SOLICITATION.pdf

PDF 2 MB Posted

Attached to
Huxtable Pumping Plant Fuel Platform Rehabilitation
Solicitation number
W912EQ22B0001
Issued by

About this file

This is a solicitation for the Huxtable Pumping Plant Fuel Platform Rehabilitation project. The project consists of repairing and patching an existing concrete access bridge deck, sandblasting and painting the access bridge and platform bents, installing monitoring points and pathway lighting, installing a new foundationless jib crane and security fence, and replacing fuel lines and flanges. The work will be performed in Lee County, Arkansas. The North American Industry Classification System code for this requirement is 237990. The solicitation is set aside for small businesses with average annual sales receipts not exceeding $36.5 million over the preceding three fiscal years. The estimated value of work is between $500,000 and $1,000,000. Sealed bids are due by January 20, 2022 and will be opened and evaluated thereafter. The U.S. Army Corps of Engineers Engineering District Memphis is the issuing agency.

View the file

Other files

File Type Posted
Official Abstract SIGNED.pdf PDF
Amendment 0002 .pdf PDF
Amendment W912EQ22B0001 0001.pdf PDF
PLANS - NOT FOR CONSTRUCTION.pdf PDF
SPECS - NOT FOR CONSTRUCTION.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Huxtable Pumping Plant Fuel Platform Rehabilitation

The project consists of repairing/patching the existing concrete access bridge deck, sandblasting and painting the access bridge and platform bents, installation of monitoring points on access bridge and platform, installation of pathw ay lighting for access bridge and platform, installation of new foundation less jib crane, installation of a new security fence, replacement of fuel lines and flanges, and incidental related w ork. The North American Industrial Classif ication System (NAICS) Code applicable to this requirement is 237990.

The estimated value of the work is between $500,000 and $1,000,000. This project is advertised as a Total Small Business Set-Aside.

X

LATASHIA A MUSE 901-544-0204

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

21-Dec-2021

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________265 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and ____0______ copies to perform the w ork required are due at the place specified in Item 8 by 1:30pm local time 20 Jan 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

167 N. MAIN STREET

MEMPHIS TN 38103-1894

W912EQ

PAGE OF PAGES

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912EQ22B0001 1 OF 207

Huxtable Fuel Platform Page 1 of 207 W912EQ22B0001

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Huxtable Fuel Platform Page 2 of 207 W912EQ22B0001

DOCUMENT 00 41 00.00 11

BIDDING SCHEDULE

PART 1 BIDDING SCHEDULE

St. Francis Basin - Maintenance Huxtable Pumping Plant Fuel Platform Rehabilitation

Lee County, Arkansas

1.1 LINE ITEMS

This contract will be awarded as one lump sum with unit prices required for specifically selected work. A schedule of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and Award." See Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR 52.236-16, Quantity Surveys," "DFARS 252.236-7008, Contract Prices."

Bid Items with Unit Prices Form ITEM DESCRIPTION Estimated Unit

Quantity Unit Price Amount

0001 Mobilization and Demobilization 1 JA _______ $____.__

0002 Environmental Protection 1 JA _______ $____.__

0002A Lead-Based Paint Abatement 1 JA _______ $____.__

0003 Concrete Repair and Patch 200 SF _______ $____.__

0004 Concrete Repair - Cracks 50 LF _______ $____.__

0005 Paint Handrails 1200 LF _______ $____.__

0006 Paint Bridge Piers 16 EA _______ $____.__ and Platform Tower

0007 Electrical Work 1 JA _______ $____.__

0008 6" Flexible Braided Metal Hose 1 LF _______ $____.__

0009 6" Rigid Pipe 304/316SS 20 LF _______ $___.___

0010 Furnish and Install 1/2 Ton Jib 1 JA _______ $____.__ Crane, Trolley and Hoist

0011 Installation of Control Points 1 JA _______ $____.__

0012 Furnish and Install Security Fence 1 JA _______ $____.__

Grand Total Items 0001 thru 00012 $

DOCUMENT 00 41 00.00 11 Page 2

Huxtable Fuel Platform Page 3 of 207 W912EQ22B0001

1.2 NOTES

NOTE 1: Bidders shall furnish unit prices for all items listed on the schedule of bid items, which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE

BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY

ITEM, HIS BID WILL BE DECLARED NONRESPONSIVE.

In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended bid. If the bidder shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.

Any bid price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced bid is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.

Award will be made as a whole to one bidder.

AC = Acre CF = Cubic Feet CY = Cubic Yard DH = Miles EA = Each FC = 1000 Cubic Feet FT = Foot HF = 100 Feet HH = 100 Cubic Feet HL = 100 Linear Feet HR = Hours HS = 100 Square Feet HY = 100 Yards LB = Pound LF = Linear Foot LH = Labor Hour JA = Job (lump sum) LY = Linear Yard MO = Months SB = Square Mile SF = Square Foot SQ = Square SY = Square Yard TL = 1000 Linear Feet TN = Net Ton UN = Unit YD = Yard YL = 100 Linear Yards YM = Cubic Yards Per Mile

All quantities are estimated except where unit is given as "JA" or "EA".

NOTE 2: If a bid or modification to a bid based on unit prices is submitted and provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price, including lump sum units, in bid schedule must be stated, or, if it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.

NOTE 3: Bidders are cautioned to read Contract Clause entitled "DFAR 252.204-7004, Alternate A, System for Award Management (FEB 2014) located in Section 00 70 00.00 11 CONTRACT CLAUSES.

-- End of Document --

Huxtable Fuel Platform Page 4 of 207 W912EQ22B0001

CONDITIONS AND NOTICES TO BIDDERS/OFFERORS

A. BIDDING MATERIAL – Copies of the Solicitation, Specifications, and drawings forms are available by INTERNET ACCESS ONLY. Prospective offeror should submit technical questions concerning this Request for Proposal via Bidder Inquiry in ProjNet at www.projnet.org/projnet. (See Paragraph M Below). All other inquiries should be emailed to the Contract Specialist, latashia.a.muse@usace.army.mil

B. BID DOCUMENTS: The following documents must be submitted with a bid:

SF 1442, Solicitation, Offer and Award

Schedule of bidder prices

Representations and Certifications (Section 00600)

All amendments must be acknowledged

Financials

Equipment list

C. SITE VISITS – Bidders should inspect the job site prior to submitting a bid. Site Visits may be coordinated by mail or telephone (COLLECT CALLS NOT ACCEPTED) between the hours of 7:30 AM and 3:00 PM, exclusive of Federal holidays. The point of contact to schedule a site visit for this Invitation for Bid is Mr. A. , Area Engineer, at (870) 238-7983 or email Loy.A.Hamilton@usace.army.mil . See Section 00100, clause 52.236-27 Alt I, entitled

“Site Visit (Construction)”.

D. CONDITIONS AFFECTING THE WORK – Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve offeror from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Request for Proposal, the specifications or related documents. See Section 00700, clause 52.236-3, entitled “Site Investigation and Conditions Affecting the Work”.

E. BID SUBMISSION INSTRUCTIONS - Due to the COVID-19 Global Pandemic, the Government is taking precautions to ensure the safety and health of all Contractors and Government employees. All submissions to this bid announcement shall be submitted electronically through DoD Safe. Bids will be opened at the time set for opening in the Invitation for Bids. Their content will be made public for the information of bidders and others interested.

As soon as practicable after bid opening, an abstract of bids will be available through our web page at: https://beta.sam.gov Contract Opportunities under attachment Abstract.

NO paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DoD SAFE

(https://safe.apps.mil).

Huxtable Fuel Platform Page 5 of 207 W912EQ22B0001 http://www.projnet.org/projnet http://www.projnet.org/projnet mailto:latashia.a.muse@usace.army.mil mailto:Walter.J.Delp@usace.army.mil https://safe.apps.mil/

(2) The DoD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email. Anyone has access to DoD SAFE, and the application is available for use by anyone. See the attached SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php).

F. INSTRUCTIONS FOR UPLOADING FILES -

(1.) Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.

a. Latashia A. Muse, Contract Specialist at: Latashia.a.muse@usace.army.mil

b. Priscilla Sweeney, Contracting Officer at: priscilla.g.sweeney@usace.army.mil

(2.) You will receive an email with the link to submit your drop-off. The link will be provided no later than two (2) business days prior to the proposal due date.

(3.) Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter W912EQ22B0001-FIRMNAME.

(4.) Click Upload button to send documents.

(5.) Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards ((CACs)) are not required).

File Size Limitations: Offerors are advised to follow the DoD SAFE instructions for uploading files. DoD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

• W912EQ22B0001-FIRMNAME-VOLUME I

• W912EQ22B0001-FIRMNAME-VOLUME II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description. Please see examples above.

File Organization: Although hard copies are not accepted, each submittal shall be clearly indexed and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 foldouts, etc.) will be counted as two (2) pages.

Huxtable Fuel Platform Page 6 of 207 W912EQ22B0001

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DoD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (i.e. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Bidders are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 52.214-7.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

As another precaution, the Federal building is closed to the public for viewing. In lieu of this, there will be a conference phone line available for all who are interested in attending the bid opening. Bid opening call-in information:

USA Toll-Free: 1-844-800-2712

Meeting Number: 2763 973 4062

Password: bhCjhJP$299

G. BIDDER’S ADDRESS – Prospective bidders should indicate in the bid, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the bidder on Standard Form 1442 Block 14.

H. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS - The right is reserved as the interest of the Government may require, to revise or modify the specifications or drawings or both prior to the date set for receiving Request for Proposal. Such revisions and amendments, if any, will be announced by an amendment or modifications to this Request for Proposal. If the revisions and modifications are of a nature which requires material changes in quantities or prices or both, the date set for Request for Proposal may be postponed by such number of days as in the opinion of the issuing officer will enable offerors to revise their proposal. In such cases, the amendment will include an announcement of the new date for proposals.

I. NOTICE TO BIDDERS - NINETY DAY OFFER GUARANTEE (See SF 1442 Block 13d) Bidders are advised to review CLASS DEVIATION REVISIONS-FAR 52.219-14-

Limitations on Subcontracting (DEVIATION 2019-O0003) and 52.291-27 Notice of Service-

Disabled-Veteran-Owned Small Business Set-Aside (DEVIATION 2019-O0003) implemented by the Small Business Administration in accordance with FAR part 19.

Huxtable Fuel Platform Page 7 of 207 W912EQ22B0001

1. Federal Acquisition Regulation (FAR) provisions/clauses are numbered as follows:

52.252-1.

2. Defense Acquisition Regulation Supplement (DFARS) provisions/clauses are numbered as follows: 252.204-7000.

3. Army Federal Acquisition Regulation Supplement (AFARS), provisions/clauses are numbered as follows: 5152.237-9000.

4. USACE Acquisition Instruction (UAI) provisions/clauses are numbered as follows:

5152.232-9001.

K. REQUIRED SYSTEM FOR AWARD MANAGEMENT REGISTRATION - By submission of a bid, the bidders acknowledges the requirement that prospective awardees must be registered in the System for Award Management (SAM) database prior to award, during performance, and through final payment of any contract resulting from this quote. Lack of registration in the SAM database will make an offeror ineligible for award. Contractors may obtain information on registration and annual confirmation requirements by calling 1-888-227-

2423, or at: http://www.sam.gov.

L. BIDDER’S QUALIFICATIONS - To establish its responsibility, bidders may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources (including recent financial statements or audits), plant available to be used in performing the work and, if applicable, an approved sub-contracting plan in accordance with FAR 9.104-1. All documents relevant to establish a bidder’s responsibility shall be made available as soon as practicable after receiving proposal; but, not later than 3 days after request by the Contracting Officer or the authorized Representative of the Contracting Officer.

The Government may perform a price realism analysis as a part of its fair and reasonable price determination. A price realism analysis may also be used for the purpose of measuring a

Bidder’s understanding of the requirements, to evaluate whether the Bidder can realistically perform the requirements at the fixed price proposed, and to assess the risk to the Government inherent in the bid.

M. NOTICE OF BONDS AND INSURANCE - The following proposal/contract information is applicable only if the proposal/contract is over one hundred fifty thousand dollars ($150,000):

1. PERFORMANCE BONDS. The penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received within ten (10) days after receipt of contract award. See Section 00700, clause 52.228-15, entitled

“Performance and Payment Bonds – Construction”.

2. PAYMENT BONDS: Within ten (10) days after receipt of contract award to the offeror whom award is made, one (1) bond, with good and sufficient surety or sureties acceptable to the Government, shall be furnished; namely a Payment Bond (Standard Form 25A). The penal amount of such bonds shall equal one hundred percent (100%) of the contract price. See Section 00700, clause 52.228-15, entitled “Performance and Payment Bonds –

Construction”.

J. EXPLANATION OF PROVISION/CLAUSE NUMBERS UTILIZED IN THIS SOLICITATION –

Huxtable Fuel Platform Page 8 of 207 W912EQ22B0001 http://www.sam.gov/

3. INSURANCE: The accepted offeror shall provide adequate insurance, within ten (10) days after receipt of contract award. See Section 00800, entitled Insurance

Requirements and Section 00 80 00.00 11, Special Contract Requirements --- Additional

Insurance References.

N. POST AWARD SUBMITTAL REQUIREMENTS - Within ten (10) days after receipt of contract award, the contractor shall submit an acceptable performance bond, payment bond and certificate of insurance. Within fifteen (15) days after receipt of notice of award, the contractor shall provide an approved Accident Prevention Plan, Environmental Protection Plan and Quality Control Plan. (See Sections 00 80 00.00 11, 01 57 20.00 11, and 01 45 04.00 11)

Within ten (10) days prior to commencement of work under this contract, the contractor shall submit to the Contracting Officer’s Chief of Security, a list of all Personnel, Vehicles and

Equipment that may be used during the construction work under this contract. (See Sections

00800)

O. PROJNET BIDDER INQUIRY

1. Prospective Offerors should submit questions concerning this Request for Proposal via

Bidder Inquiry in ProjNet at www.projnet.org/projnet.

a. To submit and review inquiry items, prospective offerors will need to use the Bidder

Inquiry Key presented below and follow the instructions listed below the key for access.

A prospective offeror who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective bidder once the reply is available for viewing.

b. The Solicitation Number is: W912EQ22B0001

c. The Bidder Inquiry Key is: M5XSFC-UWRMNE

Specific Instructions for First Time ProjNet Bid Inquiry Access:

(1.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

(2.) Identify the Agency. This should be marked USACE.

(3.) Key. Enter the Bidder Inquiry Key listed above.

(4.) Email. Enter the email address you would like to use for communication.

(5.) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

(6.) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

(7.) Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Huxtable Fuel Platform Page 9 of 207 W912EQ22B0001 http://www.projnet.org/projnet

Specific Instructions for Future ProjNet Bid Inquiry Access:

(1.) For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

(2.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

(3.) Identify the Agency. This should be marked USACE.

(4.) Key. Enter the Bidder Inquiry Key listed above.

(5.) Email. Enter the email address you used to register previously in ProjNet.

(6.) Click Continue. A page will then open asking you to enter the answer to your

Secret Question.

(7.) Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

2. The Bidder Inquiry System will be unavailable for new inquires Seven (7) business days prior to bid opening to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry

System for answers to questions prior to submission of a new inquiry.

4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago).

The telephone number for the Call Center is 800-428-HELP.

5. Oral explanations or instructions are not binding. Any information given to an offeror which impacts the offer will be given in the form of a written amendment to the solicitation.

P. BUSINESS INTEGRITY- The apparent successful offeror as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to

Business Integrity.

Huxtable Fuel Platform Page 10 of 207 W912EQ22B0001

Section 00100 INSTRUCTIONS TO BIDDERS

52.204-7 System for Award Management OCT 2018

52.204-18 Commercial and Government Entity Code Maintenance AUG 2020

52.214-3 Amendments To Invitations For Bids DEC 2016

52.214-5 Submission Of Bids DEC 2016

52.214-6 Explanation To Prospective Bidders APR 1984

52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999

52.214-18 Preparation of Bids-Construction APR 1984

52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.216-1 Type Of Contract APR 1984

52.222-5 Construction Wage Rate Requirements--Secondary Site of the MAY 2014

Work

52.222-23 Notice of Requirement for Affirmative Action to Ensure FEB 1999

Equal Employment Opportunity for Construction

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.233-2 Service Of Protest SEP 2006

52.236-27 Alt I Site Visit (Construction) (Feb 1995) - Alternate I FEB 1995

252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019

252.204-7008 Compliance With Safeguarding Covered Defense Information OCT 2016 Controls

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020

Huxtable Fuel Platform Page 11 of 207 W912EQ22B0001

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for

Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding

Accountability and Transparency Act of 2006 (see subpart 4.14) into SAM;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in SAM;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification

Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or

Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) An Offeror is required to be registered in SAM when submitting an offer or quotation, and shall continue to be registered until time of award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation

``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in SAM.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

(7) Number of employees at your location.

Huxtable Fuel Platform Page 12 of 207 W912EQ22B0001

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) Processing time should be taken into consideration when registering. Offerors who are not registered in SAM should consider applying for registration immediately upon receipt of this solicitation. See https://www.sam.gov for information on registration.

(End of Provision)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(a) Definition. As used in this clause--

Commercial and Government Entity (CAGE) code means--

(1) An identifier assigned to entities located in the United States or its outlying areas by the Defense Logistics

Agency (DLA) Commercial and Government Entity (CAGE) Branch to identify a commercial or government entity by unique location; or

(2) An identifier assigned by a member of the North Atlantic Treaty Organization (NATO) or by the NATO Support and Procurement Agency (NSPA) to entities located outside the United States and its outlying areas that the DLA

Commercial and Government Entity (CAGE) Branch records and maintains in the CAGE master file. This type of code is known as a NATO CAGE (NCAGE) code.

(b) Contractors shall ensure that the CAGE code is maintained throughout the life of the contract for each location of contract, including subcontract, performance. For contractors registered in the System for Award Management

(SAM), the DLA Commercial and Government Entity (CAGE) Branch shall only modify data received from SAM in the CAGE master file if the contractor initiates those changes via update of its SAM registration. Contractors undergoing a novation or change-of-name agreement shall notify the contracting officer in accordance with subpart

42.12. The contractor shall communicate any change to the CAGE code to the contracting officer within 30 days after the change, so that a modification can be issued to update the CAGE code on the contract.

(c) Contractors located in the United States or its outlying areas that are not registered in SAM shall submit written change requests to the DLA Commercial and Government Entity (CAGE) Branch. Requests for changes shall be provided at https://cage.dla.mil. Change requests to the CAGE master file are accepted from the entity identified by the code.

(d) Contractors located outside the United States and its outlying areas that are not registered in SAM shall contact the appropriate National Codification Bureau (points of contact available at http://www.nato.int/structur/AC/135/main/links/contacts.htm) or NSPA at https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx to request CAGE changes.

(e) Additional guidance for maintaining CAGE codes is available at https://cage.dla.mil.

(f) If the contract includes Federal Acquisition Regulation clause 52.204-2, Security Requirements, the contractor shall ensure that subcontractors maintain their CAGE code(s) throughout the life of the contract.

(End of Clause)

Huxtable Fuel Platform Page 13 of 207 W912EQ22B0001 https://www.sam.gov/ https://cage.dla.mil/ http://www.nato.int/structur/AC/135/main/links/contacts.htm https://eportal.nspa.nato.int/AC135Public/scage/CageList.aspx https://cage.dla.mil/

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) (1) Bidders shall acknowledge receipt of any amendment to this solicitation--

(i) By signing and returning the amendment;

(ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid;

(iii) By letter;

(iv) By facsimile, if facsimile bids are authorized in the solicitation; or

(v) By email, if email bids are authorized in the solicitation.

(2) The Government must receive the acknowledgement by the time and at the place specified for receipt of bids.

(End of provision)

52.214-5 SUBMISSION OF BIDS (DEC 2016)

(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.

(c) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.

(d) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.

(End of provision)

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)

Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.

(End of provision)

Huxtable Fuel Platform Page 14 of 207 W912EQ22B0001

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the

Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the

Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--

(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the

Government, will be considered at any time it is received and may be accepted.

(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent

Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first workday on which normal Government processes resume.

(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the

IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.

52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)

(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.

(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--

(1) Lump sum bidding;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of subparagraphs (1) through (3) above.

Huxtable Fuel Platform Page 15 of 207 W912EQ22B0001

(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.

(d) Alternate bids will not be considered unless this solicitation authorizes their submission.

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than

English shall be rejected.

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.

dollars shall be rejected.

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm-fixed price construction contract resulting from this solicitation.

Huxtable Fuel Platform Page 16 of 207 W912EQ22B0001

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting

Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

SMSA Counties 32.3

Non-SMSA Counties 26.5 6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract

Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from

Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

Huxtable Fuel Platform Page 17 of 207 W912EQ22B0001

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract

Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Economic Area

055, Memphhis, TN as follows:

SMSA Counties:

4920 Memphis, TN-AR-MS------------------------------------------------32.3

AR Crittenden; MS DeSoto, TN Shelby, TN Tipton

Non-SMSA Counties.........................................................................26.5

AR Clay; AR Craighead; AR Cross, AR Greene; AR Lawrence; AR Lee, AR Mississippi; AR Phillips, AR Poinsett; AR Randolph; AR St. Francis;

MS Alcorn; MS Benton; MS Bolivar; MS Calhoun; MS Carroll;

MS Chickasaw; MS Clay; MS Coahoma; MS Grenada; MS Itawamba;

MS Lafayette; MS Lee; MS Leflore; MS Marshall; MS Monroe;

MS Montgomery; MS Panola; MS Pontotoc; MS Prentiss; MS Quitman;

MS Sunflower; MS Tallahatchie; MS Tate; MS Tippah; MS Tishomingo;

MS Tunica; MS Union; MS Washington; MS Webster; MS Yalobusha;

MO Dunklin; MO New Madrid; MO Pemiscot, TN Benton; TN Carroll, TN Chester; TN Crockett; TN Decatur; TN Dyer; TN Fayette, TN Gibson;

TN Hardeman; TN Hardin; TN Haywood; TN Henderson; TN Henry; TN Lake;

TN Lauderdale; TN McNairy; TN Madison; TN Obion; TN Weakley.

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under

Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by

Huxtable Fuel Platform Page 18 of 207 W912EQ22B0001 paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph

(b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause

52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

Chief, Construction A/E Contracting Division

ATTN: CEMVM-CT, Room 681

U.S. Army Corps of Engineers, Memphis District

167 N. Main Street, B-202

Memphis, TN 38103-1894

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

Huxtable Fuel Platform Page 19 of 207 W912EQ22B0001

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Two site visits will be scheduled. Perspective viewers must contact the Wynne Area Office at the number below for show dates, times and meeting place.

(c) Bidders desiring a site visit shall contact:

NAME: Mr. JONATHON DELP

ADDRESS: Wynne, AR Area Office

1932 N. Falls Boulevard, P.O. Box 729

Wynne, Arkansas 72396-0729

TELEPHONE: (870) 238-7983

COLLECT TELEPHONE CALLS WILL NOT BE ACCEPTED.

(End of provision)

252.204-7004 LEVEL I ANTITERRORISM AWARENESS TRAINING FOR CONTRACTORS (FEB 2019)

(a) Definition. As used in this clause--

Military…

This is the start of the file's text. The full file is on GovTribe.