Solicitation - N6660426Q0239.pdf
PDF 1 MB Posted
- Attached to
- Electrical Hull Fitting (EHF) Repairs
- Solicitation number
- N66604-26-Q-0239
About this file
This is a Request for Quotation (RFQ) issued by the Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) for Electrical Hull Fitting (EHF) inspection and repair services supporting the AN/WSQ-9 submarine defensive systems program.
The solicitation requires contractors to inspect, repair, test, and document Electrical Hull Fittings provided as Government Furnished Material (GFM) to meet SUBSAFE and Level I requirements. The contract includes four line items: three separate requirements for EHF repairs (Items 0001, 0002, and 0003) in quantities of 2 each on a firm fixed-price basis, and one item (0004) for Contract Data Requirements List (CDRL) deliverables in a lot quantity. Work must comply with multiple applicable documents including SUBSAFE quality standards, ISO 9001:2015 requirements, NAVSEA specifications, and MIL-STD standards. Deliverables include inspection reports, certification data, test/inspection records, certificates of compliance, contract status reports, and a Government Property inventory report. The contractor must notify the Certifying Activity (Naval Surface Warfare Center Philadelphia) at least seven working days prior to inspection or testing. Initial inspection will be conducted by NSWC Philadelphia at the contractor's plant, with final inspection and acceptance by NUWCDIVNPT within seven days after installation/checkout/testing. The Government will furnish quality assurance records, design data packages, and Government Furnished Property. Award will be made on a Lowest Price Technically Acceptable (LPTA) basis, with offerors required to demonstrate current ISO 9001:2015 registration, proof of previous First Article Testing compliance, and acceptable past performance ratings. Delivery is to NUWC Division Newport, Newport, Rhode Island on an F.O.B. Destination basis with firm fixed pricing. All payments must be submitted through the Wide Area Workflow (WAWF) system. The solicitation is not a small business set-aside and includes comprehensive security, cybersecurity maturity model certification (CMMC Level 2), mercury exclusion, and operational security requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6660426Q0239 Amendment 0001.pdf | ||
| Attachment 2 - SUBSAFE Appendix A.pdf | ||
| Attachment 3 - SUBSAFE Appendix F.pdf | ||
| Exhibit A - CDRLs_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Created On:
15 Jul 2026, 17:19 PM Greenwich Mean Time
Section A - Solicitation/Contract Form
Electrical Hull Fitting (EHF) Inspection and Repairs
Distribution: FILE, KR, NUWC 01, TPOC: TBD, WAWF: TBD NUWCDIVNPT PID Number: N66604-26-SIMACQ-NPT-85-0239 NUWCDIVNPT Requisition Number:1301374133 NUWCDIVNPT POC: Andrew McCall, andrew.c.mccall4.civ@us.navy.mil, (401) 832-6935
Offerors must fill-in information as required by this solicitation and specifically the provisions in Section K.
N6660426Q0239
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
MARK FOR INFORMATION
The Contractor shall include the following "Mark For" information clearly on all packages (or items themselves if they are not packaged) delivered under this Purchase Order.
Mark For:
Receiving Officer, Naval Station Newport
47 Chandler Street
NSLC BLDG 47
Newport, RI 02841-1716
NUWC Division Newport Code 85
ATTN: CODE 85 SUBSAFE
Purchase Order #: N66604-26-P-TBD
Item Supplies/Service Quantity Unit Unit Price Amount
Electrical Hull Fitting (EHF) Repair
EHF repairs in accordance with the Statement of Work (see Section C).
Pricing Arrangement: Firm Fixed Price
2 Each
Option Line Item
Electrical Hull Fitting (EHF) Repair
EHF repairs in accordance with the Statement of Work (see Section C).
Pricing Arrangement: Firm Fixed Price
2 Each
Option Line Item
Electrical Hull Fitting (EHF) Repair
EHF repairs in accordance with the Statement of Work (see Section C).
Pricing Arrangement: Firm Fixed Price
2 Each
Data in accordance with Exhibit A, Contract Data Requirements List (CDRL), DD Form 1432-2 with Addendum.
Pricing Arrangement: Firm Fixed Price
1 Lot
Section C - Description/Specifications/Statement of Work
STATEMENT OF WORK (SOW)/PERFORMANCE WORK STATEMENT (PWS)
SUBSAFE/LEVEL I
Submarine Defense Systems Not Ready for Issue (NRFI) Electrical Hull Fitting (EHF) Inspections and Repairs Background The Naval Undersea Warfare Center Division, Newport (NUWCDIVNPT) Undersea Warfare Weapons, Vehicles, and Defensive Systems Department (Code 85) and the Submarine Defense Systems Branch (Code 8541), is responsible for providing Research, Development, Test and Evaluation (RDT&E), systems and logistic products, acquisition, system integration, configuration management, and system level depot maintenance support for submarine defensive systems.
1.1 Places of Performance
Contractor's site.
1.2 Authorized Users
NUWCDIVNPT Code 8541 is the Technical Direction Agent (TDA) for this effort.
Naval Surface Warfare Center Philadelphia is the Certifying Activity (CA).
1.3 Sponsors
Undersea Defensive Warfare Systems Program Office (PMS415)
1.4 Types of Funding
Operations and Maintenance, Navy (O&M,N)
2.0 Scope
The Contractor shall inspect, repair, test and document Electrical Hull Fittings (EHFs), provided as Government Furnished Material (GFM), for the AN/WSQ-9 program. The hardware must meet and maintain SUBSAFE and LEVEL I requirements. The minimum quality requirements for LEVEL I material are provided in SOW Appendix A; "Minimum Standard Quality Contract Requirements for Procurement, Modification, Repair or Overhaul of Non-Nuclear Level I Material SMICs L1, C1, S1 and Level I Support SMIC Q3, VG". The contractor shall comply with Appendix A for all LEVEL I parts.
The minimum quality requirements for NON-LEVEL I / SUBSAFE Material are provided in Appendix F, "Minimum Standard Quality Requirements for Procurement, Modification, Repair or Overhaul of Material - NON-LEVEL I / SUBSAFE Boundary Material (SMIC Q5)". The contractor shall comply with all requirements established in Appendix F for all NON-LEVEL I /SUBSAFE parts.
2.1 Program or Systems Supported
AN/WSQ9 Program
3.0 Applicable Documents
The contractor shall perform the tasking required in Section 4.0 in accordance with (IAW) the below Applicable Documents (ADs).
Number Title Task Number
3.1 Appendix A, QP-01/SOP 8.1 Rev. A: Minimum Standard Quality Contract Requirements for Material Procurement, Modification, Repair or Overhaul of Non-Nuclear Level I Material SMICs L1, C1, S1 And Level I Support SMIC Q3, VG. dated 5May2023
4.0, 4.1, 4.2, 4.3
3.2 Appendix F, QP-01/SOP 8.1 Rev. A: Minimum Standard Quality Contract Requirements for Material Procurement, Modification, Repair or Overhaul of Non-Level SUBSAFE Boundary Material (SMIC Q5), dated 5May2023
4.0, 4.1, 4.2, 4.3
3.3 Submarine Safety (SUBSAFE) Requirements Manual NAVSEA 0924-LP-062-0010 Rev. D ACN 1-1, dated 23Aug2023. 4.0, 4.1, 4.2
3.4 NAVSEA 0948-LP-045-7010 MATERIAL CONTROL STANDARD Rev.4, dated 09APR2024 4.0, 4.1, 4.2
3.5 NAVSEA 413-7502540, Rev I dated 03MAY2026, Procurement Specification Electrical Hull Penetrator, High Power, Fiber Optic Interconnection for Signal Analysis System, AN/WSQ-9 (V)
4.1, 4.2
3.5.1 NAVSEAINST 4855.34, Procedures for Qualifying and Authorizing Activities to Perform SUBSAFE, FBWSCS, DSS- SOC Certification Work, dated 1 December 2021
4.1, 4.2
3.5.2 MS NO. 1110-081-029 REV-CHG-14 dated 4/24/2024 4.1, 4.2
3.6 MIL-STD-130, Identification Marking of U.S. Military Property, Rev N CH-1, dated 16NOV2012 4.1, 4.2
3.7 MIL-STD-792, Manufacturing Process Standard: Identification Marking Requirements for Special Purpose Components, Rev F, dated 19May2006
4.1, 4.2
3.8 ANSI/ISO/ASQ 09001-2015, American National Standard; Quality Management Systems-Requirements, dated 15Sep2015
4.1, 4.2
3.9 ISO 10012:2003, Measurement management systems, dated 15Apr2003 4.1, 4.2
3.10 ANSI/NCSL Z540-1, Calibration Laboratories and Measuring and Test Equipment - General Requirements, dated 1Nov2017
4.1, 4.2
3.11 NAVSEAINST 5100.3, Mercury, Mercury Compounds, and Components Containing Mercury or Mercury Compounds, Control of, Rev E, dated 20Feb2018
4.1, 4.2
3.12 NAVSEA NOTICE 5000, Activities Qualified to Perform Submarine Safety, Fly-By-Wire Ship Control Systems, and Deep Submergence Systems-Scope of Certification Work, dated 29Oct2024
4.1, 4.2
3.13 MIL-DTL-24231, Connectors, Plugs, Receptacles, Adapters, Hull Inserts, and Hull Insert Plugs, Pressure-Proof, General Specification For Rev. E dated 26Apr2013
4.1, 4.2
4.0 Technical Requirements
To ensure adequate material traceability and certification, the contractor shall control all EHFs in accordance with documents 3.1, 3.2 and 3.3. Upon award of this contract and in accordance with documents 3.1, 3.2, 3.3, and 3.5, the Contractor shall provide the Procuring Contracting Officer (PCO) Inspection System Procedures (CDRL A001). If the contractor has one of the ISO certifications listed in document 3.1, a copy of the certification is an acceptable alternative.
Deliverable(s) CDRL A001 Inspection and Test Plan (DI-QCIC-81110):
4.1 Inspection
The contractor shall perform incoming receipt inspections of two (2) NRFI EHFs and applicable traceability documentation received from the Government using applicable documents 3.1-3.13. With a material transfer, the contractor shall verify the material traceability documentation in accordance with applicable document 3.3, paragraph 6.5. The contractor shall evaluate the EHFs and material traceability documentation to verify the material integrity of all SUBSAFE and Level I components. The contractor shall notify the Government within five (5) business days if any SUBSAFE and Level I components or if the material traceability documentation are not in compliance with the requirements. The Government will provide the contractor with all the non-SUBSAFE and non-Level I Government Furnished Materials (GFM) needed to repair the EHFs. The contractor shall provide an inspection report as a Technical Report (CDRL A007) verifying: 1) all SUBSAFE and Level I components on the EHFs are reusable, 2) the material traceability documentation meet material control requirements, and 3) the non-SUBSAFE and non-Level I GFM components are accounted for and ready for installation.
Deliverable(s): CDRL A007 Technical Report (DI-MISC-80508B)
4.2 Refurbishment
The contractor shall repair the NRFI EHFs in accordance with applicable documents 3.1 - 3.13 and using GFI 7.1 - 7.2. The contractor shall use Government Furnished Materials (GFM) for repairs, which will be in accordance with applicable document 3.13. The contractor shall replace any obsolete parts with the GFM components provided by the Government. The contractor shall return all components that were replaced during the EHF repairs to the Government. The contractor shall provide a Certification/Data Report (CDRL A003) documenting that every component on the EHFs meet specified requirements. After repairs are completed, the contractor shall provide Test and Inspection Records (CDRL A004), Certification Data for Non-Nuclear Level I material (CDRL A002), and a Certificate of Compliance (CDRL A006).
Deliverable(s):
CDRL A002 Certification Data for Non-Nuclear Level 1 Material (DI-MISC-81020A) CDRL A003 Certification/Data Report (DI-MISC-80678 (S/S DI-MISC-82386)) CDRL A004 Test/Inspection Report (DI-NDTI-80809B) CDRL A006 Certificate of Compliance (DI-MISC-81356A)
4.3 Government Inspection and Acceptance of Supplies
As defined in ADs 3.1 and 3.2, the contractor shall inspect the EHFs. The contractor shall notify the appropriate Government representative (DCMA or NUWCDIVNPT representative) prior to Government inspections in accordance with the requirements of ADs 3.1 and 3.2. Prior to the delivery of the EHFs, the contractor shall comply with the material shipping requirements as defined in AD 3.1 Section 4.8.
5.0 Progress Reports
5.1 Contract Status Report
The Contractor shall prepare a Contractor's Status Report (CDRL A005) that indicates the progress of work, status of the program(s), and existing or potential problem areas for all assigned tasks. The Contractor shall submit the Contract Status Report for the same timeframe as each invoice submitted in the Wide Area Workflow (WAWF) Module of the Procurement Integrated Enterprise Environment (PIEE).
Deliverable(s): CDRL A005 Contract Status Report (DI-MGMT-81991)
6.0 Government Furnished Information
The following Government Furnished Information (GFI) will be made available under this contract.
Number Title Applicable SOW Task Number
6.1 Quality Assurance Records 4.1, 4.2
6.2 Design Data Packages 4.1, 4.2
7.0 Government Furnished Property
The Government may provide Government Furnished Property (GFP) as listed in Attachment 1. The contractor shall adhere to DFARS Clause
252.245-7005 for the management and reporting of Government Property and shall use the GFP Module of the Procurement Integrated Enterprise Environment (PIEE) as specified in the clause. In addition, the Contractor shall prepare and submit a Government Property (GP) Inventory Report to capture GFP status IAW CDRL A008.
Deliverable(s): CDRL A008 Government Property (GP) Inventory Report (DI-MGMT-80441D)
8.0 Quality Surveillance and Performance Standards
The Government will conduct quality surveillance via various methods including formal and informal meetings, review of technical reports, review of monthly progress reports, and review of deliverables. Contractor performance will be evaluated in the areas of technical quality, schedule/timeliness, management, and regulatory compliance as follows:
Schedule/Timeliness: The government will evaluate the contractor's ability to meet negotiated milestones and delivery schedules.
Management: The government will evaluate the contractor's ability to integrate and coordinate all activities needed to execute the contract.
Regulatory Compliance: The government will evaluate the contractor's compliance with the terms and conditions of the contract relating to applicable regulations and codes.
9.0 Information and Communication Technology (ICT) Accessibility Requirements The Government has determined that this procurement is not for Information and Communication Technology (ICT).
Security Compliance
10.1 Program Protection
SECURITY: All Contractor personnel shall adhere to the Security provisions of 32 CFR Part 117 - National Industrial Security Program Operating Manual (NISPOM). While performing work at a Government Facility, Contractor personnel shall comply with the security regulations of the host facility. Applicable FAR, DFARS, NMCARS clauses, and NAVSEA text shall be adhered to in the performance of this contract. Security incidents shall be promptly reported through the companies Facility Security Officer (FSO), to the Contracting Officer's Representative (COR), Technical Point of Contact (TPOC), and the Cognizant Security Office to NUWCDIVNPT Security. Controlled Unclassified Information (CUI) including Legacy FOUO and Covered Defense Information (meeting the definition of 48 CFR 252.204-7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, CUI available at: https://www.esd.whs.mil/Portals/54/Documents/DD/issuances /dodi/520048p.PDF. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) in accordance with DoDI 5230.24 (Distribution Statements on Technical Documents); and DoDI 5230.24, Enclosure 3 Procedures, available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/523024p.pdf
INFORMATION SECURITY: If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with National Industrial Security Program Operating Manual (NISPOM) codifying 32 CFR Part 117, NISPOM Rule, and SECNAV M-5510.36B. If the work is performed at the Government's facility, the Contractor shall comply with facility policy.
CUI INCIDENT REPORTING AND RESPONSE: The Contractor shall promptly report any unauthorized, inadvertent, or illegal release or disclosure of CUI to the Contracting Officer's Representative / Technical Point of Contact (TPOC), Procuring Contracting Officer, and the Security Office.
Contractor personnel shall coordinate this effort through the relevant industry site FSO.
PUBLIC RELEASE: Any controlled unclassified information pertaining to this contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S. Government authority. Proposed public releases shall be submitted for approval prior to release through the appropriate U.S. Government Office.
10.2 Operations Security (OPSEC)
OPSEC is a process that identifies critical information to determine if friendly actions can be observed by adversary intelligence systems, determines if information obtained by adversaries could be interpreted to be useful to them, and then executes selected measures that eliminate or reduce adversary exploitation of friendly critical information. The Contractor shall develop and implement, and update and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. The Contractor developed OPSEC program may include Information Assurance and Communications Security (COMSEC). The OPSEC program shall be in accordance with National Security Presidential Memorandum (NSPM) 28, and at a minimum shall include:
Assignment of responsibility for OPSEC direction and implementation.
Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.
Establishment of OPSEC education and awareness training. To include initial and annual OPSEC training.
Provisions for management, annual review, and evaluation of OPSEC programs.
Flow down of OPSEC requirements to subcontractors when applicable.
While performing aboard Government sites, the contractor shall: comply with all OPSEC instructions and policies; include OPSEC as part of its ongoing security awareness program and take all required Agency training; Be responsive to the Supporting OPSEC Manager on a non-interference basis; and Protect sensitive unclassified information and activities, which could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Organization and contractor in support of the mission.
10.3 Electronic Spillage
Electronic Spillage (ES) is defined as a situation where information of higher classification than a system is authorized to process is introduced into that system, intentionally or otherwise. If a Contractor is determined to be responsible for an ES, all direct and indirect costs incurred by the Government for ES remediation will be charged to the Contractor.
Requirements The contractor shall inspect, repair, test, and document multiple Electrical Hull Fittings.
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)
(a) Department means the Department of the Navy.
(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.
(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.
(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:
(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.
(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.
(Endof Text)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)
(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.
(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:
(1) The support contractor not disclose any information;
(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;
(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,
(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.
(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.
(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.
(End of Text)
C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018) (Dec 2018)
The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.
(End of Text)
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)
Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.
(End of Text)
C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018) (Oct 2018)
(a) Definitions.
(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).
(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.
(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.
(End of Text)
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019) (Mar 2019)
(a) Definitions. As used in this text:
Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and
(iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.
Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.
Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.
Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.
Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.
Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.
(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.
(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).
(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen. No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.
(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.
(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair.
Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.
(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination.
The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.
(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.
(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M- 5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.
(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL-DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).
(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989- 064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.
(End of Text)
C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit A, attached hereto.
(End of Text)
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)
The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.
(End of Text)
Section D - Packaging and Marking
Additional Regulation or Supplemental Clauses Incorporated by Full Text
D-211-H002 MARKING OF REPORTS (NAVSEA) (OCT 2018) (Oct 2018)
All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report:
(1) name and business address of the Contractor
(2) contract number
(3) sponsor:
(Name of Individual Sponsor)
NUWCDIVNPT
(Name of Requiring Activity)
Newport, RI
(City and State)
(End of Text)
D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018) (Oct 2018)
The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.
(End of Text)
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)
Item(s) 0001, 0002, and 0003. The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.
(End of Text)
D-247-H005 MARKING AND PACKING LIST(S) – ALTERNATE I (NAVSEA) (OCT 2018) (Oct 2018)
(a) . Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL-STD-129R with Change 1 dated 24 Marking May 2018.
(b) . A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, Packing List(s) shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL- STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.
Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.
(c) . In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one Master Packing List shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.
(d) . All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit packPart Identification
(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.
(End of Text)
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996
FAR Clauses Incorporated by Full Text
52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)
Higher-Level Contract Quality Requirement (Dec 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ANSI/ISO/ASQ 09001-2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in-
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-W004 PROCUREMENT QUALITY ASSURANCE INSPECTION AND ACCEPTANCE
(NAVSEA) (OCT 2018)
(Oct 2018)
(a) Initial inspection of the supplies to be furnished hereunder shall be made by at the contractor's or subcontractor's plant located NSWC Philadelphia at . The contractor shall notify the cognizant inspector when the material is available for inspection. The place designated for such inspections TBD shall not be changed without authorization of the Contracting Officer. Final inspection and acceptance shall be made by within NUWCDIVNPT days after installation/checkout/test. seven (7)
(b) Initial inspection shall consist of quality assurance at point of manufacture or assembly and check/test prior to shipment. Final inspection and acceptance will be made by the Receiving Activity after installation/check out/testing of the supplies.
(End of Text)
E-246-H013 INSPECTION AND ACCEPTANCE OF DATA (NAVSEA) (OCT 2018) (Oct 2018)
Inspection and acceptance of all data shall be as specified on the attached Contract Data Requirements List(s), DD Form 1423.
(End of Text)
E-246-W007 NOTIFICATION OF INSPECTION OR TEST (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor agrees to notify , in writing, when the material will be inspected and/or tested. A minimum of Certifying Activity (CA) seven (7) working days is required to arrange such a visit.
(End of Text)
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:
2015 "Quality Management Systems - Requirements" and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
(End of Text)
Section F - Deliveries or Performance
Overall Contract Delivery Period
Ship To DoDAAC: N66604 CountryCode: USA
NUWC DIV NEWPORT
1176 HOWELL ST, NEWPORT RI 02841-1703
NEWPORT, RI 02841-1703
UNITED STATES
Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991
Additional Regulation or Supplemental Clauses Incorporated by Full Text
F-242-H001 CONTRACTOR NOTICE REGARDING LATE DELIVERY (NAVSEA) (OCT 2018) (Oct 2018)
In the event the contractor anticipates or encounters difficulty in complying with the contract delivery schedule or date, the contractor shall immediately notify, in writing, the Contracting Officer and the cognizant Contract Administration Services Office, if assigned. The notice shall give the pertinent details; however, such notice shall not constitute a waiver by the Government of any contract delivery schedule, or of any rights or remedies provided by law or under this contract.
(End of Text)
F-247-H001 DELIVERY OF DATA (NAVSEA) (OCT 2018) (Oct 2018)
All data to be furnished under this contract shall be delivered prepaid to the destination(s) and at the time(s) specified on the Contract Data Requirements List(s), DD Form 1423.
(End of Text)
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
INVOICE AND RECEIVING REPORT COMBO
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
NOT APPLICABLE
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC TBD
Issue By DoDAAC TBD
Admin DoDAAC TBD
Inspect By DoDAAC TBD
Ship To Code TBD
Ship From Code TBD
Mark For Code TBD
Service Approver (DoDAAC) TBD
Service Acceptor (DoDAAC) TBD
Accept at Other DoDAAC TBD
LPO DoDAAC TBD
DCAA Auditor DoDAAC TBD
Other DoDAAC(s) TBD
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
NOTE: WAWF email notifications - The contractor shall enter the email address identified below in the "Send Additional Email Notifications" field of WAWF once a document is submitted in the system: TBD
Additional Regulation or Supplemental Clauses Incorporated by Full Text
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
2019)
(Jan 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of Text)
Section H - Special Contract Requirements
Additional Regulation or Supplemental Clauses Incorporated by Full Text
H-246-H001 CALIBRATION SYSTEM REQUIREMENTS (NAVSEA) (FEB 2023) (Feb 2023)
(a) Definitions:
(1) All definitions, with the exception of Commercial Service Provider, are found in OPNAVINST3960.16 (series).
(2) Commercial Service Providers. Suppliers of tools, instruments, fixtures, test, measurement, and diagnostic equipment, including original equipment manufacturers, who may calibrate their own products but are not engaged in calibration as a major line of business, and other commercial laboratories that provide either calibration services in support of Navy contracts, or low volume, model specific, or unique parameter calibration services.
(b) The accuracy of Navy and Contractor calibrated equipment used for quantitative and qualitative measurements are ensured through measurement traceability. The Contractor is required to ensure that all calibrated equipment used for quantitative or qualitative measurements required for the research, design, test, production, and maintenance of NAVSEA systems will be maintained and calibrated in accordance with references OPNAVINST 3960.16 and NAVSEAINST 4734.1. Calibration sources shall be accredited by a U.S.
based, Navy approved accreditation body to U.S. national standards:
(1) ANSI/NCSL Z540.3, Requirements for the Calibration of Measuring and Test Equipment, dated 3 Aug 2006; or
(2) ISO/IEC 17025:2017, General Requirements for the Competence of Testing and Calibration Laboratories (3rd Edition), dated 29 Nov 2017; or
(3) Certified by the U.S. Navy to NAVSEA 04-4734, Navy and Marine Corps Calibration Laboratory Audit /Certification Manual.
(c) ISO/IEC 17025:2017 and ANSI/NCSL Z540.3 accreditations must be performed by a U.S. based accreditation body. Calibration accreditation must include the parameters required to execute the calibration at appropriate ranges and tolerances. A calibration certificate meeting the requirements of ANSI/NCSL Z540.3 or ISO/IEC 17025:2017 must be provided with the returned calibrated unit. The calibration certificate must be evaluated to confirm that the calibration was performed within the laboratory's accreditation scope and that each calibration measurement met or exceeded a 4:1 Test Uncertainty Ratio (TUR).
(d) Certification to Navy standard NAVSEA 04-4734, is acceptable in place of ANSI/NCSL Z540.3 and ISO /IEC 17025:2017 accreditations. For activities certified to NAVSEA 04-4734, calibrations must be evaluated to confirm that the calibration was performed within the laboratory's NAVSEA scope of certification, and calibration event records shall be provided to the Government upon request. Calibration intervals that deviate from NAVSEA OD 45845, Metrology Requirements List (METRL), shall reflect Test, Measurement and Diagnostic Equipment (TMDE) end of period reliability greater than 85%. TMDE reliability data shall be provided upon request. TURs shall be greater than or equal to 4:1, or ensure a Probability of False Acceptance (PFA) of 2% or less and a Probability of False Rejections (PFR) of 15% or less. Measurement traceability, including TUR, PFA, and PFR shall be documented in accordance to MIL-STD-1839. Calibration procedures, methods, and measurement traceability used by the Contractor shall be provided to the Government upon request.
(e) All calibrations supporting this contract shall meet the requirements of OPNAVINST 3960.16. If the Contractor executes, subcontracts or outsources the initial or reoccurring calibration of calibrated equipment, the respective calibration laboratory, and all of their employees who perform calibration or supply calibrated equipment, shall be certified or accredited to the requirements of paragraphs (b), (c), and (d).
(f) Contractors electing certification to NAVSEA 04-4734 will contact the Contracting Officer's Representative (COR) or Technical Point of Contact (TPOC) within 60 days of contract award, who will then contact the NAVSEA09MM METCAL Technical Warrant Holder…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .