This is a Basic Ordering Agreement (BOA) for non-commercial repair products issued by NAVSUP Weapon Systems Support (NAVSUP WSS), Philadelphia, Contract N0038326RD053, effective March 18, 2026, for a five-year term. The agreement establishes terms under which Honeywell International Inc. (CAGE O2LU7) will provide repair and modification services for government property, including repairable assemblies for V-22, F/A-18, E2/C2, H-60, Common Systems, and C-130 aircraft, as well as FMS items. The contractor must furnish all labor, materials, facilities, and special tooling required to return items to Ready For Issue (RFI) condition and submit Web-based Commercial Asset Visibility (WEBCAV) reporting for all repair orders.
Orders under this BOA will be issued as either priced orders with firm-fixed pricing or unpriced orders (Monetary Limitation Orders under FAR Part 13 or Ceiling Priced Orders under FAR Part 15). For unpriced orders, definitization must occur within 180 days of proposal submission or when 50 percent of the ceiling price is expended, whichever is first. The induction period for repairs is 365 days from order date. The contractor must segregate costs by individual delivery order and comply with extensive requirements regarding packaging per MIL-STD-2073-1 and MIL-STD-129, inspection standards, CMMC cybersecurity requirements (specific level to be identified at order level), and Government Property management per FAR 52.245-1. The agreement incorporates both FAR and DFARS clauses, including provisions for value engineering, critical safety items, item unique identification, and hazardous material handling. Contracting officers are Christian Markle and Danielle Grzeszczak at the Philadelphia location (700 Robbins Avenue, Philadelphia, PA 19111-5098).
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
Section A - Solicitation/Contract Form
Honeywell BOA Renewal Non-Commercial Repair
N0038326RD053
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
B01 - SUPPLIER OR SERVICES TO BE FURNISHED
This is a Basic Ordering Agreement (BOA) with Honeywell International Inc. (O2LU7). The terms and conditions in this BOA apply to all orders issued hereunder for non-commercial repair products in accordance with Revolutionary FAR Overhaul 15 and procurement of repair products that satisfy the Simplified Acquisition Threshold under Revolutionary FAR Overhaul 13. The Government may order, in the manner provided elsewhere herein, the following:
(a) :Repairs and/or Modifications of Government Property
(1) The contractor shall furnish all effort including labor, material, and facilities as may be required to repair and/or modify the ordered quantities of repairable assemblies (hereinafter repairable assemblies or items) in the V-22, F/A-18, E2/C2, H-60, Common Systems, and C- 130 aircraft System and FMS. The repairable assemblies to be repaired and/or modified under this BOA are set forth by manufacturer's part number or National Stock Number (NSN) in Attachment "A" and constitute "Government Property" as defined in Revolutionary FAR Overhaul 52.245-1 or Revolutionary FAR Overhaul 52.245-1 Alternate I, as applicable, of this BOA. Repair and/or modification of repairable assemblies will be accomplished in accordance with the Specifications for Repair/Modification/Statement of Work.
(2) Web-based Commercial Asset Visibility (WEBCAV) Reporting: The Contractor's effort on each Order for repair and/or modification of government property shall include furnishing all effort, including labor, materials, and facilities as may be required to accumulate, format, and transmit the transactions.
B02 - PRICED ORDERS
(a) When both parties agree Priced orders under this BOA shall be those in which the contractor submits a firm-fixed price quote, offer, or proposal, and delivery schedule in response to a Request for Quotation (RFQ) or Request for Proposal (RFP), and all terms and conditions have been agreed upon prior to issuance of the order, which could include: (i) with respect to Orders for repair, the pricing for Teardown and Evaluation (TD&E) and repair of government furnished property; and (ii) with respect to all Orders, delivery and Honeywell Quotation and/or P&DR number.
B03 - UNPRICED ORDERS
(a) When both parties agree unpriced orders under this BOA shall be those in which urgency exists that does not allow the Contracting office to negotiate a definitive contract action in sufficient time to meet the Government's requirements; and it is in the Government's interest that contract performance can begin immediately.
(b) Unpriced Purchase Orders(also known as "Monetary Limitation Orders") shall be issued pursuant to the requirements of Revolutionary FAR Overhaul Part 13 and Undefinitized Contractual Action Orders (also known as "Ceiling Priced Orders") shall be issued pursuant to the requirements of DFARS 217.74 (Deviation 2026-O0027)
(c) Unpriced Purchase Orders shall contain a Monetary Limitation price at the time of issuance. An Undefinitized Contractual Action Order shall contain a mutually agreed upon Not-To-Exceed price at the time of issuance.
(d) Failure to reach agreement on price for any order issued before its price is established is a dispute under the Disputes clause, Revolutionary FAR Overhaul 52.233-1.
(e) When an RFQ is issued under Simplified Acquisition Procedures (Revolutionary FAR Monetary Limitation Orders.
Overhaul Part 13) and the estimated contract price is under the Simplified Acquisition Threshold, a realistic monetary limitation shall be mutually established for the order and the order shall be funded in the amount of the monetary limitation.
(1) All monetary limitation orders shall include the clause at Revolutionary FAR Overhual 52.216-24 with the fill-ins completed. Any modification of an order to adjust the monetary limitation shall make corresponding adjustments to Revolutionary FAR Overhaul 52.216-24.
(f) When an RFQ or RFP is issued and the estimated Ceiling Priced Orders (applies to Revolutionary FAR Overhaul 15 only).
contract price is at or above the Simplified Acquisition Threshold, when both parties agree a Not-To-Exceed price shall be established for the order and the order shall initially be funded at not more than forty-nine percent (49%) of the Not-To-Exceed price. Prior to definitization and in the Government's discretion, a modification may be issued to increase the obligated amount to not more than seventy-five percent (75%) of the Not-To-Exceed price after receipt by the Government of the contractor's qualifying proposal for a firm-fixed-price order.
(1) All Ceiling Priced Orders shall include the clause at DFARS 252.217-7027 (Deviation 2026-O0027) with all fill-ins completed.
(2) All Ceiling Priced Orders shall include the clause at FAR Revolutionary FAR Overhaul 52.216-24 with the fill-ins completed. Any modification to the obligated amount prior to definitization shall make corresponding adjustments to Revolutionary FAR Overhaul 52.216-24.
(3) For any Ceiling Priced Order, the submission by the contractor of a qualifying proposal in accordance with the definitization schedule is a material element of the contract. The contractor shall submit its firm-fixed-price proposal for definitization to the PCO within an agreed upon time period stated in the order notes of its receipt of Government Property to be repaired under the Order, unless otherwise established in clause 252.217-7027 (Deviation 2026-O0027), Contract Definitization in the Order. The contractor's proposal submission shall be in the form of a "qualifying proposal" as defined by DFARS 217.7401 (Deviation 2026-O0027); and contractor shall include in its proposal a firm delivery schedule, if not already established, as well as cost or pricing data, as may be required in accordance with Revolutionary FAR Overhaul subpart 15.4 and DFARS subpart 215.4 (Deviation 2026-O0048).
B04 - ADDITIONAL MATTERS RELATIVE TO THE ISSUANCE OF ORDERS FOR REPAIR
(a) The induction period for repairs under each order shall be 365 days from the date of the order.
(b) The contractor shall provide appropriate and adequate storage for all items received in accordance with an order for repair under this BOA.
(c) All Ceiling Priced Orders and Monetary Limitation Orders are effective and binding upon issuance by the contracting officer, unless the Order specifically provides the Contractor an opportunity to reject the Order.
(d) Contractor shall not perform any work under this BOA that is not associated with a funded and executed Order.
(e) All contractor proposals and orders issued under this BOA shall include a reference to the Procurement Instrument Identifier for this BOA (Block 2 of the Standard Form 26).
Item Supplies/Service Quantity Unit Unit Price Amount
0001 See Attachment A for repair NIINs covered under this Agreement.
Pricing Arrangement: Firm Fixed Price
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMBZ01 IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION
REPORTING
(Sep 2023)
Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in Section F, and the contractor should read this section carefully to ensure compliance. Detailed information on Commercial Asset Visibility (CAV) Repairables Portal (RP) reporting requirements can be found in the CAV Statement of Work (SOW) located at:
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/
Questions can be addressed to usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104).
N0038326RD053
https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support/Provisions-Instructions-and-Contract/ mailto:usn.philadelphia.navsupwssphil.mbx.cavsaar@us.navy.mil mailto:usn.mechanicsburg.navsupwssmech.mbx.mech-cav-saar@us.navy.mil
Section C - Description/Specifications/Statement of Work
C01 - INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED
(a) Articles to be repaired and/or modified under this agreement, as shown on Attachment "A", will be shipped at the Government's expense to the plant of the contractor at:
Honeywell International Inc. CAGE codes as specified on Business Matrix at which includes the ATTACHMENT To be Determined (TBD) associated DoDAAC for each cage code. (ATTACHMENT TBD )
ATTACHMENT TBD
The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.
(b) Upon receipt of such articles, the contractor shall:
(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment; and further verify that the articles received are covered by the applicable BOA Order;
(2) Segregate those assets that were improperly sent to the contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government;
(3) Advise the Government PCO if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished;
(4) Further advise the Government PCO of the results of the foregoing preliminary inspection in the event that the asset is not inducted, together with a list of the articles and quantities required to be repaired.
C02 - SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK
1.0 SCOPE
1.1. General. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this BOA. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for on Attachment C. This limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the BOA items.
1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see Attachment A for a list of these items) to a Ready For Issue (RFI) condition. RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.
1.2.1. Written approval from the PCO must be obtained prior to any change to the repair source or repair facility for all parts which require source approval unless the contractor is the Design Control Authority (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the contract item, in which case written notification to the PCO must be provided prior to any change to the repair source or repair facility for all parts which require source approval.
1.3. Beyond Physical Repair (BPR)
1.3.1. Scope. An item is BPR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.
1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BPR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO.
After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either requesting the submission of a proposal for BPR pricing, or ordering the disposal of the item. If asked to provide a BPR pricing proposal, the Contractor shall provide the proposal to the PCO within 30 days of receipt of the request. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor's approved Government property disposal procedures and the Contractor's approved Government property disposal procedures.
1.4. Beyond Economical Repair (BER)
1.4.1. Scope. An item is BER if the cost of the repair exceeds 80% of the replacement price for items identified on Attachment A. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this
BOA.
1.4.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER. All such determinations, including the basis for the determination, the repair required, the Contractor's proposed BER price to repair, and the DCMA written concurrence, shall be provided by the Contractor to the PCO. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions, either providing contractual authority for repair of the item or ordering the disposal of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition disposal instructions, the contractor shall submit a proposal for disposal pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor's approved Government property disposal procedures.
1.4.3. The following additional procedures may apply, if within the same delivery order or otherwise authorized, for the replacement of a BER SRA (Shop Repairable Assembly) within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:
Ship in place an accepted item from an existing spares or repair order under this BOA, if any, or MILSTRIP the SRA(s).
Authorization to ship in place or MILSTRIP must be provided by the PCO in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.
1.5. Missing on Induction (MOI).
1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing piece parts are not MOI items. Rather, repair of such items and replacement of the missing piece parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this BOA.
1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, with a copy to the PCO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.
1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA. The Contractor may request authorization to:
Ship in place an accepted item from an existing spares or repair order under this BOA, if any, or MILSTRIP the SRA(s).
Authorization to ship in place or MILSTRIP must be provided by the PCO in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.
1.6. Swapping SRAs
1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BPR, BER or MOI.
1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor's production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e. cannibalization. Permission from the PCO must be obtained and an equitable adjustment may be required. Authorization to ship in place from the Contractor's production line or MILSTRIP must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. Although permission from the PCO is required if the SRA is obtained from another repairable WRA (cannibalized), that transaction does not have to be input into CAV.
1.7. It is acknowledged that some items on this Contract may be at risk for obsolescence. Contractor has submitted a quotation and accepted an order for manufacture or repair subject to commercial availability of component parts in the market to complete the order(s).
1.7.1. If during the manufacture or repair process, the Contractor becomes aware that required component part(s) are no longer available, Contractor is authorized to immediately stop work and notify the Government of the obsolescence factors and submit a request for Beyond Physical Repair (BPR), Beyond Economical Repair (BER) or over and above (O&A) disposition, in accordance with C02-1.3, C02-1.4 and/or I12.
1.7.2. The Government may issue a BER/BPR/O&A disposition contract modification or, if the Government determines that the item is still required and so notifies the Contractor, Contractor will investigate alternative sources within the industry for compatible replacement parts that meet Contractor's Quality System Requirements and do not modify form, fit, or function of the end item. Contractor may submit a proposal for this effort.
1.7.3. In some cases, out of manufacture parts may be available on the market from distributors or surplus dealers who have made life time buys at the time of last manufacture. In such cases, distributors and dealers, to account for the risk of holding out of manufacture parts, often escalate prices substantially. The Government agrees price impacts due to obsolescence may be a basis for equitable adjustment of contract prices and that the Contractor will promptly submit a proposal for required contract changes.
1.7.4. If a suitable replacement component is not found, Contractor will so notify the Government and the Government agrees to terminate for convenience without penalty that portion of the contract affected by obsolescence.
1.7.5. As an alternative to termination for convenience, Contractor will, at Government's request, submit a quotation to perform an obsolescence review of the subject product. Upon approval or agreement of the obsolescence review, the contractor, if directed by the Government, shall provide the Government with a proposal for the effort required to identify suitable alternates for the product in order to fulfill the contract/order.
1.7.6. As of the date of the Government's notice of obsolescence factors on an item, without penalty, the delivery date will be suspended and, by mutual agreement, be re-established upon resolution of the obsolescence problem.
2.0 PARTS AND MATERIAL
2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this BOA unless parts or material are specifically identified on Attachment D as Government Furnished Material (GFM). All parts and material used in performance of this BOA shall be in accordance with the latest approved revision of applicable drawings and specifications. The contractor shall for the duration of this BOA maintain updated drawings and specifications for parts and material required for repairs performed under this BOA.
2.2. All parts and material shall be new in accordance with Revolutionary FAR Overhaul 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR Revolutionary FAR Overhaul 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping, including any actions authorized under paragraphs 1.5 and 1.6, shall not render an item BER or BPR.
2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval unless the contractor is the Design Control Authority (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the contract item, in which case written notification to the PCO must be provided prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval.
2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified.
2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.
2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material.
Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this BOA.
2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor's facility to ensure conformance with all requirements of the applicable drawings and specifications. The Contractor shall maintain evidence of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform with all requirements of the applicable drawings and specifications.
2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.
3.0 INSPECTION PROVISIONS
3.1. Government inspection shall be in accordance with Revolutionary FAR Overhaul 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference in Section E, at source by DCMA unless otherwise specified in the BOA or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this
BOA.
C03 - WEB-BASED COMMERCIAL ASSET VISIBLITY (WEBCAVS) STATEMENT OF WORK (SOW)
The CAV Statement of Work (SOW) is located at: https://www.navsup.navy.mil/NAVSUP-Enterprise/NAVSUP-Weapon-Systems-Support /Provisions-Instructions-and-Contract/; and incorporated herein by reference. The CAV SOW applies to all orders for repair.
C04 - SPECIFICATION FOR CONSUMABLE PARTS (CONTRACTOR-FURNISHED)
The contractor shall furnish on an "as required" basis all parts required to complete servicing of repairable articles hereunder within established delivery schedules. Such parts shall be in accordance with applicable drawings and specifications.
Requirements 5-year non-commercial repair BOA
Additional Regulation or Supplemental Clauses Incorporated by Full Text
WSSTERMCZ04 GOVERNMENT-INDUSTRY DATA EXCHANGE PROGRAM (GIDEP) (Feb 2025)
a. The Contractor will actively participate in the Government Industry Data Exchange Program (GIDEP) per the Operations Manual (OM). The Contractor will submit information concerning critical or major nonconformances, as defined in Revolutionary FAR Overhaul 46.101, to the GIDEP information system.
b. The Contractor will insert paragraph (a) above in any subcontract when deemed necessary by the Contractor. When so inserted, the word "contractor" will be changed to "subcontractor."
c. The Contractor will when it elects not to insert paragraph (a) in a subcontract, provide the subcontractor any GIDEP data, which may be pertinent to items of its manufacture and verify that the subcontractor utilizes any such data.
d. The Contractor shall, whether it elects to insert paragraph (a) in a subcontract or not, verify that the subcontractor utilizes and provides feedback on any GIDEP data that may be pertinent to items of its manufacture.
e. Associated Data Item Description (DID) DI-QCIC-80125B: Alert/Safe-Alert Reporting to GIDEP. Contractor format containing substantially the same information is acceptable if reporting is required.
WSSTERMCZ01 CONFIGURATION MANAGEMENT AND CONTROLS (Dec 2023)
Prescription: Required in all Navy Aviation (Phil only) solicitations/contracts
1.0 Configuration Management
1.1 The cognizant Naval Air Systems Command (NAVAIR) Program Manager will maintain configuration control and change authority for all items in this contract.
1.2 In accordance with the configuration management provisions of this contract, the Contractor must maintain the total Equipment baseline configuration of the parts on this contract including, but not limited to, hardware, software and firmware.
NOTE: The latest revisions of the DOD Forms referenced in this term can be found at https://www.esd.whs.mil/dd. The latest revisions of the DIDs referenced in this term can be found at https://quicksearch.dla.mil/.
2.0 Engineering Changes
2.1 The Government will not be responsible for any contract delay or disruption or any increased costs of performance of the Contractor due to a misclassification of an Engineering Change Proposal (ECP) by the Contractor, including those costs associated with replacement of delivered items resulting from such a misclassification. ECP's are classified as Class I (Major) or Class II (Minor).
For detailed classification criteria refer to the DD Form 1692 instructions sheet. ECPs must be prepared in accordance with DI-SESS- 80639E, Engineering Change Proposal (ECP).
NOTE: Any ECP or notification of an ECP submitted to the PCO in accordance with this paragraph must also be copied to the NAVSUP WSS CM Team at usn.philadelphia.navsupwssphil.mbx.configuration-management@us.navy.mil.
2.1.1 Class I (Major) Changes: The Contractor must coordinate with the cognizant NAVAIR Program Office prior to any Class I ECP submission. The Contractor must submit all Class I changes, via the Defense Contract Management Agency (DCMA) Contract Management Office (CMO) and the Procurement Contracting Officer (PCO), to the cognizant NAVAIR Program Office for approval
The Contractor must notify the PCO of any pending or approved Class I engineering changes with another or disapproval.
Government activity that the Contractor proposes to incorporate under this contract. The cognizant NAVAIR Program Office will approve or disapprove of all Class I changes. Any approved Class I change may necessitate contract changes by the contracting officer, which changes may be handled under the Changes clause of this contract, Revolutionary FAR Overhaul 52.243-1. The Contractor must not implement a Class I change on this contract until a contract modification is issued by the PCO.
2.1.2 Any Class II change involving a Critical Safety Item (CSI) must be submitted to the PCO for Class II (Minor) Changes:
NAVAIR Program Office approval unless NAVAIR has delegated approval authority to the cognizant DCMA CMO. For Class II changes to items without a criticality determination, the items will be considered CSI for the purposes of processing in accordance with this paragraph. Class II changes related to non-CSI's must be submitted to the cognizant DCMA CMO for concurrence in classification and may be implemented only upon receiving DCMA concurrence. Class II changes must be made at no additional cost to the Government.
2.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a Class I or Class II ECP.
3.0 Variances
3.1 The Contractor must not deliver any item for acceptance by the Government that incorporates a known departure from product definition information unless a Request for Variance (RFV) has been approved. Authorized variances are a temporary departure from the requirements only and do not authorize a change to the item's approved configuration. RFV's are classified as Critical, Major, or Minor. For detailed classification criteria refer to the DD Form 1694 instructions sheet. Any variance requests to CSI's must be classified as major, at a minimum. For variances to items without a criticality determination, the items will be considered CSI for the purposes of processing and classified as a major, at a minimum. Variance requests shall be prepared in accordance with DI-SESS- 80640E - Request for Variance (RFV).
NOTE: Any RFV submitted to the PCO in accordance with this paragraph must also be submitted to the NAVSUP WSS RFV Review Team at usn.philadelphia.navsupwssphil.mbx.rfv-review-team@us.navy.mil.
NOTE: Should a variance be discovered after product delivery, the Contractor must notify the PCO and NAVSUP WSS Quality (NOE_N22@us.navy.mil).
3.1.1 Critical/Major Variances: The Contractor must submit all critical/major variance requests, via the DCMA CMO and the PCO, to the cognizant NAVAIR Program Office for approval or disapproval. All approved critical/major variances require a contract modification by the PCO prior to final inspection and acceptance of the items.
3.1.2 Minor Variances: For minor RFVs, delivery and/or shipment of such items under this contract is not permitted until approved by the cognizant DCMA CMO.
3.2 The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a critical, major, or minor variance.
216-940109-18 SUPTXT216-940109-18 PLACING AND PROCESSING OF ORDERS (Dec 2023)
216-9401(07-18) PLACING AND PROCESSING OF ORDERS
(a) Ordering Period. The government, from time to time during the period commencing on the date of award of this Basic Ordering Agreement (BOA) and continuing for five (5) years (hereinafter called the "ordering period"), may place orders for supplies to be delivered hereunder. Each order placed under this Agreement shall be in accordance with this Agreement.
(b) Authorized Ordering Activity. A Contracting Officer of NAVSUP WSS may place orders under this Agreement. Only such Contracting Officer has the authority to make changes to the provisions of this BOA.
(c) Ordering Procedures. Orders issued hereunder may be either priced or unpriced. Each order issued hereunder shall constitute a contract. The negotiated ceiling price for an unpriced order issued hereunder is the maximum not-to-exceed price for each order. Unpriced orders will be definitized within 180 days after the date on which the contractor submits a qualifying proposal to definitize the contractual terms, specifications, and price, or the date on which the amount of funds obligated under the order is equal to more than 50 percent of the ceiling price of the order is expended whichever occurs earlier. The Contractor agrees to submit a firm fixed price proposal to meet this - definitization schedule.
(d) Content of Orders. Orders placed hereunder will be prepared on a DD Form 1155 and will at a minimum include the following if applicable:
(1) The order number, date, and the number of this Agreement.
(2) Citation of the negotiation authority under Revolutionary FAR Overhaul FAR 6.103.
(3) Appropriation and accounting data and special invoicing instructions.
(4) Special shipping instructions, place of delivery, place of inspection, DOD Priority designator and surveillance Criticality designator.
(5) Defense Order Rating certified under defense the Defense Priorities and Allocations System.
(6) Descriptions and the part numbers of the particular articles to be furnished, the quantity of each, and the stock number, if available.
(7) The model designation of the end unit for which the parts ordered applies, if available.
(8) For priced orders, the agreed upon delivery schedules, firm unit prices, firm extended amounts and a total firm price.
(9) For unpriced orders, a desired delivery schedule and a total ceiling price.
(10) Orders for change pages/revisions to existing Technical Manuals, or for new Technical Manuals will include Technical Manual Contract Requirements (TMCRs) citing the equipment and changes to be covered by the publications ordered, the manuals involved, description and specifications, delivery and packing, instructions for transmittal of negatives and retention of reproducible copies and negatives.
(11) A DD form 1423 setting forth the data ordered.
243-9400(1-92) SUPTXT243-9400(1-92) AUTHORIZED CHANGES ONLY BY THE
CONTRACTING OFFICER
(Dec 2023)
AUTHORIZED CHANGES ONLY BY THE CONTRACTING OFFICER
(a) Except as specified in paragraph (b) below, no order, statement, or conduct of Government personnel who visit the Contractor's facilities or in any other manner communicate with Contractor personnel during the performance of this contract shall constitute a change under the "Changes" clause of this contract.
(b) The Contractor shall not comply with any order, direction or request of Government personnel unless it is issued in writing and signed by the Contracting Officer, or is pursuant to specific authority otherwise included as a part of this contract.
(c) The Contracting Officer is the only person authorized to approve changes in any of the requirements of this contract and notwithstanding provisions contained elsewhere in this contract, the said authority remains solely with the Contracting Officer. In the event the Contractor effects any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in charges incurred as a result thereof. The address and telephone number of the Contracting Officer is:
NAME: Christian Markle
ADDRESS: 700 Robbins Avenue, Philadelphia, PA 19111-5098
EMAIL: christian.m.markle.civ@us.navy.mil
TELEPHONE: (771)-229-0508
NAME: Danielle Grzeszczak
ADDRESS: 700 Robbins Avenue, Philadelphia, PA 19111-5098
EMAIL: danielle.grzeszczak.civ@us.navy.mil
TELEPHONE: (771)-229-0449
245-9409(1-92) SUPTXT245-9409(1-92) FACILITIES (Dec 2023)
FACILITIES
(a) In the performance of all orders under this Basic Ordering Agreement other than orders for Foreign Military Sales (FMS), the Contractor is authorized to use on a rent-free and no-charge-for-use basis those facilities provided under Contracts N/A. In addition, on all non-FMS orders, Subcontractors are authorized to use on a rent-free basis those facilities furnished to them under facilities contracts which provide for use, without charge, of Government owned facilities furnished thereunder subject to the terms and conditions of such facilities contracts. On all orders (FMS and non-FMS) issued under this Basic Ordering Agreement, the Contractor and /or his Subcontractor(s) are also authorized to use, on a rent-free and no-charge-for-use basis, Government property (i.e., tooling and test equipment), special tooling and special test equipment which is in the Contractor's possession and which is not covered by a facilities contract. Such use is subject to the terms and conditions of the contract(s) under which the tooling or test equipment is held.
(b) The Contractor warrants that it will not include in the prices inserted in any non-FMS order issued hereunder any factor for the rental, depreciation or amortization of such facilities, special tooling or special test equipment and warrants that its subcontract prices of subcontracts on which use of facilities, special tooling or special test equipment on a no-charge-for-use basis is authorized will also not include any factor for the rental, depreciation or amortization of such facilities, special tooling, or special test equipment.
(c) If the facilities, special tooling or special test equipment are withdrawn from the Contractor or Subcontractor by the Government, or if permission to use on a no-charge-for-use basis is withdrawn from Contractor or Subcontractor at any time prior to or during the performance under any orders issued hereunder, the Contractor shall immediately notify the Contracting Officer, in writing, and advise the Contracting Officer of the steps the Contractor or Subcontractor will take to replace the property withdrawn or no longer authorized for use. The price and delivery schedule of such order shall be equitably adjusted as evidenced by a Supplemental Agreement thereto. Failure to agree upon such equitable adjustment in price and delivery shall be a dispute under the Disputes clause.
Section D - Packaging and Marking
WSSTERMDZ03 PRESERVATION, PACKAGING, PACKING AND MARKING (Nov 2025)
PRESERVATION, PACKAGING, PACKING AND MARKING
The contractor shall preserve, package, pack and mark all items as cited below. Where specifications or standards are cited herein the latest revision of that specification or standard shall apply.
1. PRESERVATION REQUIREMENTS
a. SYSTEM STOCK SHIPMENTS - The contractor shall preserve all items intended to in enter the military distribution system for stock accordance with the MIL-STD-2073-1, "Standard Practice for Military Packaging", Packaging Requirements Code specified in the Schedule.
When a Specialized Preservation Code/Method of Preservation (MOP) (Table J-Ia) is specified, and one or more of the following packaging fields (WM, CUD, CT, UC) value is a 00 (numeric), the Specialized Preservation/MOP procedure and materials takes precedence. Contractors should disregard the LP field and third digit of the PACK field and use the Unit Container Level (UCL) to identify the level of packing protection the unit container meets for packing requirements. When HM = D, the item is regulated in accordance with Title 49 Code of Federal
; when HM = N the item is not regulated for transportation.Regulations (CFR)
1) When a specified packaging material has an associated Qualified Products List (QPL), the contractor shall use only packaging materials produced by a manufacturer listed on the applicable QPL. Barrier materials that have QPLs are MIL-PRF-131, MIL-PRF-81705, MIL-PRF- 22191, MIL-PRF-3420 and MIL-PRF-22019. Sources for QPL material can be obtained from the Qualified Products Database at http://qpldocs.dla.mil/.
b. IMMEDIATE USE/INSTALLATION AND PART NUMBER BUY SHIPMENTS - Government PCO or ACO approval is required to use the packaging standards outlined in this paragraph. Any national stock numbered (NSN) item required for immediate use (used or consumed within or part numbered item (authority granted to ship without NSN) shall be preserved and packed in 7 days of receipt) or direct installation, accordance with ASTM D3951 , "Standard Practice for Commercial Packaging", for all shipments to a Continental United States -18 (2023) (CONUS) government activity or contractor-owned facility. All material destined for overseas shipment (OCONUS) shall be preserved in accordance with MIL-STD-2073-1.
c. GOVERNMENT-OWNED MATERIAL - In the event that the contract expires, is terminated, or completed, and Government-owned material is to be returned to the supply system, the contractor shall preserve and package this material in accordance with the requirements of paragraph 1.a.
2. PROTECTION FROM DEGRADATION DUE TO ELECTROSTATIC (ES)/ELECTROMAGNETIC (EM) FORCES
a. When ASTM D3951 is authorized for packaging and the item is considered Electrostatic Discharge Sensitive (ESDS), protection -18 (2023) shall be in accordance with ANSI/ESD S20.20-2021, "For the Development of an ESD Control Program for - Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive Devices)."
b. When MIL-STD-2073-1 is specified and the preservation method code (PMT) in the solicitation does not specify ESD/EM protection (PMT = GX) and the contractor's proposed item of supply is subject to degradation from ES/EM forces, contractors shall provide recommended packaging data with their proposals/quotes.
3. PACKING REQUIREMENTS - The contractor shall pack as follows:
Domestic Shipments (CONUS): Level B
Overseas Shipments (OCONUS) (including Navy ships at sea):
Via air, FPO, APO Level B
Via freight forwarder Level B
Via surface Level A
Exterior shipping containers for Packing Levels A and B are listed in MIL-STD-2073-1, Appendix C, Table C.II. Long-life reusable containers and wood containers are shipping containers which do not require overpacking for shipment.
4. MARKING REQUIREMENTS - All unit, intermediate and shipping containers shall be marked in accordance with MIL-STD-129. In addition, the following specific requirements apply:
a. ADDITIONAL MARKING FOR SPARES ONLY Each MIL-STD-129 label shall also include the following:-
1) Procurement Instrument Identifier (PIID) - the 13-digit contract order number,
2) Contract Line Item Number (CLIN) - the 4-digit individual line item number (e.g. 0001, 0002, etc.), and
3) SubCLIN - the 6-digit sub line item number (e.g. 0001AA, 0001AB, 0002AA, 0002AB, etc.).
b. DEPOT LEVEL REPAIRABLE (DLR) LABELS
1) Items identified with a Cognizance (COG) Code of either "7" or an even number preceding the NSN, excluding 6A, 6H and 6X COGs (e.
g. 7RH 5826-014289999), are defined as Depot Level Repairable (DLR) items. DLR items require that a DLR label be placed on the outside of the unit, intermediate and shipping containers as close to the bar code label as possible.
EXCEPTION: When a DLR item requires use of both a reusable inner unit container and a reusable outer shipping and storage container (excluding wood and fiberboard), only the inner unit container shall be affixed with a DLR label. In these cases only, DLR labels shall NOT be placed on the outer reusable container.
2) Labels are available via the Naval Forms Online website: . The website will advise the https://forms.documentservices.dla.mil/order/ procedures for ordering and establishing an account.
3) NAVSUP WSS authorizes contractors to create and print their own DLR labels.
Labels shall follow the standard size and font options listed in below chart. Text shall be in all upper case letters of the same style font. The label used shall be sized proportionate to the size of the container. Labels shall be horizontally printed and consist of yellow "DLR" text font on a solid blue background. Labels shall meet requirements of MIL-STD-129 section 4.2.2. Labels shall be of a water-resistant grade of paper, film, or plastic, coated on one side with water-insoluble, permanent type adhesive. The adhesive shall adhere to metal, plastic, aluminum or fiberboard surfaces under high and low temperatures. Labels shall have a finish suitable for printing and writing on with ink without feathering or spreading, be capable of withstanding normal handling and storage conditions, and remain securely in position. Application specific performance criteria and durability requirements to ensure functionality in various climatic environments should be tailored, if required, using MIL-PRF-61002. MIL-PRF-61002 can be used as an acquisition tool when labels presently being used are not performing satisfactorily or when new conditions or applications require special label stock for those particular situations.
NSN DESCRIPTION
QUANTITY
PER UNIT PACKAGE
APPLICATION FORM NUMBER
0108LF5055300
DLR Label
2 in. x 3 in.
Unit
Container
NAVSUP 1397-1
0108LF5055000
DLR Label
3 in. x 5 in.
Intermediate / Shipping
Container
NAVSUP 1397
c. SPECIAL MATERIAL IDENTIFICATION CODE (SMIC) FOR NAVSUP WSS MARITIME REQUIREMENTS ONLY
1) Certain program related items are identified by a two-position SMIC, which appears as a suffix to the NSN (e.g. 1H 4730 009001317 L1), and require special markings. Containers shall be marked or labeled with letters, maximum two inches high on two (2) sides and two
(2) ends as follows:
SMIC MARKINGS COLOR TYPE CONTAINER
L1 LEVEL 1 RED Unit, intermediate and shipping (size permitting)
S1
SURFACE
RED Unit, intermediate and shipping (size permitting)
N0038326RD053
https://forms.documentservices.dla.mil/order/%20
LEVEL 1
D4/D5/D7 DSS-SOC RED Unit, intermediate and shipping (size permitting)
C1 *
LEVEL 1 SPECIAL
CLEAN O2-N2
GREEN Unit, intermediate and shipping
CP/VG *
SPECIAL CLEAN
O2-N2 GREEN Unit, intermediate and shipping
D0/D6/D8 * DSS-SOC SPECIAL CLEAN O2-N2 GREEN Unit, intermediate and shipping
VU FBW SFCC VU BLUE Unit, intermediate and shipping (size permitting)
SW FBW SFCC SW BLUE Unit, intermediate and shipping (size permitting)
Q3/Q5 Q3 or Q5 RED Unit, intermediate and shipping
* denotes Oxygen Clean requirements in accordance with MIL-STD-1330 "Precision Cleaning and Testing of Shipboard Oxygen, Helium, Helium- Oxygen, Nitrogen, and Hydrogen Systems."
5. PALLETIZATION. Palletization of shipments shall be accomplished in accordance with MIL-STD-147 "DOD Standard…
This is the start of the file's text. The full file is on GovTribe.