Solicitation - N0010426RK054.pdf
PDF 3 MB Posted
- Solicitation number
- N0010426RK054
About this file
This is a Solicitation, Offer, and Award form (Standard Form 33, Revised 12/2022) for a negotiated Request for Proposal (RFP) issued by the Naval Supply Weapon Systems Support Mech, NAVSUP, located in Mechanicsburg, Pennsylvania. The solicitation is for Emergency Power Supply units (CAP-12115C, DODIC EY28, NSN 1377013123511) used in ACES II systems. The contract number is N0010426RK054, issued under solicitation number N0010426RK054, dated January 26, 2026. Sealed offers must be submitted electronically to andrew.e.emrich.civ@us.navy.mil by 01:00 PM local time on February 27, 2026. The contract is rated as a DO-rated order under the Defense Priorities and Allocations System (DPAS) at 15 CFR 700 for national defense and emergency preparedness purposes.
The procurement includes multiple contract line items (CLINs) for a total of 564 Emergency Power Supply units across various foreign military sales (FMS) cases and domestic requirements. Specific quantities include one technical data set, 56 investigative units, 6 production lot test samples, and 497 production units distributed across multiple FMS cases (AE-D-CAA, BA-D-CAG, EG-D-CAF, GR-D-CAA, IQ-D-CAA, IQ-D-CBO, JO-D-CCA, KS-D-CBP, N4-D-CAB, SN-D-CAK, SR-D-CAI, TK-D-CBC, and TW-D-CBC) and domestic allocations. The procurement is structured as firm fixed price with all items marked as not separately priced (NSP). The item is designated as a Critical Safety Item (CSI). Award is contemplated based on evaluation criteria in Section M, and proposals must comply with all representations, certifications, technical requirements, and delivery schedules specified throughout the solicitation document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED FY26 PR ATTACHMENTS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION
15A. NAME AND
ADDRESS
OF OFFEROR
SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.
RATING PAGE OF PAGES
2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER
CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR
INFORMATION
CALL:
A. NAME B. TELEPHONE (NO COLLECT CALLS)
AREA CODE NUMBER EXTENSION
C. EMAIL ADDRESS
11. TABLE OF CONTENTS
(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION
A B C D E F G H
I
J
K
L
M EVALUATION FACTORS FOR AWARD
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND OTHER
STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
LIST OF ATTACHMENTS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
CONTRACT CLAUSESSOLICITATION/CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/COSTS
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PACKAGING AND MARKING
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
CONTRACT ADMINISTRATION DATA
SPECIAL CONTRACT REQUIREMENTS
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause Number 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)
DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE
CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
15B. TELEPHONE NUMBER
AREA CODE NUMBER EXTENSION
15C. CHECK IF REMITTANCE ADDRESS IS
DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE
UNITED STATES CODE AT:
10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)
24. ADMINISTERED BY (If other than Item 7)
26. NAME OF CONTRACTING OFFICER (Type or print)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
25. PAYMENT WILL BE MADE BY
27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
CODE
ITEM
STANDARD FORM 33 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.214 (c)
SEALED BID (IFB) INVITATION FOR BID
NEGOTIATED (RFP) REQUEST FOR
PROPOSAL
(Hour) (Date)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
FMS Requirement
Section A - Solicitation/Contract Form
EY28
N0010426RK054
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
SECTION B NOTES -
1. This item is a CSI - Critical Safety Item.
2. See Section L for proposal submission instructions. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to andrew.e.emrich.civ@us.navy.mil.
Item Supplies/Service Quantity Unit Unit Price Amount
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
Total Quantity for CLIN 564
Information Only - This item is used in the following Systems /Configurations: ACES II
National Stock Number: 1377013123511 Pricing Arrangement: Firm Fixed Price
0001AA
TECHNICAL DATA - See DD Form 1423, Exhibit A
National Stock Number: 1377013123511
1 Set
Additional Descriptive Data:
This item is NOT SEPARATELY PRICED (NSP)
0001AB
INVESTIGATIVE UNIT(S)
Consists of: 2 Lots of 282 each net, plus an additional 31 each per lot for test. (28 each for test and 3 each for investigative purposes.)
Ownership Code 3
National Stock Number: 1377013123511
56 Each
Additional Descriptive Data:
This item is NOT SEPARATELY PRICED (NSP)
0001AC
PRODUCTION LOT TEST SAMPLES
Consists of: 2 Lots of 282 each net, plus an additional 31 each per lot for test. (28 each for test and 3 each for investigative purposes.)
Ownership Code 3
National Stock Number: 1377013123511
6 Each
Additional Descriptive Data:
This item is NOT SEPARATELY PRICED (NSP)
0001AD
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: AE-D-CAA
F2DCDE5316G002 L/I 1
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
4 Each
0001AE
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: BA-D-CAG
F2DCDE5316G002 L/I 2
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
7 Each
0001AF
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: EG-D-CAF
F2DCDE5316G002 L/I 3
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
10 Each
0001AG
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: GR-D-CAA
F2DCDE5316G002 L/I 4
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
13 Each
0001AH
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: IQ-D-CAA
F2DCDE5316G002 L/I 5
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
20 Each
0001AJ
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: IQ-D-CBO
F2DCDE5316G002 L/I 6
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
320 Each
0001AK
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: JO-D-CCA
F2DCDE5316G002 L/I 7
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
13 Each
0001AL
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: KS-D-CBP
F2DCDE5316G002 L/I 8
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
31 Each
0001AM
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: N4-D-CAB
F2DCDE5316G002 L/I 9
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
6 Each
0001AN
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: N4-D-CAB
F2DCDE5316G002 L/I 10
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
3 Each
0001AP
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: SN-D-CAK
F2DCDE5316G002 L/I 11
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
20 Each
0001AQ
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: SN-D-CAK
F2DCDE5316G002 L/I 12
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
48 Each
0001AR
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: SN-D-CAK
F2DCDE5316G002 L/I 13
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
12 Each
0001AS
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: SR-D-CAI
F2DCDE5316G002 L/I 14
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
36 Each
0001AT
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: TK-D-CBC
F2DCDE5316G002 L/I 15
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
10 Each
0001AU
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FMS CASE: TW-D-CBC
F2DCDE5316G002 L/I 16
Ownership Code 8
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
1 Each
0001AV
DODIC: EY28
Model: N/A Item Nomenclature: Emergency Power Supply
CAP-12115C
FY26 PANMC (Other) Ownership Code 5
NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
National Stock Number: 1377013123511
10 Each
Section C - Description/Specifications/Statement of Work
SECTION C - DESCRIPTION AND SPECIFICATIONS
NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS
Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon Contractor anticipation of Government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.
NOTE 2: SPECIFICATIONS THAT DO NOT INDICATE SPECIFIC REVISION LEVELS ARE TO BE MADE TO THE REVISION LEVELS LISTED IN THE ASSIST DATABASE AT http://assist.daps.dla.mil IN EFFECT AT THE TIME OF SOLICITATION
ISSUANCE.
a. 1. DATA LIST / PART NUMBERS / DRAWING NUMBERS:
CLIN DATA LIST / PART OR DRAWING NUMBERS REVISION
REVISION
DATE
0001 CAP-12115C
b. 2. SPECIFICATIONS:
CLIN SPECIFICATIONS REVISION REVISION DATE
0001 A115932 K 8/29/2012
0001 A115933 A 7/17/1989
3. For Contractor part number, Contractor SHALL submit Product Baseline in accordance with DD1423, sequence number A001. Any revisions to an approved Product Baseline require resubmission in accordance with DD1423, sequence number .A001
4. Obsolescence Alert Notice: The contractor shall notify the USG that a pending and/or emergent obsolescence issue exists by submitting a Obsolescence Alert Notice in accordance with DD1423, sequence number A002.
5. DMSMS Report: Diminishing Manufacturing Sources and Material Shortages (DMSMS) is the loss, or impending loss, of manufacturers or suppliers of items, raw materials or software. The obsolescence alert notice contain:shall
1. Contractor's Name
2. Contractor's Address
3. Contractor's Phone Number
4. Date of Notification
5. Contract Number
6. Obsolescence Alert Notice Number
7. Affected Equipment Title/Nomenclature
8. Part Number
9. National Stock Number, if applicable
10. Affected Assembly Title/Nomenclature
a. Part Number
b. National Stock Number, if applicable
11. Affected Subassembly/Element/Module Title/Nomenclature
a. Part number
b. National Stock Number, if applicable
12. Contractor's Statement of Impact
13. Contractor's Recommendation to Mitigate Obsolescence Issue/Problem, to include, as applicable:
a. Alternative Sources
b. Hardware Redesign
c. Out of Production Non-Recurring Engineering
14. Contractor's Cost Estimate to Mitigate Obsolescence Issue/Problem
The Contractor submit a DMSMS Health Assessment Report for approval/disapproval as specified in Contract Data Requirements List (CDRL) shall DD Form 1423, sequence number and in accordance with Electronic Code of Federal Regulations (CFR) 48 CFR 2.101. Data delivered using A003 the DMSMS Health Assessment Report will be used to support DMSMS management activities as a part of the Department of Defense (DoD) Total System Life Cycle Management responsibilities.
SECTION C - CONFIGURATION CONTROL: SAE EIA-649 (NAVY STOCK CLASS 1377)
1. Configuration Control - The Contractor shall maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration shall be provided to the Government in electronic format.
All contractor configuration changes that occurred between contract awards shall be submitted to the Government for approval within 45 days of contract award.
Any configuration changes after contract award shall be submitted within 45 days of contract award.
All configuration changes shall be submitted at least 60 days prior to Lot Acceptance Testing.
2. Variances - Requests for Variance (RFV) - RFVs shall be designated as Critical, Major, or Minor. The Contractor shall submit RFVs using RFV DD Form 1694 and shall include information as outlined in SAE EIA-649, Configuration Management S andard, and MIL-HDBK-61, Configuration t Management Guidance, for additional guidance on preparation of RFVs.
Note: A copy of the required RFV Form DD Form 1694 is available at:
https://www.esd.whs.mil/Directives/forms/dd1500_1999/
Additional guidance for completion of RFV can be found at the Attachment " This attachment ". RFV Form DD1694 Example Only dated 02/21/2025 is incorporated by reference with the same force and effect as if contained herein.
The Contractor's assigned RFV number shall use the following numbering format:
a. The last seven alpha-numeric characters of the contract number followed by a dash ().
b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.
Definitions of RFV Classifications: (See current SAE EIA 649 and MIL-HDBK-61, Configuration Management Guidance, for additional guidance on critical, major and minor classifications.)
Critical: Critical variances impact safety, health, environment, or other critical requirement. A departure from a requirement classified as critical in configuration documentation.
Major: Major variances have significant impacts such as performance or operational limits, structural strength, interchangeability, reliability, survivability, maintainability, durability of the item or repair parts, supportability, cost, effective use or operation, weight or size, or appearance. A departure from a requirement classified as major in configuration documentation.
Minor: Minor variances are issued when departure does not involve any of the factors listed for critical or major variance. Minor variances have little or no impact and are generally associated with non-functional factory defects that can be dispositioned locally as: "use as is" or "after suitable repair". A departure from a requirement classified as minor in configuration documentation.
3. Engineering Change Proposal (ECP) - ECPs shall be designated as Major (Class I) or Minor (Class II).The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the end-item and its sub-assemblies. Minor (Class II) and Major (Class I) ECP changes shall be approved by the Navy Configuration Control Board (CCB) and technical approval authority prior to implementation. The DD Form 1692 is the preferred format for ECP submissions. ECPs may also be prepared in Contractor format, provided it fulfils the requirements of DD Form 1692, and shall include information outlined in SAE EIA-649 and MIL-HDBK- 61, which provides additional guidance for preparation of ECPs.
ECPs submitted using DD Form 1692 shall use the following numbering format:
a. The last seven alpha-numeric characters of the contract number followed by a dash ().
b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.
Definitions of ECP Classifications: (See current SAE EIA 649 and MIL-HDBK-61 for additional guidance on Major (Class I) and Minor (Class II) classifications.)
Major (Class I):
a. A change that affects specified and approved requirements for product attributes, including safety, reliability, and supportability.
b. A change, after establishment of the product baseline, that affects compatibility with interfacing products, including such products as test equipment, support equipment, software, and products furnished by a customer or that affects one or more of the following:
- required calibration to the extent that product identification should be changed
- interchangeability or substitutability of replaceable products, assemblies, or components
- change to add a previously non-qualified supplier, where supplier selection is specified
- requires retrofit of delivered products
c. A change that affect the form, fit, and/or function, and/or requirements, performance, interoperability, supportability, maintainability, cost, safety, addition of a vendor, or a vendor moves facility and the item has not been qualified at that site.
Definitions of form, fit and/or function:
Form: the shape, external size, and marking which uniquely characterizes an item.
Fit: the ability of an item to physically interface or interconnect with and become an integral part of a higher level assembly..
Function: the action[s] that an item is designed to perform including performance, durability and safety.
The following are examples of Major (Class I) changes with regard to function
a. Change to energetic material
b. Change to component material or material properties
c. Change to electrical characteristics.
d. Change in ballistic performance.
Minor (Class II):
Affects configuration documentation (released design information), product or processes but does not affect Major Change Criteria.
Changes that do not affect the form, fit, or function.
If the Navy technical approval authority does not approve the ECP submitted by the Contractor, then the Contractor is required to revert to the Government approved revision of the drawing per the approved product baseline or to the revision used in the prior lot accepted by the Government.
The Government reserves the right to invoke First Article Testing (FAT) per paragraph 2 of "Section E-CAD/PAD Inspection and Acceptance", or require the Contractor to undergo qualification testing.
4. The Contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Local DCMA QAR, and the technical activity below:
a. Local DCMA QAR
b. NAVSUP WSS Contracting Officer
c. NSWC IHD CAD/PAD Division Acquisition Management Specialist (AMS)
5. Technical approval authority for RFVs and ECPs is NSWC IHD
6. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support.
7. Contractors do not have Material Review Board (MRB) authority.
a. Authorization to accept "as-is" or repair any nonconformance is specifically retained by the Contracting Officer. The contractor's MRB shall not make any use "as-is" or "repair" disposition on any nonconformance, and the MRB recommendations shall be submitted per paragraph four (4) above.
b. Authorization to rework the lot prior to submission to the Government for inspection and acceptance is allowed for all parts, subassemblies, and even the end item that undergoes in-process screening for defects. Such rework under the direction of the contractor must ensure all parts meet the requirements of the Technical Data Package (TDP) and/or detailed specification.
c. Authorization to rework the lot after submission to the Government for inspection and acceptance is specifically retained by the contracting officer. The MRB recommendations shall be submitted per paragraph six (6) below. Rework of a lot to correct a deficiency after it has been presented to the Government may require the lot number and all the associated records to be changed, per the requirements of MIL-STD-1168.
If the contractor recommends, through an internal MRB, to process non-conforming parts, subassemblies, or the end item for use "as-is" or "repaired", then the contractor will be required to submit a Request for Variance (RFV) to the Government for disposition. If a non-conformance is discovered, which results in a failure of the item to meet the requirements of the TDP or detailed specification after the lot has been presented to the Government, then the contractor will be required to provide to the Government documentation such as RFVs, Discrepancy Reports (DR) related to contractor's MRBs, and/or rework procedures used to correct the deficiency (if applicable).
8. Rework and Repair are defined as follows:
a. Rework: The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
b. Repair: The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
SECTION C - IDENTIFICATION OF COVERED DEFENSE INFORMATION (In Reference to 252.204-7012)
1. the Contractor In accordance with the DFARS clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, shall provide adequate security for all government and contractor owned Technical Data Packages (TDPs), drawings and item detail specifications on all covered defense information systems that support the performance of work under this contract.
Requirements
EY28
Emergency Power Supply
Section D - Packaging and Marking
SECTION D - UID CAD/PAD ITEM MARKING INFORMATION
Unless otherwise specified in the Technical Data Package (TDP), CAD/PAD items meet the Human Readable Information (HRSI) marking shall requirements of paragraph 3.1 of the attachment " . The Machine Readable Information (MRI) Data CAD/PAD Item Marking Instruction Version 1.6" Construct, paragraph 3.2, and Placement of Unique Identification (UID), paragraph 4, are mandatory requirements.
NOTE: UID marking is for investigative units (also known as retains). REQUIRED UID under the WAWF DD250s is not required for reporting investigative units.
SECTION D - PACKING, MARKING, AND TRANSPORTATION
1. Preservation, packaging, packing, and marking be in accordance with MIL-STD-129, MIL-STD-2073, CFR 49 171-178, MIL-STD-130, shall DLAR 4145.41, and Section Five (5) of Specification MIL-DTL-85097E (OS).
2. Packaging and packing for production lots, first article samples and lot acceptance samples be IAW the following by item: shall
CLIN QUP IAW
0001 1 EA SPI NO (TPO) F01-312-3511 REV J. LEVEL A
NOTE: Quantity per Unit Pack (QUP) is defined as the first tie, wrap, or container applied to a single item, or a quantity thereof, or to a group of items of a single stock number, preserved or unpreserved, which constitutes a complete or identifiable package.
3. Labels for Human Readable Information (HRI) and Machine Readable Information (MRI) meet the requirements for a Grade A, Style 2, shall Composition (b) label as specified in MIL-PRF-61002. The performance requirements for solvent and detergent resistance are not required. The label should be the pressure sensitive adhesive type.
4. Human Readable Information (HRI) markings be applied to ammunition, explosives containers and units loads IAW the applicable shall provisions of MIL-STD-129.
a. At a minimum, inner container markings for CLIN 0001 include: shall
National Stock Number and (DoD) Code: ) (see Section "B" for applicable CLIN
Item Nomenclature: (see Section "B" for applicable CLIN)
Item Assembly Drawing Number: ) (see Section "B" for applicable CLIN
Quantity: As Applicable
Lot Number: IAW MIL-STD-1168
Serial Number: Required ( x ) N/A ( )
b. At a minimum, outer container markings for CLIN 0001 include: shall
National Stock Number and (DoD) Code: ) (see Section "B" for applicable CLIN
Item Nomenclature: (see section "B" for applicable CLIN)
Item Assembly Drawing Number: ) (see Section "B" for applicable CLIN
Quantity: As Applicable
Lot Number: IAW MIL-STD-1168
Serial Number: Required ( x) N/A ( )
Gross Weight and Cube: As Applicable
DoD Contract Number: As Applicable
POP Markings: (s ee Section "D" - Packaging, Marking and Transportation paragraph 6a - .) below
UN Proper Shipping Name, UN Number, Hazard Class, Compatibility Code, Net Explosive Weight, and EX Number: (see TABLE 1 below for )applicable CLIN
CAA: USG DOT 'EX NUMBER'
( )see TABLE 1 EX NUMBER COLUMN below for applicable CLIN Example CAA: USG DOT 880832
Table 1: United Nations Shipping / Storage Information
CLIN NUM UN Proper Shipping Name UN Number Hazard Class COMPA. Code Net Explosive WT (lbs) EX Number
0001 Not regulated as a hazardous material 000 NR S .000200 EX2001050024
5. Machine Readable Information (MRI) markings be applied to ammunition, explosive containers and unit loads IAW the following coded shall elements of data from MIL-STD-129. MRI labels able to be read and interpreted by automatic bar code reading devices (scanners). MRI shall markings contain the minimum data elements identified below:shall
a. Inner container:
(N) National Stock Number: (see Section "B" for applicable CLIN)
(4R) Department of Defense identification code (DODIC): (see Section "B" for applicable CLIN)
(1P) Item Assembly Drawing Number: (see Section "B" for applicable CLIN)
(1T) Lot Number: IAW MIL-STD-1168
(S) Serial Number: Required ( x) N/A ( )
b. Outer container:
(N) National Stock Number: (see Section "B" for applicable CLIN)
(4R) Department of Defense identification code (DODIC): (see Section "B" for applicable CLIN)
(1P) Item Assembly Drawing Number: (see Section "B" for applicable CLIN)
(7Q) Quantity: As Applicable
(1T) Lot Number: IAW MIL-STD-1168
(S) Serial Number: Required (x) N/A ( )
NOTE: The parenthesis surrounding the data elements are NOT encoded in the 2D(PDF417) bar code.
6. Traceable seals are required for all ammunition and ordnance items, including inert configuration items. Traceable seals provide an indication of security, integrity and certification of material serviceability. Traceable seals ensure that the ammunition, ordnance and/or inert item is not pilfered or tampered with after being placed in each shipping container at the time of packaging. The shipping container will normally be the outer container.
The Contractor ensure one of the below traceable seals are properly affixed depending on the type of shipping container.shall
a. Type 1 TRACEABLE SEALS (WIRE SEALS): Type 1 seals are the preferred seals for containers having provisions or means for application of the seals, e.g., metal, plastic, fiberglass, or wood containers with lids or hinged covers, latches, brackets or flanges. A Type 1 seal is, typically, a wire length with an aluminum disk or pellet which is crimped or crushed using a die which imprints a "U.S." symbol on one side of the disk/pellet with an individual's traceable serial number on the reverse side of the disk/pellet.
b. Type 2 SEALS (LABEL SEALS): Type 2 seals are the preferred seals for fiberboard or Styrofoam containers or for metal, plastic, fiberglass or wood containers that will not readily accept Type 1 seals. Type 2 seals are, typically, nonmetallic labels with pressure sensitive backing. They may be pre-printed, stamped or marked with a "U.S." symbol. Type 2 seals be applied such that the label must be cut shall or defaced in order to open a container. Adhesives adhere well enough to prevent peeling during shipping conditions and well enough shall to prevent lifting and replacement of the label. Particular consideration be given to label seals required to adhere to wood and shall fiberboard surfaces.
7. Restrictions Involving Non-Manufactured Wood Packaging (NMWP) and Pallets (per Defense Logistics Agency Directive subpart 47.305-1(c) (90): " wooden pallets and wood containers produced of non-manufactured wood be constructed from Heat Treated (HT to 56 degrees All shall Centigrade for 30 minutes) material and certified by an accredited agency recognized by the American Lumber Standards Committee (ALSC) in accordance with Non-manufactured Wood Packing Policy and Non-manufactured Wood Packing Enforcement Regulations, both dated May 30, 2001."
SECTION D - PALLETIZATION
Production Lot units be palletized in accordance MIL-STD-1322, MIL-STD-1322-1000, MIL-STD-129, MIL-STD-130, and CFR 49 171-178 shall with the following exception:
a. Edge protectors be used under all strapping.shall
Section E - Inspection and Acceptance
SECTION E - PRODUCTION LOT TEST SAMPLES )(CONTRACTOR TESTING
1. Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423
0001AB Lot Acceptance Testing
0001AC LAT Investigative Units
Contractor
Contractor
Government
Government
Contractor
Contractor
Government
Government
0001AD - 0001AV Production Units Contractor
Government
Contractor
Government
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
2. Test samples are required from each production lot and are to be tested in accordance with the approved test plan. A production lot shall consist of the net deliverable quantity plus additional lot test samples and any retained sample units for investigative purposes (if applicable) as detailed in section B.
3. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have minor external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test
The selection of the samples as long as the defects do not create an interference with the form, fit, or function of the unit and/or test fixture.
production lot test samples shall be noted in a discrepancy report (DR) identifying the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defects of each serial number. A copy of the DR shall be submitted to the Contracting Officer. A second copy of the DR shall be submitted to DCMA/QAR when presenting the production lot for random selection of the remaining lot test samples as stated in paragraph 4 below. The contractor shall also annotate the DR number in the remarks section of the ADC for the applicable production lot. This clause is only applicable to the production lot test samples and the external cosmetic defects mentioned above. If additional units with minor external cosmetic defects are part of the deliverable lot and the contractor would like for the government to accept those units "as is", then a RFV shall be submitted to the Contracting Officer for the determination of disposition for those non-compliant deliverable units.
4. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all applicable. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The production lot test samples shall be selected, at random(unless following the exception noted in paragraph 3), from each production lot, by the QAR. The retains are considered part of the production lot test samples and shall also be selected, at random, from each production lot, by the QAR and identified as such.
NOTE: Sample units removed for testing from different lots shall not be commingled.
5. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by at least the cognizant QAR. A representative of the engineering activity may also elect to witness testing, therefore; the Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the AMS in Section H, and the QAR, at least 10 working days prior to the planned testing date citing the lot number that is ready to be tested. If testing is cancelled within the 10 working day period, the contractor shall provide notification to the Contracting Officer, with concurrent notification to the engineering activity. At a minimum, cancellation notification shall be sent no later than two days prior to planned test date.
NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and Contracting Officer shall be notified within 24 hours A Government representative shall be allowed to participate in the failure .
investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.
6. - Disposition of Production Lot Test Samples
The production lot samples are subjected to Non-Destructive Test (NDT) depending on the requirements delineated by the TDP and/or item specification specified in section C.
The production lot test samples are also subjected to destructive testing. These units cannot be used to meet the total contract quantity.
7. A production lot test report required and shall be submitted in accordance with the contract data requirement list (CDRL) DD Form 1423, is sequence number The test report shall include all results of testing conducted in accordance with the approved test plan.A00 4
8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required CDRLs received, and the lot has been released for service use. The retains for investigation purposes, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.
9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor within fifteen 15 calendar days after the Contracting Officer receives all applicable CDRLs. Any CDRLs provided by the Contractor deemed to be inaccurate and/or incomplete after engineering review will automatically reset the notification of production lot approval, conditional approval, or disapproval. Upon receipt of the written approval accepting a production lot
(s) and final approval of the Material Inspection Receiving Report in Wide Area Workflow (WAWF), the Contractor shall ship the production lot(s) as soon as possible and no later than fifteen (15) calendar days after receipt of such notice. Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.
a. Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b. A notice of conditional approval may state any further action required by the Contractor.
c. A notice of disapproval may cite reasons for such. In the event of a failure, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, ) with all associated costs and expenses to be borne solely by the Contractor. A005 "Failure" is defined as follows:
(i) Any of the test samples failing to meet the requirements of the specification and/or drawing,
(ii) Any of the test samples fracturing and/or exhibiting any cracks post-firing unless specifically designed to do so,
(iii) A non-ignition or failure to fire.
10. At a minimum, the following is required:
a. Failure date
b. Failed part number (e.g. national stock number (NSN), logistics control number, work unit code)
c. Test or mission being performed when the failure occurred(LAT/FAT)
d. Failure symptoms and description of detection or diagnosis methods (e.g. Built In Test)
e. Failure effects (e.g. none, degradation, abort)
f. Repair action (e.g. remove/replace)
g. Failure mode description
h. Failure mechanism/cause of failure
i. Contributing factors, including multiple factor interactions, or secondary effects of the failure
j. Corrective action required to mitigate the failure mode, including:
- Identification of the failure mode
- The recommended process or process control changes, when the failure cause is due to workmanship defects
-Proposals for retrofit of all equipment already delivered or assembled, including recommended effectivity, in accordance with the contract
- Disposition of all defective material and material rendered obsolete because of any necessary redesign, to assure their exclusion from production items
-Identification of previous functional and environmental qualification tests, if any, invalidated by the corrective action changes and recommendation of those tests that should be repeated, in accordance with the terms of the contract, to demonstrate the corrective action's effectiveness.
11. If the production lot test sample is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional production lot test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and all required CDRLs, the Contracting Officer may, at his/her discretion, equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).
12. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any of the required CDRLs, the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.
SECTION E - INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, ). The test plan shall be submitted within sixty (60) calendar days after contract award date. The Acceptance Test A006 Plan shall identify that test fixtures are available for use at the Contractor's Facility. Any revisions to an approved Test Plan / Procedure require resubmission in accordance with DD1423, sequence number ). A006
2. Notification of test plan approval, conditional approval, or disapproval shall be provided via Wide Area Workflow (WAWF). This notification may be made within 30 calendar days after receipt of the Test Plan/Procedure.
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval may state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default. However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________
Date of approval___________________
Contract number and Contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
SECTION E - CAD/PAD INSPECTION AND ACCEPTANCE
1. Inspection and acceptance be in accordance with CAP-12115C, A115932 Revision K, and A115933 Revision A.shall
2. The Government reserves the right to invoke the requirement for First Article Testing (FAT) if there is a change in process, facilities, materials, equipment, or production of the item. "Process" is defined as the steps or tasks that are performed to create a product. An example of a process change that could invoke FAT is implementation of a new production line. "Facilities" is defined as location or buildings where the process(es) are performed to manufacture a product. A contractor may have several buildings already approved for manufacture of the item that do not require notice if already approved. "Materials" is defined as all the raw ingredients that are used in the manufacturing of the item. An example of a material change that could invoke FAT is a new energetic material supplier, which will need to meet the requirements of the applicable specification. "Equipment" is defined as all the tools used to manufacture a product. An example of an equipment change that could invoke FAT is a machine upgrade that changes energetic material processing technique. "Production" is defined as to make, manufacture, or create a product. An example of a production change that could invoke FAT is a revised method to manufacture delay composition. FAT can also be invoked if two years or more have passed since the item was last manufactured, or if the item has developed a manufacturing or performance related issue that can affect form, fit, or function such as changes to technical requirements, performance, interoperability, supportability, maintainability, or safety.
If there is a desire to have predetermination of a potential change to the process, facilities, materials, equipment, or production of the item, a proposal describing the change and any supporting documentation should be written in a formal letter and provided to the Contracting Officer. The Contracting Officer will provide the letter with the supporting documentation of the proposed changes to the cognizant engineering activity. A formal response on the determination of whether an FAT is required may be provided within fifteen (15) business days after receipt from the Contracting Officer.
Note: The examples provided above are not meant to be all inclusive. The Government shall have the final decision if FAT is invoked based on the proposed change submitted by the contractor as well as the Technical Data Package and/or item specification incorporated by reference in Section C.
3. The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO 9001:2015 or an equivalent quality system. If the quality program is not modeled on ISO 9001:2015 the offeror/prospective Contractor shall indicate the quality system proposed along with how it is equivalent, under separate letter submitted with the offer/proposal.
ISO 9001:2015 Other
This quality system along with program specific production documentation shall be made available for review by the Government's representative upon request, at the Contractor's facility at no cost to the Government.
4. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes. CAD/PAD Devices are exempt from MIL-STD-129 shelf life markings on packaging; however, they shall have a minimum of 85% of the shelf life remaining at time of delivery. Any delivery from a contractor not having at least 85% shelf-life remaining shall be considered non-conforming.
NOTE: The shelf life for CLIN 000# is: 11 years and 0 months.
5. Radiographic equipment and procedures shall meet the standards stipulated in the latest revision specification ASTM E1742. Neutron radiography (N-rays), when required for a specific item, shall meet the requirements of ASTM E748 and ASTM E545.
6. Radiographers shall be certified level II or III and qualified in accordance with the requirements described in specification NAS 410.
7. Radiographic Test Technique (RTT) shall include variables which affect the exposure, such as x-ray source, kV or MeV (voltage), mA (current), SFD (Source to Film Distance), or SDD (Source to Detector Distance), exposure time, and film type/detector, and include a diagram or photo of the test setup.
8. Radiographic Test Technique for X-rays and N-rays, as applicable, shall be submitted with the First Article Test (FAT) samples to the activity cited below. If there is no FAT requirement, the radiographic test technique for X-rays and N-rays, as applicable, shall be submitted to the activity below as described in paragraphs 8a herein.
**(NO EXPLOSIVES TO BE SENT TO THIS ADDRESS)**
NSWC IHD
CAD/PAD DIVISION
INDIAN HEAD MD
a. Test technique information for is specified in section 6 of ASTM E1742, refer to Contract Data Requirement List ALL radiographs (CDRL) DD Form 1423 sequence number . The radiographic images shall display a number of units representative of a production lot.A007 Units shall be positioned on the radiographic plate at the areas of minimum and maximum geometric distortion.
9. Notification of approval…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .