Solicitation Package 12034320Q0075.pdf

PDF 786 KB Posted

Attached to
CUSTER GALLATIN NATIONAL FOREST - Quake Lake Visitor Center Roof Replacement
Solicitation number
12034320Q0075
Issued by

View the file

Other files

File Type Posted
Amendment 1 SF30.pdf PDF
J-1 Wage Determination.pdf PDF
J-3 Project Drawings Pictures Map.pdf PDF
J-2 Experience Questionaire.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12034320Q0075

1. REQUEST NO.

5a. ISSUED BY

NAME

a. NAME

c. STREET ADDRESS

d. CITY

10. PLEASE FURNISH QUOTATIONS TO

THE ISSUING OFFICE IN BLOCK 5a ON

OR BEFORE CLOSE OF BUSINESS (Date)

2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.

UNDER BDSA REG. 2

AND/OR DMS REG.1

RATING

6. DELIVERY BY (Date)

7. DELIVERY

9. DESTINATION

a. NAME OF CONSIGNEE

PAGE OF PAGES

5b. FOR INFORMATION CALL: (No collect calls)

TELEPHONE NUMBER

AREA CODE NUMBER

8. TO:

b. COMPANY

e. STATE f. ZIP CODE

c. CITY

d. STATE e. ZIP CODE

IMPORTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.

11. SCHEDULE (Include applicable Federal, State and local taxes)

THIS RFQ

REQUEST FOR QUOTATION

(THIS IS NOT AN ORDER)

IS IS NOT A SMALL BUSINESS SET ASIDEX

03/19/2020 994882

1 1

3710 FALLON STREET STE C

BOZEMAN MT 59718

USDA FOREST SERVICE

05/01/2020

USDA FOREST SERVICE

b. STREET ADDRESS

Earthquake Lake VIC

317 US-287

Cameron

MT 59720

406 624-3443WESLEY DUDLEY

04/13/2020 1700 MD

FOB DESTINATION

OTHER

(See Schedule)X

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

Quake Lake VIC Roof Replacement 2020

0001 Quake Lake VIC Roof Replacement 2020

Delivery: 05/01/2020

12. DISCOUNT FOR PROMPT PAYMENT

a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS

NUMBER PERCENTAGE

NOTE: Additional provisions and representations

13. NAME AND ADDRESS OF QUOTER

b. STREET ADDRESS

c. COUNTY

d. CITY e. STATE f. ZIP CODE

14. SIGNATURE OF PERSON AUTHORIZED TO

SIGN QUOTATION

16. SIGNER

a. NAME (Type or print)

c. TITLE (Type or print)

a. NAME OF QUOTER

AREA CODE

NUMBER

15. DATE OF QUOTATION

b. TELEPHONE are are not attached

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition not usable

STANDARD FORM 18 (REV. 6-95)

Prescribed by GSA - FAR (48 CFR) 53.215-1(a)

CUSTER GALLATIN

NATIONAL FOREST

EARTHQUAKE LAKE VISITOR CENTER

MEMBRANE ROOF REPLACEMENT

United States Department of Agriculture

II' NTDISTA1E IICl4WAY .. U.S. IIQ/1E

Forest Service-Region One Custer Gallatin National Forest Hebgen Lake Ranger District

Quake Lake VIC Roof Replacement

JIONTANA

I'", ' '

@ STA � 01lf£R ROU!E

-� '-------, I I : PR JECT I

I LOCATlON :·------------

- Joa.c Date

HORTH DAKOTA

DAKOTA

RFQ: 12034320Q0075

Quake Lake Visitor Center Roof Replacement

Custer Gallatin National Forest, Hebgen Lake Ranger District

Custer Gallatin National Forest, Hebget Lake Ranger District

SECTION B – SERVICES AND PRICES

B- 1 - SCHEDULE OF ITEMS

Main Visitor Center Roof: Original Building and Addition

Pay Item

Number Description

Method of

Measurement

Pay

Unit

Estimated

Quantity Unit Price Total Price

01000

Mobilization Lump Sum LSQ 1

022210 Building Demolition Square Foot CQ 4817

075323 EPDM Roofing

Installation Square Foot CQ 4817

075323.1 Wet insulation replacement

Square Foot AQ 50

Total

Option Item 1: Bathroom Roof

Pay Item

Number Description

Method of

Measurement

Pay

Unit

Estimated

Quantity Unit Price Total Price

01000

Mobilization Lump Sum LSQ 1

022210 Building Demolition Square Foot CQ 1300

075323 EPDM Roofing

Installation Square Foot CQ 1300

075323.1 Wet insulation replacement

Square Foot AQ 50

Total

B- 2 – NOTES TO QUOTER

Payment for bond premiums in accordance with Clause 52.232-5, Payment under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 01000 Mobilization.

One contract will be awarded to the responsive and responsible contractor’s quote offering the best value to the Government. Prospective contractors must quote on all items. Only unit prices to the nearest $0.01 will be accepted.

This is a Request for Quotation (RFQ); therefore, no public opening will be held. The results will not be made public prior to award. Quotes submitted in response to this RFQ will not be returned, but will be retained by the U.S. Forest Service for official record purposes. The RFQ does not commit the Government to pay any costs incurred in the preparation or the submission of this quote, or to make any award.

The Forest Service utilizes an electronic invoice system called Invoice Processing Platform (IPP). Awardee is required to set-up an account at www.ipp.gov in order to submit invoices.

http://www.ipp.gov/

Notice to Quoter(s)/Supplier(s): Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.

Price Quotation furnished by:

Name: _______________________________ Phone: ____________________________

Address: ______________________________ Cell: ____________________________

______________________________ FAX: ____________________________

E-Mail: ________________________________ DUNS # ___________________________

SECTION C - DESCRIPTION AND SPECIFICATIONS

C.1 PROJECT DESCRIPTION AND LOCATION

C.1.1 Intent of Contract - The intent of the contract is to provide for the completion of the work described below. The precise details of performing the work are not stipulated, except as considered essential for the successful completion of the work.

C1.2 Scope of Contract - Unless otherwise provided, furnish all labor, materials, equipment, tools, transportation, and supplies to perform all work required to complete the project. The contractor shall be responsible for all building measurements to determine necessary quantities and sizes of material to be supplied. The building measurement is for quoting purposes only.

Quoting measurements – Quake Lake VIC original building (round) – 3,117 Roof Square Feet.

Quake Lake VIC Addition – 1,700 Roof Square Feet Subtotal: 4817 SF Option Item 1:

Quake Lake Bathroom: 1,300 Roof Square Feet.

Total: 6,117 SF

Work shall consist of removing and disposing of the existing EPDM roof system and furnishing and installing a new EPDM roof system on the Quake Like Visitor Center and Bathroom. Contractor shall work with the manufacturer’s technical representatives to ensure their work will meet all requirements for a warranted job.

Contractor shall be responsible to barricade off area to ensure the safety of those near the work zone.

01000, Mobilization: Work shall consist of preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; and for other work and operations that must be performed or costs incurred prior to beginning work on the various items on the project site.

022210, Building Demolition: The Contractor shall remove all material to the roof framing. Dispose of all material legally off Government property. The Contractor will inspect the sheeting, vents, skylights, drainage scuppers and general condition of the roof and inform the CO if any components are damaged or in need of replacement before the new roof system is put on. All nails, staples and any protruding objects will be removed as part of demolition.

Metal facia and trim may be cleaned and re-used or replaced with new facia and trim.

See Section 070150.19 - PREPARATION FOR REROOFING of the Specifications for removal procedures and recommendations for cleanup. Contractor shall be responsible to barricade off area to ensure the safety of those near the work zone and comply with all OSHA Regulations.

075323, EPDM Roofing Installation: The work shall consist of furnishing and installing new EPDM roofing membrane system as specified in section 075323 of the specifications on the Quake Lake Visitor Information Center.

C.1.3 Project Location – This project is located on US-287 N, 26 miles Northwest of the Hebgen Lake Ranger District Office of the Custer Gallatin National Forest in West Yellowstone, Montana.

FROM WEST YELLOWSTONE, MT TRAVEL NORTH ON US-191 FOR 8 MILES. TURN WEST ON US-287 TOWARD

ENNIS; TRAVEL 19 MILES TO EARTHQUAKE LAKE VISITOR CENTER.

FROM ENNIS, MT TRAVEL SOUTH ON US-287 FOR 43 MILES TO EARTHQUAKE LAKE VISITOR CENTER.

FROM BOZEMAN, MT TRAVEL WEST ON US-191/MT-84 FOR 7 MILES. CONTINUE STRAIGHT ON MT-84 FOR 29 MILES TO NORRIS, MT. TURN LEFT ON US-287 TOWARD ENNIS FOR 17 MILES. TURN LEFT TO STAY ON US-

287 FOR 44 MILES TO EARTHQUAKE LAKE VISITOR CENTER.

C.1.4 Magnitude of Construction per FAR 36.204(b) - Between $25,000.00 and $100,000.00.

C.1.5 Pre-contract Tour - No pre-contract tour of the project will be scheduled or conducted.

Prospective contractors wishing to visit the site on their own may obtain direction information by contacting Zac Hiedeman at the Forest Service Supervisor’s Office, Custer Gallatin National Forest, Bozeman, Montana, telephone (406) 587-6729.

C.1.6 Start Work - It is estimated that work will begin in May 2020.

C.1.7 Period of Performance – Contract to be completed in 30 calendar days.

C.1.8 Government Furnished Materials – None.

C.1.9 Submittals- The contractor shall submit a Work Schedule, Safety Plan, and all Materials to be used on this

Project.

C.1.10 Disturbances –No work shall be permitted on weekends or Federal Holidays.

C.1.11 Staging Area - The Contractor shall coordinate with the COR on a staging area location. The Contractor shall operate all equipment and store, transport, and handle materials in a manner that will not damage the existing roads, parking lots, and landscaping. Access must be maintained to the residence, and other facilities on the site.

C.1.13 Potable Water- The contractor may use the water on-site.

C.1.14 Wastewater Facilities – The Contractor may use the restrooms on site. The Contractor shall be responsible for cleaning and/repairing the restroom if necessary as a result of the Contractor’s operations.

C.1.15 Electrical – The Contractor may use on-site electrical service for operation of small power tools.

C.2 – CLEANUP AND DISPOSAL

C.2.1 Cleanup and Disposal – The Contractor shall be responsible for solid waste disposal. The Contractor shall at all times keep the area in a clean, neat, and orderly condition. Construction related debris, including but not limited to used motor oil, oil cans, grease cartridges and refuse shall be removed promptly from the site and disposed of in a lawful manner off National Forest System lands. Fees for the use of landfills or transfer stations shall be paid for by the Contractor if there is a charge.

C.3 – SECURITY AND PROTECTION

C.3.1 Security and Protection – Security is the responsibility of the Contractor. The Contractor shall be responsible for protecting all equipment and supplies for use on the project and stored on the site. The Contractor shall be responsible for all costs required to provide such protection.

The Contractor shall complete sequences of construction activity in order to prevent damage to equipment, material, and articles incorporated into the work covered by this contract.

C-4 – OTHER RELATED DOCUMENTS AND DRAWINGS

C4.1 The following CSI formatted specifications are part of this solicitation and any resulting contract.

Section Description

01000 Mobilization

01025 Measurement and Payment

01400 Quality Control and Quantity Measurement

022210 BUILDING DEMOLITION

070150.19 PREPARATION FOR REROOFING

075323 ETHYLENE-PROPYLENE-DIENE-MONOMER

(EPDM) ROOFING

076200 SHEET METAL FLASHING AND TRIM

SECTION 01000

MOBILIZATION

PART I: GENERAL

1.1 SUMMARY

A. Section Includes: Preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed or costs incurred prior to beginning work on the various items on the project site. This specification does not include moves between project sites.

PART II: PRODUCTS

(There are no applicable requirements.)

PART III: EXECUTION

(There are no applicable requirements.)

PART IV: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT:

A. Units: Progress payments will be made as follows:

1. When 5% of the original Contract amount is earned from other quote items, 50% of the amount quote for mobilization or 5% of the original Contract amount, whichever is lesser, will be paid.

2. When 10% of the original Contract amount is earned from other quote items, 100% of the amount quotex for mobilization or 10% of the original Contract amount, whichever is lesser, will be paid.

3. Upon completion of work for the project, payment of the amount quoted for mobilization in excess of 10% of the original Contract amount will be paid.

4. The total sum of all payments shall not exceed the original Contract amount quoted for mobilization, regardless of the fact that the Contractor may have shut down the work on the project or moved equipment away from the project and then back again.

4.2 BASIS OF PAYMENT:

Payment: No direct payment for moves between project sites will be made. The Contractor shall include consideration for moves between project sites in the quote price for other items of the Contract. Prices and payment will be full compensation for the work described in this section. Payment will be made under:

Pay Item Pay Unit

(01000) Mobilization. . . . . . . . . . . . . . . . . Lump Sum

END OF SECTION

SECTION 01025

MEASUREMENT AND PAYMENT

PART I - GENERAL

1.1 Measurement and Payment - Measurement and payment for contract work will be made only for and under those pay items included in the SCHEDULE OF ITEMS. All other work and materials will be considered as included in the payment for items shown.

When more than one class, size, or thickness is specified in the SCHEDULE OF ITEMS for any pay item, suffixes will be added to the item number to differentiate between items to be quoted.

1.2 Determination of Quantities - The following methods of measurement are used to determine contract quantities for payment.

For individual construction items, longitudinal and lateral measurements for area computations will be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for seeding, mulching, geotextiles, netting, erosion control blankets, and sodding will be along slope lines.

Structures will be measured according to neat lines SHOWN ON THE DRAWINGS or as altered by the COR in writing to fit field conditions.

For standard manufactured items, such as fence, wire, plates, rolled shapes, pipe conduits, etc., identified by gauge, weight, section dimensions, etc., such identification shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances will be accepted.

1.3 Units of Measurement - Payment will be by units defined and determined according to U.S. Standard measure as follows:

A. Acre – Make longitudinal and transverse measurements for area computations horizontally.

B. Cubic Yard - A measurement computed by one of the following methods:

1. Excavation, Embankment, or Borrow - The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.

2. Material in Place or Stockpile - The measurement computed with dimensions of the in-place material.

3. Material in the Delivery Vehicle - The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.

C. Cubic Yard Mile - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material 1 mile.

D. Each - One complete unit, which may consist of one or more parts.

E. Gallon – The quantity may be measured by any of the following methods:

1. Measured volume container.

2. Metered volume. Use an approved metering system

3. Commercially packaged volumes.

F. Hour – Measurement will be for the actual number of hours ordered and performed by the Contractor.

G. Linear Foot – Measure from end to end, parallel to the base or foundation being measured, or horizontal.

H. MFBM - One thousand board feet measure based on nominal widths, thickness, and extreme usable length of each piece of lumber or timber actually incorporated in the job.

I. Mile – Measure horizontal along the centerline of each roadway, approach road, or ramp.

J. Pound – If sacked or packaged material is furnished, the net weight as packed by the manufacturer may be used.

K. Square Foot - Measure on a plane parallel to the surface being measured or horizontal.

L. Square Yard – Measure on a plane parallel to the surface being measured or horizontal.

M. Station - One hundred linear feet measured horizontally.

N. Station Yard - A combination of linear and volumetric measurement meaning the movement of a cubic yard of material one station.

O. Thousand Gallons Mile - A combination of linear and volumetric measurement meaning the movement of

1,000 gallons of material 1 mile.

P. Ton - Short ton consisting of 2,000 pounds.

Q. Ton Mile - A combination of linear and weight measurement meaning the movement of 1 ton of material 1 mile.

1.4 Methods of Measurement - One of the following methods of measurement for determining final payment is

DESIGNATED on the SCHEDULE OF ITEMS for each pay item:

A. Contract Quantities (CQ) AND Design Quantities (DQ) - These quantities denote the final number of units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

1. As a result of changes in the work authorized by the Contracting Officer.

2. As a result of the Contracting Officer determining that errors exist in the original design data used to determine designed quantities that cause a pay item to change by more than 15 percent.

3. As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design data used to determine design quantities that cause a pay item total to change by more than 15%. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

B. Staked Quantities (SQ) - These quantities are determined from staked measurements prior to construction.

C. Actual Quantities (AQ) - These quantities are determined from measurements of completed work.

D. Vehicle Quantities (VQ) - These quantities are measured or weighed in hauling vehicles.

E. Lump Sum Quantities (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They will not be measured.

PART II - PRODUCTS (Not Applicable)

PART III - EXECUTION (Not Applicable) END OF SECTION

SECTION 01400

QUALITY CONTROL AND QUANTITY MEASUREMENT

PART I - GENERAL

1.1 Scope - This work shall consist of providing quality control in conformance with the Inspection of Construction provisions of this contract to ensure compliance with the drawings, specifications, and provisions of the contract, and measuring the quantities of completed work in conformance with the provisions of the applicable specifications. The Contractor shall provide all personnel, equipment, tests, and reports necessary to meet the requirements of this specification.

1.2 Measurement and Payment - No separate payment will be made for the work included under this section.

Payment for this work is considered incidental to other items of work.

PART II - PRODUCTS (Not Applicable)

PART III – EXECUTION (Not Applicable)

END OF SECTION

SECTION 022210 - BUILDING DEMOLITION

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes demolition and removal of the following:

1. Buildings and structures.

2. Site improvements [including site utilities].

1.2 DEFINITIONS

A. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and salvaged or recycled.

B. Remove and Salvage: Detach items from existing construction and deliver them to the Contracting Officer (CO) or preserve for re-use.

C. Existing to Remain: Existing items of construction that are not to be removed and that are not otherwise indicated to be removed, removed and salvaged, or recycled.

1.3 MATERIALS OWNERSHIP

A. Historic items, relics, and similar objects including, but not limited to, cornerstones and their contents, commemorative plaques and tablets, antiques, and other items of interest or value to the CO that may be encountered during building demolition remain the Government’s property. Carefully remove and salvage each item or object in a manner to prevent damage and deliver promptly to the CO.

B. Roof Antennas: Existing roof antennas will be removed by Government prior to Contractor starting work.

1.4 SUBMITTALS

A. Qualification Data: For the following:

1. Demolition firm.

2. Roofing installation firm.

B. Proposed Protection and Control Measures: Submit statement or drawing that indicates the measures proposed for use, proposed locations, and proposed time frame for their operation. Identify options if proposed measures are later determined to be inadequate. Include measures for the following:

1. Environmental protection.

2. Dust control.

3. Noise control.

C. Schedule of Building Demolition Activities: Indicate detailed sequence of demolition and removal work, with starting and ending dates for each activity, interruption of utility services, and locations of temporary protection and means of egress.

D. Pre-demolition Photographs: Show existing conditions of adjoining construction and site improvements that might be misconstrued as damage caused by building demolition operations. Submit before Work begins.

E. Landfill Records: Indicate receipt and acceptance of hazardous wastes by a landfill facility licensed to accept hazardous wastes.

1.5 QUALITY ASSURANCE

A. Regulatory Requirements: Comply with governing EPA notification regulations before beginning demolition.

Comply with hauling and disposal regulations of authorities having jurisdiction.

B. Standards: Comply with ANSI A10.6 and NFPA 241.

C. Pre-demolition Conference: Conduct conference at Project site.

1.6 PROJECT CONDITIONS

A. The Government will occupy the building during demolition. Conduct building demolition so Government operations will not be disrupted.

1. Provide not less than 72 hours' notice to CO of activities that will affect Government operations.

2. Maintain access to existing walkways, exits, and other adjacent occupied or used facilities.

a. Do not close or obstruct walkways, exits, or other occupied or used facilities without written permission from authorities having jurisdiction.

B. Government assumes no responsibility for buildings and structures to be demolished.

1. The Government as far as practical will maintain conditions existing at time of inspection for quoting purpose.

2. Before building demolition, the Government will remove the following items:

a. Rooftop satellite and antenna.

C. Hazardous Materials: It is not expected that hazardous materials will be encountered in the Work.

1. The Government before start of the Work will remove hazardous materials.

2. If materials suspected of containing hazardous materials are encountered, do not disturb; immediately notify the CO. The Government under a separate contract will remove hazardous materials.

D. Hazardous Materials: Hazardous materials are present in buildings and structures to be demolished. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present.

1. Hazardous material remediation is specified elsewhere in the Contract Documents.

2. Do not disturb hazardous materials or items suspected of containing hazardous materials except under procedures specified elsewhere in the Contract Documents.

3. The Government will provide material safety data sheets for materials that are known to be present in buildings and structures to be demolished because of building operations or processes performed there.

E. Storage or sale of removed items or materials on-site is not permitted.

1.7 COORDINATION

A. Arrange demolition schedule so as not to interfere with the Government’s on-site operations.

PART 2 - EXECUTION

2.1 EXAMINATION

A. Survey existing conditions and correlate with requirements indicated to determine extent of building demolition required.

B. Review Project Record Documents of existing construction provided by CO. Government does not guarantee that existing conditions are same as those indicated in Project Record Documents.

C. Inventory and record the condition of items to be removed and salvaged.

D. When unanticipated mechanical, electrical, or structural elements are encountered, investigate and measure the nature and extent of the element. Promptly submit a written report to CO.

E. After roofing demolition, the Government will perform an engineering survey of condition of building to determine whether removing any element might result in structural deficiency or unplanned collapse of any portion of structure or adjacent structures during building demolition operations.

F. Verify that hazardous materials have been remediated before proceeding with building demolition operations.

2.2 PREPARATION

A. Refrigerant: Remove and store refrigerant according to 40 CFR 82 and regulations of authorities having jurisdiction.

B. Existing Utilities: Locate, identify, and protect utilities serving buildings and structures to be demolished.

C. Removed and Salvaged Items: Comply with the following:

1. Clean salvaged items of dirt and demolition debris.

2. Preserve salvaged items for re-use.

2.3 PROTECTION

A. Existing Facilities: Protect adjacent walkways, loading docks, building entries, and other building facilities during demolition operations.

B. Existing Items to Remain: Protect construction indicated to remain against damage and soiling during demolition.

When permitted by CO, items may be removed to a suitable, protected storage location during demolition and reinstalled in their original locations after demolition operations are complete.

C. Existing Utilities: Maintain utility services indicated to remain and protect them against damage during demolition operations.

1. Do not interrupt existing utilities serving adjacent occupied or operating facilities unless authorized in writing by CO and authorities having jurisdiction.

2. Provide temporary services during interruptions to existing utilities, as acceptable to the Government and to authorities having jurisdiction.

a. Provide at least 72 hours' notice to CO if shutdown of service is required during changeover.

D. Temporary Protection: Erect temporary protection, such as walks, fences, railings, canopies, and covered passageways, where required by authorities having jurisdiction, and as indicated. Comply with requirements in Division 1 Section "Temporary Facilities and Controls."

1. Protect existing site improvements, appurtenances, and landscaping to remain.

2. Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain.

3. Provide protection to ensure safe passage of people around building demolition area and to and from occupied portions of adjacent buildings and structures.

4. Protect walls, windows, roofs, and other adjacent exterior construction that are to remain and that are exposed to building demolition operations.

2.4 DEMOLITION, GENERAL

A. General: Demolish indicated existing roofing completely. Use methods required to complete the Work within limitations of governing regulations and as follows:

1. Do not use cutting torches until work area is cleared of flammable materials. Maintain portable fire-suppression devices during flame-cutting operations.

2. Maintain adequate ventilation when using cutting torches.

3. Locate building demolition equipment and remove debris and materials so as not to impose excessive loads on supporting walls, floors, or framing.

B. Engineering Surveys: Perform surveys as the Work progresses to detect hazards that may result from building demolition activities.

C. Site Access and Temporary Controls: Conduct building demolition and debris-removal operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Do not close or obstruct streets, walks, walkways, or other adjacent occupied or used facilities without permission from CO and authorities having jurisdiction. Provide alternate routes around closed or obstructed traffic ways if required by authorities having jurisdiction.

2. Use water mist and other suitable methods to limit spread of dust and dirt. Comply with governing environmental-protection regulations. Do not use water when it may damage adjacent construction or create hazardous or objectionable conditions, such as ice, flooding, and pollution.

2.5 MECHANICAL DEMOLITION

A. Remove debris from elevated portions by chute, hoist, or other device that will convey debris to grade level in a controlled descent.

2.6 REPAIRS

A. General: Promptly repair damage to adjacent construction caused by building demolition operations.

B. Where repairs to existing surfaces are required, patch to produce surfaces suitable for new materials.

C. Restore exposed finishes of patched areas and extend restoration into adjoining construction in a manner that eliminates evidence of patching and refinishing.

2.7 RECYCLING DEMOLISHED MATERIALS

A. General: Separate recyclable demolished materials from other demolished materials to the maximum extent possible. Separate recyclable materials by type.

1. Transport recyclable materials off Government’s property and legally dispose of them.

2.8 CLEANING

A. Clean adjacent structures and improvements of dust, dirt, and debris caused by building demolition operations.

Return adjacent areas to condition existing before building demolition operations began.

END OF SECTION 022210

SECTION 070150.19 - PREPARATION FOR REROOFING

1.1 SUMMARY

A. Section Includes:

1. Full tear-off of roof areas indicated.

2. Removal of base flashings.

1.2 DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and

Waterproofing Manual" apply to work of this Section.

B. Full Roof Tear-Off: Removal of existing roofing system from deck.

1.3 ACTION SUBMITTALS

A. Product Data: For each type of product.

1.4 INFORMATIONAL SUBMITTALS

A. Photographs or Videotape: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces that might be misconstrued as having been damaged by reroofing operations. Submit before Work begins.

1.5 QUALITY ASSURANCE

A. Reroofing Conference: Conduct conference at Project site.

1.6 FIELD CONDITIONS

A. Owner will occupy portions of building immediately below reroofing area. Conduct reroofing so Owner's operations are not disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect

Owner's operations.

1. Coordinate work activities daily with Owner so Owner can place protective dust and water-leakage covers over sensitive equipment and furnishings, shut down HVAC and fire-alarm or -detection equipment if needed, and evacuate occupants from below work area.

2. Before working over structurally impaired areas of deck, notify Owner to evacuate occupants from below affected area. Verify that occupants below work area have been evacuated before proceeding with work over impaired deck area.

B. Protect building to be reroofed, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from reroofing operations.

C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

D. Limit construction loads on roof to 300 POUNDS POINT LOAD for rooftop equipment wheel loads and 150

PSF for uniformly distributed loads.

E. Weather Limitations: Proceed with reroofing preparation only when existing and forecasted weather conditions permit Work to proceed without water entering existing roofing system or building.

PART 2 - PRODUCTS

2.1

A.

INFILL AND REPLACEMENT MATERIALS

Use infill materials matching existing roofing system materials unless otherwise indicated.

2.2 COVER BOARDS

A. Cover Board: ASTM C 1177/C 1177M, glass-mat, water-resistant gypsum substrate; ½ inch, factory primed.

1. Manufacturers: Subject to compliance with requirements, provide products by the following:

a. Georgia-Pacific Building Products, Dens-Deck.

B. Fasteners: Factory-coated steel fasteners, No. 12 or No. 14, and metal or plastic plates listed in FM Global's

"Approval Guide," designed for fastening cover boards to deck and acceptable to new roofing system manufacturer.

2.3 AUXILIARY REROOFING MATERIALS

A. General: Use auxiliary reroofing preparation materials recommended by roofing system manufacturer for intended use and compatible with components of existing and new roofing system.

PART 3 - EXECUTION

3.1 PREPARATION

A. Shut off rooftop utilities and service piping before beginning the Work.

B. Protect existing roofing system that is not to be reroofed.

C. Coordinate with Owner to shut down air-intake equipment in the vicinity of the Work. Cover air- intake louvers before proceeding with reroofing work that could affect indoor air quality or activate smoke detectors in the ductwork.

D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday. Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.

3.2 ROOF TEAR-OFF

A. General: Notify Owner each day of extent of roof tear-off proposed for that day and obtain authorization to proceed.

B. Full Roof Tear-Off: Where indicated, remove existing roofing and other roofing system components down to the existing framing.

1. Remove mechanical fasteners used for existing roof membrane from deck.

3.3 DECK PREPARATION

A. Inspect deck after tear-off of roofing system.

B. If broken or loose fasteners that secure deck panels to one another or to structure are observed, or if deck appears or feels inadequately attached, immediately notify Contracting Officer. Do not proceed with installation until directed by Contracting Officer.

C. If deck surface is unsuitable for receiving new roofing or if structural integrity of deck is suspect, immediately notify Contracting Officer. Do not proceed with installation until directed by Contracting Officer.

3.4 INFILL MATERIALS INSTALLATION

A. Immediately after roof tear-off, and inspection and repair, if needed, of deck, fill in tear-off areas to match existing roofing system construction.

B. Install new roofing patch over roof infill area. If new roofing is installed the same day tear-off is made, roofing patch is not required.

3.5 COVER BOARD PREPARATION

A. Remove blisters, ridges, buckles, and other substrate irregularities from existing roofing that inhibit new cover boards from conforming to substrate.

1. Broom clean existing substrate.

2. Verify that existing substrate is dry before proceeding with installation of cover boards. Spot check substrates with an electrical capacitance moisture-detection meter.

3. Remove materials that are wet or damp.

3.6 BASE FLASHING REMOVAL

A. Remove existing base flashings. Clean substrates of contaminants, such as asphalt, sheet materials, dirt, and debris.

B. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings specified in Section 076200 "Sheet Metal Flashing and Trim."

C. Remove existing parapet sheathing and replace with new parapet sheathing to comply with Section 061600

"Sheathing." If parapet framing, wood blocking, curbs, or nailers have deteriorated, immediately notify

Contracting Officer.

D. When directed by Contracting Officer, replace parapet framing, wood blocking, curbs, and nailers to comply with Section 061053 Miscellaneous Rough Carpentry."

3.7 COVER BOARD INSTALLATION

A. Install cover boards with long joints in continuous straight lines and end joints staggered between rows.

Loosely butt cover boards together and fasten to deck.

1. Tape joints of cover boards if required by roofing manufacturer.

B. Fasten cover boards to resist wind-uplift pressure at corners, perimeter, and field of roof specified in Section

075323 "Ethylene-Propylene-Diene-Monomer (EPDM) Roofing."

3.8 DISPOSAL

A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

B. Transport and legally dispose of demolished materials off Owner's property.

C.

END OF SECTION 070150.19

SECTION 075323 - ETHYLENE-PROPYLENE-DIENE-MONOMER (EPDM) ROOFING

A. Section Includes:

1. Adhered ethylene-propylene-diene-monomer (EPDM) roofing system.

2. Roof insulation.

3. Metal Accessories.

1.2

RELATED SECTIONS

A. Section 061053 – Miscellaneous Rough Carpentry

B. Section 070150.19 – Preparation for Re-Roofing

C. Section 074646 - Fiber-Cement Siding: Soffit and fascia trim items associated with roofing.

D. Section 076200 – Sheet Metal Flashing and Trim: Counterflashing, hanging gutters, downspouts, parapet scuppers, conductor heads and splash pans.

1.3

DEFINITIONS

A. Roofing Terminology: Definitions in ASTM D 1079 and glossary of NRCA's "The NRCA Roofing and Waterproofing Manual" apply to work of this Section.

1.4

PREINSTALLATION MEETINGS

A. Pre-installation Roofing Conference: Conduct conference at Project site.

1.5

ACTION SUBMITTALS

A. Product Data: For each type of product.

B. Shop Drawings: For roofing system. Include plans, elevations, sections, details, and attachments to other work.

C. Samples for Verification: For the following products:

1. Sheet roofing, of color required.

1.6 INFORMATIONAL SUBMITTALS

A. Research/Evaluation Reports: For components of roofing system, from ICC-ES.

B. Sample Warranties: For manufacturer's special warranties.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: For roofing system to include in maintenance manuals.

1.8 QUALITY ASSURANCE

A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by roofing system manufacturer to install manufacturer's product and that is eligible to receive manufacturer's special warranty.

B. Perform pull-out tests to determine the number of attachments required for the mechanically attached roof insulation.

C. Flood Test: Perform flood test after installation, followed by thermal investigation the following evening. Minor leaks will show as colder where insulation is saturated.

1. Flood test to be performed by qualified testing firm.

1.9 WARRANTY

A. Special Warranty: Manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within specified warranty period.

1. Warranty Period: 20 years from date of Substantial Completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Source Limitations: Obtain components including roof insulation, adhesive, and fasteners for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested according to ASTM G 152, ASTM G 154, or ASTM G 155.

B. Impact Resistance: Roofing system shall resist impact damage when tested according to ASTM D 3746 or ASTM D 4272.

C. Wind Up-Lift: Roofing systems shall have an approval for wind up-lift classification as a complete system. Roof systems shall resist wind up-lift as required by IBC Section 1609.

D. Exterior Fire-Test Exposure: Class C; for application and roof slopes indicated; testing by a qualified testing agency. Identify products with appropriate markings of applicable testing agency.

E. Fire-Resistance Ratings: Comply with fire-resistance-rated assembly designs indicated.

Identify products with appropriate markings of applicable testing agency.

2.3 EPDM ROOFING

A. EPDM: ASTM D 4637, Type II, scrim or fabric internally reinforced, uniform, flexible EPDM sheet.

1. Basis-of-Design Product: Subject to compliance with requirements, provide

Firestone Building Products; RubberGard EPDM or a comparable product by one of the following:

a. GAF Materials Corporation.

b. GenFlex Roofing Systems.

c. Johns Manville; a Berkshire Hathaway company.

2. Thickness: 60 mils, nominal.

3. Exposed Face Color: White.

2.4 AUXILIARY ROOFING MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with roofing.

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

B. Sheet Flashing: 60-mil-thick EPDM, partially cured or cured, according to application.

C. Bonding Adhesive: Manufacturer's standard, water based.

D. Seaming Material: Manufacturer's standard, synthetic-rubber polymer primer and 3-inch-wide minimum, butyl splice tape with release film.

E. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion- resistance provisions in FM Global 4470, designed for fastening membrane to substrate, and acceptable to roofing system manufacturer.

F. Miscellaneous Accessories: Provide lap sealant, water cutoff mastic, metal termination bars, metal battens, pourable sealers, preformed cone and vent sheet flashings, molded pipe boot flashings, preformed inside and outside corner sheet flashings, reinforced EPDM securement strips, T-joint covers, in-seam sealants, termination reglets, cover strips, and other accessories.

2.5 ROOF INSULATION

A. Existing insulation to remain. If wet insulation is encountered, immediately inform CO.

B. Composite Polyisocyanurate Board Insulation: ASTM C 1289, with factory-applied facing board on one major surface, as indicated below by type, and felt or glass-fiber mat facer on the other.

1. Basis-of-Design Product: Subject to compliance with requirements, provide

Firestone Building Products; ISOGARD HD Cover Board or comparable product.

C. Tapered Insulation: Provide factory-tapered insulation boards fabricated to slope of 1/4 inch per 12 inches (1:48) unless otherwise indicated.

D. Provide preformed saddles, crickets, tapered edge strips, and other insulation shapes where indicated for sloping to drain. Fabricate to slopes indicated.

2.6 INSULATION ACCESSORIES

A. Fasteners: Factory-coated steel fasteners and metal or plastic plates complying with corrosion- resistance provisions in FM Global 4470, designed for fastening roof insulation to substrate, and acceptable to roofing system manufacturer.

2.7 ASPHALT MATERIALS

A. Roofing Asphalt: ASTM D 312, Type III or Type IV.

B. Asphalt Primer: ASTM D 41/D 41M.

2.8 WALKWAYS

A. Flexible Walkways: Factory-formed, nonporous, heavy-duty, solid-rubber, slip-resisting, surface- textured walkway pads, approximately 3/16 inch thick and acceptable to roofing system manufacturer. (If Required)

2.9 METAL ACCESSORIES

A. Metal Roof Edging: Continuous metal edge member serving as termination of roof membrane and retainer for metal fascia; watertight with no exposed fasteners; mounted to roof edge nailer.

1. Wind Performance:

a. Membrane Pull-Off Resistance: 100 lbs/ft, minimum, when tested in accordance with ANSI/SPRI ES-1 Test Method RE-1, current edition.

b. Fascia Pull-Off Resistance: At least the minimum required when tested in accordance with ANSI/SPRI ES-1 Test Method RE-2, current edition.

c. Provide product listed in current Factory Mutual Research Corporation Approval Guide with at least FM 1-270 rating.

2. Description: Two-piece; 45 degree sloped galvanized steel sheet edge member securing top and bottom edges of formed metal fascia; EdgeGard.

4. Edge Member Height Above Nailer: 1-1/4 inches.

5. Fascia Material and Finish: 24 gage, 0.024 inch galvanized steel with Kynar 500 finish in manufacturer's standard color; matching concealed joint splice plates;

factory-installed pro- tective plastic film.

6. Length: 144 inches.

7. Functional Characteristics: Fascia retainer supports while allowing for free thermal cycling of fascia.

8. Aluminum Bar: Continuous 6063-T6 alloy aluminum extrusion with pre-punched slotted holes; miters welded; injection molded EPDM splices to allow thermal expansion.

9. Anchor Bar Cleat: 20 gage, 0.036 inch G90 coated commercial type galvanized steel with pre-punched holes.

10. Fasteners: Factory-provided corrosion resistant fasteners, with drivers; no exposed fasteners permitted.

11. Special Shaped Components: Provide factory-fabricated pieces necessary for complete installation, including miters, scuppers, and end caps; minimum 14 inch long legs on corner pieces.

12. Scuppers: Welded watertight.

13. Accessories: Provide matching brick wall cap, downspout, extenders, and other special fabrications as shown on the drawings.

B. Parapet Copings: Formed metal coping with galvanized steel anchor/support cleats for capping any parapet wall; watertight, maintenance free, without exposed fasteners; butt type joints with concealed splice plates; mechanically fastened as indicated.

1. Wind Performance:

a. At least the minimum required when tested in accordance with ANSI/SPRI ES-1 Test Method RE-3, current edition.

b. Provide product listed in current Factory Mutual Research Corporation Approval Guide with at least FM 1-90 rating.

2. Description: Coping sections allowed to expand and contract freely while locked in place on anchor cleats by mechanical pressure from hardened stainless steel springs factory attached to anchor cleats; 8 inch wide splice plates with factory applied dual non-curing sealant strips capable of providing watertight seal.

3. Material and Finish: 24 gage, 0.024 inch thick galvanized steel with Kynar 500 finish in manufacturer's standard color; matching concealed joint splice plates;

factory-installed protective plastic film.

4. Dimensions:

a. Wall Width: As indicated on the drawings.

b. Piece Length: Minimum 144 inches.

c. Curved Application: Factory fabricated in true radius.

5. Anchor/Support Cleats: 20 gage, 0.036 inch thick pre-punched galvanized cleat with 12 inch wide stainless steel spring mechanically locked to cleat at 72 inches on center.

6. Special Shaped Components: Provide factory-fabricated pieces necessary for complete installation, including miters, corners, intersections, curves, pier caps, and end caps; mini- mum 14 inch long legs on corner, intersection, and end pieces.

7. Fasteners: Factory-furnished; electrolytically compatible; minimum pull out resistance of 240 pounds for actual substrate used; no exposed fasteners.

PART 3 - EXECUTION

3.1 ROOFING INSTALLATION, GENERAL

A. Install roofing system according to roofing system manufacturer's written instructions.

B. Complete terminations and base flashings and provide temporary seals to prevent water from entering completed sections of roofing system at the end of the workday or when rain is forecast. Remove and discard temporary seals before beginning work on adjoining roofing.

C. Install roofing and auxiliary materials to tie in to existing roofing to maintain weather tightness of transition and to not void warranty for existing roofing system.

3.2 INSULATION INSTALLATION

A. Coordinate installing roofing system components, so insulation is not exposed to precipitation or left exposed at the end of the workday.

B. Install tapered insulation under area of roofing to conform to slopes indicated.

C. Mechanically Fastened Insulation: Install each layer of insulation and secure to deck using mechanical fasteners specifically designed and sized for fastening specified board-type roof insulation to deck type.

1. Fasten insulation to resist uplift pressure at corners, perimeter, and field of roof.

D. Install only as much insulation as can be covered with the completed roofing system before the end of the day's work or before the onset of inclement weather.

E. Lay roof insulation in courses parallel to roof edges.

F. Neatly and tightly fit insulation to all penetrations, projections, and nailers, with gaps not greater than 1/4 inch. Fill gaps greater than 1/4 inch with acceptable insulation. Do not leave the roofing membrane unsupported over a space greater than 1/4 inch.

3.3 ADHERED MEMBRANE ROOFING INSTALLATION

A. Adhere roofing over area to receive roofing according to membrane roofing system manufacturer's written instructions. Unroll membrane roofing and allow to relax before installing.

B. Accurately align roofing and maintain uniform side and end laps of minimum dimensions required by manufacturer. Stagger end laps.

C. Bonding Adhesive: Apply to substrate and underside of roofing at rate required by manufacturer, and allow to partially dry before installing roofing. Do not apply to splice area of roofing.

D. In addition to adhering, mechanically fasten roofing securely at terminations, penetrations, and perimeters.

E. Adhesive Seam Installation: Clean both faces of splice areas, apply splicing cement, and firmly roll side and end laps of overlapping roofing according to manufacturer's written instructions to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of roofing terminations.

1. Apply a continuous bead of in-seam sealant before closing splice if required by roofing system manufacturer.

F. Tape Seam Installation: Clean and prime both faces of splice areas, apply splice tape, and firmly roll side and end laps of overlapping roofing according to manufacturer's written instructions to ensure a watertight seam installation. Apply lap sealant and seal exposed edges of roofing terminations.

G. Repair tears,…