUM TO FAR 52.212-1, INSTRUCTIONS TO OFFERORS--COMMERCIAL PRODUCTS
AND COMMERCIAL SERVICES
The provision at FAR 52.212-1 is hereby tailored and modified as follows:
(b) Submission of offers.
This paragraph is modified to override the standard submission methods. All quotes/offers must be submitted electronically via email in accordance with the specific instructions outlined in Paragraph 9 of the "INSTRUCTIONS TO OFFERORS" section of this solicitation. Facsimile, mail, or hand-carried offers will NOT be accepted. Offerors shall submit their Technical Proposal, Price Proposal (including the Contractor Cost Breakdown and CLIN pricing), signed SF 1442, and Bid Guarantee directly to the Contract Specialist and Contracting Officer by the stated deadline.
(c) Period for acceptance of offers.
This paragraph is modified to state: The offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers, unless another time period is specified in an amendment to the solicitation.
(e) Multiple offers.
This paragraph is modified to state: Alternative or multiple offers will not be accepted. Offerors must submit a single proposal that meets the minimum requirements of the Statement of Work.
(h) Multiple awards.
This paragraph is modified to state: The Government intends to award a single, Firm-Fixed-Price (FFP) Purchase Order as a result of this solicitation.
(m) Incorporation of Specific Instructions.
The detailed, numbered instructions provided in the "INSTRUCTIONS TO OFFERORS" section of this solicitation document (Items 1 through 11) are hereby incorporated as a formal addendum to this provision. In the event of a conflict between the base text of FAR 52.212-1 and this addendum (or the detailed solicitation instructions), the addendum and solicitation instructions shall take precedence.
(End of Addendum)
*** END OF NARRATIVE ***
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price
Amount
0001 Product Service Description: Renovate barracks Product Service Code: Z2AZ Pricing Arrangement: Firm Fixed Price
1 Each
0002 Product Service Description: Performance bond Product Service Code: Z2AZ Pricing Arrangement: Firm Fixed Price
1 Each
0003 Product Service Description: Renovate barracks Product Service Code: Z2AZ Pricing Arrangement: Firm Fixed Price
1 Each
Section C - Description/Specifications/Statement of Work
The Contractor shall perform in accordance with the Statement of Work (SOW) DPW00004-6J, provided as Attachment 0001.
*** END OF NARRATIVE ***
Requirements This is a requirement for the commercial renovation of common areas at the Single Soldier Unaccompanied Personnel Housing (UPH), Building 209, Fort Hamilton, NY. The project consists of the complete renovation of common areas, requiring the contractor to furnish all labor, expertise, equipment, and materials. Key tasks include the removal and installation of HVAC equipment, extensive interior surface preparation and painting, and fixture installation.
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-12 Inspection of Construction. 1996-08
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
DFARS Clauses Incorporated by Full Text
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.232-7006 Wide Area WorkFlow Payment Instructions.
2023-01
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
NOT APPLICABLE
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
CONSTRUCTION AND FACILITIES MAINTENANCE INVOICE SRN/SDN: TBD
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC HQ0490
Issue By DoDAAC W15QKN Admin DoDAAC W15QKN Inspect By DoDAAC W16JGG Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) W16JGG Service Acceptor (DoDAAC) W16JGG Accept at Other DoDAAC N/A LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section I - Contract Clauses
Disclosure of Unit Price Information
This constitutes notification pursuant to Executive Order 12600, Pre-Disclosure Notification Procedures for Confidential Commercial Information (June 23, 1987), of our intention to release unit prices in response to any request under the Freedom of Information Act, 5 USC 552. Unit price is defined as the contract price per unit or item purchased. We consider any objection to be waived unless the contracting officer is notified of your objection to such posting prior to submission of initial proposals.
Required Insurance
In accordance with FAR 28.307-2, the Contractor is required to provide and maintain the kinds and minimum amounts of insurance stated below:
(a) Workers' Compensation and Employer's Liability. Contractors are required to comply with applicable Federal and State workers' compensation and occupational disease statutes. If occupational diseases are not compensable under those statutes, they shall be covered under the employer's liability section of the insurance policy, except when contract operations are so commingled with a contractor's commercial operations that it would not be practical to require this coverage. Employer's liability coverage of at least $100,000 shall be required, except in States with exclusive or monopolistic funds that do not permit workers' compensation to be written by private carriers. (See 28.305(c) for treatment of contracts subject to the Defense Base Act.)
(b) General Liability.
(1) The contracting officer shall require bodily injury liability insurance coverage written on the comprehensive form of policy of at least $500,000 per occurrence.
(2) Property damage liability insurance shall be required only in special circumstances as determined by the agency.
(c) Automobile Liability. The contracting officer shall require automobile liability insurance written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
(d) Aircraft Public and Passenger Liability. When aircraft are used in connection with performing the contract, the contracting officer shall require aircraft public and passenger liability insurance.
Coverage shall be at least $200,000 per person and $500,000 per occurrence for bodily injury, other than passenger liability, and $200,000 per occurrence for property damage. Coverage for passenger liability bodily injury shall be at least $200,000 multiplied by the number of seats or passengers, whichever is greater.
(e) Vessel Liability. When contract performance involves use of vessels, the contracting officer shall require, as determined by the agency, vessel collision liability and protection and indemnity liability insurance.
HQ AMC-Level Protest Program
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible contracting officer.
However, you can also protest to Headquarters, AMC. The HQ, AMC-Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103.
Send protests (other than protests to the contracting officer) to:
Address:
Headquarters U.S. Army Materiel Command
Office of Command Counsel-Deputy Command Counsel
4400 Martin Road
Rm: A6SE040.001
Redstone Arsenal, AL 35898-5000
Fax: (256) 450-8840
Email: usarmy.redstone.usamc.mbx.protests@mail.mil
The AMC-level protest procedures are found at:
Web Address: http://www.amc.army.mil/amc/commandcounsel.html
If Internet access is not available contact the contracting officer or HQ, AMC to obtain the AMC- Level Protest Procedures.
*** END OF NARRATIVE ***
FAR Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
52.203-12 Limitation on Payments to Influence Certain Federal Transactions.
2020-06
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.204-19 Incorporation by Reference of Representations and Certifications.
2014-12
52.204-91 Contractor Identification.
(Deviation 2026-O0038)
2026-02
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-3 Convict Labor. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.222-7 Withholding of Funds. (Deviation 2026-O0038)
2026-02
52.222-8 Payrolls and Basic Records.
(Deviation 2026-O0038)
2026-02
52.222-9 Apprentices and Trainees.
(Deviation 2026-O0038)
2026-02
52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026- O0038)
2026-02
52.222-11 Subcontracts (Labor Standards).
(Deviation 2026-O0038)
2026-02
52.222-12 Contract Termination-Debarment. 2014-05
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. (Deviation 2026-
2026-02
O0038)
52.222-15 Certification of Eligibility. 2014-05
52.222-35 Equal Opportunity for Veterans.
(Deviation 2026-O0038)
2026-02
52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026- O0038)
2026-02
52.222-37 Employment Reports on Veterans. (Deviation 2026- O0038)
2026-02
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)
2026-02
52.222-90 Addressing DEI Discrimination by Federal Contractors.
(Deviation 2026-O0040, Revision 1)
2026-04
52.223-2 Reporting of Biobased Products Under Service and Construction Contracts. (Deviation 2026- O0038)
2026-02
52.223-5 Pollution Prevention and Right-to- Know Information.
2024-05
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While
2024-05
Driving.
52.228-5 Insurance-Work on a Government Installation.
1997-01
52.228-11 Individual Surety-Pledge of Assets.
2021-02
52.228-15 Performance and Payment Bonds-Construction.
2020-06
52.232-18 Availability of Funds. 1984-04
52.232-23 Assignment of Claims. 2014-05
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-39 Unenforceability of Unauthorized Obligations.
2013-06
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.236-2 Differing Site Conditions. 2026-02
(Deviation 2026-O0038)
52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-6 Superintendence by the Contractor. (Deviation 2026- O0038)
2026-02
52.236-7 Permits and Responsibilities.
(Deviation 2026-O0038)
2026-02
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-O0038)
2026-02
52.236-10 Operations and Storage Areas.
(Deviation 2026-O0038)
2026-02
52.236-12 Cleaning Up. (Deviation 2026- O0038)
2026-02
52.236-13 Accident Prevention. (Deviation 2026-O0038)
2026-02
52.236-17 Layout of Work. (Deviation 2026- O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.242-14 Suspension of Work. 1984-04
52.243-5 Changes and Changed Conditions. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form).
1984-04
52.249-10 Default (Fixed-Price Construction).
1984-04
DFARS Clauses Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.205-7000 Provision of Information to Cooperative Agreement Holders.
2024-10
252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State Sponsor of Terrorism.
2019-05
252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials.
2014-09
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7001 Buy American and Balance of Payments Program.
2024-02
252.225-7002 Qualifying Country Sources as Subcontractors.
2022-03
252.225-7012 Preference for Certain Domestic Commodities.
2022-04
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.
2023-06
252.232-7010 Levies on Contract Payments. 2006-12
252.236-7013 Requirement for Competition Opportunity for American Steel Producers, Fabricators, and Manufacturers.
2023-01
252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.
2023-01
252.243-7001 Pricing of Contract Modifications. 1991-12
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
52.211-12 Liquidated Damages- Construction.
2000-09
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $59.14 [Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.219-28 Postaward Small Business Program Rerepresentation.
2026-02
Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)
Long-term contract means a contract of more than five years in duration, including options.
However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.
Small business concern-
(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.
(2) Affiliates, as used in this definition, means business concerns, one of whom directly or indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.
(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:
(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.
(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.
(3) For long-term contracts-
(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and
(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.
(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.
(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a contract other than a construction or service contract, is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition-
(1) Was set aside for small business and has a value above the simplified acquisition threshold;
(2) Used the HUBZone price evaluation preference regardless of dollar value, unless the Contractor waived the price evaluation preference; or
(3) Was an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.
(e) Except as provided in paragraph (g) of this clause, the Contractor shall make the representation(s) required by paragraph (b) of this clause by validating or updating all its representations in the Representations and Certifications section of the System for Award Management (SAM) and its other data in SAM, as necessary, to ensure that they reflect the Contractor's current status. The Contractor shall notify the contracting officer in writing within the timeframes specified in paragraph (b) of this clause, that the data have been validated or updated, and provide the date of the validation or update.
(f) If the Contractor represented that it was other than a small business concern prior to award of this contract, the Contractor may, but is not required to, take the actions required by paragraphs (e) or (g) of this clause.
(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under ____NAICS Code assigned to ____contract number.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (g)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1001.
(3) Women-owned small business (WOSB) joint venture eligible under the WOSB Program. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(4) Economically disadvantaged women-owned small business (EDWOSB) joint venture. The Contractor represents that it [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR 127.506(a) through (c). [____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __ .]
(5) Service-disabled veteran-owned small business (SDVOSB) joint venture eligible under the SDVOSB Program. The Contractor represents that it [ ] is, [ ] is not an SDVOSB joint venture eligible under the SDVOSB Program that complies with the requirements of 13 CFR 128.402.
[____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: __.]
(6) HUBZone joint venture eligible under the HUBZone Program.[ Complete only if the offeror is a HUBZone small business concern. ] The offeror represents, as part of its offer, that It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR 126.616(a) through (c). [____The Contractor shall enter the name and unique entity identifier of each party to the joint venture: .] Each HUBZone small business concern participating in the HUBZone joint venture must be certified as a HUBZone concern. [____Contractor to sign and date and insert authorized signer's name and title.]
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts.
2014-05
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the
Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
52.252-2 Clauses Incorporated by Reference.
1998-02
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/far-overhaul/far-part-deviation-guide ____ ____[Insert one or more Internet addresses]
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.236-7001 Contract Drawings and Specifications.
2000-08
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Section J - List of Attachments
Attachment 0001 - SOW DPW00004-6J
Attachment 0002 - Applicable Davis-Bacon Act Wage Determination
Attachment 0003 - Contractor Cost Breakdown Form
*** END OF NARRATIVE ***
Identifier Document Name
Document Description
Reference Identifier
Date Line Item
Page Numbers
Document Type
Provided Under Separate Cover
0001 SOW - DPW0
0004-6J (R enovate co mmon areas single so ldier
UPH)
Statement of Work
Jun
Attachment No
0002 WD NY20260
003 rev 4 d.
5.26.20 26
Wage Determination
Jun
Attachment No
0003 ATTACHMENT
0003 – CO
NTRACTOR C
OST BREAKD
OWN FORM
Proposal 12 Jun
Attachment No
Section K - Representations, Certification, & Other Statements
FAR Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-11 Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
2024-09
52.223-1 Biobased Product Certification.
(Deviation 2026-O0038)
2026-02
52.240-90 Security Prohibitions and Exclusions Representations and Certifications. (Deviation 2026-
DFARS Provisions Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials.
2022-09
252.204-7008 Compliance with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .