Solicitation w Attachments - W912BV21Q0006 - Skiatook_Birch PCMC.pdf

PDF 28 MB Posted

Attached to
W912BV21Q0006 - Herbicide Application, Janitorial, Mowing, and Park Cleaning Services at Skiatook and Birch Lakes, OK
Solicitation number
W912BV21Q0006
Issued by

About this file

This solicitation seeks herbicide application, janitorial, mowing, and park cleaning services at Skiatook and Birch Lakes in Oklahoma. The Department of the Army Corps of Engineers Engineering District Tulsa is requesting these services under solicitation number W912BV21Q0006. Offerors must submit proposals by April 5, 2021 to be considered for award of a firm-fixed price contract with an estimated value of $100,000 per year. The period of performance is one base year with four option years. The solicitation includes attachments with details on the required services, evaluation criteria, and terms and conditions for offerors to consider when preparing proposals for this opportunity.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BV21Q0006 20-Nov-2020

b. TELEPHONE NUMBER

918.669.0000

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 23 Dec 2020

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MARY B DUKE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

918-669-7436FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$8,000,000

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF102

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BV21Q0006

Section A - Solicitation/Contract Form

INSTRUCTIONS TO OFFERORS

Instructions to Offerors

MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS

Do not include excess information, such as audio-visual materials, electronic media, CD’s, thumb drives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross-outs or strike-through marks. Submit a legible quote with no correction marks.

EMAIL

Emailed quotes must be received in a supported Adobe or Microsoft Office file format. These formats are the only acceptable methods of submitting a quote electronically. Cloud storage providers, google docs, web-based drop boxes, OneNote/OneDrive, URLs, web-based format, or any other virtual/web-based memory service are NOT acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E-mail address CESWT‐CT‐SS‐Quotes@usace.army.mil and copy Mary.B.Duke@usace.army.mil. Ensure your quote is received before the due date and time. For your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received, your quote will not be considered.

FAX or MAIL

Include a cover sheet that references the Contract Specialist – Mary B. Duke and the solicitation number. Fax number is (918) 669-7436. When submitting through mail, ensure you clearly mark the envelope to:

U.S. Army Corps of Engineers, Tulsa District Mary B. Duke, CESWT-CT-E 2488 E. 81st Street Tulsa, OK 74137-4290

Clearly mark the envelope in the lower left-hand corner with the solicitation number, W912BV21Q0006. All pages should be numbered. Use only 8 ½” x 11” paper for fax or mail submissions. Do not use foldouts (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Times New Roman or Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.

Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.

HAND DELIVER

If your submission will be hand-carried, please provide notification to the Contract Specialist, at least one working day in advance, by calling (918) 669-7027 or e-mailing Mary.B.Duke@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider that upon arrival, visitors must go through security check points on the 16th floor of the 20-story Building. Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District Office. The Tulsa District Office is in the 20-story building of the CityPlex towers, address below:

U.S. Army Corps of Engineers, Tulsa District 2488 E. 81st Street

Tulsa, OK 74137-4290

Please submit the following documents:

1) Complete a signed copy of the first page of the solicitation and all amendments, including CAGE code

2) Complete the pricing schedule, provided in the solicitation

3) Complete the past experience references page, provided in the solicitation

4) Complete the sub-contractor data, provided in the solicitation - your quote must identify the business size and percentage of work to be completed by the prime contractor; and the business name, address, the percentage of work to be completed by the sub-contractor and business size of any sub-contractors, if applicable, based on the NAICS code identified. Offerors must clearly identify whether a sub-contractor(s) will be performing work, the percentage of work to be performed by each sub-contractor, and the socio-economic category into which each identified sub-contractor falls. (FAR 52.219-14 LIMITATIONS ON

SUBCONTRACTING (DEVIATION 2020-O0008) (MAR 2020).

5) Complete all FAR Clauses, with applicable blanks filled in from SECTIONS I, K, and L.

6) Complete and return the Representations and Certifications in Section K, unless already completed in the

System for Awards Management at https://www.sam.gov/

7) Contractor must respond to the representation in Section K: FAR 52.204-24 and 52.204-26. Failure to respond to these provisions will deem your offer non-responsive and unawardable.

8) Contractor must provide a current, valid copy of Herbicide Applicator’s license, issued by the State of

Oklahoma.

Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.

Quotes should be valid through 28-Feb-2021.

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):

For information related to amendments, and the dates set for receipt of proposals, please check https://beta.sam.gov.

Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐ register into the system. To self‐register go to the aforementioned web page and click on the BID tab.

Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page, you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.

The Solicitation Number is: W912BV21Q0006

The Bidder Inquiry Key is: T23VI2-MKMJUA

The Bidder Inquiry System will be unavailable for new inquiries 2:00 PM CST Wednesday, 16 December 2020 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

4. Offerors are requested to review the specification in its entirety and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

5. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.

6. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

7. The point of contact for this solicitation is:

Contract Specialist: Mary B. Duke Telephone: 918‐669‐7027 E‐mail: Mary.B.Duke@usace.army.mil

PRE-PROPOSAL/SITE VISIT CONFERENCE

A Pre-Proposal/Site Visit Conference is scheduled for:

Site Visit Date/Time: Wednesday, December 2, 2020

9:00 AM CST

Site Visit Location: U.S. Army Corps of Engineers Skiatook Lake Office 14004 Lake Road Skiatook, OK 74070

ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS

The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.

In accordance with AFARS 5132.702(a)(ii)(B): “Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.”

Section B - Supplies or Services and Prices

PRICING SCHEDULE

Pricing Schedule

Please see Section J for attachment.

SUB-CONTRACTING INFORMATION

Sub-Contracting Information

PAST EXPERIENCE INFORMATION

Past Experience Information

Section C - Descriptions and Specifications

PWS

PERFORMANCE WORK STATEMENT

SKIATOOK AND BIRCH LAKES

OSAGE COUNTY

OKLAHOMA

FOR

MOWING, JANITORIAL, PARK CLEANING,

HERBICIDE APPLICATION SERVICES

ORGANIZATION OF PERFORMANCE WORK STATEMENT

This Performance Work Statement consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.

This contains requirements that apply to all work to be performed under the provisions of this Performance Work Statement. The appendices contain a description of the facilities to be serviced and the work to be performed.

TABLE OF CONTENTS

Para.

No. Paragraph Title 1 Performance Work Statement 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Materials and Supplies 8 Performance Requirements 9 Contractor Quality Control 10 Deductions for Deficient Work 11 Safety 12 Contractor’s Facilities 13 Work Schedules 14 Reporting Defective Facilities 15 Security 16 Pre-Work Conference 17 Contractor Submittals 18 Billing

19 Changes in Amount of Facilities Serviced

EXHIBITS

No. Title 1 Quality Assurance Report 2 Specifications for Contractor-Furnished

Materials and Supplies 3 Performance Requirements 4 Quality Control Inspection Log 5 Example of Job Hazard Analysis 6 Work Schedule for Park Cleaning 7 Invoice Format

APPENDICES

Appendix Title A Mowing B Janitorial Work C Cleaning of Parks D Application of Herbicides

1. Description of Services. All services required under this contract shall be awarded via C-Type contract which may include, but are not necessarily limited to, the following types of services:

Mowing, Janitorial, Park Cleaning and Herbicide Application. For the following Government Facilities:

1.1. Mowing of public use areas, dam embankment, project office complexes, and other unimproved areas on project lands.

1.2. Janitorial services at the Skiatook Project Office complex.

1.3. Cleaning of park facilities such as toilets, picnic/camping sites, grounds-keeping, refuse collection and disposal and vault pumping of vaults and septic tanks.

1.4. Application of herbicides.

2. DEFINITIONS.

2.1. Bimonthly work is required to be performed every other month.

2.2. Biweekly work is required to be performed every other week.

2.3. Contracting Officer (KO). The person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.

2.4. Contracting Officer Representative (COR). A Government employee, designated in writing, responsible for administering the contract for the Contracting Officer.

2.5. Contractor quality control (CQC) is the contractor's system of controlling the quality of services provided under the provisions of the contract.

2.6. Critical weight is a means of subjectively designating the importance of, or weighting, Performance Requirements (PRs). Three critical weights shall be used with A being used to designate the more important PRs, B being designated as moderately important, and C the least important. Critical weights are based on the importance of each service to the integrity of the facilities being serviced, to the visiting public, to Government employees directly affected by the service, and the environment.

2.7. Deficient service is any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 3.

2.8. Government as used herein means the United States of America.

2.9. Performance Requirement (PR) is the Government's minimum requirement for each service provided under the contract. These requirements are stated as Performance Standards and Acceptable Performance Levels.

2.9.1. Performance standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.

2.9.2. Acceptable performance level (APL) is the maximum number of deficient services at which the Government will consider a service satisfactory.

2.10. Project means all Government property and easements at Skiatook and Birch Lakes.

2.11. Public use area (PUA) includes recreation areas as well as overlooks, nature and hiking trails, access points, etc.

2.12 Quality is conformance with the contract specification.

2.13. Quality Assurance (QA) Policies and procedures adopted by the government to ensure that services acquired under government contracts conform to the contract’s quality and quality requirements.

2.14. Regulations refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.15. Semi-monthly work is required to be performed two times per month.

2.16. Semi-weekly work is required to be performed two times per week.

2.17. A workday is any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean that work is not required by this specification on other days.

2.18. Emergency work is work the contractor is required to perform immediately, normally within a few hours after written request or verbal followed by written request is received from the Contracting Officer.

3. REFERENCES.

3.1 Corps of Engineers Safety & Health Requirements Manual, (EM 385-1-1, current edition to include any amendments) is hereby incorporated into this specification. The Contracting Officer will furnish EM 385-1-1 to the contractor after contract award.

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.2. Execution of all work shall be in accordance with this Performance Work Statement and awarded Contract.

4.3. The COR will notify the contractor of deficient services.

4.3.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 1).

4.3.2. If the COR directs re-performance of work to correct deficiencies, the contractor shall initiate action to accomplish corrective work within two business days.

4.3.3. Notify the COR when corrective work is completed. Notification shall be made by completing Part IV of the QA Report, provided it has been furnished to the contractor. When work has been corrected, the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.

5.1. Experience and skills.

5.1.1. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required to perform the various types of work specified.

5.1.2. Quality control personnel shall be knowledgeable of the work they inspect, inspection procedures, and all portions of this Performance Work Statement that apply to the work they inspect.

5.2. Supervision.

5.2.1. The contractor shall provide an on-site Project Manager who shall have full authority to direct any work required. This on-site Project Manager, and alternates who shall have full authority to execute work during brief absences of the on-site Project Manager, shall be designated in writing. The on-site Project Manager or alternate shall be on site at all times work is being performed. Identify, in writing, the name of the appointed on-site Project Manager and provide this information to the Contracting Officer and COR within 10 calendar days of contract award.

5.2.2. The contractor shall provide the COR a telephone number at (or through) which the contractor's supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed.

5.2.3. The on-site Project Manager shall contact, whether by phone or in person, the COR each workday between 8:30 and 9:00 a.m. to coordinate and to discuss any work deficiencies, problems or contract performance related issues. If this contact is by telephone, the COR may require the on-site Project Manager to meet and discuss the issue(s) in person. Will advise the on-site Project Manager of the designated meeting location and time.

6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within the specified time limits. Equipment breakdown does not relieve the contractor of the responsibility to complete work in accordance with the Performance Work Statement requirements on Schedule.

6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR for inspection. Equipment brought to the project shall not be used until it has passed inspection by the COR. The COR shall establish the time and location for these inspections.

6.2. Equipment requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and comply with EM 385-1-1.

6.2.1. Tractors shall be equipped and operated in accordance with the following:

6.2.1.1. Power take offs on tractors shall operate at a minimum of 540 rpm during mowing operations.

6.2.1.2. Seat belts shall be worn at all times by personnel operating tractors.

6.2.1.3. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than ¼-inch woven wire mesh or expanded metal with openings no greater than one inch.

6.2.1.4. Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose.

6.2.2. Mowers shall be rotary-type or flail-type and shall meet the following requirements:

6.2.2.1. Mowers shall be equipped with safety chains or other protective devices to prevent flying objects from injuring people or damaging property.

6.2.2.2. Only zero-turn mowers shall be used when mowing improved and lawn areas.

6.2.2.3. Use of brush hogs shall be limited to mowing dam embankment, dike areas, and semi-improved areas.

6.2.2.4. All safety devices provided by the manufacturers of push and riding mowers shall function as designed.

6.2.3. Edger’s shall be equipped with a rotary blade in an upright position. A protective guard for the blade shall be provided.

6.2.4. Trucks used for hauling refuse, litter, and debris shall have a covering device to prevent the material from being blown out of the refuse bins. Bins shall be covered at all times when material is subject to blowing from them.

6.2.5. The working pressure of power washers shall not exceed 50 PSI. The working pressure of high-pressure power washers, if used to clean facilities specified in Appendix C, shall be a minimum of 2,000 PSI.

6.2.6. All vehicles used by the contractor to perform work under this Performance work statement shall be marked by signs located on each side of the vehicles. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project. Lettering shall be at least 2 inches high. Each sign shall contain the following:

MAINTENANCE SERVICES

PROVIDED BY

(Contractor's Name)

6.3. Equipment operation.

6.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf and property or injury to others.

6.3.2. Power operated trimming equipment that utilizes monofilament line shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height.

6.4. Vehicle operation and parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.

7. MATERIALS AND SUPPLIES.

7.1. Contractor furnished. Except for the items listed in subparagraph 7.2., the contractor shall furnish all materials and supplies necessary to accomplish all work.

7.1.1. All materials and supplies shall be new. Adequate quantities shall be maintained to perform the required services without interruptions. All materials and supplies are subject to review by the COR to determine compliance.

7.1.2. Specifications for selected contractor furnished materials and supplies are provided in Exhibit 2.

7.1.3. In addition to materials and supplies listed in Exhibit 2, the contractor shall furnish the following:

Cleaning compounds Disinfectants Carpet Shampoo Glass Cleaner Floor Wax Mops, brooms, etc.

Stripping Agents Misc. Tools Lights/Lamps Hand Soap Towels Tissue Paper Tissue Paper Holders Tissue Paper Locks Refuse Container Liners Deodorant Cakes Odor control chemicals (for vault toilets) Spot Remover (for carpets and upholstered chairs) Air fresheners (for Project Office restrooms) Vacuum Cleaners

7.2. Government furnished. The Government will furnish potable water and refuse containers (cans). The contractor shall be responsible for transporting Government furnished materials and supplies to work sites.

8. PERFORMANCE REQUIREMENTS (PRs). PRs for work performed under this specification are given in Exhibit 3. The contractor's performance will be evaluated using these PRs as follows:

8.1. Services provided by the contractor will be inspected for compliance with Performance Standards (PStds). Those not meeting PStds shall be considered deficient.

8.2. Acceptable Performance Levels (APLs) establish the acceptable limits for deficient services.

The existence of some deficient services does not necessarily deem the contractor's performance unsatisfactory. However, this does not mean the contractor may knowingly offer deficient services. It only implies the Government recognizes defective performance occasionally happens even when QC is working satisfactorily.

8.3. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re-performance. Deficient services determined in this manner will be used to compute defect rates. These defect rates will be compared to APLs to determine whether the contractor’s performance is acceptable.

8.4. Whenever QA inspections indicate the contractor's performance is marginal or unsatisfactory; the contractor shall furnish the COR a written plan for correcting his/her CQC program within two (2) workdays. In addition, the contractor shall also furnish written status reports on the implementation of this plan weekly until the COR determines that performance is satisfactory. The COR will inform the contractor of the criteria to be used in determining marginal and unsatisfactory performance at the Pre-work Conference.

9. CONTRACTOR QUALITY CONTROL (CQC). The contractor shall establish and execute a CQC Plan to assure that all work required by this contract is completed on schedule and in accordance with the PRs given in Exhibit 3.

9.1. The results of quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 4). A copy of completed inspection logs shall be furnished the COR weekly.

9.2. The requirements in subparagraph 9.1 may be waived by the COR if he determines proper CQC can be achieved without the required submissions. This determination will normally be made on the basis of actual performance by the contractor and shall be made in writing by the

COR.

10. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings will be made for services that do not meet the PStds in Exhibit 3. Deductions for documented defects will be made in accordance with the following procedures:

10.1. Each service found deficient and re-performed by the contractor: No deduction.

10.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on estimates of the contractor's costs for performing the work.

10.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.

10.4. Each service found deficient and not re-performed by anyone or work not performed at all:

Deduction for loss in value shall be based on estimates of the contractor's costs for performing the work.

11. SAFETY.

11.1. Safety plan. The contractor shall furnish the COR a comprehensive safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The contractor's written safety policy shall be given to all employees and posted at a prominent location in the contractor's office throughout the contract period. The safety plan shall include, but not be limited to the following:

11.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

11.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

11.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

11.1.4. Procedures for treating and transporting injured persons to medical facilities.

11.1.5. Fire prevention plans.

11.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner.

Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the COR requests or the KO directs. Job hazard analysis directed by the COR shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 5.

11.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this performance work statement.

11.1.6.2. Equipment operation and maintenance (for each type of equipment).

11.1.6.3. Vehicle operation and maintenance.

11.2. Safety meetings. The contractor shall conduct monthly meetings to discuss safety items pertaining to ongoing work. In addition, a safety meeting shall be conducted prior to initiation of mowing operations. Employees of subcontractors shall attend safety meetings. The contractor shall provide at least one-day notice of safety meetings to the COR so that Corps of Engineers personnel can attend. A quarterly report of the meetings shall be furnished in writing to the COR by the 15th day following the end of each quarter. The report shall include the following information on each meeting: Date, and location of meeting, names of persons attending, safety items discussed and persons who conducted the meeting.

11.3. Safety violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the KO. The COR may require that the contractor remove from the work any employee the Contracting Officer (or Contracting Officer Representative) deems incompetent, careless, or otherwise objectionable. Notification for the requested removal of an unsafe employee will be provided the contractor in writing.

11.4. Personal clothing and safety apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts, tank tops, or shorts). Clothing shall be in good repair, i.e., no torn shirts or trousers. Personnel performing mowing/trimming work shall wear eye and ear protection, hardhats, and safety-toe shoes. Personnel when required by Section 5, EM 385-1-1, shall wear additional protective apparel.

11.5. Accident reports.

11.5.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.

11.5.2. The contractor shall investigate all accidents involving contractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

11.6. Exposure reports. Contractor shall maintain an accurate record of exposure data (man hours worked) and submit the figure in writing monthly by the 2nd day of the following month.

12. CONTRACTOR'S FACILITIES. The following space is available at Government facilities for storage of the contractor’s materials, supplies, and equipment.

12.1. A minimal amount of space is available at the Skiatook Project Office for storage of janitorial supplies and equipment.

12.2. An area will be made available for storage of mowing equipment on an interim basis while mowing is being performed. Storage will be at contractor’s risk.

13. WORK SCHEDULES. The contractor is responsible for managing all work performed under this performance work schedule, including written work schedules as prescribed below.

The COR’s authority in reviewing these schedules is limited to assuring compliance with this specification. If the COR determines the schedules do not comply with this specification, the contractor shall revise his schedules and resubmit them.

13.1. Cleaning of parks. The contractor shall submit a work schedule for each crew performing park cleaning (Appendix C), using the format given in Exhibit 6.

13.1.1. The schedule shall be prepared for work to be accomplished during the period which work will be started. Work schedules shall be furnished two (2) weeks prior to the beginning of each period.

13.1.2. Schedules for additional refuse collections and second cleanings for holidays and holiday weekends are to be incorporated into the work schedule. Additional collections and cleanings shall be included in the pricing schedule.

13.1.3. The contractor shall utilize these schedules for accomplishing work and shall furnish the COR a revised schedule prior to changing his mode of operation. The times given on these schedules will be used to evaluate the contractor’s performance under PR X1, Completion of all work.

14. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR each workday.

15. SECURITY.

15.1. Whenever Government personnel are not present security gates to compounds shall remain locked except for entry/exit of the contractor’s vehicles. All entrances to project office buildings shall remain locked except for ingress and egress of contractor’s employees.

15.2. At the commencement of this contract, the Government will assign keys to the contractor that will be needed to access certain gates, building and structures. The contractor will physically sign for all Government owned keys in their possession and will be held accountable for loss of any assigned key. Discharged employees shall be required to return all keys. Keys shall not be duplicated. Any occurrence of lost keys shall be reported to the COR immediately.

If keys are lost the contractor shall reimburse the Government for the cost of new keys and tumblers. The contractor shall also install the tumblers at no expense to the Government. Upon conclusion of the contract, all keys shall be returned to the Government.

16. PRE-WORK CONFERENCE. The Contracting Officer shall conduct a Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 17 below. As a minimum, the officer of the company that signed the contract, the on-site project manager, and the person that will directly supervise the administrative work associated with the contract shall represent the contractor. The Contracting Officer shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor.

17. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer two (2) weeks prior to the Pre-work Conference. All submittals, other than copies of licenses and contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer. If the Contracting Officer determines any of the proposed plans or schedules do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

17.1. Names of on-site Project Manager and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2).

17.2. CQC Plan (paragraph 9).

17.3. Safety Plan (subparagraph 11.1).

17.4. Report of Safety meetings (submit within 15 days after the end of each quarter) (subparagraph 11.2.).

17.5. Exposure reports (submit by 2nd workday of each month) (subparagraph 11.6).

17.6. Work Schedules for Cleaning of Parks (submit prior to initiation of work and prior to changing schedules) (subparagraphs 13.1 and 13.2).

17.7. Oklahoma permits and/or certification for application of herbicides and pesticides (Appendix A, C, and D).

17.8. Location of refuse disposal site(s) and a copy of the contract with the operator of the site(s) (Appendix C).

17.9. Required Insurance and Insurance Certificate.

17.9.1. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

a. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.

b. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.

c. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

17.9.2. The contractor shall submit to the Contracting Officer a copy of their insurance certificate two (2) weeks prior to the Pre-work Conference.

18. BILLING.

18.1. The contractor shall submit the original and two copies of invoices at the end of each month for all work that has been completed.

18.2. Invoices shall be prepared as shown in Exhibit 7.

18.3. All reports, i.e., CQC, safety meetings, exposure reports, etc., shall be submitted before an invoice will be accepted.

18.4. The invoices and supporting documents shall be delivered or mailed to the Lake Manager, Skiatook Lake Office, 14004 Lake Road, Skiatook, OK 74070.

19. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party only if either or both of the following conditions occur.

19.1. Services required under any appendix are deleted for a period of one (1) month or longer in an entire park.

Change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $1,000. The cost of increases or decreases shall be based on estimates of the contractor's costs for performing the work.

APPENDIX A

MOWING

1. FACILITIES TO BE SERVICED. Dam embankments, public use areas, lake office complexes, dikes, levees, and other project lands. An inventory of mowing areas is given in Table A-1.

2. FREQUENCIES AND TIMES OF SERVICE.

2.1. Mowing of PUAs shall be performed between 7:00 a.m. and 8:00 p.m.

2.2. Mowing of PUAs shall not be performed on Saturdays, Sundays, Federal holidays, or one workday prior to Federal holidays. Mowing at other locations is permitted on these days.

2.3. Mowing shall be performed from 1 March through 31 October.

3. DESCRIPTION OF WORK. The contractor shall perform the following work:

3.1. Mowing shall be performed in the following areas:

3.1.1. Improved Areas are highly developed areas, normally located in PUAs. These areas shall be maintained between a minimum height of 2 inches and a maximum height of 6 inches. The limits of most of these areas are shown on the attached maps. In addition, mow the areas described below and around facilities shown on the drawings. Since the amount of development will affect the required work, the inventory of facilities given in Table C-1a should be reviewed.

3.1.1.1. Areas adjacent to all roads and parking areas shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 50 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the COR to provide a safe viewing distance for vehicles approaching the intersections. Areas adjacent to all roads and parking areas are further defined in the attached mowing maps.

3.1.1.2. Areas around toilets located outside the limits of improved areas shown on the attached maps shall be mowed for a distance of 10 feet from the back and sides of toilets. Areas between the nearby road or parking area and the toilet shall be mowed. In addition, the area between pairs of toilets shall be mowed.

3.1.2. Semi-Improved Areas are undeveloped areas within PUAs, areas near the office complex, and oxidation lagoons that require occasional mowing. These areas shall be maintained between a minimum height of 3 inches and a maximum height of 8 inches. The limits of these areas are shown on the attached maps. Areas around oxidation ponds shall be mowed from the edge of the water to a point 10 feet outside of fences or 10 feet from the toe of dikes around the ponds, whichever is greater.

3.1.3. Lawn Areas shall be maintained between a minimum height of 2 inches and a maximum height of 4 inches. The limits of these areas are shown on the attached maps.

3.1.4. Dam Embankment, Saddle Dike and Semi-Improved Areas shall be maintained between a minimum height of 4 inches and a maximum height of 18 inches. The limits of these areas are shown on the attached maps.

3.2. Trimming.

3.2.1. Every time improved areas are mowed, trimming shall be accomplished around all vertical objects protruding from the ground, including under guardrails, within the limits of these areas.

This includes trimming along railroad ties delineating pullouts and campsites and retaining walls.

3.2.2. Every time lawn areas are mowed; trimming shall be accomplished around vertical objects protruding from the ground within the limits of these areas.

3.2.3. Every time the embankment and dike is mowed trimming shall be accomplished around all vertical objects protruding from the ground, including piezometers, staff gauges, relief wells, manholes, guard posts, and buildings located on the embankment; along the edge of the embankment riprap; and around guardrail and signposts on both sides of the embankment road.

The guardrail along fishing area shall be trimmed to the edge of the riprap area. Trim riprap drainage areas on downstream side of the embankment.

3.2.4. Every time semi-improved areas are mowed; trimming shall be accomplished around vertical objects protruding from the ground within the limits of these areas.

3.2.5. The contractor may apply approved herbicides in lieu of trimming. The COR must approve use of chemicals (and proposed application locations). The contractor shall submit a list of proposed products with manufacturers Material Safety Data Sheets (MSDS) for review. All herbicides shall be applied by a certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied. The COR shall furnish forms.

3.3. Edging shall be accomplished along all concrete walkways and curbs that are flush with the ground each time improved areas are mowed and every other time lawn areas are mowed.

3.4. Flowerbeds. Each time improved and lawn mowing is accomplished weeds, grass, debris, and litter shall be removed from flowerbeds. Flowerbeds shall be thoroughly watered unless waived by the COR. There are 4 flowerbeds for a total size of 85 square yards. See attached maps for further details. The number and size of flower and shrub beds is as follows:

Location Number Size (sq yd) Project Office 4 85

3.5. Cleanup.

3.5.1. Prior to mowing, the contractor shall remove rocks and debris (including fallen tree limbs) that are likely to damage equipment or be thrown by the mower. During mowing, the contractor shall operate equipment in such a manner to direct clippings and debris away from roadways, parking areas, parking lots, walkways, pullouts, and table and picnic shelter slabs.

3.5.2. After mowing is accomplished, the contractor shall remove vegetation and debris from parking lots, paved walkways and pullouts, and table and picnic shelter slabs.

4. RESTRICTIONS ON WORKING. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground.

The contractor shall use good judgment in determining weather conditions are suitable for mowing operations. In cases where the contractor and the COR disagree about the suitability of conditions for mowing operations, the COR will ultimately determine whether work shall progress or stop.

5. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 3.

APPENDIX B

JANITORIAL WORK - PROJECT OFFICE

1. FACILITIES TO BE SERVICED. The facilities to be serviced consist of the project office.

An inventory of this area is given in Table B.

2. FREQUENCIES AND TIMES OF SERVICES.

2.1. Services required shall be performed on Tuesday and Sunday. Tuesday work shall be accomplished between the hours of 6 p.m. and 9 p.m. Any deviation from this schedule must be approved by the COR in advance of the proposed work.

2.2. Janitorial services frequencies shall be increased during the summer months (15 May through 15 September). Services required shall be performed on Tuesday, Thursday, and Sunday during these months. Any deviation from this schedule must be approved by the COR in advance of the work.

2.3. Services required on a weekly, monthly, quarterly, or semi-annual basis shall be performed on any of the cleaning days specified above.

2.4. Janitorial services shall be performed from 1 March through 28 February.

3. DESCRIPTION OF WORK. The contractor shall perform the following work:

3.1. Interior Office and Meeting Room Areas (Excluding Restrooms). Each cleaning day: Empty trash receptacles; soap and paper towels dispensers shall be checked and re-filled if necessary;

clean sinks, dirty dishes, and counter/tabletops; clean drinking fountain; vacuum carpeted floors;

and sweep and wet mop tile and brick floors. Spot remover shall be used to remove new spills from carpeted floors. Dust venetian blinds and windowsills. Clean interior and exterior of all kitchen appliances (refrigerator, microwaves, oven/stove, ice machine). The glass on entry doors, pictures, and adjacent glass enclosures shall be cleaned. Electronic equipment (computers, copy machines, telephones, radios, etc.) shall not be cleaned.

3.2. Restrooms. Each cleaning day. Clean mirrors and plumbing fixtures. A disinfectant shall be used to eliminate odor and minimize health hazards. Deodorant cakes shall be maintained in urinals. Air fresheners shall be checked and replaced as necessary. Empty trash receptacles.

Soap, paper towels, and toilet tissue dispensers shall be checked and re-filled if necessary. Sweep and wet mop floors. Excess water shall be removed from floors. Clean partitions. Biological formations and resultant stains shall be removed from partitions. Dust venetian blinds and windowsills.

3.3. Interior Work and Storage Areas. Each cleaning day. Empty trash receptacles. Sweep or mop floors.

3.4. Monthly. Clean vent covers. Dust ceiling fans.

3.5. Quarterly. Clean light fixtures, removing all insects.

3.5.1. Carpet cleaning. The contractor shall shampoo carpeted floors. Spot remover shall be used to remove soiled spots.

3.5.2. Window washing. The contractor shall clean windows, including storm windows, inside and outside.

3.5.3. Wax tile and brick floors. Tile and brick floors shall be stripped prior to every time they are waxed and sealed.

3.6. Exterior Areas. Trash, debris, and accumulations of small litter shall be picked up each cleaning day.

3.7. Refuse Disposal. Refuse containers shall be maintained in the Project Office compound at a location designated by the COR. The contractor may use the containers for temporary storage of refuse collected at the Project Office. In addition, Government personnel may place refuse in the containers as necessary. The containers shall be emptied when it becomes full or if they begin to smell, as determined by the COR. The contractor shall dispose of all refuse collected at the Project Office in the dumpster provided in Appendix C. Services/costs for emptying of the dumpster(s) will be the responsibility of the contractor and shall be accomplished weekly.

4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs in Exhibit 3.