Solicitation_Package_10A2928.pdf
PDF 778 KB Posted
- Solicitation number
- 10A2928
- Issued by
- Mariposa County, Tuolumne County, Mariposa CDP, Tuolumne City CDP, California
About this file
Summary
This is an Invitation for Price Quote (IFPQ) issued by the California Department of Transportation (Caltrans) for Plumbing Repair and Replacement Services in Mariposa and Tuolumne Counties. The solicitation seeks qualified contractors to furnish all labor, equipment, tools, parts, materials, supplies, permits, disposal, and travel necessary to perform comprehensive plumbing repair and replacement work at two maintenance stations: Midpines Maintenance Station in Mariposa County and Groveland Maintenance Station in Tuolumne County. Services include excavating access areas, removing obstructions, disconnecting and removing sewage pipes, installing and repairing plumbing systems, marking utility lines, snaking and unclogging lines, locating gas and water lines, and providing written reports with photographs. The mandatory site inspections are scheduled for May 13, 2026, with inspections at Midpines MS at 10:15 a.m. and Groveland MS at 12:15 p.m. Written questions must be submitted by May 15, 2026, at 12:00 p.m., with price quotes due May 22, 2026, at 12:00 p.m. The estimated award date is May 29, 2026. The contract term is estimated from June 15, 2026, through June 15, 2027, with services provided during normal business hours Monday through Friday, 7:00 a.m. to 3:30 p.m., excluding State holidays.
This IFPQ is reserved exclusively for certified small businesses (SBs), micro businesses (MBs), small businesses for public works purposes (SB-PW), or disabled veteran business enterprises (DVBEs) registered with the California Department of General Services. The total bid amount must not exceed $484,000, with prevailing wage requirements applicable if the bid exceeds $15,000. Bidders must hold a valid Class A General Engineering Contractors license, C34-Pipeline Contractors license, or C42-Sanitation Systems Contractors license and maintain current registration with the Department of Industrial Relations. The price quote includes six line items covering specific work tasks at each maintenance station, plus a 10 percent allowance for parts, materials, supplies, fees, and permits (reimbursed based on receipts), and a 40-hour contingency for unforeseen labor at an hourly rate. A payment bond is required if the bid exceeds $25,000. Insurance requirements include commercial general liability ($1,000,000 per occurrence/$2,000,000 aggregate), automobile liability ($1,000,000 combined single limit), and workers' compensation. Caltrans will verify bidder licensing, DIR registration, and small business certification; therefore, copies are not required with the bid submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
May 4, 2026
Invitation for Price Quote (IFPQ)
IFPQ 10A2928
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 10A2928 entitled Plumbing Repair and Replacement Services in Mariposa and Tuolumne Counties. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $484,000.00,to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a Disabled Veteran Business Enterprise (DVBE). A bid over $484,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Wendy Kwong California Department of Transportation (Caltrans) Email address: Wendy.Kwong@dot.ca.gov Phone: (279) 789-4474
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing and at a Mandatory Site Inspection to be held on May 13, 2026. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Wendy Kwong Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:Wendy.Kwong@dot.ca.gov
Invitation for Price Quote IFPQ Number 10A2928
A) Purpose and Description of Services
1. Contractor shall furnish all labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to provide Plumbing Repair and Replacement Services to Caltrans.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. Bidder shall have at time of bid submittal, continually thereafter, and for the duration of the Agreement, a current and valid Class A General Engineering Contractors license or a C34- Pipeline Contractors license or a C42-Sanitation Systems Contractors license issued by the California Contractors State Licensing Board (CSLB) for the type of work to be performed.
2. By submitting its bid, bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
3. Bidder shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR).
Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.
4. At time of quote submittal, continuously thereafter, and for the duration of the Agreement, bidder shall be a certified small business, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE) registered with the California Department of General Services (DGS).
5. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule
It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time
(Pacific Time)
IFPQ available to prospective bidders 5/4/2026
Mandatory Site Inspection (Midpines MS) 5/13/2026 10:15 a.m.
Mandatory Site Inspection (Groveland MS) 5/13/2026 12:15 p.m.
Written Question Submittal 5/15/2026 12:00 p.m.
Final Date for Quote Submission 5/22/2026 12:00 p.m.
Proposed Award Date (estimate) 5/29/2026
2. Site Inspection
A. Mandatory Site Inspections are scheduled at 10:15 a.m., May 13, 2026, at the Midpines Maintenance Station (MS), 6610 Highway 140, Midpines, CA, 95345 AND immediately after at 12:15 p.m., at the Groveland MS, 18930 Ferretti Road, Groveland, CA 95321 for the purpose of discussing concerns regarding this IFPQ.
B. In the event a potential prime contractor is unable to attend the site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential prime contractor at a site inspection.
C. If the site inspection is mandatory, bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Failure to comply with these provisions may result in the rejection of your quote. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary. Bidders should bring any questions they have to the site inspection.
3. Reasonable Accommodation
For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the site inspection to arrange for a reasonable accommodation.
4. Questions and Answers
A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by May 15, 2026.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 10A2928. Questions must be sent to the following email:
Email: Wendy.Kwong@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website https://caleprocure.com. It is the responsibility of the bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the IFPQ’s schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
5. ADM-1412 – Price Quote Proposal
The total price quote proposal for this Agreement must not exceed $484,000.00. A bid amount more than $484,000.00 will be deemed non-responsive and will be rejected.
6. Costs Included in Bid Rates
Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
7. Employment of Undocumented Workers
No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
https://caleprocure.com/
8. State Prevailing Wages
State General Prevailing Wage Rates will apply for Counties of Mariposa, San Joaquin, and Tuolumne as described in the Proposed Form of Agreement, Exhibit B. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
9. Mandatory Organic Waste Recycling
Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
10. Motor Carrier Permit Requirements
A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and 34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Proposed Form of Agreement, Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
B. The MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
11. Contractor Registration Program
A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
D. If Contractor lists Subcontractor who is believed to be performing work that is not subject to the registration requirements, written confirmation from DIR must be obtained and submitted with the proposal to validate the bid.
12. Contractor’s License
Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current Class A General Engineering Contractors license or a C34-Pipeline Contractors license or a C42-Sanitation Systems Contractors license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof. Code Section 7028.15).4
13. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A)
Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
14. Non-Collusion Declaration for Public Works
Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.
15. Bonds
Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
16. Insurance
A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits
In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
17. California Civil Rights Laws
Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.
18. Darfur Contracting Act
A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the Darfur Contracting Act Certification form.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
19. Price Quote Submittal
A. The Price Quote should be emailed as described below. All price quotes must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:
IFPQ Number: 10A2928
PRICE QUOTATION SUBMITTAL
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: Wendy.Kwong@dot.ca.gov
F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at Wendy.Kwong@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) and Contractor Certification Clauses (CCC 04/2017) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.
20. Evaluation and Selection
A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
21. Standard Conditions of Service
A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
22. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
23. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting
A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system, https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
b) Risk to the State, or
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 10A2928
PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 2
ADM-1412 (REV. 9/2025)
Contractor’s Name (Please Print):
Item Number
Estimated Quantity
Unit of Measure Item
Unit Price (Price Per Unit of
Measure)
Total (Estimated Quantity X Unit Price)
1 1 Lump Sum
All labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to excavate an access area, remove obstructions, disconnect, and remove sewage pipes from the utility provider to the building at the Midpines Maintenance Station (MS) in Mariposa County per STD 213, Exhibit A, Scope of Work.
2 1 Lump Sum
All labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to install and/or repair the plumbing sewage pipes from the utility provider to the building at the Midpines MS in Mariposa County per STD 213, Exhibit A, Scope of Work.
3 1 Lump Sum
All labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to provide a written report and mark utilities lines, snake or unclog all lines (main lines, auxiliary lines, and hydro jet lines), locate all lines (gas, water and sewer) and provide photographs at the Midpines MS in Mariposa County per STD 213, Exhibit A, Scope of Work.
4 1 Lump Sum
All labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to excavate an access area, remove obstructions, disconnect, and remove sewage pipes from the utility provider to the building at the Groveland MS in Tuolumne County per STD 213, Exhibit A, Scope of Work.
5 1 Lump Sum
All labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to install and/or repair the plumbing sewage pipes from the utility provider to the building at the Groveland MS in Tuolumne County per STD 213, Exhibit A, Scope of Work.
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 10A2928
PRICE QUOTE PROPOSAL Attachment 1 Page 2 of 2
ADM-1412 (REV. 9/2025)
6 1 Lump Sum
All labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals necessary to provide a written report and mark utilities lines, snake or unclog all lines (main lines, auxiliary lines, and hydro jet lines), locate all lines (gas, water and sewer) and provide photographs at the Groveland MS in Tuolumne County per STD 213, Exhibit A, Scope of Work.
Subtotal:
(Sum of lines 1-6)
Maximum allowable expenditure for all parts, materials, supplies, fees, and permits per Exhibit A, Item 11. Actual cost will be reimbursed based on submitted original receipts. This Amount Shall be 10 percent (10%) of the Actual Subtotal Amount (0.10 x Subtotal). Enter 10% in Total column.
8 40 Hours Hourly rate including all labor, tools, equipment, vehicles, equipment, travel, permits and incidentals necessary to effectuate unforeseen work per STD 213, Exhibit A, Scope of Work.
1) The above quantities are estimates only and are given as a basis for comparison of bids. No guarantee is made or implied as to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.
3) Do not alter, modify, or change this bid proposal sheet. Any alterations, modifications, or changes to this bid proposal sheet will be grounds to reject the bid.
4) Each line item must be bid. Do not leave any unit price column blank or this bid proposal sheet will be deemed non-responsive.
Total This Proposal
(Subtotal + Lines 7-8)
Attachment 2 Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Non-Collusion Declaration Non-Collusion Declaration
California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification
☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
☐ Payment Bond Payment Bond
☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3 Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 10A2928
Exhibit A Public Works (State)
Scope of Work
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) Plumbing Repair and Replacement Services as described herein.
Contractor shall furnish all labor, equipment, tools, parts, materials, supplies, permits, disposal, travel, and incidentals to repair, remove and legally dispose of existing material and install plumbing.
2. Subcontracting is not permitted under this Agreement. All references to subcontracting or Subcontractors as found herein are not applicable to this Agreement.
3. The services shall be performed at District 10 in the counties of Mariposa, San Joaquin and Tuolumne at the following locations:
A. Midpines Maintenance Station (MS), 6610 Highway 140, Midpines, CA, 95345
B. Groveland MS, 18930 Ferretti Road, Groveland, CA 95321
4. Any reference to Caltrans Contract Manager shall also include designee.
5. This Agreement will commence on June 15, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on June 15, 2027 (estimate). These services shall be provided during normal business hours Monday through Friday 7:00 a.m. to 3:30 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.
6. This Agreement cites specific portions of the most current version of the Caltrans 2025 Standard Plans and Specifications (including revisions), herein collectively referred to as the “Standard Specifications”. The Standard Specifications can be accessed via the Internet at:
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications. Only the sections of the Standard Specifications cited in this Agreement are requirements and are hereby incorporated by this reference as if attached to this Agreement. All other portions of the Standards Specifications are not applicable to this Agreement.
7. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
California Department of Transportation (Caltrans)
Contractor TBD
Section/Unit: Project Manager:
Caltrans Contract Manager:
Address Address
Business Phone Number: Business Phone Number:
Email: Email:
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Exhibit A Public Works (State)
8. Detailed Description of Work
A. Contractor shall purchase, replace, install, and remove old pipes from the building to the utility provider. Contractor shall replace inefficient and noncompliant plumbing pipes at the Midpines MS and Groveland MS. Contractor shall perform general types of plumbing repairs and/or modifications, which includes, but is not limited to, furnishing pipe fittings, plumbing fixtures (water, gas, air, and sewer), piping (including underground), and septic systems (including seepage pit valves and piping furnishing).
B. Contractor shall mark utility lines. Contractor shall snake or unclog main lines or auxiliary lines, hydro jet lines, locate gas, water and sewer lines and will photograph lines and provide a written report to Caltrans Contract Manager. Contractor shall use its own appropriate equipment for this type of work.
C. Contractor shall excavate an access area.
D. Contractor shall disconnect old plumbing pipe.
E. Contractor shall remove and dispose of any obstructions in piping. The pipes shall be made free from debris to allow wastewater to be discharged to the city sewer mains.
F. Contractor shall install new plumbing pipe or repair existing.
G. Contractor shall remove and legally dispose of all replaced items and debris created from work performed.
H. Contractor shall replace drain trap, replace drain line under the building, and install four inch (4”) clean out.
I. Contractor shall conduct a final inspection with Caltrans Contract Manager.
9. Materials–General
A. Contractor shall furnish all new materials required to complete the work. Only materials conforming to the Uniform Building Code shall be incorporated in the work.
B. Materials shall be manufactured, handled, and used in a workmanlike manner to ensure completed work. Materials shall be subject to inspection and tests by Caltrans Contract Manager. Contractor shall furnish samples without charge to Caltrans upon request.
C. Contractor shall furnish a Certificate of Compliance to Caltrans Contract Manager for materials required by this Agreement. Caltrans Contract Manager may permit use of certain materials or assemblies prior to sampling and testing if accompanied by a Certificate of Compliance. The certificate shall be signed by the manufacturer and shall state that materials comply in all respects with requirements of this Agreement. A Certificate of Compliance shall be furnished with each lot of material delivered and clearly identified as the lot in the certificate.
D. Materials used based on a Certificate of Compliance may be sampled and tested at any time by Caltrans Contract Manager. The fact that material used based on a Certificate of Compliance does not relieve Contractor of its responsibility to use material that conforms to the requirements of this Agreement. Non-conforming materials shall be subject to rejection, whether in place or not.
Exhibit A Public Works (State)
E. Contractor shall furnish a list of material sources and locations where materials can be inspected before use on Caltrans’ property. The list shall be submitted on a Caltrans furnished form and shall be submitted to Caltrans Contract Manager in sufficient time to permit inspecting and testing. Caltrans Contract Manager may inspect, sample, or test materials at the source of supply or other locations. Such inspection, sampling, or testing will not be undertaken until Caltrans Contract Manager is assured by Contractor of the cooperation and the assistance of Contractor and the supplier.
F. Contractor shall ensure Caltrans Contract Manager has free access, at all times, to materials being inspected, sampled, or tested. Such inspections and tests made shall in no way guarantee acceptance of materials.
G. Reports, records of inspections, and tests shall only be made available to Caltrans Contract Manager upon request.
H. Any manufacturer’s warranties, guarantees, instruction sheets, and parts lists shall be turned over to Caltrans Contract Manager prior to Contractor starting work.
10. Defective Materials
All materials supplied by Contractor, which Caltrans Contract Manager has determined do not conform to the requirements of this Agreement will be rejected whether in place or not.
They shall be removed immediately from the site of the work, unless otherwise directed by Caltrans Contract Manager. No rejected material, the defects of which have been subsequently corrected, shall be used in the work, unless advance approval in writing has been given by Caltrans Contract Manager. Upon failure of Contractor to comply promptly with any order of Caltrans Contract Manager regarding defective materials, Caltrans Contract Manager shall have authority to cause the removal and replacement of rejected material and to deduct the cost thereof from any money due or to become due to Contractor.
11. Parts/Materials/Supplies/Fees/Permits
A. Contractor shall notify Caltrans Contract Manager in writing of any parts/materials/ supplies/fees/permits not specifically identified in Price Quote Proposal, Attachment 1 that are necessary to complete the work. Written approval from the Caltrans Contract Manager must be obtained prior to the purchase or installation of such items for the costs to be eligible for reimbursement.
B. Contractor will be reimbursed for the actual cost of pre-approved parts/materials/ supplies/fees/permits purchased to be consumed or installed at the work site in performance of the Agreement (including applicable sales tax), without additional allowance for markup. No additional compensation will be made for the cost to acquire, store, deliver, or use/install any purchased items. Cost of parts/materials/supplies/fees/ permits are to be verified and substantiated by submitting a copy of appropriately signed receipts. Total expenditure for parts/materials/supplies/fees/permits shall not exceed the amount set forth in Price Quote Proposal, Attachment 1.
C. Contractor shall not be reimbursed for any parts/materials/supplies/fees/permits that were not pre-approved in writing by Caltrans Contract Manager.
Exhibit A Public Works (State)
12. Unforeseen Labor
A. Contractor must notify Caltrans Contract Manager in writing of any labor not reasonably anticipated in Exhibit A, Scope of Work but necessary for completion of the work.
Contractor must receive written approval from Caltrans Contract Manager prior to performing unforeseen labor.
B. The cost of unforeseen labor shall be in accordance with bid rate in Price Quote Proposal, Attachment 1.
C. Contractor shall not be reimbursed for any unforeseen labor that was not pre-approved in writing by Caltrans Contract Manager.
13. Workmanship
A. Any work or material that may be found to be substandard or out of compliance under Business and Professions Code Sections 7058 and 7059, Caltrans Contract Manager will subject Contractor to a call back to redo the job and bring the job up to standard code. Any call back and any materials required shall be at Contractor’s expense.
B. If poor work by Contractor persists and necessitates a third “call back” to complete/correct jobs, Contractor is hereby advised that this poor work record shall constitute grounds for Agreement termination. If Contractor does not correct the work, Caltrans will hire another Contractor to complete the work and the cost of the work will be paid for by the original Contractor.
14. Compliance
All work performed, and materials used by Contractor shall be in compliance with applicable Uniform Building Code (UBC) and local codes. Work shall also be in compliance with current industry standards. While it is not necessary to obtain building permits to perform the work on Caltrans-owned properties, the work may be subject to inspection by local code enforcement.
Caltrans General Maintenance Contract Inspector may also inspect the work completed by Contractor before acceptance of the work.
15. Submittals
A. Photos: Contractor shall take before construction and after construction photographs.
B. Invoices/Receipts: Upon approval of Caltrans Contract Manager for the work performed by Contractor, invoices or delivery receipts for materials shall be submitted with the billing for each job. Invoices shall include information regarding the quality or graded product, and pricing shall also be stated for all materials purchased and used by Contractor.
16. Work Standards
Contractor is expected to be able to work in a professional, competent manner without direct supervision by Caltrans Contract Manager. Contractor shall provide a good quality job using the highest industry standards. All job sites are to be kept in a clean and orderly manner, especially as it pertains to tenant-occupied residences. All excess materials and debris are to be removed and disposed of at Contractor’s expense when the job is complete.
Exhibit A Public Works (State)
17. Character of Work Persons
If person employed by Contractor appears to Caltrans Contract Manager to be incompetent or to act in an unprofessional, disorderly, or improper manner, that person shall be removed immediately from the work site on the request of Caltrans Contract Manager and such person shall not be allowed to provide further service under this Agreement.
18. Completion and Inspection of Work Phases
Contractor shall notify Caltrans Contract Manager by email, telephone or fax, within 24 hours after work completion and have the work inspected. The assigned work is not considered complete unless approved by Caltrans Contract Manager.
19. Delivery, Storage, and Handling
Materials shall be delivered to the job site in manufacturer's original unopened packages clearly labeled with manufacturer's name and identification numbers. Materials shall be stored in strict accordance with the manufacturer's printed storage requirements and protected from adverse weather conditions. Material shall be handled in such a manner as to prevent damage.
Damaged materials shall be replaced at Contractor’s sole expense.
20. Areas for Contractor Use
No area is available at the project site for the exclusive use of Contractor. Contractor shall arrange with Caltrans Contract Manager for areas to store equipment and materials within the work area.
21. Cooperation
A. Contractor shall comply with all security policies and normal working hours of Caltrans.
B. Contractor shall plan work to minimize interference with…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .