Solicitation - N0017425Q1078_Issued.pdf
PDF 311 KB Posted
- Attached to
- Safety Pins Federal contract opportunity
- Solicitation number
- N0017425Q1078
About this file
This is a Request for Quotation (RFQ) N0017425Q1078 issued by the Naval Surface Warfare Center Indian Head Division for M27 and M99 Safety Pins. The solicitation is a total small business set-aside for 20 First Article Test (FAT) pins and 580 production pins, with a manufacturer's part number of 10520409. The contract is firm fixed price, with delivery required by September 30, 2025, to the Naval Surface Warfare Center in Indian Head, Maryland.
The government will evaluate quotes on a lowest price technically acceptable (LPTA) basis, with technical and price factors considered. Vendors must submit quote packages by August 11, 2025, at 10:00 AM EST, including a cover sheet with company name, point of contact, DUNS number, and cage code. Mandatory deliverables include a final dimensional inspection report, certificate of compliance, and certificate of analysis. Prospective vendors must submit a DD2345 and ITAR Certificate to receive the technical drawings, which will be sent via DoD Safe.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95)
Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NO. 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
1 47
N0017425Q1078 DO-A1
NSWC INDIAN HEAD DIVISION
DEANNA WILSON (301) 744-6891
INDIAN HEAD MD 20640-1533
INDIAN HEAD MD 20640-1533
4522 MCMAHON ROAD
INDIAN HEAD
MD 20640-1525
8/11/2025
SEE SCHEDULE
07/11/2025
N0017425Q1078
Section A - Solicitation/Contract Form
M27 and M99 Safety Pin
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
0001 Pin, Initiator (FAT)
Manufacturer's Part Number: 10520409 Pricing Arrangement: Firm Fixed Price
20 Each
0002 Pin, Initiator
Manufacturer's Part Number: 10520409 Pricing Arrangement: Firm Fixed Price
580 Each
Section C - Description/Specifications/Statement of Work
MANUFACTURING OF Hardware USING NSWC IHD DRAWINGS
PERFORMANCE WORK STATEMENT
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture M99 Initiator Pin hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface Warfare Center Indian Head Division (NSWC IHD).
2.0 Applicable Documents
M99 - CDRL_A001_Inspection
M99 - CDRL_A002_CoC
M99 - CDRL_A003_CoA
M99 - CDRL_A004_Inspection Plan
10520409 REV D - Pin, Initiator
10520409 Form 43
SAE AMS-S-6758 Rev B
SAE AMS-QQ-P-416 Rev G
SAE AMS6327 Rev L
SAE AMS6349 Rev E
SAE AMS6382 Rev R
SAE AMS6415 Rev V
SAE AMS6484 Rev F
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ) Standards:
ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List
22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical Commission (IEC) Standards:
ISO 9001 Quality Management Systems
ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration Laboratories
2.2 Technical Drawings
Department of Defense Drawings:
Drawing Number & Revision Nomenclature
10520409 Rev D Pin, Initiator
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government's sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime Contractor's quality performance metrics.
3.2 Cadmium Plating
3.2.1 Specifications:
Unless otherwise specified, parts are to be cadmium plated to the requirements of SAE AMS-QQ-P-416, Revision G, plus the following.
3.2.2 Coverage:
There shall be no rack marks, air bubbles, pin holes nor any other bare areas, except those specifically denoted as such by the contract/purchase order/or bankcard order. All internal and external threads shall have at least a presence of plating (verifiable by visual examination) and a maximum coverage thickness of .
00040 inches. All surfaces not controlled for plating thickness by the contract/purchase order/or bankcard order shall have presence of plating (verifiable by visual inspection) and a maximum coverage thickness of .
00080 inches. These requirements shall be met regardless of part configuration, contour, part size, and any in-process controls needed to perform the plating. (This includes all internal and external surfaces.)
3.2.3 Adhesion:
Plating shall show no indication of separation from the base metal when tested in accordance with ASTM D3359-2023 and shall meet adhesion requirements of the governing plating specification.
3.2.4 Embrittlement Relief:
All cadmium plated parts, regardless of hardness, must be baked, after plating, but prior to chromate finish, as specified within SAE AMS-QQ-P-416G, Section 3.2.7.
3.2.5 Corrosion and Hydrogen Embrittlement Tests:
Although the vendor is not required to perform this test, the government reserves the right to perform the test at any time, at government expense.
3.3 Test and Inspection
The Contractor shall maintain and control processes to inspect and test components as described in this PWS.
These processes should cover all phases from the ordering of the material to the Government acceptance of the finished product.
3.3.1 First Article Inspection
The Contractor shall submit First Article Test (FAT) samples to the Government if the Contractor has not provided contract deliverables for the same drawing numbers within the last 3 years.
The Contractor shall submit an Inspection Test Plan in accordance with DI-QCIC-81110 per CDRL A004 to the Government for review and approval prior to first article manufacture and delivery. The Contractor shall submit a first article sample, as listed in Table 4, completed units prior to the first delivery of any production hardware.
The first article units shall be fully representative of those proposed for production, and demonstrate the adequacy and suitability of the Contractor's processes and procedures in complying with the requirements set forth by the drawings and specifications.
Any production by the Contractor before formal acceptance of the first article sample shall be at the Contractor's cost risk.
3.3.2 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.
3.3.3 Product Certification
The Contractor shall submit a certificate of compliance in accordance with DI-QCIC-81356 per CDRL A002 to accompany the shipment of each first article and/or production lot, as required by Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements.
The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-QCIC-82386 per CDRL A003, showing the first article and/or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one
(1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
"This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001."
Test Requirement Certificate
Dwg Location
Material 10520409 REV D - Pin, Initiator IAW DWG Note #2 (M101) Analysis
Hardness 10520409 REV D - Pin, Initiator IAW DWG Note #5 Analysis
Heat Treat 10520409 REV D - Pin, Initiator IAW DWG Note #5 Compliance
Plating 10520409 REV D - Pin, Initiator IAW DWG Note #4 (M102) Compliance
Surface Finish 10520409 REV D - Pin, Initiator IAW DWG M108, M109, and M113 Compliance
Table 1: Certification Requirements
3.4 Quality Control
3.4.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:
2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. P rocedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.4.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO
/IEC 17025:2017.
3.4.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by Government dimensional inspection and certification verification at Government destination for each deliverable line item.
The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability. This may include testing at other facilities.
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) - October 2013]:
Critical: 100%
Major: Level II
Minor: Level I
Table 2: ACSI Sampling Plan
3.4.4 Government-Identified Nonconformity Reporting Procedures
The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.5 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.5.1 International Trafficking in Arms Regulations (ITAR) Compliance
The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR 122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.5.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD Directive 5230.25.
3.6 Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor's representative authorized to make such certification.
CDRL Spec Section Title
A001 DI-NDTI-80809 3.3.2 Final Dimensional Inspection Report
A002 DI-QCIC-81356 3.3.3 Certificate of Compliance
A003 DI-QCIC-82386 3.3.3 Certificate of Analysis
A004 DI-QCIC-81110 3.3.1 Inspection Test Plan
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Item Year Drawing Rev Nomenclature Qty UOI
1 Base 10520409 D Pin, Initiator (FAT) 20 EA
2 Base 10520409 D Pin, Initiator 580 EA
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division
ATTN: Joseph Shiflett/ Wesley Johnson
4522 McMahon Road
Bldg. 116, Suite 100
Indian Head, MD 20640
Requirements M27 and M99 Safety Pin for Organization M1 FY: 2025, AMS: N00174-25-SIMACQ-M1-0152
Additional Regulation or Supplemental Clauses Incorporated by Full Text
C-204-H002 IMPLEMENTATION OF ENHANCED SECURITY CONTROLS ON SELECT
DEFENSE INDUSTRIAL BASE PARTNER NETWORKS (Sep 2024)
1. System Security Plan and Plans of Action and Milestones (SSP/POAM) Reviews
a) Within thirty (30) days of contract award, the Contractor shall make its System Security Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractor's facility.
The SSP(s) shall implement the security requirements in Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract. The Contractor shall fully cooperate in the Government's review of the SSPs at the Contractor's facility.
b) If the Government determines that the SSP(s) does not adequately implement the requirements of DFARS clause 252.204-7012 then the Government shall notify the Contractor of each identified deficiency. The Contractor shall correct any identified deficiencies within thirty (30) days of notification by the Government.
The contracting officer may provide for a correction period longer than thirty (30) days and, in such a case, may require the Contractor to submit a plan of action and milestones (POAM) for the correction of the identified deficiencies. The Contractor shall immediately notify the contracting officer of any failure or anticipated failure to meet a milestone in such a POAM.
c) Upon the conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the Contractor's facilities. The Government may continue to conduct follow-on reviews until the Government determines that the Contractor has corrected all identified deficiencies in the SSP(s).
d) The Government may, in its sole discretion, conduct subsequent reviews at the Contractor's site to verify the information in the SSP(s). The Government will conduct such reviews at least every three (3) years (measured from the date of contract award) and may conduct such reviews at any time upon thirty (30) days' notice to the Contractor.
2. Compliance to NIST 800-171
a) The Contractor shall fully implement the CUI Security Requirements (Requirements) and associated Relevant Security Controls (Controls) in NIST Special Publication 800-171 (Rev. 2) (NIST SP 800-171), or establish a SSP(s) and POA&Ms that varies from NIST 800-171 only in accordance with DFARS clause 252.204-7012(b) (2), for all covered contractor information systems affecting this contract.
b) Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POA&M their plans to implement the following, at a minimum:
(1) Implement Control 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, such as CNC equipment, etc., a combination of physical and logical protections acceptable to the Government may be substituted;
(2) Implement Control 3.1.5 (least privilege) and associated Controls, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of, covered defense information to its subcontractors, suppliers, or vendors based on need-to-know principles;
(3) Implement Control 3.1.12 (monitoring and control remote access sessions) - Require monitoring and controlling of remote access sessions and include mechanisms to audit the sessions and methods.
(4) Audit user privileges on at least an annual basis;
(5) Implement:
i. Control 3.13.11 (FIPS 140-2 validated cryptology or implementation of NSA or NIST approved algorithms (i.
e. FIPS 140-2 Annex A: AES or Triple DES) or compensating controls as documented in a SSP and POAM);
and,
ii. NIST Cryptographic Algorithm Validation Program (CAVP) (see https://csrc.nist.gov/projects/cryptographic-algorithm-validation-program);
(6) Implement Control 3.13.16 (Protect the confidentiality of CUI at rest) or provide a POAM for implementation which shall be evaluated by the Navy for risk acceptance.
(7) Implement Control 3.1.19 (encrypt CUI on mobile devices) or provide a plan of action for implementation which can be evaluated by the Government Program Manager for risk to the program.
3. Cyber Incident Response
a) The Contractor shall, within fifteen (15) days of discovering the cyber incident (inclusive of the 72-hour reporting period), deliver all data used in performance of the contract that the Contractor determines is impacted by the incident and begin assessment of potential warfighter/program impact.
b) Incident data shall be delivered in accordance with the Department of Defense Cyber Crimes Center (DC3) Instructions for Submitting Media available at http://www.acq.osd.mil/dpap/dars/pgi/docs /Instructions_for_Submitting_Media.docx. In delivery of the incident data, the Contractor shall, to the extent practical, remove contractor-owned information from Government covered defense information.
c) If the Contractor subsequently identifies any such data not previously delivered to DC3, then the Contractor shall immediately notify the contracting officer in writing and shall deliver the incident data within ten (10) days of identification. In such a case, the Contractor may request a delivery date later than ten (10) days after identification. The contracting officer will approve or disapprove the request after coordination with DC3.
4. Naval Criminal Investigative Service (NCIS) Outreach
The Contractor shall engage with NCIS industry outreach efforts and consider recommendations for hardening of covered contractor information systems affecting DON programs and technologies.
5. NCIS/Industry Monitoring
a) In the event of a cyber incident or at any time the Government has indication of a vulnerability or potential vulnerability, the Contractor shall cooperate with the Naval Criminal Investigative Service (NCIS), which may include cooperation related to: threat indicators; pre-determined incident information derived from the Contractor's infrastructure systems; and the continuous provision of all Contractor, subcontractor or vendor logs that show network activity, including any additional logs the contractor, subcontractor or vendor agrees to initiate as a result of the cyber incident or notice of actual or potential vulnerability.
b) If the Government determines that the collection of all logs does not adequately protect its interests, the Contractor and NCIS will work together to implement additional measures, which may include allowing the installation of an appropriate network device that is owned and maintained by NCIS, on the Contractor's information systems or information technology assets. The specific details (e.g., type of device, type of data gathered, monitoring period) regarding the installation of an NCIS network device shall be the subject of a separate agreement negotiated between NCIS and the Contractor. In the alternative, the Contractor may install network sensor capabilities or a network monitoring service, either of which must be reviewed for acceptability by NCIS. Use of this alternative approach shall also be the subject of a separate agreement negotiated between NCIS and the Contractor.
c) In all cases, the collection or provision of data and any activities associated with this statement of work shall be in accordance with federal, state, and non-US law.
(End of Text)
Section D - Packaging and Marking Special Packaging Instructions
A. Inserting a desiccant bag per MIL-D-3464, Type I or II of appropriate size, with up to 50 components, into any poly-bag with a minimum thickness .002 inch, which is necessary to provide moisture protection. All bags must be either be heat-sealed, or zip locked. The bag must be legibly marked with part name, part number, revision letter and quantity.
B. After completion of the above requirements the parts are to be bulk packaged for shipment to the Indian head Division, Naval Surface Warfare Center.
Note: The shipping containers must be legibly marked on two surfaces with the contract number, part name, part number and quantity.
Section E - Inspection and Acceptance Additional Regulation or Supplemental Clauses Incorporated by Full Text
E-246-W005 SAMPLING OF RECEIVED MATERIAL – MAN-RATED MATERIAL (NAVSEA)
(MAY 2021) (May 2021)
(a) When NAVSEA, Naval Surface Warfare Center Indian Head Division receipt inspects man-rated material under this contract for catapults, cartridge actuated devices, propellant actuated devices and their related component parts, the sampling plan utilized shall be as outlined in the applicable technical data package or as otherwise specified in other controlling documentation. If the sampling plan is not specified within any applicable controlling documentation, the sampling plan and the sampling size shall be as outlined by one of the following:
ASQ Z1.4 (ANSI/ASQ Z1.4 -2003 (R2018):
Critical: 100%
Major: Level II
Minor: Level I
MIL-STD-1916 (DTD 1 APR 96 with NOTICE 2 DTD 5 JUN 14):
Critical: Level V
Major: Level II, N < 200 Level III, N > 200
Minor: Level I, N < 100 Level II, N > 100
(b) In all cases, the acceptance number of defects will be ZERO (0); the lot will be rejected for any defect unless specifically otherwise specified by the inspection type and code.
(c) Notwithstanding the above, NAVSEA, Naval Surface Warfare Center Indian Head Division may, at its discretion, accept a defect on an approved waiver on a case-by-case basis.
(End of Text)
E-246-H020 QUALITY MANAGEMENT SYSTEM REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)
The Contractor shall provide and maintain a quality management system that, as a minimum, adheres to the requirements of ASQ/ANSI/ISO 9001:
2015 "Quality Management Systems - Requirements" and supplemental requirements imposed by this contract. The quality management system procedures, planning, and all other documentation and data that comprise the quality management system shall be made available to the Government for review. Existing quality documents that meet the requirements of this contract may continue to be used. The Government may perform any necessary inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of the implementing procedures. The Contractor shall flow down such standards, as applicable, to lower-tier subcontractors under instances covered in FAR 52.246-11(b) or at the direction of the Contracting Officer. The Government reserves the right to disapprove the quality management system or portions thereof when it fails to meet the contractual requirements.
(End of Text)
E-246-H022 INSPECTION AND TEST RECORDS (NAVSEA) (JAN 2019) (Jan 2019)
Inspection and test records shall, as a minimum, indicate the nature of the observations, number of observations made, and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate, and shall be used for trend analysis and to assess corrective action and effectiveness. The data shall, on request, be identified and made available for on-site review by the Contracting Officer or designated Government representative.
(End of Text)
E-246-W001 CERTIFICATE OF ANALYSIS (NAVSEA) (OCT 2018) (Oct 2018)
(a) A certificate of analysis/test showing that the material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract shall be submitted to the COR or TPOC. The certificate shall be maintained by the contractor for a minimum of one (l) year; one (1) copy to accompany the shipment (in the packing list envelope) and one (1) copy mailed at time of the shipment (mark the certificate to the attention of: Code 00Q).
(b) Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
This certification concerns a matter within the jurisdiction of an agency of the United States and the making of a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code, Section 1001.
(c) Beneath the signature include the typed name of the individual signing this certificate.
(d) Certificate for shipments of bulk chemicals shall state contract number, drawing or specification number, lot number, rail car number if shipped by rail or trailer number if by truck, and the date of shipment.
(e) Any demurrage accrued as a result of detaining commercial carriers because of nonreceipt of the certificate shall be the responsibility of the Contractor.
(f) Failure to provide certification at the time of shipment may result in material being rejected and returned at the contractor's expense.
(g) The certificate shall read as follows:
I certify that on ___________ [insert date], the ______________________________ [insert Contractor's name] furnished the supplies called for by the Order/Contract No.___________________ via _________ [Carrier] on __________________ [identify the bill of lading or shipping document] in accordance with all applicable requirements. I further certify that the supplies have been sampled and/or tested and conform in all respects with the contract requirements, including specifications, drawings, preservation, packaging, packing, marking requirements, and physical item identification (part number), and are in the quantity shown on this or on the attached acceptance document.
Date of Execution: ________________________________
Signature: _______________________________________
Typed Name: ____________________________________
Title: ___________________________________________
(End of Text)
Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Joseph Shiflett, Technical POC Email: joseph.l.shiflett.civ@us.navy.mil
Inspection and Acceptance Location
Both Destination Instructions: Inspect/Accept at Destination
DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Joseph Shiflett, Technical POC Email: joseph.l.shiflett.civ@us.navy.mil
Section F - Deliveries or Performance
Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522 MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Contractor Destination
Line Item Delivery Schedule Quantity Address and POC Special Handling/Notes
Delivery On Or Before Delivery Date 30 Sep
20 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522
MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Joseph Shiflett, Technical POC Email: joseph.l.shiflett.civ@us.navy.mil
FoB Details Contractor Destination
Delivery On Or Before Delivery Date 30 Sep
580 Each Ship To DoDAAC: N00174 CountryCode: USA
NSWC INDIAN HEAD DIVISION
NAVAL SURFACE WARFARE CENTER, 4522
MCMAHON ROAD
INDIAN HEAD, MD 20640-1525
UNITED STATES
Joseph Shiflett, Technical POC Email: joseph.l.shiflett.civ@us.navy.mil
FoB Details Contractor Destination
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
52.211-17 Delivery of Excess Quantities. Sep 1989 52.242-17 Government Delay of Work. Apr 1984 52.247-34 F.o.b. Destination. Jan 1991
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate/ Deviation
Variation Effective Date
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) As used in this clause- Definitions.
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.
authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) To access WAWF, the Contractor shall- WAWF access.
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.
Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.
Protocol.
(f) The Contractor shall use the following information when submitting payment requests and receiving reports WAWF payment instructions.
in WAWF for this contract or task or delivery order:
(1) The Contractor shall submit payment requests using the following document type(s): Document type.
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
Invoice and Receiving Reports (COMBO) Destination / Destination
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice and Receiving Reports (COMBO) Destination / Destination
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in Document routing.
WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC N62838
Issue By DoDAAC N00174
Admin DoDAAC N00174
Inspect By DoDAAC N00174
Ship To Code N00174
Ship From Code ____
Mark For Code ____
Service Approver (DoDAAC) ____
Service Acceptor (DoDAAC) ____
Accept at Other DoDAAC ____
LPO DoDAAC ____
DCAA Auditor DoDAAC ____
Other DoDAAC(s) ____
(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.
accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Send additional notifications to: donna.l.tibbs.civ@us.navy.mil For invoicing questions: usn.south-potomac.nswc-ihd.mbx.vendor-pay@us.navy.mil
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Additional Regulation or Supplemental Clauses Incorporated by Full Text
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN
2019) (Jan 2019)
(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.
(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.
(End of Text)
G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND
RESPONSIBILITIES (NAVSEA) (OCT 2023) (Oct 2023)
(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.
(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.
(c) The points of contact are as follows:
(i) The Procuring Contracting Officer (PCO) is:
Name: Marlene Ridgell E-mail: marlene.l.ridgell.civ@us.navy.mil
(ii) The Contract Specialist is:
Name: Deanna Wilson E-mail: deanna.l.wilson27.civ@us.navy.mil
(iii) The Administrative Contracting Officer (ACO)is:
N/A
(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.
The Contracting Officer's Representative (COR) is:
N/A
(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.
The Alternate Contracting Officer's Representative (ACOR) is:
N/A
(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government Furnished Material (GFM) and Government Furnished Equipment (GFE) if specified in the contract as well as the inspection and acceptance of all contract deliverables.
The Technical Point of Contact (TPOC) is:
Name: Joseph Shiflett E-mail: joseph.l.shiflett.civ@us.navy.mil
(g) The Alternate Technical Point of Contact (ATPOC) is responsible for TPOC responsibilities and functions in the event that the TPOC is unavailable due to leave, illness, or other official business.
The Alternate Technical Point of Contact (ATPOC) is:
Name: Normary Camacho Cardoza E-mail: normary.b.camachocardoza.civ@us.navy.mil
(h) The Authorized Ordering Person(s) for Per-Call Maintenance is responsible for issuing and maintaining records for any per-call orders for remedial maintenance placed under this contract. No per-call order shall be placed outside the scope of this contract and the cumulative total of all orders shall not be in excess of any not-to-exceed amount specified in the contract. Per-call orders shall not, in any way, modify any terms and conditions of the contract.
(i) The Authorized Ordering Person(s) for Per-Call Maintenance is:
N/A
(j) The Contractor's point of contact for performance under this contract is:
N/A
(End of Text)
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (JUL 2021) (Jul 2021)
(a) The policy of this activity is to schedule periods of reduced operations or shutdown during holiday periods. Deliveries will not be accepted on Saturdays, Sundays or Holidays except as specifically requested by the [insert activity name]. All goods or services attempted to be delivered on a Saturday, Sunday or Holiday without specific instructions from the Contracting Officer or his duly appointed representative will be returned to the contractor at the contractor's expense with no cost or liability to the U.
S. Government.
(b) The federal Government observes public Holidays that have been established under 5 U.S.C. 6103. The actual date of observance for each of the holidays, for a specific calendar year, may be obtained from the OPM website at OPM.GOV or by using the following direct link: https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/.
(c) Delayed Opening, Early Dismissal and Closure of Government Facilities. When a Government facility has a delayed opening, is closed or Federal employees are dismissed early (due to severe weather, security threat, security exercise, or a facility related problem) that prevents personnel from working, onsite contractor personnel regularly assigned to work at that facility shall follow the same reporting and/or departure directions given to Government personnel. The contractor shall not direct charge to the contract for such time off, but shall follow parent company policies regarding taking leave (administrative or other). Non-essential contractor personnel, who are not required to remain at or report to the facility, shall follow their parent company policy regarding whether they should go/stay home or report to another company facility. Subsequent to an early dismissal, delayed opening, or during periods of inclement weather, onsite contractors should monitor the OPM website as well as radio and television announcements before departing for work to determine if the facility is closed or operating on a delayed arrival basis.
(d) When Federal employees are excused from work due to a holiday or a special event (that is unrelated to severe weather, a security threat, or a facility related problem), on site contractors shall continue working established work hours or take leave in accordance with parent company policy. Those contractor employees who take leave shall not direct charge the non-working hours to the contract. Contractors are responsible for predetermining and disclosing their charging practices for early dismissal, delayed openings, or closings in accordance with the FAR, applicable cost accounting standards, and the company's established policy and procedures. Contractors shall follow their disclosed charging practices during the contract period of performance, and shall not follow any verbal directions to the contrary. The Contracting Officer will make the determination of cost allowability for time lost due to facility closure in accordance with FAR, applicable Cost Accounting Standards, and the Contractor's established accounting policy and procedures.
(e) If you intend to visit the Contracts Office, it is advised that you call for an appointment at least 24 hours in advance.
(f) The hours of operation are as follows:
AREA FROM TO
Building 116 0730 - 1130 1230 - 1530
(g) All deliveries to the Receiving Officer, Building 116, Receiving ,shall be made Monday through Friday from to 0730 - 1130 1230 - , local time. Deliveries will not be accepted after . No deliveries will be accepted on federal government holidays.1530 1530
Section H - Special Contract Requirements
1. Voluntary Protection Program:
1.1. In August 2006, Indian Head Division (IHD) Naval Surface Warfare Center (NSWC) was nominated to participate in the DoD Voluntary Protection Program Center of Excellence Implementation Initiative of the Defense Safety Oversight Council (DSOC). The Voluntary Protection Program (VPP) was established by the Occupational Safety and Health Administration (OSHA) in 1982 to recognize and promote effective worksite-based safety and health management systems. IHD NSWC, through the utilization of VPP, desires to be a model of safety and health excellence. VPP's emphasis on trust and cooperation between OSHA, the employer, employees, employees representatives, and contractors complements the Agency's enforcement activity but does not take its place. All parties, including Contractors, are to work together to identify and resolve any safety and health problems that may arise, yet obtain Contracting Officer approval of any changes that would impact the terms of the contract. IHD NSWC as the VPP participant develops and implements systems to effectively identify, evaluate, prevent, and control occupational hazards so that injuries and illnesses to employees and contractors are prevented. Contractor and sub-contractor personnel are subject to occupational safety and health oversight. This oversight will be accomplished by IHD NSWC personnel and Contracting Officers. Contractors, sub-contractors, and their employees, while in performance of a contractual action on-site within the geographical boundaries of Naval Support Facility (NSF) Indian Head, shall be subject to the requirements of the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual" regardless of the type or duration of the contract.
Appendix 13-A, of the chapter 13 entitled "Contractor Safety Requirements When Performing Work at the Naval Support Facility (NSF) Indian Head, MD" shall be signed by the Contractor prior to commencement of services on-site at NSF Indian Head. The Contractor shall maintain one signed copy for future reference in educating its personnel and sub-contractors. A second signed copy shall be provided to the Contracting Officer to be maintained in the contract file. If an occupational safety or health related injury or illness occurs during the performance or as a result of this contractual action, the Contractor shall notify the Contracting Officer Representative (COR) as soon as practicable, who will notify the Safety Office and the Contracting Officer. 1.2 In support of VPP and in compliance with Chapter 13 of the Safety Manual, entitled "Contractor Safety," all Contractors performing on-site at NSF Indian Head shall comply with the following:
1.2.1 Public Law 91-596 (and Amendments), also known as the Occupational Safety and Health
Act of 1970, establishes that all employers, including Contractors, are responsible, as far as possible, for providing every employee a safe and healthful working environment. All employers, including Contractors, shall conform to the standards as issued by OSHA. Contractors are responsible for complying with safety requirements specified in the contract as well as all
Federal, State, and local safety and security regulations. Non-compliance may be cause for the removal of a Contractor or any Contractor employee from the activity and such non-compliance may form the basis for contractual action, up to and including termination for default.
1.2.2 Contractor personnel shall participate in basic safety awareness and hazard identification training offered by the Government activity at the work area they are supporting. Contractors performing on-site shall attend area weekly safety meetings and annual safety stand-downs, as determined by the COR.
1.3 The best Safety and Health Programs involve every level of the organization, instilling a safety culture that reduces accidents for workers and improves the bottom line for managers. When Safety and Health are part of the organization and a way of life, everyone wins. IHD NSWC is committed to safety excellence. The Contractor shall familiarize itself with the IHDIVNAVSURFWARCENINST 5100.22, "Safety Manual," Appendix 13-C entitled
"OSHA Voluntary Protection program (VPP) Fundamentals Training for Contractors".
2. Contractor On Site Training:
2.1 A Contractor providing support on-site at any IHD NSWC site may be required to have its on-site Contractor personnel participate in training covering rules, practices, procedures, equipment and systems, as needed, based on the type of support being provided.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .