Solicitation - N0016426RLL11.pdf

PDF 2 MB Posted

Attached to
N0016426RLL11 – SOLE SOURCE - New and Repair of the MK-82 Director Long Life Gyroscope (Peanut Gyro)
Solicitation number
N0016426RLL11
Issued by

About this file

This is a Request for Proposal (RFP) for manufacturing and refurbishment services related to the MK-82 Rate Integrating Gyroscope, issued by the Naval Sea Warfare Center (NSWC) Crane Division under contract number N0016426RLL11. The solicitation seeks a firm fixed price, five-year indefinite-delivery/indefinite-quantity (IDIQ) contract with an estimated ordering period from November 25, 2026, through November 25, 2031. The contract encompasses four primary line items (CLINs): new manufacture of 94 gyroscopes for the U.S. Navy (USN), new manufacture of 6 units for Foreign Military Sales (FMS), refurbishment of 621 units for USN, and refurbishment of 40 units for FMS, plus associated shipping and technical data deliverables. Contractor shall deliver all items to NSWC Crane, 300 Highway 361, Crane, Indiana 47522, within 240 calendar days of order receipt, with delivery scheduled as ordered from award through the five-year performance period.

The proposal evaluation will assess technical capability to meet specifications outlined in MIL-G-81168/5B and associated drawings, as well as cost competitiveness based on estimated annual ordering quantities (Year 1-5 totals: 19, 19, 19, 19, and 18 new manufacture units for USN; 125, 124, 124, 124, and 124 refurbishment units for USN). Offerors must demonstrate ISO 9001-2015 quality program compliance, implement counterfeit parts mitigation procedures per industry standards, and maintain CMMC Level 2 (Self) certification until November 10, 2026, after which Level 2 (C3PAO) certification is required. Sealed offers are due by 3:00 PM local time on June 18, 2026, submitted electronically with required technical proposal, cost proposal, and completed solicitation documents in four volumes. The contract is rated under the Defense Priorities and Allocations System (DPAS) as a DO-rated order for national defense use.

View the file

Other files

File Type Posted
Solicitation Amendment N0016426RLL110001 SF 30.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Section A - Solicitation/Contract Form

Request for Proposal - MK82 Long Life Gyroscope

N0016426RLL11

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

CONTRACT MINIMUM/MAXIMUM

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM QUANTITY MINIMUM AMOUNT MAXIMUM QUANTITY MAXIMUM AMOUNT

Qty. 1 - New Manufacture (CLIN 0001) TBD* N/A TBD*

*Will be identified at contract award.

QUANTITY

The quantities estimated for each CLIN is the total quantity to be ordered over the life of the five-year contract. The estimated quantity is estimated not a commitment nor a guarantee by the Government to purchase at these quantity amounts, but rather provides the Government estimate at this time and utilized the calculation of the total contract ceiling.

Item Supplies/Service Estimated Quantity

Unit Unit Price Amount

New Manufacture (USN) New Manufacture of the MK-82 Rate Integrating Gyroscope IAW

SOW 3.2

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price

94 Each

Additional Descriptive Data:

PRICE MATRIX

QUANTITY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

New Manufacture (FMS) New Manufacture of the MK-82 Rate Integrating Gyroscope IAW

SOW 3.2

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The

6 Each contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price

Additional Descriptive Data:

PRICE MATRIX

QUANTITY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

Refurbishment (USN) Refurbishment of the MK-82 Rate Integrating Gyroscope IAW SOW 3.3

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price

621 Each

Additional Descriptive Data:

PRICE MATRIX

QUANTITY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

Refurbishment (FMS) Refurbishment of the MK-82 Rate Integrating Gyroscope IAW SOW 3.3

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price

40 Each

Additional Descriptive Data:

PRICE MATRIX

QUANTITY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

Shipping (FMS) Each FMS CLIN used must also use CLIN 0005 Shipping CLIN for the FMS cost of shipping

Pricing Arrangement: Firm Fixed Price

46 Each

Additional Descriptive Data:

PRICE MATRIX

QUANTITY YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5

Data Technical Data Requirements for CLIN(s) 0001 thru 0005 IAW the CDRL(s) A001 thru A003 provided in Section J. The price/costs for all technical data generated by the contractor directly or indirectly in its procurement effort is included in the price/cost paid by the Government under CLIN(s) 0001 thru 0005. Not Separately Priced.

Pricing Arrangement: Firm Fixed Price

1 Each

Section C - Description/Specifications/Statement of Work

STATEMENT OF WORK

Rate Integrating Gyroscope Manufacturing and Refurbishment

26-JUNE-2025

1 BACKGROUND AND SCOPE

This Statement of Work (SOW) establishes the requirements for the refurbishment, manufacturing, qualification, inspection, and delivery of the Rate Integrating Gyroscope, MIL-G-81168/5B, PN#7517308 used in the MK-82 Gun and Guided Missile Director. Naval Surface Warfare Center (NSWC) Crane Division is the designated overhaul point for the MK-82 Director, a subsystem of the MK-99 Fire Control System (FCS).

2 APPLICABLE DOCUMENTS

7517308 Long life Gyroscope

MIL-G-81168 Revision Gyroscope, Rate Integrating

MIL-G-81168/5 Revision B Gyroscope, Rate Integrating

MIL-STD-129 Military Marking for Shipment and Storage

3 REQUIREMENTS

3.1 General Requirements:

3.1.1 The contractor shall furnish all equipment, parts, and labor necessary for the refurbishment and/or manufacture of Gyroscope PN# 7517308.

3.1.2 The contractor shall be responsible for shipment of all overhauled and new manufactured MK-82 Rate Integrating Gyroscopes to NSWC Crane 300 Highway 361 Crane, IN 47522.

3.1.3 For Rate Integrating Gyroscopes to be delivered to the Government, the contractor shall perform marking for shipment and storage processes IAW MIL-G-81168 Para 5.1 & 5.2 Level C Packaging

3.1.4 For Rate Integrating Gyroscopes to be delivered to the Government, the contractor shall apply equipment markings and identification processes using MIL-STD-129 IAW MIL-G-81168 Para 5.3.

3.1.5 Requirements of MIL-G-81168/5 supersede those of MIL-G-81168 when conflicting.

3.2 Manufacturing Requirements

3.2.1 The contractor shall manufacture the MK-82 Rate Integrating Gyroscope IAW MIL-G-81168/5. Testing documentation IAW para 3.4 of this SOW is applicable.

3.3 Refurbishment Requirements

3.3.1 Subcomponents which exhibit failures, or deterioration leading to imminent failure shall be designated for replacement.

3.4 Testing Requirements (CDRL A001)

3.4.1 Gyroscope Assemblies shall be tested IAW MIL-G-81168 Table I Schedule 2, paragraph 4.8, 4.9, and MIL-5-81168/5 Sheets 8 & 9.

3.4.2 Performance parameters are specified in MIL-G-81168/5 when not specified within MIL-G-81168.

3.4.3 Testing performed IAW SOW para 3.4 shall not include MIL-G-81168 Table I Schedule 1 tests.

3.5 Qualification

3.5.1 The Contractor is exempt from execution of qualification requirements in MIL-G-81168 Para 4.3.2, if the Contractor is currently production or has been in-production within the last 24 months.

3.6 Component Certifications (CDRL A002, Certificate of Compliance)

3.6.1 As specified in the drawing specifications of each assemblies' components, certificates of compliance shall be delivered to the government with each order.

3.6.2 Contractor shall inspect each manufactured item and/or purchased item against drawings/specifications, and shall provide a Certificate of Compliance (COC) to document compliance of each hardware item with item drawings/specifications. The contractor shall provide a hard copy of the COC with each hardware item produced IAW with this SOW. Contractor shall make hard copies of the COCs available to the Government upon request.

4 GOVERNMENT FURNISHED ITEMS

4.1 Government Furnished Information (GFI): The documents/drawings listed in section 2 of this SOW will be provided along with associated part lists and subassembly drawings owned by the government.

4.2 Government Furnished Material (GFM): The Government will provide gyroscopes for refurbishment IAW SOW paragraph 3.3.

4.3 GOVERNMENT FURNISHED EQUIPMENT (GFE): The Government will not provide Equipment for execution of this SOW.

4.4 Procurement Integrated Enterprise Environment (PIEE) GFP Module Reporting & Accountability

4.4.1 All Government Furnished Property is property of the U.S. Government and shall not be transferred to any individual or agency, public or private, without the express written approval of the originating Contracting Officer except as required for the specific performance of tasks under this contract/order. Accountability for Government Property under this contract/order shall be managed in accordance with FAR Part 45, DFARS Part 245 and DFARS PGI Part 245 as well as the Government Property clauses in the contract/order whether acquired by the prime or subcontractors (Contractor Acquired Property), provided by the Government, or received directly from another commercial source as a deliverable from a Government issued contract. Additional Government Property accountability requirements are outlined in the following Directives and Instructions and shall be adhered to as applicable:

- DoDI 4161.02, Accountability & Management of Government Contract Property

-DoDM 4140.01, DoD Supply Chain Material Management Procedures: Material Returns, Retention and Disposition

-DoDI 5000.64, Accountability & Management of DoD Equipment and Other Accountable Property

-OPNAVINST 4440.26C, Operating Materials & Supplies and Government Furnished Material Management

-SECNAVINST 5200.43A, Government Furnished Property, Accountability and Management

4.4.2 Receipt Reporting: FAR 52.245-1(f)(1)(ii) requires the contractor to report receipt of all GFP. Reporting of Government Furnished Property (DFARS 252.245-7005) and DoDI 4161.02, Accountability and Management of Government Contract Property Instruction requires that contractors, as part of the required receipt of any Government property, report to the DoD IUID Registry using WAWF, DLMS transactions, or direct update of the registry. Contractors shall ensure appropriate accountable property records are maintained utilizing the data reported in the DoD IUID Registry and its integral GFP Module in the Procurement Integrated Enterprise Environment (PIEE). At the time of reporting receipt of GFP in the GFP Module, the contractor will also send an email notification to cran_gfpaccounta.fct@navy.mil to ensure the NSWC Crane Property Management Division is notified.

4.4.3 Shipping Notification: DoDI 4161.02 requires use of electronic transactions when transferring Government property to a contractor and upon return of property to DoD. The contractor shall use the GFP Module in PIEE when returning GFP back to the Government. At the time of creating the shipping document to return GFP using the GFP Module, the contractor will also send an email notification to cran_gfpaccounta.

fct@navy.mil to ensure the NSWC Crane Property Management Division is notified.

4.4.4 Lost, Damaged or Stolen GFP Reporting: FAR clause 52.245-1 requires the contractor to investigate and report to the Government all incidents of property loss as soon as the facts become known. DFARS 252.245-7005 further requires the contractor to report lost, damaged or stolen government property using the Property Loss functionality within the PIEE GFP Module.

4.4.5 Excess Property Reporting: SECNAVINST 5200.43A requires unused or excess GFP be properly dispositioned as soon as the excess is identified without waiting for formal contract closeout processing. Recovering excess property from the contractor will be completed by the return of GFP back to the government via a DD-1149 or utilizing the GFP Module Plant Clearance capability as soon as possible to ensure the property is available to fill other requirements and can potentially reduce the administrative costs of the contract. The Government-appointed Plant Clearance Officer (PLCO) will accept or reject the request to excess GFP using the GFP Module Plant Clearance capability.

4.4.6 Inventory Reporting: FAR 52.245-1 requires the contractor to periodically perform, record, and disclose physical inventory results. While the FAR clause does not define "periodically," frequency of on-hand inventory count are in the Contract Data Requirements List (CDRL A003) identified in this contract.

4.4.7 GFP Reporting: The contractor shall provide data deliverables IAW the listed CDRLs by contract and contract order number to provide accountability for all Government furnished property that has been provided in support of the contract. The report shall include the fields required by the Data Item Description noted in the CDRL, DFARS 252.245-7005 and DFARS PGI 245.103-72 for the purpose of accountability.

5 DATA DELIVERABLES

The contractor shall submit the following data deliverables shall in accordance with the requirements listed in the Contractor Data Requirements Lists (CDRLs).

CDRL: A001

DID Number: DI-NDTI-80809B

DID Title: Test/Inspection Report

DID Sub-Title: Test Report

SOW Paragraph: 3.4

CDRL: A002

DID Number: DI-MISC-81356A

DID Title: Certificate of Compliance

DID Sub-Title: Component Certificate of Compliance

SOW Paragraph: 3.6

CDRL: A003

DID Number: DI-MGMT-80441D

DID Title: Government Property Inventory Report

DID Sub-Title: GFP Inventory

SOW Paragraph: 6.3.6

6 SPECIAL CONDITIONS

6.1 Quality

6.1.1 Quality Program: The contractor shall have a quality program that is ISO 9001-2015 compliant or meets the following requirements: monitor and control critical processes; continuously improve processes; establish mechanisms for performance feedback; and maintain an effective root cause analysis and corrective action system.

6.1.2 Quality Assurance. The contractor shall ensure each final machined subassembly meets all specifications IAW the applicable drawings and subsequent reference documents. The contractor shall ensure that only approved parts and processes were used to fulfill requirements of this SOW.

All assets shall be government inspected and accepted at destination.

6.2 Counterfeit Parts and Material

6.2.1 Counterfeit material is a serious threat to the safety and operational effectiveness of DoD systems. The contractor (and subcontractors at all levels) shall implement a risk mitigation process when obtaining critically or high risk materiel in accordance with Paragraphs (6.2.1 and 6.2.2) below:

6.2.2 If the materiel is currently in production or currently available, the materiel shall be obtained only from authorized sources. Authorized sources are the original manufacturer, a source with the express written authority of the original manufacturer or current design activity, or an authorized aftermarket manufacturer.

6.2.3 If the materiel is not in production or currently available from authorized sources, the materiel shall be obtained from suppliers that meet appropriate counterfeit avoidance criteria. Counterfeit avoidance criteria can be found in the following Industry Standards - SAE AS5553A; SAE AS5452; SAE AS6081; SAE ARP617; SAE AS6174; and SAE AS6301.

6.2.4 Contractors shall notify the Contracting Officer when critical or high-risk materiel cannot be obtained from an authorized source. The contractor shall take mitigating actions to authenticate the material if purchased from another source. The contractor shall report instances of counterfeit and suspect counterfeit materiel to the Contracting Officer and the Government Industry Data Exchange Program (GIDEP) as soon as the contractor becomes aware of the issue.

Requirements New and Repair of the MK-82 Director Long Life Gyroscope (Peanut Gyro)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(Endof Text)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of Text)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of Text)

C-211-H017 UPDATING SPECIFICATIONS AND STANDARDS (NAVSEA) (DEC 2018) (Dec 2018)

The contractor may request that this contract be updated to include the current version of the applicable specification or standard if the update does not affect the form, fit or function of any deliverable item or increase the cost/price of the item to the Government. The contractor should submit update requests to the Procuring Contracting Officer with copies to the Administrative Contracting Officer and cognizant program office representative for approval. The contractor shall perform the contract in accordance with the existing specifications and standards until notified of approval/disapproval of its request to update by the Procuring Contracting Officer. Any approved alternate specifications or standards will be incorporated into the contract.

(End of Text)

C-211-H016 SPECIFICATIONS AND STANDARDS (NAVSEA) (OCT 2018) (Oct 2018)

(a) Definitions.

(i) A "zero-tier reference" is a specification, standard, or drawing that is cited in the contract (including its attachments).

(ii) A "first-tier reference" is either: (1) a specification, standard, or drawing cited in a zero-tier reference, or (2) a specification cited in a first-tier drawing.

(b) Requirements. All zero-tier and first-tier references, as defined above, are mandatory for use. All lower tier references shall be used for guidance only unless specifically identified below.

(End of Text)

C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019) (Mar 2019)

(a) Definitions. As used in this text:

Article means a manufactured item other than a fluid or particle: (i) which is formed to a specific shape or design during manufacture; (ii) which has end use function(s) dependent in whole or in part upon its shape or design during end use; and

(iii) which under normal conditions of use does not release more than very small quantities, e.g., minute or trace amounts of a hazardous chemical, and does not pose a physical hazard or health risk to employees.

Boundary of containment means a continuous tight seal (barrier) to prevent the release of functional mercury during normal operation and maintenance. Examples include the exterior of a fluorescent lamp, glass capsule of a mercury switch, and container for mercury reagents. A double boundary of containment consists of two independent seals.

Functional mercury means mercury or mercury compound(s) contained in equipment that is required for the equipment to operate properly, such as that found in mercury switches, fluorescent lamps, flat-panel monitors, thermostats, thermostat probes, small coin type batteries, barometers, and dental amalgams.

Hardware means any article, container, piece of material, individual part, subassembly, assembly, component, or system to which mercury control requirements apply.

Mercury-free means hardware that does not contain functional mercury and is not contaminated by mercury or mercury compounds.

Portable means items that are frequently transported during normal operation. Desk lamps, shop lights, and hand-held instruments are considered portable, while bulbs in stationary light fixtures are not. In general, items that require transport only during maintenance, installation, and removal of the items are not considered portable.

(b) The Contractor, and all subcontractors and vendors, shall ensure that mercury or mercury containing compounds are not intentionally added to, or come in direct contact with, hardware or supplies furnished under this contract.

(1) The Contractor shall ensure that mercury and mercury compounds are not taken onboard naval vessels by Contractor, subcontractor, or vendor personnel except for functional mercury used in batteries, dental amalgams, fluorescent lamps, flat-panel monitors, required instruments, sensors or controls, weapon systems, and chemical analysis reagents specified by the Naval Sea Systems Command (NAVSEA).

(2) Portable fluorescent lamps and portable instruments containing elemental mercury must be shock-proof in accordance with MIL-DTL-901E entitled Requirements for Shock Tests, H.I. (High Impact) Shipboard Machinery, Equipment, and Systems and have mercury enclosed by a double boundary of containment. Some devices with liquid crystal display (LCD) screens utilize a fluorescent bulb backlight to illuminate the LCD screen. No additional restrictions or controls apply to devices with LCD screens; however, the Contractor shall remove the LCD screen and seal it in plastic following any evidence that the backlight failed.

(3) For Submarines, any use of mercury containing items must be approved as required by the Nuclear Powered Submarine Atmosphere Control Manual (S9510-AB-ATM-010/U) Volume 1.

(4) The Contractor shall ensure that mercury and mercury compounds do not contact hardware surfaces in systems covered by NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submarine air systems, level I systems per NAVSEA Publication 0948-LP-045-7010, NAVSEA Material Control Standard, or the submarine safety program (SUBSAFE) surfaces during maintenance or repair.

Such hardware is designated as mercury-free. The Contractor shall ensure that all other hardware that could be structurally degraded by contamination with elemental mercury or reactive mercury compounds is separated from it by sufficient distance, or boundaries of containment that effectively prevents contact in all but the most extreme circumstances.

(5) The Contractor shall check any hardware surfaces in the above systems which are known or suspected to have come in contact with mercury or mercury compounds for evidence of structural degradation and external mercury contamination.

The existence of external mercury contamination can be determined following MIL-STD-2041D entitled Control of Detrimental Materials.

(6) The presence of mercury in a product may be determined by checking product labeling on material safety data sheets or safety data sheets. Chemical analysis is not required.

(7) The Contractor shall dispose of any mercury and mercury compounds in accordance with OPNAV Manual (OPNAV M- 5090.1) entitled Environmental Readiness Program Manual of 10 January 2014.

(8) If the use of mercury or mercury compounds cannot be avoided, a risk assessment and waiver request, if required, must be performed and submitted per the NAVSEA Hazardous Material Avoidance Process (T9070-AL-DPC-020/077-2). For systems covered by the NAVSEA Manual NAVSEA 0989-064-3000 entitled Cleanliness Requirements for Nuclear Propulsion Plant Maintenance and Construction, submit the risk assessment and waiver request, if required to Nuclear Propulsion (NAVSEA 08).

(c) In all cases where mercury or a mercury compound has contacted hardware surfaces required to be mercury-free the Contractor shall immediately provide a report to the NAVSEA Dry Environmental Systems and Hazardous Materials (NAVSEA 05P5) via the cognizant contract administration safety office. Reports concerning systems covered by NAVSEA Manual 0989- 064-3000 must include NAVSEA Nuclear Propulsion Directorate (SEA 08) in the distribution. Reports must be in letter form and include the date and details of the contact, the surfaces contacted, the recovery actions taken, and the status of the affected surfaces.

(End of Text)

C-227-H006 DATA REQUIREMENTS (NAVSEA) (OCT 2018) (Oct 2018)

The data to be furnished hereunder shall be prepared in accordance with the Contract Data Requirements List, DD Form 1423, Exhibit(s) A8, attached hereto.

(End of Text)

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC

(NAVSEA) (OCT 2018)

(Oct 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;

and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal

(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

(End of Text)

C-242-H002 POST AWARD MEETING (NAVSEA) (OCT 2018) (Oct 2018)

(a) A post-award meeting with the successful offeror will be conducted within [ * ] days after award of the contract. The meeting will be held at the address below:

Location/Address: *

(b) The contractor will be given [ * ] working days notice prior to the date of the meeting by the Contracting Officer.

(c) The requirement for a post-award meeting shall in no event constitute grounds for excusable delay by the contractor in performance of any provisions in the contract.

(d) The post-award meeting will include, but is not limited to, the establishment of work level points of contact, determining the administration strategy, roles and responsibilities, and ensure prompt payment and close out. Specific topics shall be mutually agreed to prior to the meeting.

[ * ] To be specified at contract award

(End of Text)

C-242-H001 EXPEDITING CONTRACT CLOSEOUT (NAVSEA) (OCT 2018) (Oct 2018)

(a) As part of the negotiated fixed price or total estimated amount of this contract, both the Government and the Contractor have agreed to waive any entitlement that otherwise might accrue to either party in any residual dollar amount of $1,000 or less at the time of final contract closeout. The term "residual dollar amount" shall include all money that would otherwise be owed to either party at the end of the contract, except that, amounts connected in any way with taxation, allegations of fraud and/or antitrust violations shall be excluded. For purposes of determining residual dollar amounts, offsets of money owed by one party against money that would otherwise be paid by that party may be considered to the extent permitted by law.

(b) This agreement to waive entitlement to residual dollar amounts has been considered by both parties. It is agreed that the administrative costs for either party associated with collecting such small dollar amounts could exceed the amount to be recovered.

(End of Text)

C-244-H002 SUBCONTRACTORS/CONSULTANTS (NAVSEA) (FEB 2023) (Feb 2023)

In addition to the information required by FAR 52.244-2(e) of the contract, when consent to subcontract is required per FAR 52.244-2, the contractor shall also include the following information in requests to add subcontractors or consultants during performance:

(1) Impact on subcontracting goals,

(2) Impact on providing support at the contracted value,

(3) IF SEAPORT TASK ORDER - The results of negotiations to incorporate fee rate caps no higher than the lower of (i) SeaPort NXG fee rate caps for the prime contractor, or in the case where the proposed subcontractor is also a SeaPort NXG prime, (ii) fee rate caps that are no higher than the subcontractor's prime SeaPort NXG contract.

(End of Text)

C-245-H005 INFORMATION AND DATA FURNISHED BY THE GOVERNMENT--ALTERNATE

I (NAVSEA) (MAY 2019)

(May 2019)

(a) Contract Specifications, Drawings and Data. The Government will furnish, if not included as an attachment to the contract, any unique contract specifications or other design or alteration data cited or referenced in Section C.

(b) . GFI is defined as that information essential for the installation, test, operation, Government Furnished Information (GFI) and interface support of all Government Furnished Material identified in an attachment in Section J. The Government shall furnish only the GFI identified in an attachment in Section J. The GFI furnished to the contractor need not be in any particular format. Further, the Government reserves the right to revise the listing of GFI as follows:

(1) The Contracting Officer may at any time by written order:

(i) delete, supersede, or revise, in whole or in part, data identified in an attachment in Section J; or

(ii) add items of data or information to the attachment identified in Section J; or

(iii) establish or revise due dates for items of data or information in the attachment identified in Section J.

(2) If any action taken by the Contracting Officer pursuant to subparagraph (1) immediately above causes an increase or decrease in the costs of, or the time required for, performance of any part of the work under this contract, the contractor may be entitled to an equitable adjustment in the contract amount and delivery schedule in accordance with the procedures provided for in the "CHANGES" clause of this contract.

(c) Except for the Government information and data specified by paragraphs (a) and (b) above, the Government will not be obligated to furnish the Contractor any specification, standard, drawing, technical documentation, or other publication, notwithstanding anything to the contrary in the contract specifications, the GFI identified in an attachment in Section J, the clause of this contract entitled "Government Property" (FAR 52.245-1) or "Government Property Installation Operation Services" (FAR 52.245-2), as applicable, or any other term or condition of this contract. Such referenced documentation may be obtained:

(1) From the ASSIST database via the internet at https://assist.dla.mil/online/start/; or

(2) By submitting a request to the

Department of Defense Single Stock Point (DoDSSP)

Building 4, Section D

700 Robbins Avenue

Philadelphia, Pennsylvania 19111-5094

Telephone (215) 697-6396

Facsimile (215) 697-9398

Commercial specifications and standards, which may be referenced in the contract specification or any sub-tier specification or standard, are not available from Government sources and should be obtained from the publishers.

(End of Text)

C-245-H003 FACILITIES TO BE GOVERNMENT FURNISHED--ALTERNATE I (NAVSEA)

(MAR 2019)

(Mar 2019)

(a) The price and delivery schedule set forth in this contract contemplate the rentfree use of the facilities identified in paragraph

(b) below. If the Government limits or terminates the Contractor's rentfree use of said facilities, and such action affects the ability of the Contractor to perform this contract in accordance with its terms and conditions, then an equitable adjustment in the price or delivery schedule or both, shall be made pursuant to the clause entitled "ChangesFixed Price" (FAR 52.2431) or "Changes-Cost-Reimbursement" (FAR 52.2432), as applicable, provided; however, that if the limitation or termination is due to failure by the Contractor to perform its obligations under this contract, the Contractor shall be entitled only to such adjustment as the Contracting Officer determines to be appropriate under the circumstances.

N0016426RLL11

https://assist.dla.mil/online/start/

(b) The Contractor is authorized to use the facilities described below upon the prior written approval of the cognizant Contract Administration Office, which shall determine that such facilities are required to carry out the work provided for by this contract. Immediately upon receipt of each item of approved facilities, the Contractor shall notify the cognizant Contract Administration Office of the receipt of such facilities owned by the Government, which shall be made a part of the plant account assigned to the Contractor at that location.

DESCRIPTION AND IDENTITY OF FACILITIES

(c) In the event there is in existence a facilities management contract effective at the same plant or general location, the facilities provided hereunder shall be made subject to all the terms and conditions of the facilities management contract.

(End of Text)

C-246-H002 GOVERNMENT USE OF CONTRACTOR’S INSPECTION EQUIPMENT (NAVSEA)

(OCT 2018)

(Oct 2018)

The contractor's gages, measuring, and testing devices shall be made available to the Government when required to determine contractor conformance with contract requirements. If conditions warrant, the contractor's personnel shall be made available for operation of such devices and for verification of their accuracy and condition.

(End of Text)

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018) (Dec 2018)

The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits for complying with any applicable Federal, State, and Municipal laws, codes, and regulations for shipping and transportation including, but not limited to, any movement over public highways of overweight/over dimensional materials.

(End of Text)

Section D - Packaging and Marking

Additional Regulation or Supplemental Clauses Incorporated by Full Text

D-211-H001 PACKAGING OF DATA (NAVSEA) (FEB 2022) (Feb 2022)

Data to be delivered by Integrated Digital Environment (IDE) or other electronic media shall be as specified in the contract.

All unclassified data to be shipped shall be prepared for shipment in accordance with best commercial practice.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial Security Program Operating Manual (NISPOM), 32 CFR Part 117.

(End of Text)

D-211-H005 IDENTIFICATION MARKING OF PARTS -- ALTERNATE I (NAVSEA) (OCT 2018) (Oct 2018)

(a) For all parts not subject to the marking requirements in DFARS 252.211-7003 - Item Unique Identification and Valuation, marking shall be accomplished in accordance with the following:

(1) Parts not manufactured to Government specifications shall be marked in accordance with generally accepted commercial practice.

(2) Parts manufactured to Government specifications shall be marked as follows:

(i) Electrical Parts - that is, all parts in electrical equipment and electrical parts when used in equipment which are not electrical in nature (e.g., electric controls and motors in a hydraulic system) - shall be identified and marked in accordance with MIL-STD-1285D(2) dated 22 June 2018, or, where MIL-STD-1285D(2) does not cover such a part, in accordance with MIL-STD-130N(1) dated 16 November 2012. Requirements of MIL-STD-1686C dated 25 October 1995 for Electrostatic Discharge Control shall be addressed.

(ii) Electronic Parts - that is, all parts in electronic equipment and electronic parts when used in equipment which are not electronic in nature (e.g., electronic fuel controls in some engines) - shall be identified and marked in accordance with Requirement 67 of MIL-HDBK- 454B dated 15 April 2007 with Notice 1 dated 12 December 2012. Requirements of MIL-STD-1686C for Electrostatic Discharge Control shall be addressed.

(iii) Parts other than electrical or electronic parts (as described above) shall be identified and marked in accordance with MIL-STD-130N (1).

(b) In cases where parts are so small as not to permit identification marking as provided above, such parts shall be appropriately coded so as to permit ready identification.

(End of Text)

D-246-H003 WARRANTY NOTIFICATION FOR ITEM(S) —ALTERNATE I (NAVSEA) (APR

2024)

(Apr 2024)

The Contractor shall apply a permanent warranty notification stamping or marking on each warranted deliverable end item and its container in accordance with MIL-STD-129R with Change 3 dated 25 February 2023 and MIL-STD-130N(1) dated 16 November 2012. The notification shall be placed in close proximity to other required stamping or markings so as to be easily readable by personnel. The warranty notification shall read:

THIS ITEM WARRANTED UNDER CONTRACT TO CONFORM TO DESIGN, N0016426RLL11

MANUFACTURING, AND PERFORMANCE REQUIREMENTS AND BE FREE FROM DEFECTS

IN MATERIAL AND WORKMANSHIP FOR FROM DATE OF MK-82 Director Long Life Gyroscope

ACCEPTANCE. IF ITEM IS DEFECTIVE NOTIFY RTA AND PCO.

(End of Text)

ADDITIONAL MARKING REQUIREMENTS FOR FMS ITEMS (NAVSEA) (OCT

D-247-H001 2018) (Oct 2018)

(a) The following identifying marks shall appear on the outside of each box, parcel and/or crate and all shipping papers included in each shipment:

NAVY FMS CASE _________________________________________________________

REQUISITION NO. _________________________________________________________

ITEM DESCRIPTION _________________________________________________________

If a consolidated shipment of several items in one container is forwarded, add to the above information "CONSOLIDATED SHIPMENT, CONTAINS ____ ITEMS".

(b) The inscription "UNITED STATES OF AMERICA" shall be affixed in a suitable size indelible stencil, label or printed form on all external shipping containers or the exterior surface of uncrated items.

(c) All invoices, correspondence, reports and other documents shall be identified with the appropriate FMS case designator, requisition number(s), and item description(s).

(End of Text)

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018) (Oct 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

(End of Text)

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)

Item(s) The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.N/A

(End of Text)

D-247-H005 MARKING AND PACKING LIST(S) – ALTERNATE I (NAVSEA) (OCT 2018) (Oct 2018)

(a) . Shipments, shipping containers and palletized unit loads shall be marked in accordance with MIL-STD-129R with Change 1 dated 24 Marking May 2018.

(b) . A packing list (DD Form 250 Material Inspection and Receiving Report may be used) identifying the contents of each shipment, Packing List(s) shipping container or palletized unit load shall be provided by the Contractor with each shipment in accordance with the above cited MIL- STD. When a contract line item identified under a single stock number includes an assortment of related items such as kit or set components, detached parts or accessories, installation hardware or material, the packing list(s) shall identify the assorted items.

Where DD Form 1348-1 or DD Form 1348-1A is applicable and an assortment of related items is included in the shipping container, a packing list identifying the contents shall be furnished.

(c) . In addition to the requirements in paragraph (b) above, a master packing list shall be prepared where more than one Master Packing List shipment, shipping container or palletized unit load comprise the contract line item being shipped. The master packing list shall be attached to the number one container and so identified.

(d) . All items within the kit, set, installation hardware or material shall be suitably segregated and identified within the unit packPart Identification

(s) or shipping container by part number and/or national stock number. Refer to the above cited MIL-STD for marking of assorted (related-unrelated) items.

(End of Text)

Section E - Inspection and Acceptance

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-2 Inspection of Supplies-Fixed-Price. Aug 1996 52.246-15 Certificate of Conformance. Apr 1984 52.246-16 Responsibility for Supplies. Apr 1984

FAR Clauses Incorporated by Full Text

52.246-11 Higher-Level Contract Quality Requirement. (Dec 2014)

Higher-Level Contract Quality Requirement (Dec 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

The contractor shall have a quality program that is ISO 9001-2015 compliant for meets the following requirements: monitor and control critical…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .