Solicitation - N6278926Q3110.pdf

PDF 389 KB Posted

Attached to
Preparation and Preservation in Potable Water Tank Onboard Submarine
Solicitation number
N6278926Q3001
Issued by

About this file

This is a Request for Quote (RFQ) for preparation and preservation services on a Potable Water Tank #2 aboard a Virginia Class Submarine, issued by the Naval Sea Systems Command (NAVSEA) at Naval Submarine Base New London in Groton, Connecticut.

The solicitation N6278926Q3001 seeks a Women-Owned Small Business (WOSB) to provide tank preparation and preservation services under four line items: (1) preparation efforts using abrasive blasting to near white metal (SSPC-SP-10) or power tools (SSPC-SP-11) with feathering of adherent paint; (2) preservation system repair/restoration; (3) material costs for consumables, paint, fuel, rentals, and disposal; and (4) contractor travel and per diem for two trips to the base. All work must be completed on a firm fixed-price basis by November 30, 2026, with performance scheduled from October 30 through November 30, 2026. The contractor must work two shifts, seven days per week including holidays, maintain one personnel per shift with an active secret clearance, and provide documentation of AMPP certifications (C7, C12, C14, CAS Level 2) and QP-1 qualification. The offer due date is September 29, 2026, at 5:00 PM. The Government contact is Andrea Cook (Contract Specialist) at 860-433-8436, and the technical point of contact is Russ Joyner at 860-694-2475. All contractor personnel must be U.S. citizens, pass background checks for DBIDS credentials, and comply with confined space entry requirements including Marine Chemist certification. Payment will be made via electronic funds transfer (EFT) through Wide Area WorkFlow (WAWF), and the contract incorporates FAR and DFARS clauses including security, cybersecurity maturity model certification (CMMC Level 1), and various compliance and representation requirements.

View the file

Other files

File Type Posted
Wage-Determination.pdf PDF
PW TANK SPEC.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Created On:

15 Sep 2026, 19:26 PM Greenwich Mean Time

See Schedule

See Section G - Contract Administration Data

See Schedule

5. SOLICITATION NUMBER

N6278926Q3001

Andrea Cook 860-433-8436

29 Sep 2026

05:00 PM

N62789

SUP OF SHIPBUILDING GROTON

CONVERSION AND REPAIR USN, 73 EASTERN POINT RD

GROTON, CT 06340-4990

UNITED STATES

Andrea Cook, Email: andrea.a.cook.civ@us.navy.mil Telephone: 860-433-8436

336611

See Schedule

Section A - Solicitation/Contract Form Preparation & Preservation of Potable Water Tank #2

N6278926Q3001

Section B - Supplies or Services & Prices or Costs Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Preparation Efforts. Prepare Potable Water Tank #2 in accordance with the included statement of work. Contractor to clearly state the number of people performing work, hours per person, job title of each person and corresponding labor rate, total number of days required to complete the preparation. Vendor shall consider this requirement calls for the vendor to complete the preparation by working two shifts, seven days per week, inclusive of holidays, as necessary.

Pricing Arrangement: Firm Fixed Price

1 Job

Preservation Efforts. Preserve Potable Water Tank #2 in accordance with the included statement of work. Contractor to clearly state the number of people performing work, hours per person, job title of each person and corresponding labor rate, total number of days required to complete the preservation. Vendor shall consider this requirement calls for the vendor to complete the preservation by working two shifts, seven days per week, inclusive of holidays, as necessary.

Pricing Arrangement: Firm Fixed Price

1 Job

Material Costs. Contractor to state material costs and/or equipment usage costs to be incurred in support of the tank preparation and preservation. Contractor to break down and clearly state the materials and equipment to be used (consumables, paint, fuel, rentals, disposal etc).

Pricing Arrangement: Firm Fixed Price

1 Job

Contractor Travel/Per Diem. Travel costs to Naval Submarine Base New London on two occasions for tank preparation and preservation efforts. Contractor to provide a complete break down of travel plans (number of people travelling, hotel costs, flights, car rental expenses, meals/incidentals) to assist in evaluation.

Pricing Arrangement: Firm Fixed Price

1 Each

Section C - Description/Specifications/Statement of Work ORIGINATOR: Russ Joyner 860-694-2475

: 25 August 2026DATE

: 336611NAICS

1. SCOPE:

: PREPARE POTABLE WATER TANK NO. 2 & PRESERVATION ON VIRGINIA CLASS SUBMARINE.TITLE

2. REFERENCE/PLANS:

Maintenance Standard (MS) NO. 6310-081-015, REV J, CH-9, Submarine Maintenance Standard, MR Description: Submarine Preservation2.1 and General Painting Unrestricted Operation (URO) Maintenance Requirement Card (MRC), URO MRC 001 MOD 70, Perform Non-destructive Testing (NDT) 2.2

Surveillance Inspection of Selected Hull Welds

DFS 781-1101-2026 2.3

3. REQUIREMENTS:

A Virginia Class Submarine has a requirement to conduct NDT of welds in Potable Water (PW) Tank #2 (two), which is located onboard the3.1 vessel per reference 2.3. In support of the NDT efforts, (which will be performed by the Government), the PW tank surfaces must be prepared and preserved. The Contractor shall provide tank preparation and preservation services in accordance with References 2.1 and 2.2 as follows:

3.2 In accordance with reference 2.1, the Contractor shall provide the Government with documentation of each of the following qualifications:

3.2.1 AMPP C7

AMPP C12 3.2.2

AMPP C14 3.2.3

AMPP CAS Level 2 3.2.4

QP-1 3.2.5

The Contractor shall prepare the tanks surface by using abrasive blasting to near white metal (SSPC-SP-10) in accordance with reference 2.1. 3.3 For inaccessible areas, the Contractor shall prepare the surface using power tools (SSPC-SP-11) in accordance with reference 2.1. After the surface has been prepared, the Contractor shall accomplish feathering of adherent paint remaining after the required surface preparation by creating a smooth, one to two inch wide transition area between the prepared surface and the adherent paint using hand or power tool sanding or grinding.

The areas to be blasted/prepared in PW Tank #2 (two) is listed in reference 2.3. 3.3.1

Surface Preparation Requirements are as follows per reference 2.1: 3.3.2

When accomplishing complete repainting, the surface preparation must be abrasive blast to near white metal (SSPC-SP 10) in 3.3.2.1 accordance with Step 5.e.(9) of Reference 2.1, except in situations where a space cannot be isolated without risk of damage, then surface preparation to SSPC-SP 11 is allowed, as determined by the local technical authority.

When accomplishing the repair or restoration of the coating system, the surface preparation must be as determined by the repair 3.3.2.2 activity (Navy) based on an inspection of the existing coating system. Power tool cleaning must be in accordance with SSPC-SP 11. Abrasive blasting must be in accordance with SSPC-SP 10 (sound paint or bare metal) and Step 5.e.(9) of Reference 2.1.

Surface preparation for touchup painting must be in accordance with SSPC-SP 11. 3.3.2.3 Recyclable encapsulated abrasive media blasting may be used as an alternative to power tool cleaning, SSPC-SP 11 or SSPC-SP 10. 3.3.2.4 Once the area has been blasted and is ready for the NDT inspection the vendor shall wrap the area of the tank that was not blasted 3.3.2.5 with a fire-retardant wrap to protect the paint system.

The Contractor shall repair/restore the preservation system in PW Tank #2 (two) in accordance with reference 2.1. 3.4

Upon restoration of the preservation system, the Contractor shall notify the TPOC for NACE inspection/acceptance of work. 3.4.1

Upon completion of the repair/restoration efforts, the Contractor shall provide a Certificate of Compliance (Contractor's format). The Certificate 3.5 of Compliance shall certify that all work performed and replaced components comply with the requirements of the procurement documents, invoked specifications and drawings, and assert that the physical and chemical properties (material type, yield strength, tensile strength, elongation or hardness testing) are as specified in the contract specifications. The certificate shall include:

a. Contractor's name, address, phone number and date.

b. The issuing agency's purchase order number.

c. Item nomenclature of the purchased item (the product is identified by description, amount, lot number, etc.).

d. Contractor's or authorized person's signature.

4. NOTES:

The performance location will be at a pier at the Submarine Base, New London, CT.4.1

The Contractor shall ensure personnel working in tanks or other confined spaces are trained and qualified for the hazard potentials. If4.2 respirators are required, workers shall be trained and medically qualified per local OSH (occupational, safety and health) instructions.

The Contractor shall comply with all local, state, and federal OSH and Environmental Protection (EP) rules and regulations as directed by local 4.3 implementation plans.

All Contractor personnel shall be a citizen of the United States of America. 4.4

Prior to entering any tank, the Contractor shall ensure each tank is certified by a Marine Chemist as safe for personnel entry; the Marine 4.5 Chemist shall issue a Marine Chemist Certificate "Safe for Work/Entry" and leave it posted in order for personnel to enter and conduct work in the tanks.

The Contractor shall provide all material required to complete all requirements of this specification. 4.6

To accommodate ships schedule, the contractor shall complete the preparation and preservation by working two shifts, seven days per week, 4.7 inclusive of holidays as necessary. The contractor shall not remain onsite for the duration of NDT testing and will instead be recalled to complete the preservation services at the end of NDT testing.

4.8 The contractor shall demonstrate it is able to support an on-site response within a 2-hour notification in order to support a highly sensitive ship schedule.

4.9 For Contractor personnel that do not have a Common Access Card (CAC) or a Navy Commercial Access Control System (NCACS) card, the following is required to obtain Defense Biometric Identification System (DBIDS) credentials to gain access the base:

a. Ensure you provide the names of personnel requiring access to the Naval Submarine Base New London (SUBASE) to the Naval Submarine Support Facility (NSSF) Point of Contact (POC). NSSF will pass the information to the SUBASE Pass and ID office as your government sponsor.

b. Upon arrival at SUBASE, Present valid identification, Real ID Act-compliant state driver's license. If you don't have a Real ID compliant driver's license, you can use a passport. If you don't have a passport you will be required to have an original birth certificate and your social security card (not just your number).

c. Present a completed copy of the SECNAV 5512/1 form to obtain your background check. A copy of SECNAV 5512/1 can be obtained by contacting the NSSF POC.

d. Upon satisfactory completion of the background check, the Visitor Control Center representative will complete the DBIDS enrollment process, which includes your photo, finger prints, base restrictions, and several other assessments; after all this is done, you will be provided with your new DBIDS credential. You may now proceed to enter the base. The Government assumes no liability for failed background checks and all cost incurred as a result of failed background checks is the responsibility of the Contractor.

Contractor shall ensure they have one (1) personnel per shift with an active secret clearance for 4.10 escorting additional personnel on the submarine.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 None

Requirements Preparation and Preservation of Potable Water Tank #2 onboard Virginia Class Submarine.

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under theNational Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicableNational Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(End of Text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of Text)

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018) (Dec 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

(End of Text)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of Text)

C-223-W002 ON-SITE SAFETY REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)

(a) The contractor shall ensure that each contractor employee reads any necessary safety documents within 30 days of commencing performance at any Government facility. Required safety documents can be obtained from the respective safety office. Contractors shall notify the Safety office points of contact below to report completion of the required training via email. The email shall include the contractor employee's name, work site, and contract number.

(b) It is expected that contractor employees will have received training from their employer on hazards associated with the areas in which they will be working and know what to do in order to protect themselves. Contractors are required to adhere to the requirements of 29 CFR 1910, 29 CFR 1926 and applicable state and local requirements while in Government spaces. The contractor shall ensure that all on-site contractor work at the Government facility is in accordance with any local safety instructions as provided via the COR. The contractor shall report all work-related injuries/illnesses that occurred while working at the Government site to the COR.

(c) Contractors whose employees perform work within Government spaces in excess of 1000 hours per calendar quarter during a calendar year shall submit the data elements on OSHA Form 300A, Summary of Work Related Injuries and Illnesses, for those employees to the safety office via the COR by 15 January for the previous calendar year, even if no work related injuries or , illnesses occurred. If a contractor's injury/illness rates are above the Bureau of Labor Statistics industry standards, a safety assessment may be performed by the Safety Office to determine if any administrative or engineering controls can be utilized to prevent further injuries/illnesses, or if any additional Personal Protective Equipment or training will be required.

(d) Any contractor employee exhibiting unsafe behavior may be removed from the Government site. Such removal shall not relieve the contractor from meeting its contractual obligations and shall not be considered an excusable delay as defined in FAR 52.249-14.

(e) The Safety Office points of contacts are as follows:

Fred Zeppieri - fred.e.zeppieri.civ@us.navy.mil

(End of Text)

Section D - Packaging and Marking

Section E - Inspection and Acceptance Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: None.

DoDAAC: N62789 CountryCode: USA

SUP OF SHIPBUILDING GROTON

CONVERSION AND REPAIR USN, 73 EASTERN POINT RD

GROTON, CT 06340-4990

UNITED STATES

Russ Joyner, Technical Email: russel.c.joyner.civ@us.navy.mil Telephone: 860-694-2424

Inspection and Acceptance Location

Both Destination Instructions: None.

DoDAAC: N62789 CountryCode: USA

SUP OF SHIPBUILDING GROTON

CONVERSION AND REPAIR USN, 73 EASTERN POINT RD

GROTON, CT 06340-4990

UNITED STATES

Russ Joyner, Technical Email: russel.c.joyner.civ@us.navy.mil Telephone: 860-694-2424

Inspection and Acceptance Location

Both Destination Instructions: None.

DoDAAC: N62789 CountryCode: USA

SUP OF SHIPBUILDING GROTON

CONVERSION AND REPAIR USN, 73 EASTERN POINT RD

GROTON, CT 06340-4990

UNITED STATES

Russ Joyner, Technical Email: russel.c.joyner.civ@us.navy.mil Telephone: 860-694-2424

Inspection and Acceptance Location

Both Destination Instructions: None.

DoDAAC: N62789 CountryCode: USA

SUP OF SHIPBUILDING GROTON

CONVERSION AND REPAIR USN, 73 EASTERN POINT RD

GROTON, CT 06340-4990

UNITED STATES

Russ Joyner, Technical Email: russel.c.joyner.civ@us.navy.mil Telephone: 860-694-2424

Section F - Deliveries or Performance

Line Item Delivery Schedule Quantity Address and POC

Period of Performance From 30 Oct 2026 To 30 Nov 2026

1 Job

Period of Performance From 30 Oct 2026 To 30 Nov 2026

1 Job

Period of Performance From 30 Oct 2026 To 30 Nov 2026

1 Job

Period of Performance From 30 Oct 2026 To 30 Nov 2026

1 Each

Section G - Contract Administration Data

DFARS Clauses Incorporated by Full Text

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. (Dec 2018)

ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS (DEC 2018)

(a) . As used in this clause-Definitions

"Contract financing payment" means an authorized Government disbursement of monies to a contractor prior to acceptance of supplies or services by the Government.

(1) Contract financing payments include-

(i) Advance payments;

(ii) Performance-based payments;

(iii) Commercial advance and interim payments;

(iv) Progress payments based on cost under the clause at Federal Acquisition Regulation (FAR) 52.232-16, Progress Payments;

(v) Progress payments based on a percentage or stage of completion (see FAR 32.102(e)), except those made under the clause at FAR 52.232-5, Payments Under Fixed-Price Construction Contracts, or the clause at FAR 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(vi) Interim payments under a cost reimbursement contract, except for a cost reimbursement contract for services when Alternate I of the clause at FAR 52.232-25, Prompt Payment, is used.

(2) Contract financing payments do not include-

(i) Invoice payments;

(ii) Payments for partial deliveries; or

(iii) Lease and rental payments.

"Electronic form" means any automated system that transmits information electronically from the initiating system to affected systems.

"Invoice payment" means a Government disbursement of monies to a contractor under a contract or other authorization for supplies or services accepted by the Government.

(1) Invoice payments include-

(i) Payments for partial deliveries that have been accepted by the Government;

(ii) Final cost or fee payments where amounts owed have been settled between the Government and the contractor;

(iii) For purposes of subpart 32.9 only, all payments made under the clause at 52.232-5, Payments Under Fixed-Price Construction Contracts, and the clause at 52.232-10, Payments Under Fixed-Price Architect-Engineer Contracts; and

(iv) Interim payments under a cost-reimbursement contract for services when Alternate I of the clause at 52.232-25, Prompt Payment, is used.

(2) Invoice payments do not include contract financing payments.

"Payment request" means any request for contract financing payment or invoice payment submitted by the Contractor under this contract or task or delivery order.

"Receiving report" means the data prepared in the manner and to the extent required by Appendix F, Material Inspection and Receiving Report, of the Defense Federal Acquisition Regulation Supplement.

(b) Except as provided in paragraph (d) of this clause, the Contractor shall submit payment requests and receiving reports in electronic form using Wide Area WorkFlow (WAWF). The Contractor shall prepare and furnish to the Government a receiving report at the time of each delivery of supplies or services under this contract or task or delivery order. .

(c) Submit payment requests and receiving reports to WAWF in one of the following electronic formats:

(1) Electronic Data Interchange.

(2) Secure File Transfer Protocol.

(3) Direct input through the WAWF website.

(d) The Contractor may submit a payment request and receiving report using methods other than WAWF only when-

(1) The Contractor has requested permission in writing to do so, and the Contracting Officer has provided instructions for a temporary alternative method of submission of payment requests and receiving reports in the contract administration data section of this contract or task or delivery order;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment on a contract or task or delivery order for rendered health care services using the TRICARE Encounter Data System; or

(4) The Governmentwide commercial purchase card is used as the method of payment, in which case submission of only the receiving report in WAWF is required.

(e) Information regarding WAWF is available at https://wawf.eb.mil/.

(f) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(End of clause)

252.232-7006 Wide Area WorkFlow Payment Instructions. (Tailored) (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause-Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, asElectronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall-WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the PracticeWAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File TransferWAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports inWAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s):Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Combo

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWFDocument routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N6280B

Issue By DoDAAC N62789

Admin DoDAAC N62789

Inspect By DoDAAC N62789

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) N62789

Service Acceptor (DoDAAC) N62789

Accept at Other DoDAAC ____

LPO DoDAAC N62789

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request inPayment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

Russ Joyner -- Russel.c.joyner.civ@us.navy.mil usn.ncr.sea-01.mbx.wawf-hq-functional-mail-box@us.navy.mil

DFAS: https://corpweb1.dfas.mil/askdfas/askap.jsp DFAS Phone: 216.204.1073 Local DFAS Support: Donald.c.fauver.civ@us.navy.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-232-H002- H002 PAYMENT INSTRUCTIONS (NAVSEA) (FEB 2024) (Feb 2024)

Payment office allocation methods can be found in the table at DFARS PGI 204.7108(b)(2) (https://www.acq.osd.mil/dpap /dars/pgi/pgi_htm/current/PGI204_71.htm#payment_instructions).

(End of text)

G-242-H001 - GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023) (Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Name: Stephanie Neale Address: 73 Eastern Point Rd., Groton, CT 06340 Phone: (860) 433-3709 E-mail: stephanie.l.neale.civ@us.navy.mil

(ii) The Contract Specialist is:

Name: Andrea Cook Address: 73 Eastern Point Rd., Groton, CT 06340 Phone: (860) 433-8436 E-mail: andrea.a.cook.civ@us.navy.mil

(d) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.

The Technical Point of Contact (TPOC) is:

Name: Russ Joyner Address: Naval Submarine Base, Groton, CT 06340 Phone: (860) 694-2475 E-mail: Russel.c.joyner.civ@us.navy.mil

(e) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.

The Alternate Technical Point of Contact (ATPOC) is:

Name: Jim Crudden Address: Naval Submarine Base, Groton, CT 06340 Phone: (860) 694-2424 E-mail: james.c.crudden.civ@us.navy.mil

(f) The Contractor's point of contact for performance under this contract is:

Name: [ * ] Address:

[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]

[ * ] To be completed at contract award

(End of Text)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)

(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.

S. Government.

(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.

(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.

(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.

(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.

(f) The hours of operation are as follows:

AREA FROM TO

Contracts 7:30a.m. 3:30p.m.

Business Office 6:00a.m. 2:00p.m.

(End of Text)

Section H - Special Contract Requirements Additional Regulation or Supplemental Clauses Incorporated by Full Text

H-209-H003 REQUIRED DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST

(NAVSEA) (NOV 2022) (Nov 2022)

(a) "Organizational Conflict of Interest" means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the Government, or the person's objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. "Person" as used herein includes Corporations, Partnerships, Joint Ventures, and other business enterprises.

(b) The Contractor warrants that to the best of its knowledge and belief, and except as otherwise set forth in the contract, at the time of execution of this contract the Contractor does not have any organizational conflict of interest(s) as defined in paragraph (a).

(c) The Contractor agrees that, if after award, it discovers an actual or potential organizational conflict of interest, it shall make immediate and full disclosure in writing to the Contracting Officer. The notification shall include a description of the actual or potential organizational conflict of interest, a description of the action which the Contractor has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevant information that would assist the Contracting Officer in making a determination on this matter. Notwithstanding this notification, the Government may terminate the contract for the convenience of the Government if determined to be in the best interest of the Government.

(d) Notwithstanding paragraph (c) above, if the Contractor was aware, or should have been aware, of an organizational conflict of interest prior to the award of this contract or becomes, or should become, aware of an organizational conflict of interest after award of this contract and does not make an immediate and full disclosure in writing to the Contracting Officer, the Government may terminate this contract for default.

(e) If the Contractor fails to take action required by this requirement, or required by the Contracting Officer upon receipt of the Contractor's disclosure required by paragraph (c), the Government may terminate this contract for default.

(f) The Contracting Officer's decision as to the existence or nonexistence of an actual or potential organizational conflict of interest shall be final.

(g) The Contractor shall promptly notify the Contracting Officer, in writing, if it has been tasked to evaluate or advise the Government concerning its own products or activities, those of its subcontractors, those of one of its prime contractors (to which the contractor is a subcontractor), or those of a competitor in order to ensure proper safeguards exist to guarantee objectivity and to protect the Government's interest.

(h) The Contractor shall include this requirement in subcontracts of any tier which involve access to information or situations/conditions covered by the preceding paragraphs, substituting "subcontractor" for "contractor" where appropriate.

(i) The rights and remedies described herein shall not be exclusive and are in addition to other rights and remedies provided by law or elsewhere included in this contract.

(j) Compliance with this requirement is a material requirement of this contract.

(End of Text)

Section I - Contract Clauses FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026- O0038) Feb 2026

52.222-35 Equal Opportunity for Veterans. (Deviation 2026-O0038) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities. (Deviation 2026-O0038) Feb 2026 52.222-37 Employment Reports on Veterans. (Deviation 2026-O0038) Feb 2026 52.222-41 Service Contract Labor Standards. (Deviation 2026-O0038) Feb 2026 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026-O0038) Feb 2026

52.222-90 Addressing DEI Discrimination by Federal Contractors. (Deviation 2026-O0040, Revision 1) Apr 2026

52.223-23 Sustainable Products. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026

52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026- O0038) Apr 2026

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting (DEVIATION 2026-O0025) May 2024 Deviation 2026-O0025 Jun 2026

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023

252.204-7022 Expediting Contract Closeout. May 2021 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023

252.232-7010 Levies on Contract Payments. Dec 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel. Jan 2023

252.240-7007 Prohibitions Relating to Chinese Military Companies. (DEVIATION 2026- O0025) Jun 2026 Deviation 2026-O0025 Jun 2026

252.240-7997 NIST SP 800-171 DoD Assessment Requirements. (DEVIATION 2026- O0025) Feb 2026 Deviation 2026-O0025 Feb 2026

252.247-7023 Transportation of Supplies by Sea. Oct 2024

FAR Clauses Incorporated by Full Text

52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026- O0038) (Feb 2026)

TERMS AND CONDITIONS-COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FEB 2026) (DEVIATION 2026-O0038)

(a) . The clause at Federal Acquisition Regulation (FAR) 52.202-1, Definitions, is incorporated by reference.Definitions

(b) . The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. TheInspection/Acceptance Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post acceptance rights-

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(c) . The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank,Assignment trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.

C. 3727). However, when a third party makes payment ( use of the Governmentwide commercial purchase card), the Contractor may not assigne.g., its rights to receive payment under this contract.

(d) . Changes in the terms and conditions of this contract may be made only by written agreement of the parties.Changes

(e) . This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on anyDisputes request for equitable adjustment, claim, appeal, or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause FAR 52.233-1, Disputes, which is incorporated in this contract by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(f) . The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control ofExcusable delays the Contractor and without its fault or negligence. Examples of occurrences include acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. When an excusable delay occurs, the Contractor shall-

(1) Notify the Contracting Officer in writing as soon as possible;

(2) Remedy the delay as quickly as possible; and

(3) Notify the Contracting Officer when the occurrence is over.

(g) Invoice. The Government will handle invoices according to the Prompt Payment Act (31 U.S.C. 3903) and 5 CFR part 1315. The Contractor shall submit invoices to the address designated in the contract to receive invoices. An invoice must include the information required by 5 CFR part 1315.9(b).

(h) . The Contractor shall indemnify the Government and its officers, employees, and agents against liability, including costs, forPatent indemnity actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark, or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) -Payment

(1) . Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth inItems accepted this contract.

(2) . The Government will make payment in accordance with the Prompt Payment Act ( 31 U.S.C. 3903) and prompt paymentPrompt payment regulations at .5 CFR part 1315

(3) . In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose ofDiscount computing the discount earned, payment shall be considered to have been made on the date that appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(4) . If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwiseOverpayments overpaid on a contract financing or invoice payment, the Contractor shall-

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the-

(A) Circumstances of the overpayment ( , duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);e.g.

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable;

(D) Contractor point of contact; and

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

.(5) Interest All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid(i) unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) . The Contracting Officer will issue a final decision as required by FAR part 33 if-Final decisions

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see FAR part 32).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .