Solicitation_Package_03A4161.pdf
PDF 5 MB Posted
- Attached to
- Paving Services in Nevada County
- Solicitation number
- 03A4161
- Issued by
- Nevada County, Nevada City, California
About this file
This is an Invitation for Price Quote (IFPQ) issued by the California Department of Transportation (Caltrans) for paving services at the Kingvale Maintenance Station located at 51121 Donner Pass Road, Kingvale, California in Nevada County. The scope of work includes performing a field study to document existing pavement slopes, removing approximately 528 cubic yards of full-depth asphalt concrete, installing approximately 121 cubic yards of new Class 2 aggregate base, installing approximately 987 tons of new hot-mix asphalt concrete, and restoring disturbed utility boxes and items to original condition. The mandatory site inspection is scheduled for May 6, 2026, at 1:00 p.m., with the written question submittal deadline on May 8, 2026, at 12:00 p.m., and the final quote submission deadline on May 14, 2026, at 12:00 p.m. The estimated award date is May 21, 2026. The contract term is estimated to commence on June 15, 2026, and expire on October 30, 2027. Work shall be performed during normal business hours Monday through Friday, 7:00 a.m. to 5:00 p.m., excluding State holidays.
This solicitation is limited to certified Small Businesses (SB), Micro Businesses (MB), Small Businesses for the purpose of public works (SB-PW), or Disabled Veteran Business Enterprises (DVBE), with a maximum bid amount not to exceed $484,000. Prevailing wage requirements apply if the total bid amount exceeds $15,000. Bidders must possess a valid Class A General Engineering Contractor license or a C-8 Concrete Contractor license and C-12 Earthwork and Paving Contractor license issued by the California Contractors State Licensing Board, maintain current registration with the Department of Industrial Relations, and hold DGS certification as an SB/MB/SB-PW or DVBE. A payment bond equal to 100 percent of the contract amount is required if the bid exceeds $25,000. Insurance requirements include Commercial General Liability of $1,000,000 per occurrence and $2,000,000 aggregate, Automobile Liability of $1,000,000 combined single limit, and Workers' Compensation with Employer's Liability of $1,000,000. At least two price quotes from certified small businesses or DVBEs must be received before award can be made. All contractors must comply with prevailing wage laws, organic waste recycling requirements under Senate Bill 1383, motor carrier permit requirements, and various state and federal regulations regarding employment, discrimination, and sanctions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR
California Department of Transportation
ADMINISTRATION
DIVISION OF PROCUREMENT AND CONTRACTS
1727 30TH STREET, MS 65
SACRAMENTO, CA 95816-7006
PHONE (916) 227-6000
TTY 711
https://dot.ca.gov/programs/procurement-and-contracts/
April 28, 2026
Invitation for Price Quote (IFPQ)
IFPQ 03A4161
Notice to Prospective Contractors
You are invited to review and respond to this Small Business (SB) Invitation for Price Quote (IFPQ), IFPQ 03A4161 entitled Paving Services in Nevada County. In submitting your quote, you must comply with the instructions found herein.
“This solicitation is authorized pursuant to Government Code Section 14838.7, which provides for the award of contracts for the acquisition of construction, including the erection, construction, alteration, repair, or improvement of any State structure, building, road, or other State improvement of any kind, that has an estimated value of greater than $5,000.00, but not more than $484,000.00,to a certified SB, including a micro business (MB), SB for the purpose of public works (SB-PW), or a Disabled Veteran Business Enterprise (DVBE). A bid over $484,000.00 will result in rejection of your bid due to non-responsiveness.”
This contract requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000 then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement, for requirement details.
In the opinion of Caltrans, this IFPQ is complete and without need of explanation; however, if you have questions, or should you need any clarifying information, the contact person for this IFPQ is:
Wendy Kwong California Department of Transportation (Caltrans) Email address: Wendy.Kwong@dot.ca.gov Phone: (279) 789-4474
Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.
*Technical questions regarding this solicitation will be addressed, in writing and at a Mandatory Site Inspection to be held on May 6. 2026 at 51121 Donner Pass Road, Kingvale, CA 95728. See Section C1, Time Schedule, for more details.
ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE DOCUMENT
LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.
Sincerely, Wendy Kwong Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/ mailto:Wendy.Kwong@dot.ca.gov
Invitation for Price Quote IFPQ Number 03A4161
A) Purpose and Description of Services
1. Contractor shall furnish all labor, tools, equipment, materials, parts, supplies, travel, disposal and incidentals necessary to provide Pavement Services to Caltrans.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
B) Bidder’s Minimum Qualifications
1. Bidder and subcontractor (if applicable) must possess, at the time of bid submittal, continuously thereafter, and for the duration of the agreement, a valid and current Class A – General Engineering Contractor license OR a C-8 – Concrete Contractor license AND a C-12 Earthwork and Paving Contractor issued by the California Contractors State Licensing Board (CSLB).
2. By submitting its bid, bidder certifies, under penalty of perjury, that its Contractors State License Board (CSLB) license is in a classification appropriate to the work to be undertaken as identified in the Proposed Form of Agreement, Exhibit A. This requirement has also been added in the Proposed Form of Agreement, Exhibit E. Refer to Section C, Price Quotation Requirements and Information, Contractor’s License, for submittal requirements. Caltrans will verify bidder’s Contractor License, and any Subcontractor Licenses, thus it is not necessary for bidders to provide a copy.
3. Bidder and subcontractor (if applicable) shall possess at the time of bid submittal, continuously thereafter, and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy.
4. At time of quote submittal, continuously thereafter, and for the duration of the Agreement, bidder and subcontractor (if applicable) shall be a certified small business, including a micro business (MB), SB for the purpose of public works (SB-PW), or a disabled veteran business enterprise (DVBE) registered with the California Department of General Services (DGS).
5. Failure of Bidder to sufficiently provide any or all the minimum qualifications, in the opinion of Caltrans, will result in the bidder’s bid deemed non-responsive.
C) Price Quotation Requirements and Information
1. Time Schedule
It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.
Event Date Time
(Pacific Time)
IFPQ available to prospective bidders 4/28/2026
Mandatory Site Inspection 5/6/2026 1:00 p.m.
Written Question Submittal 5/8/2026 12:00 p.m.
Final Date for Quote Submission 5/14/2026 12:00 p.m.
Proposed Award Date (estimate) 5/21/2026
2. Site Inspection
A. A Mandatory Site inspection is scheduled at 1:00 p.m., May 6, 2026, at 51121 Donner Pass Road, Kingvale, CA 95728 for the purpose of discussing concerns regarding this IFPQ.
B. In the event a potential prime contractor is unable to attend the site inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential prime contractor at a site inspection.
C. If the site inspection is mandatory, bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Failure to comply with these provisions may result in the rejection of your quote. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary. Bidders should bring any questions they have to the site inspection.
3. Reasonable Accommodation
For bidders who have and need assistance due to a physical impairment, a reasonable accommodation will be provided upon request for the site inspection. The bidder must call the designated Contract Analyst contact no later than the fifth (5th) working day prior to the scheduled date and time of the site inspection to arrange for a reasonable accommodation.
4. Questions and Answers
A. Questions regarding this IFPQ must be submitted in writing. Bidders are encouraged to submit their written questions by May 8, 2026.
B. Written questions must include the individual's name, firm name, complete address, and must reference IFPQ No. 03A4161. Questions must be sent to the following email:
Email: Wendy.Kwong@dot.ca.gov
C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website https://caleprocure.com. It is the responsibility of the bidder to access the website for any changes or addenda that may be posted. Refer to Section C1, Time Schedule, for the IFPQ’s schedule of events and dates/times. Bidder can contact the Contract Analyst named above.
5. ADM-1412 – Price Quote Proposal
The total price quote proposal for this Agreement must not exceed $484,000.00. A bid amount more than $484,000.00 will be deemed non-responsive and will be rejected.
6. Costs Included in Bid Rates
Quotation prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including, but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be made thereof unless separate payment provisions in the Agreement should specifically so provide.
7. Employment of Undocumented Workers
No State agency or department, as defined in Public Contract Code Section 10335.7, that is subject to this code, shall award a public works contract to a bidder or contractor, nor shall a bidder or contractor be eligible to bid for or receive a public works contract, who has, in the preceding five (5) years, been convicted of violating a State or Federal law regarding the employment of undocumented workers (Pub. Cont. Code Section 6101).
https://caleprocure.com/
8. State Prevailing Wages
State General Prevailing Wage Rates will apply for the County of Nevada as described in the Proposed Form of Agreement, Exhibit B. The predetermined general prevailing wage rates published by the Director of Industrial Relations (DIR) may be obtained via the Internet at https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm. It is the bidder's responsibility to use the correct classification determination published by the DIR. By signing the attached Bid/Bidder Certification Sheet, the bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.
9. Mandatory Organic Waste Recycling
Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate the Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Section 42649.8 et seq. When applicable, Contractor must comply with these provisions.
10. Motor Carrier Permit Requirements
A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and 34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Proposed Form of Agreement, Exhibit A, Scope of Work, and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain and maintain in good standing during the entire term of this Agreement any such required MCP(s).
B. The MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager or their designee, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.
11. Contractor Registration Program
A. No Contractor or Subcontractor may be listed on a price quote proposal for a contract with prevailing wages unless registered with the DIR, pursuant to Labor Code Section 1725.5 (with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)).
B. No Contractor or Subcontractor may be awarded a contract with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5.
C. Caltrans will verify each of the registration numbers provided by the bidder prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.
D. If Contractor lists Subcontractor who is believed to be performing work that is not subject to the registration requirements, written confirmation from DIR must be obtained and submitted with the proposal to validate the bid.
https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm
12. Contractor’s License
Bidder must have, at time of quote submittal and for the duration of the contract, a valid, current Class A – General Engineering Contractor license OR a C-8 – Concrete Contractor license AND a C-12 Earthwork and Paving Contractor license issued by the CSLB, for the type of work to be performed. Bidder shall obtain, pay for, and maintain, in good standing, all necessary licenses and permits to accomplish the work. Bidders will be considered non-responsive unless proper licensing requirements are met. An invalid license will result in rejection of the bid. Positive verification of a valid license issued by the CSLB will be performed by Caltrans (Bus. and Prof.
Code Section 7028.15).
13. Subcontractors
Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement. If subcontractors are used, complete the Bidder Declaration (GSPD–05-105). Failure of a subcontractor to have the proper licenses, permits, and/or certifications, shall be cause for rejection of price quote. Bidder may only subcontract portions of the work to a qualified Department of General Services (DGS) Certified Small Business (SB), Micro Business (MB), or SB for the purpose of Public Works (SB-PW), or Disabled Veteran Business Enterprise (DVBE), with the same status of bidder. No work may be subcontracted to any business not certified as a SB/MB/SB-PW or DVBE by DGS. Bidder must ensure the Subcontractor(s) is DGS Certified SB/MB/SB-PW or DVBE and has all necessary licenses, permits, and/or certifications to accomplish its portion of the work.
14. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A)
Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
15. Non-Collusion Declaration for Public Works
Bidder must submit a non-collusion declaration for Public Works. The Non-Collusion Declaration for Public Works is provided as a link in Attachment 2, Required Documents.
16. Bonds
Payment Bond Requirement: If the successful bidder’s bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to the Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate the Contractor’s obligations under this Agreement.
17. Insurance
A. The bidder who receives the Agreement award must provide a Certificate of Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days from the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.
B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:
Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.
C. The additional insured endorsement must accompany the certificate of insurance.
D. Satisfying a Self-Insured Retention (SIR)
All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.
E. Available Coverages/Limits
In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.
17. California Civil Rights Laws
Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.
18. Darfur Contracting Act
A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM-0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.
B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on the Darfur Contracting Act Certification form.
C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot, bid on or submit a proposal for an Agreement with a State agency for goods or services (Pub. Cont. Code Section 10477(a)).
D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had) business activities or other operations outside of the United States to certify that it is not a “scrutinized” company, during the Agreement award process with a State agency.
E. A scrutinized company may still, however, submit a bid or proposal for a Contract with a State agency for goods or services if the company first obtains permission from the Department of
General Services (DGS) according to the criteria set forth in Public Contract Code Section 10477(b).
19. Price Quote Submittal
A. The Price Quote should be emailed as described below. All price quotes must be received by the Caltrans, Division of Procurement and Contracts (DPAC), by dates and times shown in Section C, Price Quotation Requirements and Information.
B. The price quote email should be clearly marked with the IFPQ number, title, and ‘PRICE QUOTATION SUBMITTAL’, as shown in the following example:
IFPQ Number: 03A4161
PRICE QUOTATION SUBMITTAL
C. All quotes shall include the documents identified in the IFPQ; see Attachment 2, Required Documents. Quotes not including the required documents may be deemed non-responsive. A non-responsive price quote is one that does not meet the basic quote requirements.
D. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.
E. Email to: Wendy.Kwong@dot.ca.gov
F. Pursuant to Government Code Section 14838.7, Caltrans must receive at least two (2) price quotes from certified SB/MBs or at least two (2) price quotes from DVBEs before it can make an Agreement award. Therefore, at Caltrans’ discretion, if only one price quote is received, the timeframe for receipt of price quotes may be extended in order to receive the minimum number of quotes required by the Government Code. All prospective bidders will be notified via email of any extensions.
G. Price quotes must include the performance of all the services described herein. Any attempt to modify the Price Quote Proposal document to deviate from the work specifications will not be considered and will cause a price quote to be rejected.
H. A price quote may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any price quote on the basis that it is not responsive or from responsible bidder and may waive any immaterial deviation in a quote.
Caltrans’ waiver of an immaterial defect shall in no way modify the IFPQ document or excuse the bidder from full compliance with all requirements if awarded the Agreement.
I. Costs for developing price quotes and in anticipation of award of the Agreement are entirely the responsibility of the bidder and shall not be charged to Caltrans.
J. A bidder may modify a price quote after its submission by first withdrawing the original price quote and then by resubmitting a new price quote prior to the price quote submittal deadline.
Bidder modifications offered in any other manner, oral or written, will not be considered.
K. A bidder may withdraw a price quote by, prior to price quote submission deadline, submitting a written withdrawal request to Caltrans, at Wendy.Kwong@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section L, below. A bidder may thereafter submit a new price quote prior to the price quote submittal deadline. Price quotes may not be withdrawn without cause subsequent to the price quote submittal deadline.
L. Only an individual who is authorized to bind the bidding firm contractually shall sign the Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. An unsigned price quote may be cause for bid rejection.
M. Caltrans may modify the IFPQ prior to the date fixed for submission of price quotations by the issuance of an addendum sent to all parties who received an IFPQ package.
N. Caltrans reserves the right to reject all price quotes for reasonable cause.
O. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFPQ requirements.
P. Where applicable, bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.
Q. Caltrans does not accept alternate Agreement language from a bidder. A price quote with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC 02/2025) and Contractor Certification Clauses (CCC 04/2017) are not negotiable. The GTC 02/2025 may be viewed at Internet site https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List- Folder/Standard-Contract-Language.
20. Evaluation and Selection
A. At the time of quote opening, price quotes will be checked for the presence or absence of required information in conformance with the submission requirements of this IFPQ.
B. Caltrans will check the price quote submittal package to verify it received all required documents. Positive verification of required documents will be performed to determine its responsiveness to the State’s needs.
C. Price quotes that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.
D. The Agreement, if awarded, shall be awarded to the responsible bidder who submits the lowest price quote and meets all the specifications. A price quote meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie quote, Caltrans will draw lots to determine the successful bidder. Only one (1) price quote may be submitted by an entity:
individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one (1) price quote from an entity will result in all quotes from that entity being rejected and returned to the bidder.
21. Standard Conditions of Service
A. Service shall not begin before the start date set forth in the Agreement. After all approvals have been obtained, and the Agreement is executed should Contractor fail to commence work at the agreed upon time, Caltrans, upon five (5) days written notice to contractor, reserves the right to terminate the Agreement. In addition, contractor shall be liable to Caltrans for the difference between contractor’s quote price and the actual cost of performing the work by the second low bidder or by another contractor.
B. All performance under the Agreement shall be completed on or before the expiration date of the Agreement.
C. Antitrust Provisions
1) Bidder offers and agrees, and will require all of his other Subcontractors and suppliers to agree, that if the bid is accepted to assign to the awarding body all rights, title, and interest in and to all causes of action they may have under Section 4 of the Clayton Act (15 USC Section 15) or under the Cartwright Act (Chapter 2 (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code) arising from purchases of goods, services, or materials pursuant to the public works Agreement or subcontract. The assignment made by Contractor and all additional assignments made by Subcontractors https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language and suppliers shall be deemed to have been made and will become effective at the time the awarding body tenders final payment to Contractor without further acknowledgment or the necessity of tendering to the awarding body any written assignments.
2) If an awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under Government Code Sections 4550-4554, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, and attributable overcharges that were paid by the assignor but were not paid by the public body as a part of the price quote, less the expenses incurred in obtaining that portion of the recovery.
3) Upon demand in writing by the assignor, the assignee shall, within one year from such demand, reassign the cause of action assigned under Government Code Sections 4550- 4554 if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (See Government Code Section 4554).
D. If bidder is awarded Agreement and refuses to sign Agreement presented for signature within time and manner required, bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount quoted, whichever is less.
E. Loss Leader usage is prohibited in this Solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a "loss leader" as defined in Business and Professions Code Section 17030. "Loss Leader" means any article or product sold at less than cost: a) where the purpose is to induce, promote, or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.
F. No oral understanding or agreement shall be binding on either party.
22. Executive Order N-6-22 – Russia Sanctions
On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e. there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.
23. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting
A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies.
B. Bidder / Offeror must notify the State in writing if it:
1) Intends to provide GenAI as a deliverable to the State; or
2) Intends to utilize GenAI as a deliverable to the State; including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:
a) Functionality of a State system,
b) Risk to the State, or https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf
c) Contract performance.
Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.
C. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.
D. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.
E. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 03A4161
PRICE QUOTE PROPOSAL Attachment 1 Page 1 of 2
ADM-1412 (REV. 9/2025)
Contractor’s Name (Please Print):
Item
Number
Estimated
Quantity
Unit Of
Measure Item
Unit Price
(Price Per Unit of Measure)
Total
(Estimated Quantity X Unit Price)
1 1 Lump Sum
All labor, tools, equipment, materials, parts, supplies travel, and incidentals necessary to perform a field study prior to construction per STD 213, Exhibit A, Scope of Work.
2 1 Lump Sum All labor, tools, equipment, materials, parts, supplies travel, disposal and incidentals necessary to remove full depth of asphalt concrete per STD 213, Exhibit A, Scope of Work.
3 121 Cubic Yards
All labor, tools, equipment, materials, parts, supplies travel, and incidentals necessary to install new class 2 aggregate base per STD 213, Exhibit A, Scope of Work.
4 987 Tons All labor, tools, equipment, materials, parts, supplies travel, and incidentals necessary to install new asphalt concrete (hot-mix asphalt) per STD 213, Exhibit A, Scope of Work.
5 1 Lump Sum All labor, tools, equipment, materials, parts, supplies travel, and incidentals necessary to restore items disturbed during construction per STD 213, Exhibit A, Scope of Work.
Subtotal:
(Sum of lines 1-5)
Maximum allowable expenditure for all parts, materials, supplies, fees, and permits per Exhibit A, Item 21. Actual cost will be reimbursed based on submitted original receipts. This Amount Shall be five percent (5%) of the Actual Subtotal Amount (0.05 x Subtotal). Enter 5% in Total column.
STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 03A4161
PRICE QUOTE PROPOSAL Attachment 1 Page 2 of 2
ADM-1412 (REV. 9/2025)
7 40 Hours
Hourly rate including all labor, tools, equipment, materials, supplies, parts, vehicles, equipment, travel, permits, disposal and incidentals necessary to effectuate unforeseen work per STD 213, Exhibit A, Scope of Work.
1) The above quantities are estimates only and are given as a basis for comparison of quotes. No guarantee is made or implied as to the exact quantity that will be needed.
2) In case of discrepancy between the unit price and the total set forth for a unit basis time, the unit price shall prevail.
3) Do not alter, modify, or change this quote proposal sheet. Any alterations, modifications, or changes to this quote proposal sheet will be grounds to reject the quote.
4) Each line item must be quoted. Do not leave any unit price column blank or this quote proposal sheet will be deemed non-responsive.
Total This Proposal
(Sum of Lines 1-7)
Attachment 2 Required Documents
The following documents should be submitted, or your bid may be considered non-responsive.
Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFPQ Requirements and/or as listed below.
☐ Attachment 1 – Price Quote Proposal (ADM-1412)
☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet
☐ Bidder Declaration (GSPD 05105) Bidder Declaration
☐ Non-Collusion Declaration Non-Collusion Declaration
California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification
☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification
The following documents will be requested of the WINNING BIDDER at time of contract award;
they are NOT required at time of bid submittal:
☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses
☐ Payment Bond Payment Bond
☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)
☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://www.documents.dgs.ca.gov/dgs/fmc/gs/pd/gspd05-105.pdf https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1418 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM2009 https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf
Attachment 3 Proposed Form of Agreement
Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFPQ 03A4161. Please review it carefully and present any questions in writing to the contact identified for this IFPQ.
2. The term of this Agreement is:
Contractor’s Name TBD Agreement Number 03A4161
Exhibit A Public Works (State)
Scope of Work
1. Contractor agrees to provide to the California Department of Transportation (Caltrans) Pavement Services as described herein.
Contractor shall provide all labor, tools, equipment, materials, parts, supplies, travel, disposal and incidentals necessary to perform site preparations, plans, grading, and paving services to Caltrans.
2. The services shall be performed at District 3, Kingvale Maintenance Station (MS), located at 51121 Donner Pass Road, Kingvale, CA 95728.
3. Any reference to Caltrans Contract Manager shall also include designee.
4. This Agreement will commence on June 15, 2026 (estimate), or upon approval by Caltrans, whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by Caltrans. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Caltrans Contract Manager. This Agreement will expire on October 30, 2027 (estimate). The services shall be provided during normal business hours Monday through Friday 7:00 a.m. to 5:00 p.m., excluding State holidays. The parties may amend this Agreement as permitted by law.
5. This Agreement cites specific portions of the most current version of the Caltrans 2025 Standard Plans and Specifications (including revisions), herein collectively referred to as the “Standard Specifications”. The Standard Specifications can be accessed via the Internet at:
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications. Only the sections of the Standard Specifications cited in this Agreement are requirements and are hereby incorporated by this reference as if attached to this Agreement. All other portions of the Standards Specifications are not applicable to this Agreement.
6. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.
California Department of Transportation (Caltrans)
Contractor TBD
Section/Unit:
Project Manager:
Caltrans Contract Manager:
Address: Address:
Business Phone Number: Business Phone Number:
Email: Email:
https://dot.ca.gov/programs/design/ccs-standard-plans-and-standard-specifications
Exhibit A Public Works (State)
7. Detailed Description of Work:
A. See Attachment 3, Photos and Attachment 4, Plans for further details about this agreement.
B. Contractor shall perform the following paving and prep work on the Kingvale Maintenance Station. Attachment 4, Plans details approximate outlines and distribution of work to be performed. The limits of work will be outlined by Caltrans Contract Manager prior to start of construction.
1) Contractor shall perform a field study to document existing pavement slopes and features. Field study shall be provided to Caltrans Contract Manager for approval prior to start of work. Field study at minimum shall include the following:
a) Documentation of existing pavement slopes for each area specified in Attachment 4, Plans.
b) Type, size, and approximate location of existing utility boxes. Contractor shall coordinate with Caltrans Contract Manager to positively identify which utility boxes shall be replaced and/or removed.
2) Contractor shall remove the full depth of existing asphalt (approximately 528 cubic yards). Contractor shall be responsible for legally disposing of all waste and debris.
See Attachment 4, Plans, Sheet C-1, AC Pavement Repair Table, for estimated existing asphalt concrete depth. Where pavement depths vary significantly from those described, notify the Caltrans Contract Manager immediately.
a) Where outlined in Attachment 4, Plans, contractor shall install new class 2 aggregate base to provide straight grade between limits of roadway excavation.
a) Contractor shall be responsible for coordinating with Caltrans Contract Manager to identify utility boxes to be removed. Utility boxes shall be removed in accordance with Attachment 4, Plans.
b) When authorized by Caltrans Contract Manager, Contractor shall install Class 2 Aggregate Base as necessary to maintain existing pavement slopes and grades unless otherwise specified in Attachment 4, Plans. Contractor shall review with Caltrans Contract Manager final subgrade slopes and elevations and obtain approval to begin paving work.
3) Contractor shall pave approximately 987 tons of new asphalt concrete (hot-mix asphalt) to restore original slopes and grades of each area described in Attachment 4, Plans, unless otherwise specified. Anticipated depth of asphalt concrete removed and replaced is as specified in Attachment 4, Plans, Sheet C-1, AC Pavement Repair Table. Asphalt shall be placed in accordance with Standards Specifications Sections 39 and 92. The asphalt binder performance grade for this project shall be
PG 64-28.
4) Contractor shall restore any items detected in Exhibit A, Section 7., B., 1) during the field study, that were disturbed by construction to original layouts and intended sections as noted in field study. For all utility boxes that were not removed, Contractor shall replace existing boxes in like kind and adjust to final grade as detailed in Attachment 4, Plans.
Exhibit A Public Works (State)
8. General Requirements
A. Contractor shall comply with security policies of the Department facility.
B. Contractor shall submit a request for authorization before interrupting any service for the purpose of making or breaking a connection. Include in the request the proposed time necessary to complete the work. Allow 5 days for the review of each request.
C. Contractor shall not use Department telephones.
D. Department will be working at or near the job site. Contractor shall coordinate activities with the department to avoid delays.
9. Existing Facilities
A. Preparation
1) Contractor shall locate and identify the limits of removal. Items to be removed, the interface of items to be removed, and items to remain intact must be identified and marked by Contractor.
2) Contractor shall ensure that a saw cut of approximately one inch (1”) deep must be made along the limits of removal on all faces that will be visible in the completed work prior to removing concrete or masonry.
3) Contractor shall ensure that the full depth saw cuts must be made from both faces at the new door openings in concrete or masonry. Overcuts must not be made at corners. Remaining material at corners must be chipped out and the surfaces ground smooth.
B. Removal
1) Contractor shall ensure that removal must be to the limits shown. Removal must be done carefully to minimize damage to the portions to remain. Remaining portions that are damaged by your operation must be restored to original or improved condition at your expense.
2) Contractor shall ensure that existing apparatuses, devices, or accessories which would be functionally impaired by new construction or remodeling must be moved, brought out to new surfaces, or provided with new access covers, as necessary to restore apparatuses, devices, or accessories to their original usefulness.
3) Contractor shall ensure piping and conduits to be abandoned must be capped or plugged.
4) Contractor shall ensure surfaces that are exposed to view at the limits of removal work must be patched, bumps must be removed and depressions filled, and the surface must be finished to match the existing surrounding surfaces. Depressions in concrete less than one inch deep must be deepened to one-inch minimum depth before filling with cement mortar.
5) Contractor shall ensure all anchor bolts and reinforcement must be removed at least one inch (1”) below the surrounding surfaces and the resulting hole must be patched with cement mortar.
Exhibit A Public Works (State)
6) Contractor shall ensure that existing reinforcement that is to be incorporated into the new work must be protected from damage and thoroughly cleaned before being embedded in new concrete.
10. Removal of Asphalt Concrete
A. Contractor shall remove the full depth of the existing asphalt concrete surfacing and replace it with hot mix asphalt (HMA). Caltrans Contract Manager determines the exact limits of asphalt concrete surfacing to be replaced.
B. Contractor shall outline the replacement area and cut neat lines with a saw or grind to full depth of the existing asphalt concrete before removing asphalt concrete.
C. Construction
1) Contractor shall excavate to the described or authorized grade. If Contractor over excavates then Contractor shall backfill with an authorized material and compact it.
2) Contractor shall ensure that compaction must achieve a relative compaction of at least 95 percent for at least a depth of two and a half feet (2.5’) below the finished grade for the width of the outlined work.
3) If contractor does not complete placing the HMA surfacing before end of shift, Contractor must:
a) Construct a temporary HMA taper to the level of the existing pavement.
b) Provide adequate signage to notify maintenance station workers of varying conditions.
c) Place HMA surfacing within three (3) calendar days.
11. Class 2 Aggregate Base (AB)
A. Contractor shall ensure that aggregate must be clean and consist of any combination of the following:
1) Broken stone
2) Crushed gravel
3) Natural rough-surfaced gravel
4) Sand
5) Processed reclaimed asphalt concrete, PCC, LCB, or CTB
B. Contractor shall use either 1-1/2-inch or 3/4-inch maximum aggregate gradation unless otherwise specified. Do not change your selected aggregate gradation without authorization.
C. Contractor shall ensure that aggregate gradation is within the percentage passing limits for the sieve sizes shown in the following table:
Exhibit A Public Works (State)
D. Contractor shall ensure that aggregate quality characteristics must comply with the requirements shown in the following table:
E. Construction
1) Contractor shall apply water to the Aggregate Base (AB) as needed for compaction.
2) Contractor shall ensure that immediately before spreading AB, the subgrade must comply with the specified compaction and elevation tolerance for the material involved and be free from loose or extraneous material.
3) Contractor may use AB to fill areas of the subgrade that are lower than the grade established by the Engineer.
4) Contractor shall deliver uniform mixtures of AB to the roadbed. When AB is spread and compacted, the moisture content must be uniform and sufficient to obtain the required compaction. Avoid material segregation. AB must be free from pockets of coarse or fine material.
5) Contractor shall spread and compact AB by any means that will attain the specified requirements at locations inaccessible to spreading equipment.
6) Contractor shall compact each AB layer to at least 95 percent relative compaction.
7) The finished AB surface must not vary more than 0.05 foot from the grade established by Caltrans Contract Manager.
12. Debris
A. Contractor shall ensure debris shall not be disposed of within the State right of way.
Contractor shall make arrangements for disposal outside the State right of way area.
B. Contractor authorizes Caltrans to remove partially demolished structures and/or piles of debris that remain for a period of more than three (3) working days. The removal work shall be done by Caltrans hazardous removal contractor and the cost shall be deducted
Exhibit A Public Works (State) from monies due or to become due to Contractor. This work may be performed without prior notification to Contractor.
C. Debris to be removed from the site includes all glass. Materials to be disposed of shall not be burned either inside or outside the State right of way.
13. Pre-work Meeting
A. Contractor shall begin work within 20 business days of receiving a written approval notification or Notice to Proceed (NTP) by Caltrans Contract Manager. Failure to begin work within 20 business days, or to execute the work within the time frame agreed upon, shall be considered grounds for termination of this Agreement in accordance with Exhibit D, Termination.
B. After receiving the NTP from Caltrans Contract Manager, Contractor shall contact Caltrans Contract Manager to schedule a mutually agreed upon date for the Pre-Work Meeting to discuss the process steps and schedule of work performance.
C. The Pre-Work Meeting shall be held within 10 business days of the NTP.
D. Caltrans Contract Manager will discuss and pre-approve the schedule and dates for work to be completed within the timeframe provided in this Agreement. All work scheduling shall be coordinated with Caltrans Contract Manager.
14. Construction Schedule
Contractor shall submit a work schedule to the Caltrans Contract Manager prior to the commencement of work. The Contractor shall coordinate with Caltrans Contract Manager and Caltrans Maintenance Yard Supervisor to establish a working schedule that does not conflict with daily operation of maintenance yard.
15. Contractor Responsibilities
A. Contractor shall ensure only qualified and competent employee(s) are permitted on the job site and that the work shall be safely performed by the highest industry standards.
Contractor shall take all the necessary precautions to prevent injury or hazard to Caltrans employee(s), invitee(s), and/or to the general public, and shall avoid…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .