Solicitation - SPMYM226Q5880.pdf
PDF 2 MB Posted
- Attached to
- LOAD CELL RETRO KIT
- Solicitation number
- SPMYM226Q5880
About this file
This is a Women-Owned Small Business (WOSB) solicitation for the procurement of load cell retrofit kits and related components for use at Puget Sound Naval Shipyard. The solicitation number is SPMYM226Q5880, issued on March 31, 2026, with an offer due date of April 2, 2026 at 10:00 AM. The contracting officer is Naomi Larson with the DLA Maritime Puget Sound Contracting Division (DLA-PME) located in Bremerton, Washington.
The procurement includes four line items with firm fixed pricing: (1) 13 MSI Retrofit Kit Assemblies, Model 6360, P/N 228612; (2) 26 Remote Displays for MSI Load Cells, Model MSI-8004HD GEN2, P/N 228974; (3) 26 Installation Totes for MSI Load Cells, Model 8004D/8000HD, P/N 228992; and (4) 13 Battery Well Assemblies for MSI Load Cells, Model 4260B/6360, P/N 141257. All items are sole-sourced to Measurement Systems International (a Rice Lake Weighing Systems Company). Delivery dates vary by line item, ranging from February 13, 2026 to July 27, 2026. The delivery destination is Puget Sound Naval Shipyard IMF Maintenance Facility, Building 514, 1400 Farragut Avenue, Bremerton, WA 98314-5001. Inspection and acceptance will be conducted at destination with QA Level 7 (7-day inspection). Payment will be made via Wide Area WorkFlow (WAWF) electronic invoicing. The contract is 100% set-aside for Women-Owned Small Businesses under the NAICS code 333923 with a size standard of 1,250 employees. All delivery items must pass through the base Truck Inspection Station and contractors must obtain Defense Biometric Identification System (DBIDS) credentials for base access.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
Section A - Solicitation/Contract Form
LOAD CELL RETRO KIT
Additional Regulation or Supplemental Clauses Incorporated by Full Text
A1 WAWF PAYMENT, Over $15,000.00 and all requirements with CDRLs (Nov 2025)
1. The Contractor's POC is Phone:
Fax:
E-mail:
2. Buyer POC is: NAOMI LARSON Phone: 385-591-9078 Fax:
E-mail: NAOMI.LARSON@DLA.MIL
3. Invoice Information:
The contractor shall utilize the electronic invoicing upon delivery of supplies indicated herein. Invoice may be submitted not more than one every two weeks. Invoices must be submitted electronically using Wide Area Work Flow (WAWF) - Receipt and Acceptance. The contractor shall self-register at the web site: https://piee.eb.mil. Contractor training is available on the Internet at https://pieetraining.eb.mil/wbt/.
Additional support can be accessed by calling the NAVY WAWF Assistance Line: 1-800-756-4571.
See clause 252.232-7006 for WAWF table.
4. Inspection Level:
QA 7 - 7 days inspection
5. Defense Biometric Identification System (DBIDS):
Effective 14 August 2017, NCACS credentials will no longer be accepted for base access. Any new contractor, vendor or supplier requesting base access will be required to obtain a Defense Biometric Identification System (DBIDS) credential. NCACS credentials will no longer be issued. Only DBIDS credentials will be issued to ALL contractors, vendors and suppliers seeking base access AFTER 30 June 2017. Defense Biometric Identification System (DBIDS) increases installation security and communications by receiving frequent database updates on changes to personnel /credential status, law enforcement warrants, lost/stolen cards, and force protection conditions. The system provides continuous vetting anytime the DBIDS card is scanned at an installation entry point.
If you currently have a Navy Commercial Access Control System (NCACS) card, the following is required to get a DBIDS credential:
Present your NCACS Card and a completed copy of the SECNAV FORM 5512/1 to the base Visitor Control Center (VCC) representative.
The VCC will pull up your information in the computer, ensuring all information is current and correct.
Once your information is validated, a temporary DBIDS credential is provided.
Your temporary credential will have an expiration date, prior to which you will need to obtain your permanent DBIDS credential (~ 180 days).
For each additional U.S. Navy installation to which you need access, the first time you visit you only need to bring your DBIDS credential and statement of purpose for base access when arriving at the Visitor Control Center.
The representative will enter base access authorization and then you may proceed to work.
If you do NOT have an NCACS Card, the following is required to obtain a DBIDS credential:
Present a letter or official document from any government sponsoring organization that provides the purpose for your access.
Present valid identification, such as a passport or Real ID Act-compliant state driver's license.
Present a completed copy of the SECNAV 5512/1 form to obtain your background check.
Upon completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential.
All deliveries must pass through the base Truck Inspection Station. All delivery vehicles are subject to inspection. Drivers should expect delays due to
SPMYM226Q5880
heightened security.
For access to the main, perimeter gates at any Navy Base Kitsap installation, contractors are required to be a US Citizen and have either:
(a) DBIDS badge or
(b) Request a One-day Visitor badge at Pass & ID. Be prepared to present:
-Photo ID -Original proof of citizenship (any one of the following is acceptable):
State Certified Birth Certificate (must have the raised seal) Unexpired U.S. passport/Passport Card Alien Registration Card State Issued ENHANCED Drivers License Naturalization papers Certificate/Statement of Birth Born Abroad) -Current vehicle registration and insurance -Bill of lading that has the delivery address on it
Please note: The DBIDS badge does not give access through the second, Operational Area (OA) gate to lower base Bangor or to the Controlled Industrial Area (CIA) at Puget Sound Naval Shipyard (PSNS). To gain access to either the OA Gate or CIA area, a Navy Region Bangor or NAVSEA Badge is required.
To request a NAVY REGION NW badge, https://www.bavr.cnic.navy.mil/. Sponsor email is trina.williamson@navy.mil
To request a NAVSEA badge, call PSNS Pass & ID 360-476-4882.
FOR MORE INFORMATION VISIT: https://www.cnic.navy.mil/om/dbids.html
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
LOAD CELL RETRO KIT
13 EA. MSI RETROFIT KIT ASSEMBLIES, MODEL: 6360, P/N:
228612 SOLE SOURCE TO: Measurement Systems International (A Rice Lake Weighing Systems CO.)
Pricing Arrangement: Firm Fixed Price
13 Each
REMOTE DISPLAY
26 EA. REMOTE DISPLAYS FOR MSI LOAD CELLS, MODEL:
MSl-8004HD GEN2, P/N: 228974 SOLE SOURCE TO: Measurement Systems International (A Rice Lake Weighing Systems CO.)
Pricing Arrangement: Firm Fixed Price
ACRN: AD
PR Number: N4523A26PR01816 PR Line Item Number: 0001
26 Each
INSTALL TOTE
26 EA. INSTALLATION TOTES FOR MSI LOAD CELLS,
MODEL: 8004D 8000HD, P/N: 228992
SOLE SOURCE TO: MEASUREMENT SYSTEMS
INTERNATIONAL
Pricing Arrangement: Firm Fixed Price
ACRN: AB
PR Number: N4523A26PR01814 PR Line Item Number: 0001
26 Each
BATTERY WELL ASSY
13 EA. BATTERY WELL ASSEMBLIES FOR MSI LOAD CELLS,
MODEL: 4260B/6360, P/N: 141257
SOLE SOURCE TO: MEASUREMENT SYSTEMS
INTERNATIONAL
Pricing Arrangement: Firm Fixed Price
ACRN: AC
PR Number: N4523A26PR01815 PR Line Item Number: 0001
13 Each
Section C - Description/Specifications/Statement of Work
Requirements
LOAD CELL RETRO KIT
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD Proc Note C02 Manufacturing Phase -Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components (DEC 2016)
(Sep 2025)
The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer. In the event that manufacturing phase-out or discontinuance of production of such items is contemplated, the contractor is required to notify the contracting officer and publish the discontinuance in the Government-Industry Data Exchange Program (GIDEP), where feasible; and to provide immediate advance notice of production phase-out to DLA DMSMS at dscc.dmsms@dla.mil.
C20 Vendor Shipment Module (VSM) (JUL 2024) (Nov 2025)
Applies to all solicitations and contracts; except for metals or wood products, or when DCMA administers the contract and any of the following apply:
(i) Contracts where ultimate destination is outside the contiguous United States;
(ii) Hazardous material (HAZMAT) contracts;
(iii) Foreign Military Sales (FMS) contracts; or
(iv) Contracts requiring Transportation Protective Service.
(1) The DLA Vendor Shipment Module (VSM) is a web-based system for DLA contractors to obtain current shipping addresses, two-dimensional bar coded shipping labels in accordance with MIL-STD-129, bills of lading, packing lists, and other shipping documentation.
Contractors using VSM do not need to contact the transportation office prior to shipping items.
Contractors shall use VSM to print labels for f.o.b. destination contracts ; and to print labels and arrange for shipping for f.o.b. origin contracts. All contractors will use VSM to obtain shipping labels no more than two (2) days prior to shipment to ensure the current destination address is used.
(2) To obtain information for contracts administered by DLA or to register as a VSM user, the contractor shall contact the DLA VSM Helpdesk at (800) 456-5507 or via email to delivery@dla.mil.
(a) Before contacting the Government to advise that material is ready to ship, the contractor shall complete its VSM profile, to include regular business hours and observed holidays. The Government may request reimbursement for occurrences when the Government sends carrier equipment but is unable to pick-up a shipment because the material was unavailable or the contractor facility was closed.
(3) To obtain information for contracts administered by DCMA, the contractor shall contact the DCMA that are for contracts where the ultimate destination is outside the contiguous United
SPMYM226Q5880
mailto:delivery@dla.mil
States, hazardous material, foreign military sales (FMS), or contracts requiring Transportation Protective Service], the contractor shall contact the DCMA Transportation to determine the cognizant Transportation Office at dcma.stlouis-mo.hq.mbx.transportation-inbox@mail.mil
DLAD Proc Note C03 Contractor Retention of Supply Chain Traceability Documentation (SEP 2016) (Sep 2025)
(1) By submitting a quotation or offer, the contractor agrees that, when the contractor is not the manufacturer of the item, it is confirming that it currently has or will obtain before delivery and shall retain documented evidence (supply chain traceability documentation) that the item is from the approved manufacturer and conforms to the technical requirements. The retention period is five years after final payment under this contract.
(2) At a minimum, the supply chain traceability documentation for the item shall include: basic item description, part number and/or national stock number, manufacturing source, manufacturing source's Commercial and Government Entity (CAGE) code, and clear identification of the name and location of all supply chain intermediaries between the manufacturer to the contractor to item(s) acceptance by the Government. The documentation should also include, where available, the manufacturer's batch identification for the item(s), such as date codes, lot codes, or serial numbers.
(3) Examples of acceptable supply chain traceability documentation can be found at: http://www.dla.mil/LandandMaritime/Business/Selling /Counterfeit-Detection-Avoidance-Program/
(4) The contractor shall immediately make available documentation upon request of the contracting officer. The contracting officer determines the acceptability and sufficiency of documentation. If the contractor fails to retain or provide the documentation or the contracting officer finds the documentation to be unacceptable, corrective action may be taken including, but not limited to, cancellation of undelivered orders or rejection of delivered supplies.
SPMYM226Q5880
mailto:dcma.stlouis-mo.hq.mbx.transportation-inbox@mail.mil
Section D - Packaging and Marking
Additional Regulation or Supplemental Clauses Incorporated by Full Text
D17 MARKING OF SHIPMENTS (COMMERCIALLY PACKAGED ITEMS) (Jul 2025)
(i) Marking shall be in accordance with ASTM-D-3951 (most current edition) and with the information set forth in paragraph (ii) below. Unless specified elsewhere in this contract/order, bar coding is not required.
(ii) All unit and exterior containers/packs shall, as a minimum, be marked as follows:
1. National stock number (NSN), when available, or Federal stock number (FSN), when NSN is not available, or part number when neither NSN or FSN are available.
2. Noun nomenclature cited on contract or order.
3. Quantity and unit of issue.
4. Contract, or order number.
5. From:_______________________________________________ (Contractor's Name) (Address)
6. To: (See delivery address on page 1 or in Section F)
(iii) Markings may be applied by any means which provide legibility.
DLAD Proc Note C14 Repackaging or Relabeling to Correct Deficiencies (AUG 2017) (Sep 2025)
The Government may correct packaging or labeling deficiencies if the estimated costs of the corrections are $300 or less ($500 for C&T items). The contracting officer will advise the contractor of the discrepancy and that the Government has completed the repackaging or relabeling. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
If the estimated costs of repackaging or relabeling are more than $300 ($500 for C&T), the contracting officer may advise the contractor of the discrepancy and have the material returned to the contractor for correction/resubmittal; or, if there are urgent requirements, have the Government remediate the discrepancy at the contractor's expense. Upon receipt of notice from the contracting officer, the contractor shall reimburse the Government for the costs incurred by the Government to correct the deficiencies.
D20 PREPARATION FOR DELIVERY (COMMERCIALLY PACKAGED ITEMS) (Jul 2025)
(a) Preservation, packaging, and packing shall be in accordance with ASTM-D-3951 (most current edition), "Standard for Commercial Packing." The unit pack quantity that applies to items under this contract is "Industry Standard".
(b) Prohibited Packing Materials. The use of asbestos, excelsior, loose fill polystyrene, newspaper or shredded paper (all types including waxed paper, computer paper and similar hydroscopic or non-neutral material) is prohibited.
(c) Non-Manufactured Wood Packing. All non-manufactured wood utilized in wood pallets and wood containers shall be heat treated to a minimum core temperature of 56 degrees centigrade for 30 minutes and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC). Refer to www.aphis.usda.gov/ppq/swp/eunmwp.html for wood packing policy, enforcement regulations and accredited agencies.
Non-coniferous (hardwood) and manufactured wood, such as particleboard and plywood, are exempt from this requirement.
(d) Mandatory Pallet Usage. Items that are not being shipped via SMALL PARCEL SERVICE (UPS/FEDEX/DHL) are required to be on PALLETS.
Section E - Inspection and Acceptance
Additional Regulation or Supplemental Clauses Incorporated by Full Text
DLAD Proc Note G01 Additional Wide Area Workflow (WAWF) Information (AUG 2017) (Sep 2025)
Contractors shall include the Transportation Control Number (TCN) and carrier shipment tracking information when submitting the DD250/iRAPT Receiving Report in Wide Area Workflow (WAWF) in order to assist with material inspection and acceptance.
E12 INSPECTION AND ACCEPTANCE (DESTINATION) (Jul 2025)
Inspection and acceptance of the supplies or services to be furnished hereunder shall be made at destination by the receiving activity.
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept= 7 and 7 days
DoDAAC: N4523A CountryCode: USA
PUGET SOUND NAVAL SHIPYARD IMF
MAINT FAC REC OFFICER BLDG 514, 1400 FARRAGUT AVE
BREMERTON, WA 98314-5001
UNITED STATES
RECEIVING OFFICIAL, Inspect/Accept Telephone: 360-476-7640
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept= 7and 7 days
DoDAAC: N4523A CountryCode: USA
PUGET SOUND NAVAL SHIPYARD IMF
MAINT FAC REC OFFICER BLDG 514, 1400 FARRAGUT AVE
BREMERTON, WA 98314-5001
UNITED STATES
RECEIVING, Inspect/Accept Telephone: 360-476-7640
Section F - Deliveries or Performance
Overall Contract Delivery Period
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery Requested By Delivery Date 27 Jul
13 Each Ship To DoDAAC: N4523A CountryCode: USA
PUGET SOUND NAVAL SHIPYARD IMF
MAINT FAC REC OFFICER BLDG 514, 1400
FARRAGUT AVE
BREMERTON, WA 98314-5001
UNITED STATES
RECEIVING OFFICIAL, RECEIVING
Telephone: 360-476-7640
FoB Details Contractor Destination
Delivery Requested By Delivery Date 27 Jul
26 Each Ship To DoDAAC: N4523A CountryCode: USA
PUGET SOUND NAVAL SHIPYARD IMF
MAINT FAC REC OFFICER BLDG 514, 1400
FARRAGUT AVE
BREMERTON, WA 98314-5001
UNITED STATES
RECEIVING OFFICIAL, RECEIVING
Telephone: 360-476-7640
FoB Details Contractor Destination
Delivery Requested By Delivery Date 13 Feb
26 Each Ship To DoDAAC: N4523A
PUGET SOUND NAVAL SHIPYARD IMF
MAINT FAC REC OFFICER BLDG 514
BREMERTON WA USA
FoB Details Contractor Destination
Delivery Requested By Delivery Date 27 Jul
13 Each Ship To DoDAAC: N4523A CountryCode: USA
PUGET SOUND NAVAL SHIPYARD IMF
MAINT FAC REC OFFICER BLDG 514, 1400
FARRAGUT AVE
BREMERTON, WA 98314-5001
UNITED STATES
RECEIVING OFFICIAL, RECEIVING
Telephone: 360-476-7640
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.211-17 Delivery of Excess Quantities. Sep 1989
52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
ACRN LOA Total Amount
AA
^^^017^2026^2026^^1804^000^^260^D^1B4B^^^^^^17008711^050120^700SN^A00009807257^^1301334076^61
00.3260^^00000-00-LOCAL00^
USD 0.00
Line Item PR/MIPR - PR Line Item# CIN Amount
ACRN LOA Total Amount
AB
^^^017^2026^2026^^1804^000^^260^D^1B4B^^^^^^17008711^050120^700SN^A00009807258^^1301334077^61
00.3260^^00000-00-LOCAL00^
USD 0.00Line Item PR/MIPR - PR Line Item# CIN Amount
CLIN 0003 N4523A26PR01814 - 0001 USD 0.00
ACRN LOA Total Amount
AC
^^^017^2026^2026^^1804^000^^260^D^1B4B^^^^^^17008711^050120^700SN^A00009807259^^1301334078^61
00.3260^^00000-00-LOCAL00^
USD 0.00Line Item PR/MIPR - PR Line Item# CIN Amount
CLIN 0005 N4523A26PR01815 - 0001 USD 0.00
ACRN LOA Total Amount
AD
^^^017^2026^2026^^1804^000^^260^D^1B4B^^^^^^17008711^050120^700SN^A00009807260^^1301334079^61
00.3260^^00000-00-LOCAL00^
USD 0.00Line Item PR/MIPR - PR Line Item# CIN Amount
CLIN 0002 N4523A26PR01816 - 0001 USD 0.00
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
COMBO
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N50082
Issue By DoDAAC SPMYM2
Admin DoDAAC SPMYM2
Inspect By DoDAAC N4523A
Ship To Code N4523A
Ship From Code TBD
Mark For Code NA
Service Approver (DoDAAC) NA
Service Acceptor (DoDAAC) NA
Accept at Other DoDAAC NA
LPO DoDAAC N4523A
DCAA Auditor DoDAAC NA
Other DoDAAC(s) NA
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses 5452.233-9001 Disputes - Agreement to Use Alternative Dispute Resolution (ADR) .
As prescribed in 33.21433.214 Alternative dispute resolution (ADR)., insert the following provision:
DISPUTES - AGREEMENT TO USE ALTERNATIVE DISPUTE RESOLUTION (JUN 2020)
(a) The parties agree to negotiate with each other to try to resolve any disputes that may arise. If unassisted negotiations are unsuccessful, the parties will use alternative dispute resolution (ADR) techniques to try to resolve the dispute. Litigation will only be considered as a last resort when ADR is unsuccessful or has been documented by the party rejecting ADR to be inappropriate for resolving the dispute.
(b) Before either party determines ADR inappropriate, that party must discuss the use of ADR with the other party. The documentation rejecting ADR must be signed by an official authorized to bind the contractor (see FAR 52.233-1), or, for the Agency, by the contracting officer, and approved at a level above the contracting officer after consultation with the ADR Specialist and legal counsel. Contractor personnel are also encouraged to include the ADR Specialist in their discussions with the contracting officer before determining ADR to be inappropriate.
(c) If you wish to opt out of this clause, check here [ ]. Alternate wording may be negotiated with the contracting officer.
(End of Provision)
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards. (Deviation) Feb 2026 52.204-13 System for Award Management-Maintenance. (Deviation) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation)
Feb 2026
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation) Feb 2026
52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders- Commercial Products and Commercial Services. (Alternate I)
Oct 2025 Alternate I Feb 2000
52.219-6 Notice of Total Small Business Set-Aside. (Deviation) Feb 2026 52.222-3 Convict Labor. (Deviation) Feb 2026 52.222-19 Child Labor-Cooperation with Authorities and Remedies. (Deviation) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation) Feb 2026 52.223-23 Sustainable Products. (Deviation) Feb 2026 52.225-3 Buy American-Free Trade Agreements-Israeli Trade Act. (Deviation) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-39 Unenforceability of Unauthorized Obligations. Jun 2013 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-1 Disputes. (Deviation) Feb 2026 52.233-3 Protest after Award. (Deviation) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation) Feb 2026 52.240-91 Security Prohibitions and Exclusions. (Deviation) Feb 2026 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation) Feb 2026
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
Jan 2023
252.204-7022 Expediting Contract Closeout. May 2021 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7001 Buy American and Balance of Payments Program. (Alternate I) Feb 2024 Alternate I Feb 2024 252.225-7001 Buy American and Balance of Payments Program. Feb 2024 252.225-7002 Qualifying Country Sources as Subcontractors. Mar 2022 252.225-7013 Duty-Free Entry. Aug 2025 252.225-7041 Correspondence in English. Jun 1997 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.247-7023 Transportation of Supplies by Sea. (Alternate I) Oct 2024 Alternate I Oct 2024 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation) (Alternate I)
(Feb 2026) Alternate I (Feb 2026)
Alternate I . When contemplating a time-and-materials or labor-hour contract, substitute the following paragraphs (a), (FEB 2026) (DEVIATION) (b), (i), (l), and (m) for those in the basic clause.
(a) The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference. As used in this clause-
Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.
Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are-
(1) Performed by the contractor;
(2) Performed by the subcontractors; or
(3) Transferred between divisions, subsidiaries, or affiliates of the contractor under a common control.
Materials means-
(1) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the contractor under a common control;
(2) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;
(3) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.);
(4) The following subcontracts for services which are specifically excluded from the hourly rate: [Insert any subcontracts for services ____ ; andto be excluded from the hourly rates prescribed in the schedule.]
(5) Indirect costs specifically provided for in this clause.
Subcontract means any contract, as defined in FAR 2.101, entered into with a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract including transfers between divisions, subsidiaries, or affiliates of a contractor or subcontractor. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
(b) .Inspection/Acceptance
(1) The Government has the right to inspect and test all materials furnished and services performed under this contract at all places and times before acceptance. The Government will perform inspections and tests in a manner that will not unduly delay the work.
(2) If the Government performs inspection or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.
(3) Unless otherwise specified in the contract, the Government will accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they will be presumed accepted 60 days after the date of delivery, unless accepted earlier.
(4) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in paragraph (b)(6) of this clause, the cost of replacement or correction shall be determined under paragraph (i) of this clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. Unless otherwise specified below, the portion of the "hourly rate" attributable to profit shall be 10 percent. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken. [Insert ____ portion of labor rate attributable to profit.]
(5)(i) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may-
(A) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract; or
(B) Terminate this contract for cause.
(ii) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute under the Disputes clause of the contract.
(6) Notwithstanding paragraphs (b)(4) and (5) of this clause, the Government may, at any time, require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to-
(i) Fraud, lack of good faith, or willful misconduct on the part of the Contractor's managerial personnel; or
(ii) The conduct of one or more of the Contractor's employees selected or retained by the Contractor after any of the Contractor's managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.
(7) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.
(8) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.
(9) Unless otherwise specified in the contract, the Contractor's obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.
(i) .Payments
(1) . The Government will pay the Contractor as follows upon the submission of commercial invoices approved by the Work performed Contracting Officer:
(i) .Hourly rate
(A) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the contract by the number of direct labor hours performed. Fractional parts of an hour shall be payable on a prorated basis.
(B) The rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract.
Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by individuals that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.
(C) Invoices may be submitted once each month (or at more frequent intervals, if approved by the Contracting Officer) to the Contracting Officer or the authorized representative.
(D) When requested by the Contracting Officer or the authorized representative, the Contractor shall substantiate invoices (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment, individual daily job timecards, records that verify the employees meet the qualifications for the labor categories specified in the contract, or other substantiation specified in the contract.
(E) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis.
( ) If no overtime rates are provided in the Schedule and the Contracting Officer approves overtime work in advance, overtime rates shall be 1 negotiated.
( ) Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract.2
( ) If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved 3 by the Contracting Officer.
(ii) .Materials
(A) If the Contractor furnishes materials that meet the definition of a commercial product at FAR 2.101, the price to be paid for such materials shall not exceed the Contractor's established catalog or market price, adjusted to reflect the-
( ) Quantities being acquired; and1
( ) Any modifications necessary because of contract requirements.2
(B) Except as provided for in paragraph (i)(1)(ii)(A) and (D)(2) of this clause, the Government will reimburse the Contractor the actual cost of materials (less any rebates, refunds, or discounts received by the contractor that are identifiable to the contract) provided the Contractor-
( ) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or1
( ) Makes these payments within 30 days of the submission of the Contractor's payment request to the Government and such payment is in 2 accordance with the terms and conditions of the agreement or invoice.
(C) To the extent able, the Contractor shall-
( ) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and1
( ) Give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that are identifiable to the contract.2
(D) Unless listed below, other direct and indirect costs will not be reimbursed.
( ) . The Government will reimburse the Contractor on the basis of actual cost for the following, provided such costs comply with 1 Other direct costs the requirements in paragraph (i)(1)(ii)(B) of this clause: [Insert each element of other direct costs (e.g., travel, computer usage charges, etc. ____ Insert "None" if no reimbursement for other direct costs will be provided. If this is an indefinite delivery contract, the Contracting Officer may insert "Each order must list separately the elements of other direct charge(s) for that order or, if no reimbursement for other direct costs will be provided, insert 'None'".]
( . The Government will reimburse the Contractor for indirect costs on a pro-2) Indirect costs (material handling, subcontract administration, etc.)
rata basis over the period of contract performance at the following fixed price: [Insert a fixed amount for the indirect costs and payment schedule. ____ Insert "$0" if no fixed price reimbursement for indirect costs will be provided. (If this is an indefinite delivery contract, the Contracting Officer may insert "Each order must list separately the fixed amount for the indirect costs and payment schedule or, if no reimbursement for indirect costs, insert 'None')."]
(2) . The total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Total cost Schedule. The Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during the performance of this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performance of this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the revised estimate of the total amount of effort to be required under the contract.
(3) . The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and Ceiling price the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.
(4) . At any time before final payment under this contract, the Contracting Officer (or authorized representative) will have Access to records access to the following (access shall be limited to the listing below unless otherwise agreed to by the Contractor and the Contracting Officer):
(i) Records that verify that the employees whose time has been included in any invoice meet the qualifications for the labor categories specified in the contract;
(ii) For labor hours (including any subcontractor hours reimbursed at the hourly rate in the schedule), when timecards are required as substantiation for payment-
(A) The original timecards (paper-based or electronic);
(B) The Contractor's timekeeping procedures;
(C) Contractor records that show the distribution of labor between jobs or contracts; and
(D) Employees whose time has been included in any invoice for the purpose of verifying that these employees have worked the hours shown on the invoices.
(iii) For material and subcontract costs that are reimbursed on the basis of actual cost-
(A) Any invoices or subcontract agreements substantiating material costs; and
(B) Any documents supporting payment of those invoices.
(5) . Each payment previously made shall be subject to reduction to the extent of amounts, on preceding Overpayments/Underpayments invoices, that are found by the Contracting Officer not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. The Contractor shall promptly pay any such reduction within 30 days unless the parties agree otherwise. The Government will pay any such increases within 30 days, unless the parties agree otherwise. The Contractor's payment will be made by check. If the Contractor becomes aware of a duplicate invoice payment or that the Government has otherwise overpaid on an invoice payment, the Contractor shall-
(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-
(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);
(B) Affected contract number and delivery order number, if applicable;
(C) Affected line item or subline item, if applicable; and
(D) Contractor point of contact.
(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.
(6) .Interest
(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury, as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, and then at the rate applicable for each six-month period as established by the Secretary until the amount is paid.
(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.
(iii) The Contracting Officer will issue a final decision if-
(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt in a timely manner;
(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or
(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer.
(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.
(v) Amounts shall be due at the earliest of the following dates:
(A) The date fixed under this contract.
(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.
(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on-
(A) The date on which the designated office receives payment from the Contractor;
(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or
(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.
(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR part 32 in effect on the date of this contract.
(viii) Upon receipt and approval of the invoice designated by the Contractor as the "completion invoice" and supporting documentation, and upon compliance by the Contractor with all terms of this contract, any outstanding balances will be paid within 30 days unless the parties agree otherwise. The completion invoice, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 1 year (or such longer period as the Contracting Officer may approve in writing) from the date of completion.
(7) . The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of Release of claims final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions:
(i) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible to exact statement by the Contractor.
(ii) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.
(iii) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.
(8) . The Government will make payment in…
This is the start of the file's text. The full file is on GovTribe.