Solicitation.pdf
PDF 1 MB Posted
- Attached to
- Walhonding Area Herbicide Spraying
- Solicitation number
- W91237-20-Q-0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.03.09 14.4 NBN Spraying Map.pdf | ||
| A.03.09 Exhibits.pdf | ||
| A.03.09 PHC Spraying Maps.pdf | ||
| A.03.09 CMB Spraying Area Map.pdf | ||
| A.03.09 MOL Spraying maps.pdf | ||
| A.03.09 19.55 MKW Spraying Area Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9123720Q0029 27-Feb-2020
b. TELEPHONE NUMBER
304-399-5339
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 11 Mar 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912379. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
CHRIS HARTLEY
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
SEE SCHEDULE
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
USACE, CONTRACTING DIVISION
CHRIS HARTLEY, 502 8TH STREET
HUNTINGTON WV 25701-2070
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 963463 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
LOGISTICS MANAGEMENT OFFICE
WAREHOUSE, 715 13TH STREET
HUNTINGTON WV 25701
TEL: FAX:
FAX:
TEL: 304-399-5339 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF92
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS TO OFFERORS
Award will be made to the lowest priced responsive and responsible offeror in accordance with FAR Clause 52.217- 5 “Evaluation of Options” and 52.212-1 “Instructions to Offerors – Commercial Items.” Prospective offerors must complete the information below.
Estimated Delivery Time: __________________________________
Unique Entity Identifier (formerly DUNS): ___________________________
TAX ID: ________________________
IMPORTANT NOTICE: Effective September 26, 2018 and in accordance with FAR Clause 52.204-7, “an Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.”
Vendors are highly encouraged to check their registration status and plan accordingly prior to submitting an offer.
Please direct all questions to Christopher Hartley at (304) 399-5339 or christopher.l.hartley@usace.army.mil. THE
SOLICITATION AND RESULTING CONTRACT SHALL BE THE GOVERNING DOCUMENT IN ALL
CASES.
QUOTES CAN BE FAXED OR E-MAILED TO christopher.l.hartley at (304) 399-5281 or christopher.l.hartley@usace.army.mil. Mailed offers will not be accepted.
CONTRACTOR FEEDBACK. Help us in BUILDING STRONG. Please provide us with your feedback, comments and recommendations for improvement by visiting our Interactive Customer Evaluation (ICE) Website at:
https://ice.disa.mil/index.cfm?fa=SiteSuggestions&site_id=856&dep=*DoD&suggestion_type=1
PERFORMANCE WORK STATEMENT
Walhonding Area Specifications For
Herbicide Spraying
CONTRACT INTENT:
The Corps of Engineers Walhonding Area’s intent is to limit exposure of pesticide chemicals to Contractor Personnel, Project Personnel, Public Visitors and the local wildlife so required Dam Safety inspections of the areas may be maintained. The Corps of Engineers has a priority interest that of environmental protection as well as personnel, while working within the considerations of available Government resources.
The Corps of Engineers requires each project to be sprayed only ONCE per growing season and have a continuous foliage kill for the whole season at the selected sites. The contractor shall not treat areas with more than the manufacturer’s recommendations for a single dose or season.
GENERAL INFORMATION:
These specifications are for the application of herbicide at the following Walhonding Projects located within the Muskingum Area. The following is where the project office is located:
Charles Mill Dam – 2203 St. Rt. 603 Lucas, Ohio 44843-9606 Mohawk Dam – 36007 State Route 715 Warsaw, Ohio 4384-9534 Mohicanville Dam – 2297 CR 175 Lakeville, Ohio 44638-9610 North Branch of Kokosing Dam – 18350 Waterford Rd., Fredericktown, Ohio 43019 Pleasant Hill Dam – 1041 CR 3006 Perrysville Ohio 44864-9782
Chemicals and purpose or equivalent:
Exhibit #1 - Accord XRT II EPA REG# 62719-556 – control or destruction of many herbaceous and woody plants.
Exhibit #2 – Polaris SP- EPA REG# 228-536 – Bareground treatment for Post-emergence.
Exhibit #3 - Hi-Light by Becker – Indicates where you spray, Improves applicator safety, Indicates skips and overlaps.
Exhibit #4 – Garlon3A – Broadleaf vegetation control where trees and grass are to be left unaffected.
Contractor requirements:
Contractor shall be licensed by Ohio Department of Agriculture Contractor shall be Commercial CORE and Category 5 – Licensed
PERFORMANCE WORK STATEMENT:
A-1 Application of herbicide: The contractor shall apply herbicide tank mixture to areas to be sprayed. The contractor shall spray to wet entire coverage area.
Product tank mix rate with 100 Gal of water which is applied to 1 Acre.
Polaris SP – EPA REG #228-536 – 32oz / 100gal Water/ 1 Acre Accord XRT II – EPA REG# 62719-556 – 1 gal/ 100gal Water/ 1 Acre
Hi-Light – 16oz/ 100gal Water/ 1 Acre
The herbicide application the Corps of Engineers proposes to have applied for this contract is a tank mixture of Polaris SP, Accord XRT II and Hi-Light dye at the above mixture rates. The Contractor shall provide a minimum 25 foot buffer zone from all surface water, within this 25 foot buffer zone, Accord XRT II shall be used at a rate of 1 gal/100/ 1Acre. The contractor shall apply Garlon3A in designated areas set by the projects to control vegetation where trees and grass are to be left unaffected. The contractor shall incorporate HI-LIGHT by Becker-Underwood or other colorant equivalent, as approved by the Manager, as a temporary colorant that will leave a clear indication of completed coverage of treated areas. The Contractor shall follow mixture procedures set forth by the manufacturer.
Mixture and application rates shall not exceed the manufactures maximum application labels. The contractor shall always follow the more restrictive manufacturers label when making an application involving tank-mixes. All colorant treated herbicide solutions will be applied in a uniform and accurate manner according to the manufacturer’s instructions and the laws of the State of Ohio. No herbicide solution will be applied to any water surface or sprayed across streams to the opposite bank.
A-2. Mixing shall take place off of U.S. Government property or in those areas on U.S. Government property specifically directed by the Project Supervisor. Rinsing of contractor’s equipment shall not be permitted on U.S.
Government property. Transport of the pesticide or pesticide mix shall be done in a manner to reduce the probability of spills. All chemicals are to be mixed, handled, applied, and disposed of in accordance with all manufacturer’s instructions and applicable State and Federal laws by a contractor possessing a valid Public Operators License for General Industrial Vegetation Application issued by the State of Ohio Department of Agriculture. Proof of this license must be in possession of the contractor and the applicator at all times while on the project and presented, upon request, to any employee, agent, or representative of the Corps of Engineers, the State of Ohio, or other agencies having jurisdiction in these matters.
A-3. The contractor shall report to the Manager with the pesticide application record within 2 days of application using an ORD Form 1031 or a State approved form. All spraying must be performed in accordance with specimen label directions and federal and state laws. The amount of spray per acre should be just sufficient to achieve a total kill of undesirable vegetation, but not excessive to the point of runoff. The contractor shall apply product only during periods when there is very little to no hazard from spray drift, and during periods when there are minimal chances for chemical to be washed into Lakes. A photocopy of the valid applicator’s license in the State of Ohio and proof of insurance shall be provided the Project Maintenance Mechanic on the date of application.
A-4. Contractor shall guarantee total eradication of vegetation within 30 days and eradication of future pest growth during the season of treatment unless conditions exist that limits uptake of herbicides. The contractor shall return to inspect, re-treat growth or spray missed applications after initial treatment in 30 days at no additional expense to the Government. Any missed or regrowth areas shall be re-treated. No herbicide solution will be applied to any water surface or sprayed across streams to the opposite bank.
A-5. The contractor shall be responsible for traffic control of vehicles on public roadways adjacent to treatment areas with the use of warning devices and flagger as needed. Flaggers must have high visibility safety vests and other appropriate equipment for traffic control. Since some of the spraying will be along rail road beds, the contractor shall be required to contact the rail road for permission to be on or adjacent to the rail road tracks. All treatment areas within or adjacent to public recreation sites will be posted appropriately for a minimum of 48 hours during and following treatment to notify users of the presence of the herbicides. Spraying will not take place on weekends unless approved by the Facility Manager of the Area where the project is located.
A-6. A site inspection by the offeror prior to the submission of offers is strongly recommended. All acreage amounts are estimated and offerors should inspect the site for specific areas, and special conditions. Appointments for site inspections should be made with the Facility Manager for the Project. Phone numbers for the Facility Manager can be found on the attached specification sheets.
A-7. Payments: The contractor shall submit an invoice for 75% of the total amount of each job upon completion of the initial treatment (treatment No. 1) and an invoice for 25% of the total amount of each job upon completion of any required re spraying (treatment No. 2) provided that satisfactory results are achieved.
A-8. At the option of the Government this contract may be renewed for four (4) one year periods from 01 Jan 2021 thru 31 Dec 2021, 01 Jan 2022 thru 31 Dec 2022 and 01 Jan 2023 thru 31 Dec 2023, 01 Jan 2024 thru 31 Dec 2024.
Dates for treatments to begin shall be decided during the option years at the discretion of the Facility Manager. Type and concentration of Herbicide may change at the discretion of the Government.
“The Corps of Engineers has as its priority interest that of environmental protection, working within consideration of available Government resources.”
SAFETY REQUIREMENTS:
A. Before the commencement of work the contractor shall provide an Abbreviated Accident Prevention Plan (APP) to be accepted by the Huntington District Safety Office that outlines safety precautions and Activity Hazard Analysis (AHA) for all sites to be treated in accordance with all Federal and State Laws and the current Corps of Engineers Safety Manual EM 385 1 1. This plan will include a Hazard Communications Plan addressing all hazardous materials to be brought on site. The plan shall include inventory and copies of all SDS for all materials used by the contractor, first aid equipment available to the contractor employees, and the protective equipment or apparel required to be worn by the applicator and those who will be handling chemicals. The Contractor will notify the respective project POC when they arrive on site either in person or by phone call before beginning each day and when finished each day.
B. Contractor Abbreviated Accident Prevention Plan (AAPP). The Contractor shall prepare a site-specific Abbreviated Accident Prevention Plan as outlined in EM 385-1-1 (30 November 2014), Appendix A beginning with subparagraph 3.k on page A-10. Contractor must address each element/sub-element in the order they appear in the outline. Any element the contractor feels is not applicable to work under this contract must be listed and a brief explanation provided. Plan must be accepted by the Contracting Officer prior to commencement of any work.
Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. at (304)399-5039/5032/5326.
The web address for EM 385-1-1 is:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
(Attached for your information and use is CESO Checklist A-01. This checklist was developed to assist you in the development of a site-specific Abbreviated Accident Prevention Plan. This checklist is provided as a tool only.)
C. Contractor Risk Management Process. Contractor may use Job Safety analyses (JSAs), Job Hazard Analyses (JHAs) or Activity Hazard Analysis (AHA) for the purpose of risk assessment. Before beginning each work activity Contractor performing that work activity shall prepare an initial assessment (AHA/JSA/JHA) listing each job step, anticipated hazards, site conditions, equipment, materials, personnel and control measures to be implemented. A Risk Assessment Code (RAC) shall be assigned to each step assessing the level of risk remaining after implementation of controls. Once this process is complete a RAC will be assigned to the activity as a whole (cannot be lower than the highest step RAC). Residual risk must be communicated to the proper authority for acceptance in order to proceed. It is the Contractor's responsibility to prepare the AHA/JSA/JHA. Analysis with RAC shall be accepted by the GDA and discussed with al engaged in the activity including Contractor, subcontractor(s), and on-site government representative prior to commencement of work. Names of Competent Person(s) and Qualified Person(s) required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities specified by OSHA and/or EM 385-1-1) shall be identified and included in the AHA/JSA/JHA and proof of their competency/qualification.
NOTES:
Work crews of two or more must have two people holding currently qualifications in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician. Training must include a hands-on element and the contractor must maintain appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.
Contractor shall employ a minimum of one Competent Person at each worksite to function as the Site Safety and Health Officer (SSHO). The SSHO as a minimum must have completed the 30-hour OSHA Construction or General Industry Safety class or its equivalent as specified in EM 385-1-1 Section 01.A.17.b and have a minimum of 5 years’ experience relative to the work being completed. The SSHO must be on-site at all times work is being performed. SSHO responsibilities may be collateral duty. (Note: SSHO qualification requirements may be waived at the discretion of the USACE District Safety & Occupational Health Office for extremely low risk operations.)
D. Accident/Mishap Reporting: The Contractor shall report all recordable mishaps to the GDA within 24-hours in accordance with EM 385-1-1 Section 01.D. Accidents shall be investigated to determine causal factors and corrective actions shall be implemented. Accidents resulting in: days away injuries, days away illnesses, restricted/transfer injuries, property damage of $5,000.00 or more shall be investigated and reported to the GDA using the USACE Accident Investigation Report Form ENG 3394 within 24 hours of the occurrence.
(1) Immediate notification to the GDA is required for all serious accidents:
a. Fatal Injury/illness;
b. Permanent totally disabling injury/illness;
c. Permanent partial disabling injury/illness;
d. One (1) or more persons hospitalized as inpatients as a result of a single occurrence;
e. $500,000 or greater accidental property damage;
f. Three (3) or more individuals become ill or have a medical condition suspected to be related to a site condition, or a hazardous or toxic agent on the site;
g. USACE aircraft destroyed or missing;
The Contractor shall maintain an OSHA Log of Work Related Injuries and Illnesses, OSHA Form 300 and comply with all accident reporting and recordkeeping requirements specified in 29 CFR 1904.39.
(2) In addition to the above, any mishap occurring in any of the following high hazard areas shall be reported immediately to the GDA, investigated and corrective actions implemented.
a. Electrical (includes Arc Flash, electrical shock, etc.);
b. Uncontrolled Release of Hazardous Energy (includes electrical and non-electrical);
c. Load Handling Equipment (LHE) or Rigging;
d. Fall-from-Height (any level or other than same surface);
e. Underwater Diving
SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on any contract who require access in and/or around any Huntington District facilities, projects, owned or leased facility/space shall receive authorization to be on site at these areas based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12).
The Huntington District Security Management Office shall submit contractor(s) personal information to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on any contract based upon the results of the background investigation provided by the Huntington District Security Management Office. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
FOR ALL CONTRACTS 1-YEAR AND SUBSEQUENT OPTION YEARS:
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities.
The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working,
(2) Project Name, (3) Contract Number (4) Task Order Number when applicable, and (5) Security Information Sheet on each employee working on site must be submitted directly to the Huntington District Security Management Office.
The Contractor must provide a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State) and Driver’s license number if available. It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
Contractors shall have background checks completed for their employees annually in the case of Contracts with option periods. For instance, if the employee was cleared in May of 2018, they shall be cleared again in May of 2019. It is the Contractor’s responsibility to ensure that each employee’s security is up to date. Failure to comply may lead to possible removal from the project/jobsite.
The Contractor must ensure if new employees are brought in to work on an existing Contract with the U.S. Army Corps of Engineers (USACE), they must process the employee through the Huntington District USACE Security Management Office for background purposes.
FOR CONTRACTORS REQUIRING DOD COMMON ACCESS CARDS (CAC)
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management Office).
Contractor shall report any changes in personnel, or at any time conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Huntington District Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, the Huntington District Security Management Office will make recommendations to the PCO or their Designated Representative. The Huntington District Security Management Office cannot give approval due to unfavorable report(s). The Huntington District Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derogatory information. The PCO will make the determination whether to allow the Contractor personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise the Contractor of the decision.
PRE-BID MEETINGS
Any Contractor or sub contractor who plans to attend a pre-bid site visit to any Huntington District facilities, projects, owned or leased facility/spaces must be vetted by having a background investigation conducted by the Security Management Office prior to the site visit. Information for the background investigation must contain the following: a full legal name, complete SSN#, Date of Birth, Place of Birth (City and State). It is the Contractor’s responsibility to ensure the above information is accurate and legible, otherwise delays may occur.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters staff to complete. All Foreign Nationals must be cleared 30 to 45 days in advance of any site visit, tour or work on USACE owned/leased property. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following: a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, the Contractor is encouraged to work closely with the Huntington District Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work. A scanned copy of a valid passport must be sent to the Security Management Office in order to formally request a visit to any Huntington District facilities, projects, owned or leased facility/spaces.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, Engineering or Army regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Huntington District Security Management Office by phone, letter, or email at the following numbers/addresses:
CELRH-SM
502 Eighth Street Huntington, WV 25701
Scott E. Grandon, phone (304) 399-5661; email scott.e.grandon@usace.army.mil Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil
AT/OPSEC Requirements. The following shall be accomplished by the contractor before any work will be ordered:
Access and General Protection/Security Policy and Procedures. All Contractor and all associated sub‐ contractors employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
SITES TO BE TREATED
SITE ACRES*
Walhonding Projects Charles Mill Dam 4.3 Mohawk Dam 19.5 Mohicanville Dam 5.25 Pleasant Hill Dam 5.2 North Branch of Kokosing 14.4
NOTE: Site visits are highly recommended so that accurate estimates of application areas can be determined by potential offerors. Also, once on site the contractor shall contact the project office and a representative will point out the areas to be sprayed. Square foot and acreage estimates are approximations of total areas where treatment will occur and are NOT representative of the total amount of spraying that may occur.
Hours of Operation
A. Working Hours: 0730-1600 hours Monday through Friday. Work may continue outside these times with permission from the on site government representative. All work shall be performed during daylight hours. Delay of work may occur during excessive rainfall or wet periods due to access to the site.
Federal Holidays: When one of the designated holidays falls on a Sunday the following Monday is observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday. Work that interferes with other ongoing functions at the project shall be scheduled around normal working hours to be approved by Project Maintenance Mechanic. Work shall be scheduled around the above listed Federal holidays unless approved in advance.
Ten Federal holidays observed are as follows:
New Years Day (January 1st)
Martin Luther King Day (3rd Monday in January) President’s Day (3rd Monday in February)
Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
Contractor and Government Equipment and Supplies
The contractor shall furnish all personnel, equipment, transportation, disposal, supplies and materials to perform the work. No government equipment or supplies shall be used for this project. The Contractor shall provide Personal Protection Equipment to include steel-toed safety boots, hard hat, safety glasses, hearing protection, sleeved shirts, long pants, gloves and sunscreen.
Site Visit
Offerors are encouraged to make a site visit by contacting:
Robert Hawk Facility Manager U.S. Army Corps of Engineers Walhonding Facility Area
PH: (740) 824-4343 X2
FAX: (740) 824-4605
OR the Project Manager at each project and area as follows:
Walhonding Area Project Contacts are:
Scott Collins Maintenance Mechanic U.S. Army Corps of Engineers Charles Mill Dam
PH: (419) 368-4334
FAX: (419)368-4175
Eric Smith Maintenance Mechanic U.S. Army Corps of Engineers Mohawk Dam
PH: (740) 824-4343 X4
FAX: (740) 824-4605
Larry Moore Maintenance Mechanic U.S. Army Corps of Engineers Mohicanville Dam
PH: (419) 368-4712
FAX: (419) 368-8144
Frank Shannon Maintenance Mechanic U.S. Army Corps of Engineers
Pleasant Hill Dam
PH: (419) 938-5785
FAX: (419) 938-7072
Submit Invoices To:
Lake Project Assistant U.S. Army Corps of Engineers Mohawk Dam
36007 SR 715
Warsaw, Ohio 43844
PH: (740) 824-4343 X1
FAX: (740) 824-4605
Contractor Submittals
The successful offerors shall provide as a minimum the following documentation:
A. Accident Prevention Plan – EM 385-1-1 Appendix A and APP (Accident Prevention Plan) B. Activity Hazard Analysis C. Invoice as stated on the contract award.
D. Man-hour report to project office monthly at completion of work.
E. Pesticide/Herbicide application license and an official ID card with picture (eg: Drivers license in addition to the application license)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
BASE PERIOD -1 APR 2020 TO 31 MAR 2021
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohawk Dam, Warsaw, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
FOB: Destination
PURCHASE REQUEST NUMBER: W81F8E93445344
NET AMT
0002 1 Job
BASE PERIOD -1 APR 2020 TO 31 MAR 2021
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for North Branch of Kokosing Dam, Fredricktown, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
FOB: Destination
MILSTRIP: W81F8E93455537
PURCHASE REQUEST NUMBER: W81F8E93455537
0003 1 Job
BASE PERIOD -1 APR 2020 TO 31 MAR 2021
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Charles Mill Dam, Lucas, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
PURCHASE REQUEST NUMBER: W81F8E93465598
0004 1 Job
BASE PERIOD -1 APR 2020 TO 31 MAR 2021
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohicanville Dam, Lakeville, Ohio.
All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
PURCHASE REQUEST NUMBER: W81F8E93465599
0005 1 Job
BASE PERIOD -1 APR 2020 TO 31 MAR 2021
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Pleasant Hill Dam, Perrysville, Ohio.
All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
PURCHASE REQUEST NUMBER: W81F8E93465600
0006 1 Job
OPTION OPTION 1 -1 APR 2021 TO 31 MAR 2022
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohawk Dam, Warsaw, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
0007 1 Job
OPTION OPTION 1 -1 APR 2021 TO 31 MAR 2022
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for North Branch of Kokosing Dam, Fredricktown, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
0008 1 Job
OPTION OPTION 1 -1 APR 2021 TO 31 MAR 2022
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Charles Mill Dam, Lucas, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0009 1 Job
OPTION OPTION 1 -1 APR 2021 TO 31 MAR 2022
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohicanville Dam, Lakeville, Ohio.
All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
0010 1 Job
OPTION OPTION 1 -1 APR 2021 TO 31 MAR 2022
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Pleasant Hill Dam, Perrysville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
0011 1 Job
OPTION OPTION 2 -1 APR 2022 TO 31 MAR 2023
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohawk Dam, Warsaw, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0012 1 Job
OPTION OPTION 2 -1 APR 2022 TO 31 MAR 2023
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for North Branch of Kokosing Dam, Fredricktown, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
0013 1 Job
OPTION OPTION 2 -1 APR 2022 TO 31 MAR 2023
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Charles Mill Dam, Lucas, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0014 1 Job
OPTION OPTION 2 -1 APR 2022 TO 31 MAR 2023
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohicanville Dam, Lakeville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
0015 1 Job
OPTION OPTION 2 -1 APR 2022 TO 31 MAR 2023
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Pleasant Hill Dam, Perrysville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
0016 1 Job
OPTION OPTION 3 -1 APR 2023 TO 31 MAR 2024
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohawk Dam, Warsaw, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0017 1 Job
OPTION OPTION 3 -1 APR 2023 TO 31 MAR 2024
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for North Branch of Kokosing Dam, Fredricktown, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
0018 1 Job
OPTION OPTION 3 -1 APR 2023 TO 31 MAR 2024
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Charles Mill Dam, Lucas, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0019 1 Job
OPTION OPTION 3 -1 APR 2023 TO 31 MAR 2024
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohicanville Dam, Lakeville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
0020 1 Job
OPTION OPTION 3 -1 APR 2023 TO 31 MAR 2024
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Pleasant Hill Dam, Perrysville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
0021 1 Job
OPTION OPTION 4 -1 APR 2024 TO 31 MAR 2025
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohawk Dam, Warsaw, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0022 1 Job
OPTION OPTION 4 -1 APR 2024 TO 31 MAR 2025
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for North Branch of Kokosing Dam, Fredricktown, Ohio. All work shall be completed in accordance with the Performance Work Statement and the terms and conditions of this contract.
0023 1 Job
OPTION OPTION 4 -1 APR 2024 TO 31 MAR 2025
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Charles Mill Dam, Lucas, Ohio. All work shall be completed in accordance with the Performance Work Statement and
0024 1 Job
OPTION OPTION 4 -1 APR 2024 TO 31 MAR 2025
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Mohicanville Dam, Lakeville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
0025 1 Job
OPTION OPTION 4 -1 APR 2024 TO 31 MAR 2025
FFP
Contractor shall furnish all necessary management, personnel, materials, supplies, equipment, except as otherwise noted in the Performance Work Statement, required to perform herbicide spraying for Pleasant Hill Dam, Perrysville, Ohio.
All work shall be completed in accordance with the Performance Work Statement
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.204-22 Alternative Line Item Proposal JAN 2017 52.212-4 Contract Terms and Conditions--Commercial Items OCT 2018 52.217-5 Evaluation Of Options JUL 1990 52.219-6 (Dev) Notice of Total Small Business Set-Aside (DEVIATION
2019-O0003).
JAN 2019
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.232-40 Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.237-1 Site Visit APR 1984 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.253-1 Computer Generated Forms JAN 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7015 Notice of Authorized Disclosure of Information for Litigation
Support
MAY 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
DEC 2019
252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.
JAN 2018
252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.223-7008 Prohibition of Hexavalent Chromium JUN 2013 252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JUN 2013 252.247-7023 Transportation of Supplies by Sea FEB 2019
CLAUSES INCORPORATED BY FULL TEXT
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (JUN 2016)
(a) Definitions. As used in this clause--
Covered contractor information system means an information system that is owned or operated by a contractor that processes, stores, or transmits Federal contract information.
Federal contract information means information, not intended for public release, that is provided by or generated for the Government under a contract to develop or deliver a product or service to the Government, but not including information provided by the Government to the public (such as on public Web sites) or simple transactional information, such as necessary to process payments.
Information means any communication or representation of knowledge such as facts, data, or opinions, in any medium or form, including textual, numerical, graphic, cartographic, narrative, or audiovisual (Committee on National Security Systems Instruction (CNSSI) 4009).
Information system means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502).
Safeguarding means measures or controls that are prescribed to protect information systems.
(b) Safeguarding requirements and procedures.
(1) The Contractor shall apply the following basic safeguarding requirements and procedures to protect covered contractor information systems. Requirements and procedures for basic safeguarding of covered contractor information systems shall include, at a minimum, the following security controls:
(i) Limit information system access to authorized users, processes acting on behalf of authorized users, or devices (including other information systems).
(ii) Limit information system access to the types of transactions and functions that authorized users are permitted to execute.
(iii) Verify and control/limit connections to and use of external information systems.
(iv) Control information posted or processed on publicly accessible information systems.
(v) Identify information system users, processes acting on behalf of users, or devices.
(vi) Authenticate (or verify) the identities of those users, processes, or devices, as a prerequisite to allowing access to organizational information systems.
(vii) Sanitize or destroy information system media containing Federal Contract Information before disposal or release for reuse.
(viii) Limit physical access to organizational information systems, equipment, and the respective operating environments to authorized individuals.
(ix) Escort visitors and monitor visitor activity; maintain audit logs of physical access; and control and manage physical access devices.
(x) Monitor, control, and protect organizational communications (i.e., information transmitted or received by organizational information systems) at the external boundaries and key internal boundaries of the information systems.
(xi) Implement subnetworks for publicly accessible system components that are physically or logically separated from internal networks.
(xii) Identify, report, and correct information and information system flaws in a timely manner.
(xiii) Provide protection from malicious code at appropriate locations within organizational information systems.
(xiv) Update malicious code protection mechanisms when new releases are available.
(xv) Perform periodic scans of the information system and real-time scans of files from external sources as files are downloaded, opened, or executed.
(2) Other requirements. This clause does not relieve the Contractor of any other specific safeguarding requirements specified by Federal agencies and departments relating to covered contractor information systems generally or other Federal safeguarding requirements for controlled unclassified information (CUI) as established by Executive Order 13556.
(c) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (c), in subcontracts under this contract (including subcontracts for the acquisition of commercial items, other than commercially available off-the-shelf items), in which the subcontractor may have Federal contract information residing in or transiting through its…