Solicitation FA811723R0001.pdf

PDF 442 KB Posted

Attached to
Repair F-15 Power Supply
Solicitation number
FA8117-23-R-0001
Issued by

View the file

Other files

File Type Posted
FA8117-23-R-0001 _0003.pdf PDF
FA811723R0001_0001.pdf PDF
ExhibitA.pdf PDF
Transportation Report.pdf PDF
Packaging Report.pdf PDF
GFP.pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV.2/2012)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30 J

1. REQUISITION NUMBER

FD20302202103

5. SOLICITATION NUMBER

FA8117-23-R-0001

6. SOLICITATION ISSUE DATE

b. TELEPHONE NUMBER (No collect calls) (405 ) 739 -2318 ext.

2. CONTRACT NO.

7. FOR SOLICITATION

INFORMATION CALL

3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

a. NAME Sasha Lewis

8. OFFER DUE DATE/LOCAL

TIME

12. DISCOUNT TERMS11. DELIVERY FOR FOB DEST.

UNLESS BLOCK IS MARKED

SEE SCHEDULE

10. THIS ACQUISITION IS UNRESTRICTED SET ASIDE: % FOR:

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

HUBZONE SMALL (WOSB)ELIGIBLE UNDER THE WOMEN-OWNED

BUSINESS SMALL BUSINESS PROGRAM

NAICS CODE:

SERVICE-DISABLED EDWOSB 336413

VETERAN-OWNED SIZE STANDARD

SMALL BUSINESS 8 (A) 1,250 :

13a. THIS CONTRACT IS A

RATED ORDER

UNDER DPAS

(15 CFR 700)

13b. RATING

DO: A1 52.211-14, 52.211-15

14. METHOD OF SOLICITATION

RFQ IFB RFP

9. ISSUED BY CODE

DEPARTMENT OF THE AIR FORCE, AFSC PZABA

3001 STAFF DR STE 1AC4 97E

TINKER AFB OK 73145-3015

BUYER: Sasha Lewis/AFSC/PZABA sasha.lewis.1@us.af.mil Phone: (405) 739- 2318

15. DELIVER TO CODE

SEE LINE ITEM SCHEDULE

16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR FACILITY

CODE CODE

18a. PAYMENT WILL BE MADE BY CODE

(SEE ESP CLAUSE 252.232-7003.)

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED. SEE ELECTRONIC SUBMISSION OF PAYMENT REQUESTS, CLAUSE 252.232-7003.

FA8117

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 90 days.

In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1 when serviceable assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned serviceable asset. If a DD1348-1 is not included with each returned serviceable asset, DCMA will not sign the DD250.

TAC:

EZ CODE:

RIC:

BASIC: $

OPTION YEAR I: TBN TBN

OPTION YEAR II: TBN TBN

TOTAL ESTIMATED AMOUNT

SEE LINE ITEM SCHEDULE

(Attach Additional Sheets as Necessary)

26. AWARD AMOUNT (For Gov’t use only) $ 234,158.00

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO ISSUING

OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. OFFER DATED - - . YOUR OFFER ON

SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

X X

X X

X

X

25. ACCOUNTING AND APPROPRIATION DATA SEE FUNDS SCHEDULE

X

SCD:B

EFT:T

Estimated

STANDARD FORM 1449 (REV. 2/2012) BACK

COMPUTER GENERATED 12/13/2022, 2:52 PM

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOV’T REPRESENTATIVE

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

32c. DATE

41c. DATE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER36. PAYMENT

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

SEE LINE ITEM SCHEDULE

(Attach Additional Sheets as Necessary)

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

FA8117-23-R-0001

SUPPLIES OR SERVICES AND PRICES/COSTS

Repair: Power Supply

Base Year Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

12 EA

CLIN ACRN ACRN Total

0001 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY Basic Year Transforms a 3-phase, 400hz, 115/200 VAC input to an unregulated 28 VDC output Metal alloys and electrical components

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0001

Priority: R

Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO Deliver 1 each every 30 days after receipt of order or assests until complete

Req No / Pri

Required Delivery

A SW3211 12 EA *30 Calendar Days Non-MilStrip

Proposed Delivery

A SW3211 12 EA

No Fault Found: Power Supply

Base Year Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

1 EA

CLIN ACRN ACRN Total

0002 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO 1 EACH

EVERY 30 DAYS

AFTER RECEIPT OF

ORDER OR ASSETS

UNTIL COMPLETE.

Req No / Pri

Required Delivery

A SW3211 1 EA *30 Calendar Days Non-MilStrip

Proposed Delivery

A SW3211 1 EA

Beyond Economic Repair: Power Supply

Base Year Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

1 EA

CLIN ACRN ACRN Total

0003 AB

Beyond Economic Repair: Power Supply

Base Year

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBDTBD ORIGIN

Type / Ship To PACRN Mark For

A TBDTBD PAD

Type / Ship To Quantity (U/I) To be determined Req No / Pri

Required Delivery

A TBDTBD 1 EA TBD Non-MilStrip

Proposed Delivery

A TBDTBD 1 EA

Over and Above: Power Supply

Base Year Item No.

To Be Negotiated Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0004 AB

Over and Above Over & Above is negotiated on an as needed basis NOTE: Each contractor request for authorization to perform Over and Above (O&A) work shall be negotiated in accordance with the following and must be approved by the Government prior to performance.

OVER AND ABOVE WORK

Description: The O&A items set forth below are not included in the scope and prices of the basic work items detailed under the Attachments, outlined in Section J. In accordance with DFARS 252.217-7028, Over and Above Work, any work/performance required by this CLIN shall be accomplished only when directed and authorized by the Procuring Contracting Officer (PCO). In conjunction with the necessary Defense Contract Management Agency (DCMA) concurrence.

1) Fixed Price Items- to be negotiated as necessary

PROPOSED CONTRACTOR FIXED PRICING

Period Covered by Pricing Rate Per Hour, Man Hours (MH)

Over and Above: Power Supply

Base Year Basic TBN Option I TBN Option II TBN Option III TBN Option IV TBN Option V TBN Option VI TBN

2) Fixed Hourly Rate Items - to accomplish work set forth under this CLIN, the above fixed hourly rate per hour shall be used in negotiating the price.

Quality Audits Shall be processed in accordance with Appendix A to accomplish the performance of Quality Audits. The contractor shall not be paid for performance of Quality Audits that are determined unacceptable.

Teardown Deficiency Reports (TDRs) To accomplish work required by TDRs

Item Beyond Economical Repair Shall be processed in accordance with Section H "End Items Beyond Economical Repair

New and/or Revised Technical Order Requirement To comply with new and/or revised technical order requirements not listed in the work specifications and procedures under Section J Attachments

3) ACO Negotiated Items Disposal Costs To cover disposal costs including but not limited to, associated packing and handling incident to removal and return of residual property.

Exterior Shipping Containers To cover repair, modification, and/or replacement of exterior shipping containers if reusable containers are not furnished by the Government

Associated Document(s) Line Item(s)

FD20302202103 0004

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBNTBN ORIGIN

Type / Ship To PACRN Mark For A TBNTBN PAD Account 09 Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

A TBNTBN 1 LO TBD

Proposed Delivery

A TBNTBN 1 LO

Over and Above Surge: Power Supply

Base Year Item No.

To Be Negotiated Quantity U/I Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

0005 AB

Over and Above (Surge) PR Line Item 0005: O&A (SURGE Expedite Fee)Is negotiated on an as needed basis for SURGE.

Associated Document(s) Line Item(s)

FD20302202103 0005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBNTBN ORIGIN

Type / Ship To PACRN Mark For A TBNTBN PAD Account 09 Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

A TBNTBN 1 LO TBD Non-MilStrip

Proposed Delivery

A TBNTBN 1 LO

Data: Power Supply

Base Year Item No.

Data: Power Supply

Base Year Not Separately Priced Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

0006 AB

Data See attached Exhibit A

Data Not Separately Priced. Data IAW DD 1423 CDRL. CAVAF Reporting.

Exhibit CDRL Line Item No

Related Line Item No.

Data Item Description

DID No. Qty Unit Unit Price

Total Price

A001 0006 Teardown Deficiency Report

DIPSSS815

34A

1 LO NSP NSP

A002 0006 Deficiency Report

DIPSSS815

35A

A003 0006 Counterfeit Prevention Plan

DIMISC818

N/A N/A NSP NSP

A004 0006 Production Surge Plan

DIMGMT8

1 LO NSP NSP

A005 0006 Engineering Change Proposal

DISESS806

39E

N/A N/A NSP NSP

A006 0006 Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

DIPSSS816

56B

1 DD NSP NSP

A007 0006 Commercial Asset Visibility

(CAV)

Reporting

DIMGMT8

1 LO NSP NSP

A008 0006 Government Property (GP) Inventory Report

DIMGMT8

0441D

1 LO NSP NSP

A009 0006 Contract Depot Maintenance

(CDM)

Monthly Production Report

DIPSSS819

95A

1 LO NSP NSP

Associated Document(s) Line Item(s)

FD20302202103 0006

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBDTBD ORIGIN

Type / Ship To PACRN Mark For

A TBDTBD PAD

Type / Ship To Quantity (U/I) *ARO IAW CDRLS Req No / Pri

Required Delivery

A TBDTBD 1 LO IAW CDRLS Non-MilStrip

Proposed Delivery

A TBDTBD 1 LO

Repair: Power Supply Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

12 EA

CLIN ACRN ACRN Total

1001 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Transforms a 3-phase, 400hz, 115/200 VAC input to an unregulated 28 VDC output Metal alloys and electrical components Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0001

Priority: R

Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

Repair: Power Supply Option Year I

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO 1 EACH

EVERY 30 DAYS

AFTER RECEIPT OF

ORDER OR ASSETS

UNTIL COMPLETE.

Req No / Pri

Required Delivery

A SW3211 12 EA *30 Calendar Days Non-MilStrip

Proposed Delivery

A SW3211 12 EA

No Fault Found: Power Supply Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

1 EA

CLIN ACRN ACRN Total

1002 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO 1 EACH

EVERY 30 DAYS

AFTER RECEIPT OF

ORDER OR ASSETS

UNTIL COMPLETE.

Req No / Pri

Required

No Fault Found: Power Supply Option Year I

A SW3211 1 EA *30 Calendar Days

Proposed Delivery

A SW3211 1 EA

Beyond Economic Repair: Power Supply Option Year I

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

1 EA

CLIN ACRN ACRN Total

1003 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBDTBD ORIGIN

Type / Ship To PACRN Mark For

A TBDTBD PAD

Type / Ship To Quantity (U/I) To be determined Req No / Pri

Required Delivery

A TBDTBD 1 EA TBD Non-MilStrip

Proposed Delivery

A TBDTBD 1 EA

Over and Above: Power Supply Option Year I

Item No.

To Be Negotiated Quantity U/I Unit Price Estimated Total Price

Over and Above: Power Supply Option Year I

1 LO

CLIN ACRN ACRN Total

1004 AB

Over and Above PR Line Item 0004: Over & Above is negotiated on an as needed basis NOTE: Each contractor request for authorization to perform Over and Above (O&A) work shall be negotiated in accordance with the following and must be approved by the Government prior to performance.

OVER AND ABOVE WORK

Description: The O&A items set forth below are not included in the scope and prices of the basic work items detailed under the Attachments, outlined in Section J. In accordance with DFARS 252.217-7028, Over and Above Work, any work/performance required by this CLIN shall be accomplished only when directed and authorized by the Procuring Contracting Officer (PCO). In conjunction with the necessary Defense Contract Management Agency (DCMA) concurrence.

1) Fixed Price Items- to be negotiated as necessary

PROPOSED CONTRACTOR FIXED PRICING

Period Covered by Pricing Rate Per Hour, Man Hours (MH) Basic TBN Option I TBN Option II TBN Option III TBN Option IV TBN Option V TBN Option VI TBN

2) Fixed Hourly Rate Items - to accomplish work set forth under this CLIN, the above fixed hourly rate per hour shall be used in negotiating the price.

Quality Audits Shall be processed in accordance with Appendix A to accomplish the performance of Quality Audits. The contractor shall not be paid for performance of Quality Audits that are determined unacceptable.

Teardown Deficiency Reports (TDRs) To accomplish work required by TDRs

Item Beyond Economical Repair Shall be processed in accordance with Section H "End Items Beyond Economical Repair

New and/or Revised Technical Order Requirement To comply with new and/or revised technical order requirements not listed in the work specifications and procedures under Section J Attachments

3) ACO Negotiated Items Disposal Costs To cover disposal costs including but not limited to, associated packing and handling incident to removal and return of residual property.

Over and Above: Power Supply Option Year I

Exterior Shipping Containers To cover repair, modification, and/or replacement of exterior shipping containers if reusable containers are not furnished by the Government

Associated Document(s) Line Item(s)

FD20302202103 0004

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBNTBN ORIGIN

Type / Ship To PACRN Mark For A TBNTBN PAD Account 09 Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

A TBNTBN 1 LO TBD

Proposed Delivery

A TBNTBN 1 LO

Over and Above (Surge): Power Supply Option Year I

Item No.

To Be Negotiated Quantity U/I Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

1005 AB

Over and Above (Surge) PR Line Item 0005: O&A (SURGE Expedite Fee)Is negotiated on an as needed basis for SURGE.

Associated Document(s) Line Item(s)

FD20302202103 0005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin

Over and Above (Surge): Power Supply Option Year I

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBNTBN ORIGIN

Type / Ship To PACRN Mark For A TBNTBN PAD Account 09 Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

A TBNTBN 1 LO TBD Non-MilStrip

Proposed Delivery

A TBNTBN 1 LO

Data: Power Supply Option Year I

Item No.

Not Separately Priced Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

1006 AB

Data See attached Exhibit A

Data Not Separately Priced. Data IAW DD 1423 CDRL. CAVAF Reporting.

Exhibit CDRL Line Item No

Related Line Item No.

Data Item Description

DID No. Qty Unit Unit Price

Total Price

A001 1006 Teardown Deficiency Report

DIPSSS815

34A

1 LO NSP NSP

A002 1006 Deficiency Report

DIPSSS815

35A

A003 1006 Counterfeit Prevention Plan

DIMISC818

N/A N/A NSP NSP

A004 1006 Production Surge Plan

DIMGMT8

1 LO NSP NSP

A005 1006 Engineering Change Proposal

DISESS806

39E

N/A N/A NSP NSP

A006 1006 Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

DIPSSS816

56B

1 DD NSP NSP

A007 1006 Commercial Asset Visibility

(CAV)

Reporting

DIMGMT8

1 LO NSP NSP

A008 1006 Government Property (GP) Inventory Report

DIMGMT8

0441D

1 LO NSP NSP

A009 1006 Contract Depot Maintenance

(CDM)

Monthly Production Report

DIPSSS819

95A

1 LO NSP NSP

Associated Document(s) Line Item(s)

FD20302202103 0006

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBDTBD ORIGIN

Type / Ship To PACRN Mark For

A TBDTBD PAD

Type / Ship To Quantity (U/I) IAW CDRLS Req No / Pri

Required Delivery

A TBDTBD 1 LO IAW CDRLS

Proposed Delivery

A TBDTBD 1 LO

Repair: Power Supply Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

12 EA

CLIN ACRN ACRN Total

2001 AB

NSN: 6130-01-239-0390 HY

Repair: Power Supply Option Year II

POWER SUPPLY

Transforms a 3-phase, 400hz, 115/200 VAC input to an unregulated 28 VDC output Metal alloys and electrical components Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0001

Priority: R

Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)

Title Number Date Tailoring

ISO 9001-2008 2008

IUID Required: Yes Physical Item Markings:

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO 1 EACH

EVERY 30 DAYS

AFTER RECEIPT OF

ORDER OR ASSETS

UNTIL COMPLETE.

Req No / Pri

Required Delivery

A SW3211 12 EA *30 Calendar Days Non-MilStrip

Proposed Delivery

A SW3211 12 EA

No Fault Found: Power Supply Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

1 EA

CLIN ACRN ACRN Total

2002 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101

No Fault Found: Power Supply Option Year II

Associated Document(s) Line Item(s)

FD20302202103 0002

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A SW3211 ORIGIN

Type / Ship To PACRN Mark For A SW3211 PAD Account 09 Type / Ship To Quantity (U/I) *ARO 1 EACH

EVERY 30 DAYS

AFTER RECEIPT OF

ORDER OR ASSETS

UNTIL COMPLETE.

Req No / Pri

Required Delivery

A SW3211 1 EA *30 Calendar Days

Proposed Delivery

A SW3211 1 EA

Beyond Economic Repair: Power Supply Option Year II

Item No.

Firm Fixed Price Best Estimated Qty

U/I Unit Price Estimated Total Price

1 EA

CLIN ACRN ACRN Total

2003 AB

NSN: 6130-01-239-0390 HY

POWER SUPPLY

Manufacturer Part Number 08748 4-465-01 76301 68-790092-101 Associated Document(s) Line Item(s)

FD20302202103 0003

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin

Beyond Economic Repair: Power Supply Option Year II

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBDTBD ORIGIN

Type / Ship To PACRN Mark For

A TBDTBD PAD

Type / Ship To Quantity (U/I) To be determined Req No / Pri

Required Delivery

A TBDTBD 1 EA TBD

Proposed Delivery

A TBDTBD 1 EA

Over & Above: Power Supply Option Year II

Item No.

To Be Negotiated Quantity U/I Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

2004 AB

Over and Above PR Line Item 0004: Over & AboveIs negotiated on an as needed basis.

NOTE: Each contractor request for authorization to perform Over and Above (O&A) work shall be negotiated in accordance with the following and must be approved by the Government prior to performance.

OVER AND ABOVE WORK

Description: The O&A items set forth below are not included in the scope and prices of the basic work items detailed under the Attachments, outlined in Section J. In accordance with DFARS 252.217-7028, Over and Above Work, any work/performance required by this CLIN shall be accomplished only when directed and authorized by the Procuring Contracting Officer (PCO). In conjunction with the necessary Defense Contract Management Agency (DCMA) concurrence.

1) Fixed Price Items- to be negotiated as necessary

PROPOSED CONTRACTOR FIXED PRICING

Period Covered by Pricing Rate Per Hour, Man Hours (MH) Basic TBN Option I TBN Option II TBN Option III TBN Option IV TBN Option V TBN Option VI TBN

2) Fixed Hourly Rate Items - to accomplish work set forth under this CLIN, the above fixed hourly rate per hour shall be used in negotiating the price.

Quality Audits Shall be processed in accordance with Appendix A to accomplish the performance of Quality Audits. The contractor shall not be paid for performance of Quality Audits

Over & Above: Power Supply Option Year II that are determined unacceptable.

Teardown Deficiency Reports (TDRs) To accomplish work required by TDRs

Item Beyond Economical Repair Shall be processed in accordance with Section H "End Items Beyond Economical Repair

New and/or Revised Technical Order Requirement To comply with new and/or revised technical order requirements not listed in the work specifications and procedures under Section J Attachments

3) ACO Negotiated Items Disposal Costs To cover disposal costs including but not limited to, associated packing and handling incident to removal and return of residual property.

Exterior Shipping Containers To cover repair, modification, and/or replacement of exterior shipping containers if reusable containers are not furnished by the Government

Associated Document(s) Line Item(s)

FD20302202103 0004

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBNTBN ORIGIN

Type / Ship To PACRN Mark For A TBNTBN PAD Account 09 Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

A TBNTBN 1 LO TBD

Proposed

A TBNTBN 1 LO

Over & Above (Surge): Power Supply Option Year II

Item No.

To Be Negotiated Quantity U/I Unit Price Estimated Total Price

1 LO

CLIN ACRN ACRN Total

2005 AB

Over and Above PR Line Item 0005: O&A (SURGE Expedite Fee)Is negotiated on an as needed basis for SURGE.

Associated Document(s) Line Item(s)

FD20302202103 0005

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBNTBN ORIGIN

Type / Ship To PACRN Mark For A TBNTBN PAD Account 09 Type / Ship To Quantity (U/I) To be determined_ Req No / Pri

Required Delivery

A TBNTBN 1 LO TBD

Proposed Delivery

A TBNTBN 1 LO

Data: Power Supply Option Year II

Item No.

Not Separately Priced Quantity U/I Unit Price Amount

1 LO

CLIN ACRN ACRN Total

2006 AB

Data See Attached Exhibit A

Data Not Separately Priced. Data IAW DD 1423 CDRL. CAVAF Reporting.

Exhibit CDRL Line Item No

Related Line Item No.

Data Item Description

DID No. Qty Unit Unit Price

Total Price

A001 2006 Teardown DIPSSS815 1 LO NSP NSP

Deficiency Report

34A

A002 2006 Deficiency Report

DIPSSS815

35A

A003 2006 Counterfeit Prevention Plan

DIMISC818

N/A N/A NSP NSP

A004 2006 Production Surge Plan

DIMGMT8

1 LO NSP NSP

A005 2006 Engineering Change Proposal

DISESS806

39E

N/A N/A NSP NSP

A006 2006 Bill of Materials (BOM) for Logistics and Supply Chain Risk Management

DIPSSS816

56B

1 DD NSP NSP

A007 2006 Commercial Asset Visibility

(CAV)

Reporting

DIMGMT8

1 LO NSP NSP

A008 2006 Government Property (GP) Inventory Report

DIMGMT8

0441D

1 LO NSP NSP

A009 2006 Contract Depot Maintenance

(CDM)

Monthly Production Report

DIPSSS819

95A

1 LO NSP NSP

Associated Document(s) Line Item(s)

FD20302202103 0006

Priority: R

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection

Transportation From Continental United States CONUS (CONUS) Sources

TYPE / SHIP TO CODE F.O.B.

A TBDTBD ORIGIN

Type / Ship To PACRN Mark For

A TBDTBD PAD

Type / Ship To Quantity (U/I) IAW CDRLS Req No / Pri

Required Delivery

A TBDTBD 1 LO IAW CDRLS

Proposed Delivery

A TBDTBD 1 LO

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE: A SW3211

DLA DISTRIBUTION DEPOT OKLAHOMA

3301 F AVE CEN REC BLDG 506 DR 22

TINKER AFB OK 73145-8000

TINKER AFB OK 73145-8000

USA

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A TBDTBD 00000-0000

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE: A TBNTBN

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

CONTRACT CLAUSES

252.2037000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP 2011) (IAW DFARS 203.1714(a), DFARS 212.301(f)(ii))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2021)

(IAW DFARS 204.2105(c))

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)

(IAW DFARS 211.274-6(a)(1), DFARS 212.301(f)(xii))

(a) Definitions. As used in this clause—

“DoD recognized unique identification equivalent” means a unique identification method that is in commercial use and has been recognized by DoD. All DoD recognized unique identification equivalents are listed at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

“Unique item identifier type” means a designator to indicate which method of uniquely identifying a part has been used. The current list of accepted unique item identifier types is maintained at https://www.acq.osd.mil/asda/dpc/ce/ds/unique-id.html.

(c) Unique item identifier.

(1) The Contractor shall provide a unique item identifier for the following:

(i) Delivered items for which the Government’s unit acquisition cost is $5,000 or more, except for the following line items:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

See Schedule as Applicable

(ii) Items for which the Government’s unit acquisition cost is less than $5,000 that are identified in the Schedule or the following table:

Contract Line, Subline, or Exhibit Line Item Number

Item Description

*Items less than $5000, which require UID, will be specifically identified in the schedule.

See Schedule as Applicable

(iii) Subassemblies, components, and parts embedded within delivered items, items with warranty requirements, DoD serially managed reparables and DoD serially managed nonreparables as specified in Attachment Number _____( or See Schedule as Applicable).

(iv) Any item of special tooling or special test equipment as defined in FAR 2.101 that have been designated for preservation and storage for a Major Defense Acquisition Program as specified in Attachment Number _____( or See Schedule as Applicable).

(v) Any item not included in paragraphs (c)(1)(i), (ii), (iii), or (iv) of this clause for which the contractor creates and marks a unique item identifier for traceability.

(f) The Contractor shall submit the information required by paragraphs (d) and (e) of this clause as follows:

(1) End items shall be reported using the receiving report capability in Wide Area WorkFlow (WAWF) in accordance with the clause at 252.232-7003. If WAWF is not required by this contract, and the contractor is not using WAWF, follow the procedures at http://dodprocurementtoolbox.com/site/uidregistry/ .

(2) Embedded items shall be reported by one of the following methods—

(i) Use of the embedded items capability in WAWF;

(ii) Direct data submission to the IUID Registry following the procedures and formats at http://dodprocurementtoolbox.com/site/uidregistry/; or

(iii) Via WAWF as a deliverable attachment for exhibit line item number ______, Unique Item Identifier Report for Embedded Items, Contract Data Requirements List, DD Form 1423.

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS -- COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(OCT 2022)

(IAW FAR 12.301(b)(4))

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19,Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L.

115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 89(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015)

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77, 108-78 (19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] __ __ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021)(41 U.S.C. 4704 and 10 U.S.C. 2402).

__ __ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41

U.S.C. 3509).

__ __ (3) 52.203-15, Whistleblower Protections Under the American Recovery and

Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5).

(Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__X __ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L. 109-282) (31 U.S.C. 6101 note).

(5) [Reserved] __ __ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L.

111-117, section 743 of Div. C).

__ __ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

__X __ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment (NOV 2021) (31 U.S.C. 6101 note).

__ __ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) (41 U.S.C. 2313).

____ (10) [Reserved} __ __ (11) (i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (OCT

2022)(15 U.S.C. 657a).

__ __ (11) (ii) Alternate I (MAR 2020) of 52.219-3.

__ __ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business

Concerns (OCT 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer)(15 U.S.C. 657a).

__ _ (12) (ii) Alternate I (MAR 2020) of 52.219-4.

(13) [Reserved]

__ __ (14) (i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020)(15 U.S.C.

644).

__ __ (14) (ii) Alternate I (MAR 2020) OF 52.219-6.

__ __ (15) (i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020)(15 U.S.C.

644).

__ __ (15) (ii) Alternate I (MAR 2020) of 52.219-7.

__ __ (16) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C.

637(d)(2) and (3)).

(17) (i) 52.219-9, Small Business Subcontracting Plan (OCT 2022) (15 U.S.C.

637(d)(4)).

__ __ (17) (ii) Alternate I (Nov 2016) of 52.219-9.

__ __ (17) (iii) Alternate II (Nov 2016) of 52.219-9.

__ __ (17) (iv) Alternate III (JUN 2020) of 52.219-9.

(17) (v) Alternate IV (SEP 2021) of 52.219-9.

__ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

__ (18) (ii) Alternate I (MAR 2020) of 52.219-13.

__ (19) 52.219-14, Limitations on Subcontracting (OCT 2022)(15 U.S.C. 657s).

__ __ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C.

637(d)(4)(F)(i)).

__ __ (21) 52.219–27, Notice of Service-Disabled Veteran-Owned Small Business

Set-Aside (OCT 2022) (15 U.S.C. 657f).

__X __ (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (OCT

2022) (15 U.S.C. 632(a)(2)).

(22) (ii) Alternate I (MAR 2020) of 52.219-28.

__ __ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (OCT 2022) (15 U.S.C. 637(m)).

__ __ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (OCT 2022) (15 U.S.C. 637(m)).

(25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).

(26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).

__X __ (27) 52.222-3, Convict Labor (June 2003)(E.O. 11755).

__ __ (28) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (JAN 2022)

(E.O. 13126).

__X __ (29) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

__X __ (30) (i) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246

(30) (ii) Alternate I (Feb 1999) of 52.222-26.

__X __ (31) (i) 52.222-35, Equal Opportunity for Veterans (JUN 2020)(38 U.S.C.

4212).

(31) (ii) Alternate I (July 2014) of 52.222-35.

__X __ (32) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN

2020) (29 U.S.C. 793).

(32) (ii) Alternate I (July 2014) of 52.222-36.

__X __ (33) 52.222-37, Employment Reports on Veterans (JUN 2020)(38 U.S.C. 4212).

__ __ (34) 52.222-40, Notification of Employee Rights Under the National Labor relations

Act (Dec 2010) E.O. 13496).

__X __ (35) (i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter

78 and E.O. 13627).

__ __ (35) (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ __ (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ __ (37) (i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA-Designated Items (May 2008)(42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ _ (37) (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ __ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June 2016) (E.O. 13693).

__ __ (39) 52.223-12, Maintenance, Service, repair, or Disposal of Refrigeration Equipment and Air Conditioners (June 2016) (E.O.13693).

__ _ (40) (i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and 13514).

__ _ (40) (ii) Alternate I (Oct 2015) of 52.223-13.

__ _ (41) (i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (Jun 2014) (E.O.s

13423 and 13514).

__ _ (41) (ii) Alternate I (Jun 2014) of 52.223-14.

__ __ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020)

(42.U.S.C. 8259b).

__ __ (43) (i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products

(Oct 2015) (E.O.s 13423 and 13514).

__ _ (43) (ii) Alternate I (Oct 2015) of 52.223-16.

__X __ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While

Driving (JUN 2020) (E.O.13513).

__X __ (45) 52.223-20, Aerosols (Jun 2016) (E.O. 13693) __ __ (46) 52.223-21, Foams (Jun 2016) (E.O. 13693).

__X __ (47) (i) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a).

___ (47) (ii) Alternate I, (Jan 2017) of 52.244-3.

__ __ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).

__ __ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV

2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).

__ _ (49) (ii) Alternate I (JAN 2021) of 52.225-3.

__ _ (49) (iii) Alternate II (JAN 2021) of 52.225-3.

__ _ (49) (iv) Alternate III (JAN 2021) of 52.225-3.

__ __ (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C.

3301 note).

__ X __ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of Treasury).

__ __ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

__ __ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007)(42 U.S.C.

5150).

__ __ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007)(42 U.S.C. 5150).

__ __ (55) 52.229–12, Tax on Certain Foreign Procurements (FEB 2021).

__ __ (56) 52.232-29, Terms for financing of Purchases of Commercial Products and

Commercial Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ __ (57) 52.232-30, Installment Payments for Commercial Products and Commercial

Services (NOV 2021)(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__X __ (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award

Management (Oct 2018) (31.U.S.C. 3332).

__ __ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for

Award Management (Jul 2013)(31.U.S.C. 3332).

__ __ (60) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ __ (61) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).

__ __ (62) 52.242-5, Payment to Small Business Subcontractors (Jan 2017) (15 U.S.C.

637(d)(13)).

__ __ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels

(NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631).

__ _ (63) (ii) Alternate I (Apr 2003) of 52.247-64.

(63) (iii) Alternate II (NOV 2021) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] __X __ (1) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67).

__X __ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) (29

U.S.C. 206 and 41 U.S.C. chapter 67).

__ __ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor

Standards--Price Adjustment (Multiple Year and Option Contracts) (Aug 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__X __ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards - Price Adjustment (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ __ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (May 2014) (41 U.S.C. chapter 67).

__ __ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services—Requirements (May 2014)(41 U.S.C.

chapter 67).

__X __ (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026

(JAN 2022).

__X __ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706. (Jan 2022) (E.O.

13706).

__ __ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract and does not contain the clause at 52.215-2, Audit and Records--Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.

(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.

(e)(1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c) and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in paragraphs (e)(1) of this paragraph in a subcontract for commercial products or commercial services. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—

(i) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C.

3509).

(ii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(iii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).

(iv) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L.

115-232).

(v) 52.219-8, Utilization of Small Business Concerns (Oct 2022) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds the applicable threshold specified in FAR 19.702(a) on the date of subcontract award, the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.

(vi) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

(vii) 52.222-26, Equal Opportunity (Sep 2016) (E.O. 11246).

(viii) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

(ix) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) (29 U.S.C. 793).

(x) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

(xi) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.

(xii) 52.222-41, Service Contract Labor Standards (Aug 2018), (41 U.S.C. chapter 67).

(xiii) X (A) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627). (B) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 E.O. 13627).

(xiv) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)

(xv) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (May 2014) (41 U.S.C. chapter 67)

(xvi) 52.222-54, Employment Eligibility Verification (MAY 2022) (E. O. 12989).

(xvii) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026

(JAN 2022).

(xviii) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).

(xix) (A) 52.224-3, Privacy Training (Jan 2017) (5 U.S.C. 552a). (B) Alternate I (Jan 2017) of 52.224-3.

(xx) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).

(xxi) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (JUN 2020) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.

(xxii)52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (NOV 2021) (46 U.S.C. 55305 and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.

(2) While not required, the Contractor may include in its subcontracts for commercial products and commercial services a minimal number of additional clauses necessary to satisfy its contractual obligations.

252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS (DEVIATION 2020-O0015) (MAY 2020)

(IAW Deviation 2020-O0015)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

(IAW DFARS 232.7004(a))

(a) Definitions. As used in this clause—

(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .