Solicitation - N0017426Q1123.pdf
PDF 1 MB Posted
- Attached to
- METAL PARTS
- Solicitation number
- N00174-26-SIMACQ-M13-0046
About this file
This Request for Quotation (RFQ) is for the manufacturing of M26 metal parts for naval applications at Naval Surface Warfare Center Indian Head Division (NSWC IHD). The procurement includes five metal components with both First Article Test (FAT) and production quantities: Retainer Cartridge (part 8593313 Rev J), Cap (part 8595254 Rev E), Initiator Chamber (part 8593314 Rev J), Firing Pin (part 8594744 Rev J), and Firing Pin Housing (part 8594858 Rev J). FAT quantities of 5 units each are due 60 calendar days from contract award, with production quantities of 50 units each due 150 calendar days after FAT approval. The RFQ also requires five contractual data requirements list (CDRL) deliverables: Test/Inspection Reports, Certification Data for Non-Nuclear Level 1 Material, Certificate of Completion & Compliance, Inspection Test Plan, and Request for Variance documentation.
The contract uses firm fixed pricing and is not a small business set-aside. Delivery is FOB Destination to NSWC IHD Building 116 in Indian Head, Maryland 20640. The contractor must comply with extensive technical and quality requirements including cadmium plating to AMS-QQ-P-416 Revision G, hydrostatic pressure testing at 5500-6500 psi, First Article Testing with Government approval, 100% dimensional inspection, material certifications, ISO 9001:2015 quality management systems, ISO/IEC 17025:2017 calibration standards, ITAR export control compliance, CMMC Level 2 cybersecurity certification, and NIST SP 800-171 security controls. The contractor must maintain a quality system adhering to ASQ/ANSI/ISO 9001:2015 standards and provide comprehensive inspection and test records. The contract includes standard FAR and DFARS clauses covering representations, cybersecurity, buy American requirements, item unique identification, and various other federal contracting requirements. Section M for evaluation factors is blank, indicating this is a simplified quotation request rather than a competitive proposal evaluation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
Created On:
21 Sep 2026, 16:09 PM Greenwich Mean Time
Section A - Solicitation/Contract Form
M26 Metal Parts
N0017426Q1123
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
M26 Cap - FAT 8595254 Rev E
Part Number Description: 8595254 Rev E Pricing Arrangement: Firm Fixed Price
5 Each
M26 Cap - Production 8595254 Rev E
Part Number Description: 8595254 Rev E Pricing Arrangement: Firm Fixed Price
50 Each
M26 Initiator Chamber - FAT 8593314 Rev J
Part Number Description: 8593314 Rev J Pricing Arrangement: Firm Fixed Price
5 Each
M26 Initiator Chamber - Production 8593314 Rev J
Part Number Description: 8593314 Rev J Pricing Arrangement: Firm Fixed Price
50 Each
M26 Retainer Cartridge - FAT 8593313 Rev J
Part Number Description: 8593313 Rev J Pricing Arrangement: Firm Fixed Price
5 Each
M26 Retainer Cartridge - Production 8593313 Rev J
Part Number Description: 8593313 Rev J Pricing Arrangement: Firm Fixed Price
50 Each
M26 Firing Pin - FAT 8594744 Rev J
Part Number Description: 8594744 Rev J Pricing Arrangement: Firm Fixed Price
5 Each
M26 Firing Pin - Production 8594744 Rev J
Part Number Description: 8594744 Rev J Pricing Arrangement: Firm Fixed Price
50 Each
M26 Firing Pin Housing - FAT 8594858 Rev J
Part Number Description: 8594858 Rev J Pricing Arrangement: Firm Fixed Price
5 Each
M26 Firing Pin Housing - Production 8594858 Rev J
Part Number Description: 8594858 Rev J Pricing Arrangement: Firm Fixed Price
50 Each
CDRL A001
Test/ Inspection Report/DI-NDTI-80809
Pricing Arrangement: Firm Fixed Price
1 Each
CDRL A002
CERTIFICATION DATA NON-NUCLEAR LEVEL 1 MATERIAL
/DI-MISC-81020A
Pricing Arrangement: Firm Fixed Price
1 Each
CDRL A003
Certification Data Report/DI-MISC-82386
Pricing Arrangement: Firm Fixed Price
1 Each
CDRL A004
Inspection Test Plan/DI-QCIC-81110
Pricing Arrangement: Firm Fixed Price
1 Each
CDRL A005
Request for Variance/DI-SESS-80640
Pricing Arrangement: Firm Fixed Price
1 Each
Section C - Description/Specifications/Statement of Work
MANUFACTURING OF Hardware USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Indian Head Division (NSWC IHD).
2.0 Applicable Documents
M26 - CDRL_A001_Inspection
M26 - CDRL_A002_Non-Nuclear Material
M26 - CDRL_A003_Completion
M26 - CDRL_A004_Inspection Plan
M26 - CDRL_A005_Request for Variance
8593313 Rev J- Retainer, Cartridge
8595254 Rev E - Cap
8594744 Rev J Pin, Firing
8594858 Rev J - Housing, Firing Pin
8593314 Rev J- Chamber, Initiator
MIL-I-60508A
SAE AMS6348F
MIL-STD-171F
SAE AMS6349F
SAE AMS6382S
SAE AMS6758B
SAE AMS6415V
SAE AMS6484F
SAE AMS6327M
MIL-F-7190B
SAE AMS-QQ-P-416G
SAE AMS-H-6875C
SAE AMS-S-6758B
SAE AS202-4
SAE AMS2301M
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:
ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List
22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems
ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories
2.2 Technical Drawings
Drawing Number & Revision Nomenclature
8593313 Rev J Retainer, Cartridge
8595254 Rev E Cap
8593314 Rev J Chamber, Initiator
8594744 Rev J Pin, Firing
8594858 Rev J Housing, Firing Pin
Department of Defense Drawings:
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government's sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor's quality performance metrics.
3.2 Cadmium Plating
3.2.1 Specifications:
Unless otherwise specified, parts are to be cadmium plated to the requirements of AMS-QQ-P-416, Revision G, plus the following.
3.2.2 Coverage:
There shall be no rack marks, air bubbles, pin holes nor any other bare areas, except those specifically denoted as such by the contract/purchase order/or bankcard order. All internal and external threads shall have at least a presence of plating (verifiable by visual examination) and a maximum coverage thickness of .00040 inches. All surfaces not controlled for plating thickness by the contract/purchase order/or bankcard order shall have presence of plating (verifiable by visual inspection) and a maximum coverage thickness of .00080 inches. These requirements shall be met regardless of part configuration, contour, part size, and any in-process controls needed to perform the plating. (This includes all internal and external surfaces.)
3.2.3 Adhesion:
Plating shall show no indication of separation from the base metal when tested in accordance with ASTM D3359-95A and shall meet adhesion requirements of the governing plating specification.
3.2.4 Embrittlement Relief:
All cadmium plated parts, regardless of hardness, must be baked, after plating, but prior to chromate finish, as specified below. Any parts exceeding R/C 36 (160 ksi) in hardness, shall also be subject to the following baking requirements between stripping and replating.
3.2.5 Time between Plating and Baking:
Shall not exceed 4 hours
Temperature for Baking: 375 F +/- 25 F
Time for Baking: 23 hours minimum
3.2.6 Corrosion and Hydrogen Embrittlement Tests:
Although the vendor is not required to perform this test, the government reserves the right to perform the test at any time, at government expense.
3.3 Hydrostatic Testing
Prior to application of protective finish, parts shall be tested to withstand a hydrostatic pressure of 5500 to 6500 pounds per square inch (psi) for 15 seconds minimum, without deformation or mechanical failure. The parts shall be mounted in the hydrotest equipment using a fixture for properly sealing all openings.
3.4 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this SOW.
These processes should cover all phases, from the ordering of the material to the Government acceptance of the finished product.
3.4.1 First Article Testing
The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 2 years.
The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per Controlled Data Requirements List (CDRL) A004 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample of 5 EA complete units prior to the first delivery of any production hardware. The first article units shall be fully representative of those proposed for production and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.
Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor's cost risk.
3.4.2 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, SOW, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.
3.4.3 Product Certification
The Contractor shall submit certificates of completion and compliance in accordance with DI-MISC-82386 per CDRL A003 to accompany the shipment of each first article and/or production lot, as required by Table 3. The certificate shall state compliance of the requirement with its respective drawing or specification, and contract /order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit material certification data (C1qin accordance with DI-MISC-81020 per CDRL A002 showing the first article and/or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1.
The certificates shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and any additional copies as described by the associated CDRL. Each certificate must be traceable to the material covered by the certificate.
The certificates shall state, above the signature of a legally authorized representative of the company, the following:
"This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001."
Table 1: Certification Requirements
Test Requirement Certificate
DWG/ Specification Location
Material 8593313 Rev J- Retainer, Cartridge IAW DWG Note 2 (M118) Material Certification
Hardness 8593313 Rev J- Retainer, Cartridge IAW DWG Note 8 Hardness Certification
Heat Treat 8593313 Rev J- Retainer, Cartridge IAW DWG Note 8 Completion
Plating 8593313 Rev J- Retainer, Cartridge IAW DWG Note 4 (M120) Completion
Visual 8593313 Rev J - Retainer, Cartridge IAW DWG Note #9 (C1) & #10 (M116) Compliance
Material 8595254 Rev E - Cap IAW DWG Note 2 (M113) Material Certification
Hardness 8595254 Rev E - Cap IAW DWG Note 5 Hardness Certification
Hydro Test
MIL-I-60508A
100% inspection required Section 3.5 Testing Report
Heat Treatment 8595254 Rev E - Cap IAW DWG Note 5 Completion
Plating 8595254 Rev E - Cap IAW DWG Note 4 (M114) and SOW 3.2 Completion
Material 8593314 Rev J- Chamber, Initiator IAW DWG Note 2 Material Certification
Hardness 8593314 Rev J- Chamber, Initiator IAW DWG Note 7 Hardness Certification
Plating 8593314 Rev J- Chamber, Initiator IAW DWG Note 4 Completion
Surface Finish 8593314 Rev J- Chamber, Initiator IAW DWG Zone D3 Completion
Material 8594744 Rev J - Pin, Firing IAW DWG Note 2 (M112) Material Certification
Hardness 8594744 Rev J - Pin, Firing IAW DWG Note 2 (M112) Hardness Certification
Heat Treatment 8594744 Rev J - Pin, Firing IAW DWG Note 2 (M112) Completion
Plating 8594744 Rev J - Pin, Firing IAW DWG Note 4 (M113) and SOW 3.2 Completion
Surface Finish 8594744 Rev J - Pin, Firing IAW DWG M114, M115 Completion
Material 8594858 Rev J - Housing, Firing Pin IAW DWG Note 2 (M101) Material Certification
Hardness 8594858 Rev J - Housing, Firing Pin IAW DWG Note 10 Hardness Certification
Heat Treat 8594858 Rev J - Housing, Firing Pin IAW DWG Note 10 Completion
Plating 8594858 Rev J - Housing, Firing Pin IAW DWG Note 4 (M102) and SOW 3.2 Completion
Surface Finish 8594858 Rev J - Housing, Firing Pin IAW DWG Note #5 (C1) and M130 Completion
Dimensional 8594858 Rev J - Housing, Firing Pin IAW DWG Note # 13 (M105) - Inlet port Compliance
3.5 Quality Control
3.5.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:
2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. P rocedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.5.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO
/IEC 17025:2017.
3.5.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item.
The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.
Table 2: ACSI Sampling Plan
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) - October 2013]:
Critical: 100%
Major: Level II
Minor: Level I
3.5.4 Government-Identified Nonconformity Reporting Procedures
The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within ten (10) working days.
3.5.5 Contractor-Identified Nonconformity Reporting & Request for Variance
The Contractor shall alert the Government to any nonconforming deliverables within one (1) working day of identifying the nonconformity. If applicable, a request for variance must be submitted in accordance with DI- SESS-80640E per CDRL A005. The Government shall review and respond to the request for variance within fifteen (15) business days.
3.6 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.6.1 International Trafficking in Arms Regulations (ITAR) Compliance
The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.6.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
3.6.3 Controlled Unclassified Information
Due to the inclusion of Controlled Unclassified Information, the Contractor shall maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 compliance through self-certification, in accordance with NIST SP 800-171 R2, as required by DFARS clause 252.204-7012.
3.7 Operations Security (OPSEC)
Contractor personnel are subject to applicable provisions of Department of Defense Manual 5205.02-M, Enclosure 6 and NSWC IHD 3070.3D OPSEC Program. Contractor personnel supporting this contract/task order must complete government approved or provided OPSEC awareness training, and be prepared to provide completion certificates as requested by the Government. OPSEC education and training may be accomplished through established programs within the DoD Component, using external resources such as the Director of National Intelligence (DNI) and the Defense Security Service Academy, or a combination (i.e.
https://securityawareness.dcsa.mil/opsec/index.htm). Contractor personnel may have access to government Critical Information (CI), Indicators and Observables that may indirectly disclose CI. CI includes but is not limited to: ship movements and schedules, weapons and sensor system installations, capabilities, and configurations; specific platform installations and characteristics, test schedules, deficiencies, and vulnerabilities.
Indicators and Observables may include but are not limited to: outdoors system testing; ship's external hull or superstructure modifications; shipboard equipment, ordnance, weapons, fuels, and/or stores loading/unloading operations, and/or personnel or aircraft embarkation. No CI, Indicators, or Observables may be divulged to third parties (including other company employees who are not subject to this contract/task order) without approval of the local command Security Officer, OPSEC Officer, or the NSWC IHD OPSEC Program Manager.
3.8 Packaging and Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport.
A. Individual Part Protection Primary physical protection shall be provided by covering each part with a web-type sleeve or bubble wrap. Up to 10 components shall be packaged in a single .002 inch minimum thickness poly bag. A desiccant bag meeting MIL-D-3464, Type I or II, of a size appropriate for the bag volume, shall be inserted into each bag. All bags must be securely closed by heat-sealing or a zip-lock mechanism.
Each bag must be legibly marked with the following information:
1. Part Name
2. Part Number
3. Revision Letter
4. Quantity
B. Shipping Container Requirements Packaged parts are to be placed in heavy-duty cardboard shipping containers for shipment to the Indian Head Division, Naval Surface Warfare Center. Sufficient dunnage must be used to prevent movement of the parts within the container during transit.
Shipping containers must be legibly marked on at least two surfaces with the following information:
5. Contract Number
6. Part Name
7. Part Number
8. Total Quantity
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor's representative authorized to make such certification.
Table 3: Contract Data Requirements List
CDRL Spec Section Title
A001 DI-NDTI-80809 3.4.2 Final Dimensional Inspection Report
A002 DI-MISC-81020 3.4.3 Certification Data for Non-Nuclear Level I Material
A003 DI-MSIC-82386 3.4.3 Certificate of Completion & Compliance
A004 DI-QCIC-81110 3.4.1 Inspection Test Plan
A005 DI-SESS-80640E 3.5.5 Request for Variance
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Table 4: Hardware Deliverables
Item Year Drawing Rev Nomenclature Qty UOI
1 Base 8593313 J Retainer, Cartridge (FAT) 5 EA
2 Base 8593313 J Retainer, Cartridge (FAT) 50 EA
1 Base 8595254 E Cap (FAT) 5 EA
2 Base 8595254 E Cap 50 EA
3 Base 8593314 J Chamber, Initiator (FAT) 5 EA
4 Base 8593314 J Chamber, Initiator 50 EA
5 Base 8594744 J Pin, Firing (FAT) 5 EA
6 Base 8594744 J Pin, Firing 50 EA
7 Base 8594858 J Housing, Firing Pin (FAT) 5 EA
8 Base 8594858 J Housing, Firing Pin 50 EA
Full Delivery address provided once awarded: Indian Head 20640
Requirements M26 Metal Parts for N00174-26-SIMACQ-M13-0046
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT
DEFENSE INDUSTRIAL BASE PARTNER NETWORKS
(Sep 2024)
1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor's facility.
The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government's review of the SSPs at the Contractor's facility.
b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government.
The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a POAM.
c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor's facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor's site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days' notice to the Contractor.
2. Compliance to NIST 800-171
a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 2) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b) (2), for all covered contractor information systems affecting this contract.
b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(4) Audit user privileges on at least an annual basis;
(5) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.
e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM);
and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response
a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs /Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.
(End of Text)
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-15 Certificate of Conformance. Apr 1984
Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018) (Oct 2018)
(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).
(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Beneath the signature include the typed name of the individual signing this certificate.
(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.
(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.
(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(g) The certificate shall read as follows:
I certify that on ___________ [insert date], the ______________________________ [insert Contractor's name] furnished the supplies called for by the Order/Contract No.___________________ via _________ [Carrier] on __________________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.
Date of Execution: ________________________________
Signature: _______________________________________
Typed Name: ____________________________________
Title: ___________________________________________
(End of Text)
E-246-W005 SAMPLING OF RECEIVED MATERIAL – MAN-RATED MATERIAL (NAVSEA)
(MAY 2021)
(May 2021)
(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects man-rated material under this contract for catapults, cartridge actuated devices, propellant actuated devices and their related component parts, the sampling plan utilized shall be as outlined in the applicable technical data package or as otherwise specified in other controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined by one of the following:
ASQ Z1.4 (ANSI/ASQ Z1.4 - 2003 (R2018):
Critical: 100%
Major: Level II
Minor: Level I
MIL-STD-1916 (DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14):
Critical: Level V
Major: Level II, N < 200 Level III, N > 200
Minor: Level I, N < 100 Level II, N > 100
(b) In all cases, the acceptance number of defects will be ZERO (0); the lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.
(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.
(End of Text)
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019) (Jan 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
(End of Text)
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:
2015 "Quality Management Systems - Requirements" and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
(End of Text)
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination Please contract TPOC for inspection and acceptance.
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Receiving, Receiver/TPOC Telephone: 301-744-2657
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination Please contract TPOC for inspection and acceptance.
N0017426Q1123 https://quicksearch.dla.mil/qsDocDetails.aspx?ident_number=120287
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Receiving, Receiver/TPOC Telephone: 301-744-2657
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination Please contract TPOC for inspection and acceptance.
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Receiving, Receiver/TPOC Telephone: 301-744-2657
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination Please contract TPOC for inspection and acceptance.
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Receiving, Receiver/TPOC Telephone: 301-744-2657
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination Please contract TPOC for inspection and acceptance.
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Receiving, Receiver/TPOC Telephone: 301-744-2657
Section F - Deliveries or Performance
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt
5 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 150 Calendar Days Date of First Article Test Approval
50 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt
5 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 150 Calendar Days Date of First Article Test Approval
50 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt
5 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
0005 BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 150 Calendar Days Date of First Article Test Approval
50 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt
5 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 150 Calendar Days Date of First Article Test Approval
50 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 60 Calendar Days Date of Award Receipt
5 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
Delivery Schedule From date of lead time event to delivery 150 Calendar Days Date of First Article Test
50 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
0010 Approval BUILDING 116
INDIAN HEAD, MD 20640-1525
UNITED STATES
TPOC, TPOC/Receiver Telephone: 301-744-2657
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Tailored) (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.
WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Invoice and Receiving Reports (COMBO) Destination / Destination
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice and Receiving Reports (COMBO) Destination / Destination
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.
when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62838
Issue By DoDAAC N00174
Admin DoDAAC N00174
Inspect By DoDAAC N00174
Ship To Code N00174
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
usn.ncr.sea-01.mbx.wawf-hq-functional-mail-box@us.navy.mil
NSWC IHD Mailbox Vendor-Pay: usn.south-potomac.nswc-ihd.mbx.vendor-pay@us.navy.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
G-232-H005- SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
2019)
(Jan 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of Text)
G-242-H001 - GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2023)
(Oct 2023)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(ii) The Contract Specialist is:
Name: Latrice Whitfield Address: NSWC Indian Head Phone: 301-643-9608 E-mail: latrice.t.whitfield.civ@us.navy.mil
(iii) The Administrative Contracting Officer (ACO) is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail: [ * ]
(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.
The Contracting Officer's Representative (COR) is:
Name: [ * ] Address:
[ *Street ] [ *City, State, Zip ] Phone: (Area Code) xxx- [xxxx] E-mail:…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .