This is a Request for Proposal (RFP) issued by the U.S. Navy for a Design-Bid-Build fixed-price construction contract for the P-1550 SOF Marine Raider Battalion Company & Team Facilities at Marine Corps Base Camp Lejeune in North Carolina. The project encompasses construction of approximately 218,200 square feet across multiple facilities, including a 73,400 SF SOF Marine Battalion Operations, Supply, Communications, and Intel facility; a 127,200 SF Company HQ and Team Facilities building; a 17,600 SF Company Storage Building; and miscellaneous supporting structures, utilities, parking, roadways, pedestrian ways, and site work. The structures will feature single-story steel frame construction with brick veneer over metal studs, standing seam metal roofs, metal soffits, and translucent wall panels, with special features including pile foundations, surcharged sites, wetlands mitigation, and stormwater best management practices. The solicitation is unrestricted for full and open competition under FAR Part 15, with a contract award date of December 10, 2026, for proposal evaluation purposes only. The total contract duration is 1,246 calendar days from the date of award receipt, with performance to begin within 15 calendar days of award. The procurement is designated as a DO-rated order under the Defense Priorities and Allocations System (DPAS) for national defense purposes.
The contract is structured as a firm fixed-price award with base pricing and two optional line items for Audio Visual System equipment and Furniture, Fixtures, and Equipment (FF&E). The estimated construction magnitude is between $100 million and $250 million, with NAICS code 236220 (Commercial and Institutional Building Construction) and a small business size standard of $45 million. Offerors must submit a 20 percent bid bond or $3 million, whichever is less. Evaluation will be based on price and five non-cost factors of equal importance: Corporate Experience (minimum two to five relevant projects over $50 million completed within ten years), Management Approach and Schedule (ten-page narrative and CPM schedule), Safety (DART and TCR rates for five calendar years plus technical approach narrative), Past Performance (based on Factor 1 projects), and Small Business Utilization and Participation (minimum 20 percent small business participation requirement, with command-wide targets of 40 percent SB, 5 percent SDB, 3 percent HUBZone SB, 9 percent WOSB, and 5 percent SDVOSB). Large business offerors must submit a Small Business Subcontracting Plan. Proposals must be submitted electronically via the PIEE Solicitation Module in PDF format by the deadline specified in Block 13A of Standard Form 1442, with all required documentation including executed SF1442, price proposal form, bid bond, SAM registration confirmation, financial statements, bank references, and equipment/facilities descriptions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Section 00 00 00 - Procurement and Contracting Requirements
Design-Bid-Build (DBB) P-1550 SOF Marine Raider Battalion Company & Team Facilities
N4008526R0138
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
BASE PRICE: Total Price for Line Item 0001, the entire work for Project P-1550- SOF Armory in accordance with the drawings and specifications, complete, but excluding work provided in another priced line item. (Sum of items 0001A through 0001J)
Pricing Arrangement: Firm Fixed Price
1 Task
Option Line Item
Option Item No. 1: Price for providing Audio Visual System (A/V) Equipment, testing, and associated training in accordance with the drawings and specifications, but excluding work provided in another priced line item. Equipment includes, but is not limited to, items such as flat panel monitors, projectors, wall input boxes, touch screens, push button control panels, video teleconferencing codecs, microphones, speakers and the communication cabling connecting these devices together.Include the price for supporting permanent infrastructure under the Base Price.
Interior supporting infrastructure includes items such as conduit, junction boxes, mounting hardware, and power connections.
Pricing Arrangement: Firm Fixed Price
1 Task
Option Line Item
Option Item No. 2: Price for providing work in connection with labor, material, equipment, transportation and supervision required for the Furniture, Fixtures, and Equipment (FF&E), complete in accordance with the drawings and specifications, but excluding work provided in another priced line item.
Pricing Arrangement: Firm Fixed Price
1 Task
Section 00 21 00 - Instructions
TABLE OF CONTENTS
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
1.2 GENERAL OVERVIEW OF CONTRACT
2. BASIS FOR AWARD
3. EVALUATION FACTORS FOR AWARD
4. PROPOSAL REQUIREMENTS
4.1 PRE-PROPOSAL CONFERENCE AND SITE VISIT
4.2 PROPOSAL SUBMISSION INSTRUCTIONS
4.3 PRE-PROPOSAL INQUIRIES (PPIs)
4.4 CONTRACT OPPORTUNITIES
5. INCORPORATION OF TECHNICAL PROPOSALS
6. ATTACHMENTS: LOCATED ON CONTRACT OPPORTUNITIES UNDER ATTACHMENTS
6.1 ATTACHMENT A - PRE-PROPOSAL INQUIRY (PPI) LOG
6.2 ATTACHMENT B - PIEE VENDOR ACCESS INSTRUCTIONS
6.3 ATTACHMENT C - PRICE PROPOSAL FORM
6.4 ATTACHMENT D - CONSTRUCTION EXPERIENCE PROJECT DATA SHEET
6.5 ATTACHMENT E - PAST PERFORMANCE QUESTIONAIRE (PPQ)
6.6 ATTACHMENT F - HISTORICAL SMALL BUSINESS UTILIZATION
6.7 ATTACHMENT G - SMALL BUSINESS PARTICIPATION COMMITMENT DOCUMENT (SPCD)
6.8 ATTACHMENT H - SMALL BUSINESS SUBCONTRACTING PLAN
1. GENERAL
1.1 GENERAL OVERVIEW OF PROCUREMENT PROCESS
This solicitation is being issues as UNRESTRICTED FOR FULL AND OPEN COMPETITION.
The NAICS Code for this procurement is 236220 and the Size Standard is $45,000,000.
This acquisition will be advertised utilizing FAR Part 15 - Contracting by Negotiation resulting in a Firm-Fixed Price (FFP) Contract for Construction Services.
In accordance with DFARS 236.204, the estimated magnitude of construction is between $100,000,000 and $250,000,000.
1.2 GENERAL OVERVIEW OF THE CONTRACT
The general intent of this solicitation is to award a Fixed Price Construction Contract for a Design-Bid-Build (DBB), construction services for the P- 1550 SOF Marine Raider Battalion Company & Team Facilities located at the Marine Corps Base in Camp Lejeune in North Carolina. The project is to provide construction of 6,815 SM (73,400 SF) SOF Marine Battalion Operations, Supply, Communications, and Intel facility; 11,812 SM (127,200 SF) Company HQ and Team Facilities; 1,635 SM (17,600 SF) Company Storage Buildings and miscellaneous supporting structures, utilities, parking, roadways, pedestrian ways/sidewalks, and site work at Stone Bay at the Marine Corps Base (MCB) in Camp Lejeune, North Carolina. The structures will be single-story steel frame buildings with brick veneer over metal studs, standing seam metal roofs, metal soffits, and translucent wall panels.
Special construction features include pile foundations, surcharged sites, wetlands mitigation, and storm water best management practices.
2. BASIS FOR AWARD
The Government reserves the right to eliminate from consideration for award any or all offers at any time prior to award of the contract to negotiate with offerors in the competitive range; and to award the contract to the offeror submitting the proposal determined to represent the best value--the proposal most advantageous to the Government, cost/price and other factors considered.
The Government intends to evaluate proposals and award a contract after conducting discussions with offerors whose proposals have been determined to be within the competitive range. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the range to the greatest number that will permit an efficient competition among the most highly rated proposals.
The tradeoff process is selected as appropriate for this acquisition. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
As stated in the solicitation, all technical factors, when combined, are of equal importance to the performance confidence assessment (past performance) rating; and all technical factors and the performance confidence assessment (past performance) rating, when combined, are approximately equal to price.
Any proposal found to have a Deficiency in meeting the stated solicitation requirements or performance objectives will be considered ineligible for award unless the Deficiency is corrected through discussions. An Unacceptable rating in any of the non-cost/price factors will result in an overall rating of "Unacceptable" for the non-cost/price factors, unless corrected through discussions, if held. Proposals may be found to have either a Significant Weakness or multiple Weaknesses that impact either the individual factor rating or the overall rating for the proposal. The evaluation report must document the evaluation board's assessment of the identified Weakness(s) and the associated risk to successful contract performance resulting from the Weakness(s). This assessment must provide the rationale for proceeding to award without discussions.
3. EVALUATION FACTORS FOR AWARD
The solicitation requires the evaluation of price and the following non-cost/price factors:
Factor 1 - Corporate Experience
Factor 2 - Management Approach and Schedule
Factor 3 - Safety
Factor 4 - Past Performance
Factor 5 - Small Business Utilization and Participation
The distinction between Corporate Experience and Past Performance is Corporate Experience pertains to the types of work and volume of work completed by a contractor that are comparable to the types of work covered by this requirement, in terms of size, scope, and complexity. Past Performance pertains to both the relevance of recent efforts and how well a contractor has performed on the contracts.
The relative order of importance of the non-cost/price evaluation factors is the technical factors (Factors 1, 2, 3, and 5) are of equal importance to each other and, when combined, are equal in importance to the past performance evaluation/performance confidence assessment factor (Factor 4). When the proposal is evaluated as a whole, the technical factors and past performance/performance confidence assessment factor combined (i.e., the non-cost /price evaluation factors) are approximately equal to price.
The importance of price will increase if the Offerors' non-cost/price proposals are considered essentially equal in terms of overall quality, or if price is so high as to significantly diminish the value of a non-cost/price proposal's superiority to the Government. Award will be made to the responsible Offeror whose offer conforms to the solicitation and represents the best value to the Government, price and non-price factors considered.
Basis of Evaluation and Submittal Requirements for Each Factor.
Price Proposal:
(i) Solicitation Submittal Requirements:
Price shall be submitted on the Price Proposal Form included in the solicitation. The offeror shall submit one (1) electronic copy via PIEE of the solicitation submittal requirements identified below. The Price and Non-price proposals shall be submitted in separate files and submitted in Portable Document Format (PDF). In addition, non-price/technical information included in the price proposal will not be considered; likewise, price information included in the non-price/technical proposal will not be considered. All required proposal documents shall be submitted in accordance with FAR 15.208.
All submissions shall include the following:
1. Executed SF1442. Offeror shall insert its company name and address in Block #14, telephone number in Block #15, acknowledge all amendments in Block #19 (if applicable), name and title of person authorized to sign in Block #20A, signature in Block #20B, and offer date in Block #20C of the SF1442. In addition, Offeror shall provide a cover page with solicitation number, solicitation title, Offeror name, address, phone number, fax number, Unique Entity Identifier (UEI), CAGE code, Federal Tax ID number, Point of Contact (POC), POC phone number, and POC email address with its proposal.
2. Completed Price Proposal Form. The Offeror is required to submit a complete Price Proposal Form that includes completion of all contract line items numbers (CLINs). Pricing information is not required to be completed under Section 00 10 00 - Solicitation Contract Form in SF 1442.
3. Bid Bond (SF-24). Offeror shall submit a bid bond (SF-24) in the amount of 20% of total project bid price for the project or $3M, whichever amount is less. The bid bond shall be in the name of the offeror identified on the SF1442.
4. SAM registration. Offeror shall ensure current registration on the SAM Website, www.sam.gov, including Annual Representations and Certifications are complete and updated for this procurement. If a Representation or Certification required by Section 00 45 00 of the RFP is not provided in SAM, include the representation or certification in your price proposal. Please also submit the representation and certification for 52.209-13 - Violation of Arms Control Treaties or Agreements- Certification separately. It is not included in the annual representations and certifications in the System for Award Management. The Contracting Officer and/or Contract Specialist will verify the Offeror's registration in SAM only at time of submission of an offer and at the time of contract award, unless an exemption applies under FAR 4.1102(a)
5. FAPIIS. Offeror shall ensure Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete, as required by FAR 52.209-7, Information Regarding Responsibility Matters.
6. VETS-4212 registration. Confirmation of filing of Veterans' Employment and Training (VETS-4212) for the 2024 filing cycle, if the Offeror is required to submit. Offeror shall ensure a current VETS-4212 report has been submitted to the Department of Labor (DOL) website, http://www.dol.gov/vets/vets4212.htm. An email confirmation of submission can be requested and received by the Offeror from the DOL website and submitted in the price proposal. If the Offeror is not required to submit a report to VETS-4212, include a brief statement and justification explaining why the Offeror is not required to submit a report. Visit the VETS-4212 website for details concerning if your company is required to submit a VETS-4212 report and to request an email confirmation of submission.
7. Small business Subcontracting Plan (Reference FAR 52.219-9 ALT II and DFARS 252.219-7003).
In accordance with FAR 19.7, all other than small businesses shall submit a Small Business Subcontracting Plan (SBSP) utilizing the template provided as Attachment H. Acceptability of the SBSP will be considered a responsibility matter. The SBSP will not be evaluated or rated by the SSEB but reviewed by a Small Business Professional/Authorized Representative and the Contracting Officer for acceptability. The SBSP shall be negotiated and/or accepted within the time specified by the Contracting Officer. Failure to negotiate an acceptable subcontracting plan within the time limit prescribed by the Contracting Officer will render the Offeror ineligible for award of the contract. The SBSP will be incorporated into the resulting contract.
NAVFAC's command-wide small business subcontracting targets are shown below. These may be higher or lower than percentages that would represent, challenging, small business subcontracting goals for this acquisition consistent with efficient and effective performance of the contract.
These targets are based on a percentage of total planned subcontract dollars.
Small Business (SB) 40%
Small Disadvantaged Business (SDB) 5%
HUBZone SB 3%
Woman-Owned Small Business (WOSB) 9%
Service-Disabled Veteran-Owned Small Business (SDVOSB) 5%
The SBSP shall be consistent with the commitments offered in the Small Business Utilization and Participation factor. In accordance with DFARS 215.304(c)(i), when an evaluation assesses the extent that small businesses are specifically identified in proposals, those small businesses considered in the evaluation shall be listed in the SBSP.
Please note that SBSP goals and the participation rates provided in the Small Business Participation Commitment Document (SBPCD) WILL NOT be the same. The participation rates within the SBPCD are provided as percentages of the total contract value; subcontract plan goals are provided as a percentage of planned subcontracting dollars. While the percentages will differ, the types of products/services identified in the SBSP, should be the same as those products/services identified in the SBPCD. Likewise, the planned small business subcontract dollars in the SBSP will be equal to (or in some cases greater than) the extent of small business participation identified in the SBPCD.
8. Bank Reference. One (1) Signed Bank Reference demonstrating adequate financial resources. If offeror's firm has a line of credit, provide information on how many figures the offeror can borrow against the line of credit (i.e. medium 6 figures - exact line of credit is not required).
9. Financial Statements. The Offeror shall provide the latest three complete fiscal year financial statements for the prime contractor, certified by an independent accounting firm, if practicable, or signed by an authorized officer of the organization. Submit evidence of availability of working/operating capital, which will be used for the performance of the resultant contract. For Joint Venture arrangements, submit the latest three complete fiscal year financial statements for each company in the Joint Venture and discuss the financial responsibilities among the companies.
10. Facilities and Equipment. Provide a description of offeror's facilities and equipment.
11. Other Work. Provide a list of offeror's other work presently under contract.
(ii) Basis of Evaluation:
The Government will evaluate price based on the total price. Total price consists of the basic requirements, all option items, and FF&E and A/V (see Attachment C - Price Proposal Form of the solicitation). The Government intends to evaluate all options and has included the provision FAR 52.217- 5, Evaluation of Options (JUL 1990) in Section 00 21 00 of the solicitation. In accordance with FAR 52.217-5, evaluation of options will not obligate the Government to exercise the option(s). Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
Although required to be submitted with offeror's price proposal, Items 3 through 11 above will not be evaluated as part of the price proposal. This information will be utilized by the Government in the responsibility determination and for considering responsiveness to the solicitation requirements.
Non-Price Factors:
Refer to individual factors for page limitations. Information submitted beyond any of the page limits below will not be considered.
Note: If proposing as a Joint-Venture (JV), the offeror must submit the POC, UEI, and Cage Code for each JV partner.
Factor 1, Corporate Experience:
(i) Solicitation Submittal Requirements
The Offeror shall submit the following information:
Submit a minimum of two (2) up to a maximum of five (5) relevant construction projects for the Offeror that best demonstrate your experience on relevant projects that are similar in Size, Scope, and Complexity as defined below.
Experience shall be that of the offeror, performed as the . Experience of proposed subcontractors will not be considered. Prime Contractor Furthermore, experience of the offeror while working as a subcontractor will not be considered.
For purposes of this evaluation, a relevant project is further defined as:
Size: A final construction cost of $50 million or greater. Additionally, each project must include at least one building of 50,000 SF or greater.
Scope: New construction of multiple industrial building(s) and/or administrative/commercial building(s) in a single project.
Complexity: Each submitted project does not require demonstrated experience with all of the following components, but collectively, experience with all of the elements below must be established throughout the submitted relevant projects.
a) Experience with new construction of at least one (1) industrial building;
b) Experience with new construction of at least one (1) administrative/ commercial building.
Note: To be considered relevant, a project must meet the above Size, Scope, and at least one element of Complexity.
Projects submitted for the Offeror shall have been completed within the past ten (10) years from the date of issuance of this RFP. Projects which are not complete as of the date of issuance of this RFP will be considered "Not Relevant". Additionally, projects completed prior to ten (10) years from the date of issuance of this RFP will be considered "Not Relevant."
A project is defined as a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather, Offerors shall submit the work performed under a task order as a project. The submission of a multiple award and/or indefinite delivery/indefinite quantity type contract as a whole will be considered Not Relevant.
The attached Construction Experience Project Data Sheet (Attachment D) is and be used to submit project information. The MANDATORY SHALL Government will not consider information submitted in addition to this form nor will the Government consider information submitted via any other medium. Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed two (2) pages.
For all submitted projects, ensure that the project description clearly addresses how the project meets the required timeframe as well as the above Size, Scope, and Complexity requirements and clearly provides the final construction cost. The absence of any such information or information that does not clearly address the requirements may result in the project being considered Not Relevant, which could result in a rating of UNACCEPTABLE for this Factor if the minimum requirements are not met.
If the Offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture members. Offerors may submit experience where a member of the JV performed as a JV with another entity, but the offeror shall clearly demonstrate what portion of the work was performed by the JV member offering on this contract. For a JV, the offeror shall submit the SIGNED JV agreement which must also indicate the proposed participation of each Joint Venture member. For an 8(a) Mentor-Protege Joint Venture, the offeror shall submit the signed U.S. Small Business Administration (SBA) Mentor-Protege approval letter and signed JV agreement. .Offerors are still limited to a total of five (5) projects combined
Offerors that are not submitting as a JV may submit a project where it performed as a JV with another entity but must clearly demonstrate what portion of the work was performed by the JV member offering on this contract.
If an Offeror is utilizing experience information of affiliates/subsidiaries/parent/LLC/LTD member companies (name is not exactly as stated on the SF1442), the Offeror shall clearly demonstrate that the affiliate/subsidiary/parent firm will have meaningful involvement and clearly describe the role that firm will have in the performance of the contract. If meaningful involvement is not demonstrated, experience of the affiliate/subsidiary/parent firm will not be considered. The information pertaining to affiliates/subsidiaries/parent/LLC/LTD member companies has no page limitation and must be included within Factor 1 but does not need to be included on a Project Data Sheet.
(ii) Basis of Evaluation:
The basis of evaluation will include the Offeror's demonstrated experience and depth of experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror's relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. The Government will only review five (5) projects total. Any projects submitted in excess of the five (5) for Experience will not be considered. The Government will review the first five projects if more are submitted. An offeror that does not submit a minimum of two (2) relevant projects as defined above will be assigned a Deficiency and receive a rating of "Unacceptable". An Offeror with an "Unacceptable" rating in any Factor will not be eligible for award.
Proposals that do not demonstrate relevant project experience for each JV member may be considered less favorably.
Offerors that demonstrate experience with both Complexity elements in a single relevant project may be rated more favorably.
Factor 2, Management Approach and Schedule:
(i) Solicitation Submittal Requirements:
The offeror shall submit a Management Approach Narrative and Critical Path Schedule as detailed below. The narrative shall not exceed ten (10) pages, 8-1/2" x 11" size. The schedule must be submitted in 11" x 17" pages and in an Adobe PDF file. There is no page limit for the schedule.
Management Approach Narrative
The narrative shall include, but is not limited to:
- Provide a narrative work plan that clearly addresses and demonstrates understanding of the scope, major elements of work, technical complexities, project risks, and mitigation measures. Identify any activities that may affect the project timeline, including other on and off site activities.
- Identify activities that may affect the project timeline, including other/off site work activities.
Critical Path Schedule
The schedule shall include, but is not limited to:
Project schedule shall illustrate the offeror's ability to achieve or improve on the contract completion date set out in the RFP. The total duration of the contract is 1,246 calendar days. Identify the overall completion time for this project, in accordance with the RFP, as well as interim completion times and key milestones for sequences as required to complete construction. The schedule shall demonstrate an understanding of the work to include the base CLIN and all options, a logical sequence of events to accomplish the work, and contain enough information to identify all of the major milestones of the RFP. The schedule shall be based on a contract award date of 10 December 2026. This planned award date is for proposal purposes only and not dispositive of an anticipated/planned award date.
NOTE: The Offeror's proposal must AT LEAST comply with the required contract duration indicated in this RFP. If an Offeror proposes a realistic and feasible schedule that is shorter than the required duration, and that Offeror is selected for award, that proposed schedule and duration will be incorporated into the resultant contract. Offerors who propose durations longer than the RFP will be rated as UNACCEPTABLE.
Offerors shall provide a critical path method (CPM) schedule for execution and completion of the work to achieve the required interim and final completion milestones for the project. At a minimum, the CPM schedule shall address the following:
- Identify major activities and milestones
- Provide sequencing (precedence/succession) of critical activities, ensuring that critical and near-critical activities are sufficiently detailed
- Demonstrate knowledge of project regulatory constraints
- The CPM Schedule should document any tasks on the Critical Path.
Provide a Summary Schedule on no more than one (1) 11" x 17" page.
(ii) Basis of Evaluation:
Management Approach Narrative - Offerors will be evaluated on the extent to which they provide a narrative that demonstrates a clear understanding of the requirements of the RFP in accordance with the above Solicitation Submittal Requirements. An Offeror's narrative work plan that identifies areas of risk in logistics and resource management and provides a comprehensive contingency plan that addresses mitigation of any identified risks with potential solutions may be considered more favorably that those that do not.
Critical Path Schedule - Offerors will be evaluated on the extent to which they demonstrate a clear understanding of the requirements of the RFP. A schedule that proposes a realistic and feasible contract duration shorter than the required duration indicated in the RFP may be considered more favorably than those that do not.
Factor 3, Safety:
(i) Solicitation Submittal Requirements:
The Offeror shall submit the following information:
The Days Away from Work, Restricted Duty, or Job Transfer (DART) Rate; and Total Case Rate (TCR) for the specified five (5) Calendar Years (CY), as well as a safety narrative as described further below. For a partnership, joint venture, the Offeror shall submit separate DART, TCR for the specified five (5) CY for each contractor who is part of the partnership or joint venture; however, only one safety narrative is required. Any fatalities experienced within this 5-year timeframe must be explained in detail, to include root cause and corrective actions.
NOTE: DART and TCR shall not be submitted for subcontractors.
1. DART Rate: Submit five (5) previous complete calendar years' [CY2025, CY2024, CY2023, CY2022, and CY2021] worth of data (not an overall average). If the Offeror has no DART rate for any year, the Offeror must affirmatively state so and explain why. Should a negative trend occur above Moderate Risk levels, an acceptable/detailed explanation is required that includes any corrective actions taken for improvement.
a. DART cases include injuries or illnesses resulting in death, days away from work, and/or restricted work or transfer to another job days beyond the day of injury/illness.
b. Calculation of DART rate: Multiply the total number of DART cases by 200,000 and then divide by the number of employee labor hours worked.
2. TCR Rate: Submit five (5) previous complete calendar years' [CY2025, 2024, 2023, 2022, and 2021] worth of data (not an overall average). If the Offeror has no TCR rate for any year, the Offeror must affirmatively state so and explain why. Should a negative trend occur above Moderate Risk levels, an acceptable/detailed explanation is required, that includes any corrective actions taken for improvement.
a. TCR cases include injuries or illnesses resulting in death, days away from work, restricted work or transfer to another job days beyond the day of injury/illness, medical treatment beyond first aid, or loss of consciousness.
b. Calculation of TCR rate: Multiply the total number of TCR incidents by 200,000 and then divide by the number of employee labor hours worked.
3. Technical Approach for Safety: Submit a narrative that addresses the following:
a. Describe the Offeror's approach to implementing and executing a Safety Management System (SMS) including Management /Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describe the evaluation process used to select potential subcontractors.
c. Describe the processes of how the Offeror will oversee safety compliance of subcontractors at all levels throughout the performance of the contract (to include their own in-house workforce).
d. The Technical Approach to Safety narrative shall be limited to two (2) pages.
4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC's Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
(ii) Basis of Evaluation:
The Government is seeking to determine that the Offeror has consistently demonstrated a commitment to safety and that the Offeror plans to properly manage and implement safety procedures for itself and its subcontractors. The evaluation will collectively consider the DART rate, TCR, Technical Approach to Safety, and other sources of information available to the Government as part of such collective evaluation. The board will evaluate the DART rates and TCR to determine if the Offeror has demonstrated a history of safe work practices taking into account any negative trends and extenuating circumstances that impact the rating.
1. DART Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above Moderate Risk levels require the Offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a Deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) may indicate a Strength.
c. An increasing DART rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk (EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the DART rate to the level of risk:
Risk DART Rate
Very Low Risk Less Than 1.0
Low Risk From 1.0 to 1.99
Moderate Risk From 2.0 to 2.99
High Risk From 3.0 to 4.0
Extremely High Risk Greater than 4.0
2. TCR Rate: The board will evaluate trends over the last five years considering changes that take it from one risk level (or more) to the next up or down. Negative trends occurring above Moderate Risk levels require the Offeror to provide a detailed explanation that includes any corrective actions taken for improvement.
a. Missing data without an explanation is considered a Deficiency.
b. Declining trends that push the risk levels from Moderate Risk (MR) or higher to Low Risk (LR) or Very Low Risk (VLR) may indicate a Strength.
c. An increasing TCR rate trend could be considered a Weakness (i.e. MR or better to High Risk (HR) or Extremely High Risk (EHR)) if an acceptable explanation is not provided for any trends that rise above Moderate.
d. This chart correlates the TCR rate to the level of risk:
Risk TCR Rate
Very Low Risk Less Than 2.49
Low Risk From 2.5 to 3.49
Moderate Risk From 3.5 to 4.49
High Risk From 4.5 to 5.99
Extremely High Risk Greater than 6.0
3. The Technical Approach to Safety Narrative. To determine the degree to which the Offeror:
a. Describes a viable SMS that addresses the Offeror's approach to implementing and executing a Safety Management System (SMS) including Management/Leadership involvement, Employee involvement, Hazard prevention, Hazard control, Worksite analysis, and Safety and health training, to include the standard(s) used to benchmark the SMS.
b. Describes a methodical process of evaluating subcontractor's safety performance in their selection process.
c. Describes a logical management plan to hold themselves and their subcontractors accountable for adhering to the safety requirements of the contract.
d. The Technical Approach to Safety narrative shall be limited to two (2) pages. Information on pages beyond this limit will not be considered.
4. The Government reserves the right to review other available sources (public/Government internal) of information. These may include but are not limited to OSHA data, NAVFAC's Contractor Incident Reporting System (CIRS), Contractor Performance Assessment Reporting System (CPARS), Electronic Contract Management System (eCMS), etc.
Factor 4, Past Performance:
(i) Solicitation Submittal Requirements:
Recent, relevant projects are determined in Factor 1, Corporate Experience.
If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal for each project included in Factor 1. The offeror shall include all completed CPARS evaluations (interim and final) for a project. If there is not a completed CPARS evaluation, the Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1 Corporate Experience. AN OFFEROR SHALL NOT SUBMIT
A PPQ WHEN A COMPLETED CPARS IS AVAILABLE.
If a CPARS evaluation is not available, completed PPQs should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment E), which will provide contract and client information for the respective project(s). Offerors should ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, Andy Bui, via email at andy.h.
bui.civ@us.navy.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
Offerors are highly encouraged to provide any information on problems encountered and the corrective actions taken on projects submitted under Factor 1 - Corporate Experience. Offerors are also highly encouraged to address any adverse past performance issues. Such explanations shall not exceed four (4) pages in total. Information beyond this page limitation will not be considered.
Sources of Past Performance Information for evaluation that may be used are as follows:
- Past performance information provided by the offeror, as solicited;
- Past performance information obtained from questionnaires tailored to the circumstances of the acquisition; and
- Past performance information obtained from any other sources available to the Government, to include, but not limited to, Contractor Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; the Defense Contract Management Agency; and interviews with Program Managers, Contracting Officers, and Fee Determining Officials.
While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
A copy of the blank Past Performance Questionnaire to be used for requesting client references is included as Attachment E.
The Government reserves the right to contact references for verification or additional information. The Government's inability to contact any of the Offeror's references or the references' unwillingness to provide the information requested may affect the Government's evaluation of this factor.
(ii) Basis of Evaluation:
This evaluation focuses on how well the Offeror performed on projects deemed Relevant under Factor 1 - Corporate Experience and past performance on other relevant projects currently documented in known sources. The Government will consider the currency and relevance of the information, the source of the information, context of the data, and general trends in Contractor's performance. In the case of Offerors for which there is no information on past performance, or where past performance information is not available or so sparse that no meaningful assessment can be performed, the Offeror may not be evaluated favorably or unfavorably and will instead receive a "Neutral" rating (See FAR 15.305(a)(2)(iv)). The
Government may determine that a "Substantial Confidence" or "Satisfactory Confidence" past performance rating is worth more than a "Neutral Confidence" past performance rating in a best value tradeoff as long as the determination is consistent with stated selection criteria.
The Government will consider the degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., CPARS, Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering:
- A pattern of successful completion of tasks;
- A pattern of deliverables that are timely and of good quality;
- A pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); and
- Recency of tasks performed that are identical to, similar to, or related to the task at hand
Factor 5, Small Business Utilization and Participation:
It is the policy of the Government to provide maximum practicable opportunities in its acquisitions to Small Business (SB) concerns, including Small Disadvantaged Business (SDB), Woman-Owned Small Business (WOSB), Historically Underutilized Business Zone Small Business (HUBZone SB), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and other small business concerns. Further, it is the policy of the Government that such concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance.
This Factor assesses both the historical achievements in utilizing small business concerns and the proposed small business participation commitment for this requirement. The offeror is required to demonstrate its previous commitment to SBs through its record of past utilization of SBs and the level of commitment to small business if awarded a contract under this solicitation.
(i) Solicitation Submittal Requirements:
1. All Offerors (large, non-profits, small businesses) shall use (Historical Small Business Utilization) to demonstrate their AND Attachment F historical utilization of SBs. Each project submitted under , shall be included on . Failure to include Factor 1, Corporate Experience Attachment F each project submitted under , on , or the failure to fully complete for each project Factor 1, Corporate Experience Attachment F Attachment F may result in a Deficiency. Only complete Information provided in a different format and/or on a form created by the offeror will not Attachment F.
be evaluated. Attachments or addendums to will not be evaluated. Attachment F Offerors are permitted to expand portions of the form, as needed, to provide sufficient response. Instructions regarding how to complete are included at the beginning of the attachment. Attachment F
2. All Offerors (large, non-profits, small businesses) shall use (Small Business Participation Commitment Document (SBPCD) AND Attachment G to submit the following required information for evaluation of this factor:
To demonstrate commitment to use small business concerns in the performance of this contract, identify by name the subcontractors that will be used to support each small business category, including SDB, WOSB, HUBZone SB, VOSB, and SDVOSBs. Identify the type and complexity of product/service to be subcontracted, and the type of commitment (i.e., teaming agreement, joint venture agreement, mentor protege agreement, letter of commitment, etc.) with each subcontractor.
If subcontractors are not identified by name, offerors shall provide a detailed explanation why subcontractors are not identified. If firm written commitments with SBs are not in place, offerors shall provide an explanation and rationale on the ability to achieve the proposed participation. (See Attachment G, paragraph 5) If a LB offeror does not intend to subcontract, provide a why subcontracting detailed explanation would not result in efficient contract performance. SBs intending to 100% self-perform are not required to provide an explanation. (See , paragraph 6)Attachment G To demonstrate maximum practicable participation of small businesses, identify (in terms of dollar
) the offeror's proposed small business value and percentage of the total contract value participation. The minimum required small business participation (i.e. work to be performed by small business as the prime contractor and/or work to be performed by small business subcontractors) is . Offerors who are not able to meet the minimum total small business 20% participation requirement of (of the total contract value) shall provide a detailed explanation 20% why the minimum total small business participation requirement cannot be achieved.
Only complete . Information provided in a different format and/or on a form created by Attachment G the offeror will not be evaluated. Attachments or addendums to will not be evaluated. Attachment G
Large business offerors may achieve the minimum total small business participation requirement through subcontracting to small businesses.
Small business offerors may achieve the minimum total small business participation requirement through their own performance/participation as a prime as well as through a joint venture, teaming arrangement, and/or subcontracting with other small business concerns.
(ii) Basis of Evaluation:
The Government will evaluate the likelihood of success in achieving the small business objectives of this acquisition based on the following:
1. The extent to which the offeror is able to demonstrate a history of supporting Government policies concerning the utilization of small business concerns, including SDB, WOSB, HUBZone SB, VOSB, and SDVOSB and the success in achieving goals established by subcontracting plans on prior contracts. For projects submitted for , that did not have established small business goals, consideration will be Factor 1, Corporate Experience given to the utilization of the small business concerns and the degree of usage of small business relative to the total contract value. Historical Small Business Utilization will only be evaluated if performed by the offeror.
2. The extent to which the offeror has demonstrated an achievable commitment to use small businesses, including SDB, WOSB, HUBZone SB, in the performance of this contract within the SBPCD.VOSB, and SDVOSB
- The minimum small business participation requirement, through work performed by the small business prime and/or subcontracting with small businesses, shall meet or exceed of the total contract value, unless the offeror provides a reasonable 20% and well-documented explanation for why the minimum small business participation requirement cannot be achieved.20% o Offerors that demonstrate a commitment to providing maximum practical opportunity to small businesses may be rated higher.
o Proposing less than total small business participation requirement may result in a Deficiency20% .
o Offerors that do not demonstrate commitment to providing maximum practical opportunity to small businesses may result in a Deficiency.
- The SBPCD will be evaluated to determine the extent to which small business concerns are specifically identified by name and socioeconomic category in the document and the degree to which small business concerns, including SDB, WOSB, HUBZone SB, will participate relative to the total contract value. The complexity and variety of the work small business VOSB, and SDVOSB concerns will perform and the degree of commitment to use named sources through formal teaming agreements, joint venture agreements, mentor protege agreements, written/signed letters of /commitment, etc. will be evaluated to assess achievability of the commitment.
o The offeror may receive a Deficiency if firm commitments with subcontractors are not provided and the offeror fails to provide a detailed explanation for how the proposed small business participation…