SOLICITATION ATTACHMENT- STATEMENT OF WORK.pdf

PDF 586 KB Posted

Attached to
SCAFFOLD AND CONTAINMENT Federal contract opportunity
Solicitation number
70Z04026Q60261Y00
Issued by
Department of Homeland Security US Coast Guard

About this file

This is a Performance Work Statement for scaffolding and containment services for the Eagle Mizzen Mast at the U.S. Coast Guard Yard in Baltimore, Maryland (P/R: 2126406Y6176J96005).

The contractor must provide complete scaffolding and 100% fireproof shrink wrap containment around the vessel, including sides to the ship lift floor, a fireproof membrane/plastic bottom, and a roof top. The scaffolding must be Safway systems type or compatible and erected under supervision of a competent scaffolding person, meeting OSHA Shipyard standards (29 CFR 1915 Subpart E) with a safety factor of no less than four. The containment system must maintain a constant environment, contain blast media, dust, and paint overspray while preventing moisture intrusion from rain, snow, and foreign objects. The staging system must allow complete access to the entire mast and appendages with work platforms and ladders; deck boards must be non-solid to allow grit to fall through, and contractors must use substantial wooden pads distributed over at least four square feet per contact point. The structure must be secured to the dock floor using weights or non-destructive methods only—not to ship mounts or foundations. A Professional Engineer-stamped engineering drawing must certify the containment can sustain 60 MPH wind gusts and six inches of wet snow throughout assembly, construction, and the entire performance period, with a sloped roof to prevent water accumulation. Work commences on or around September 28, 2026, and must be completed within seven calendar days (by October 5, 2026), with removal scheduled to begin January 5, 2027 unless extended weekly. The contractor is responsible for all labor, materials, equipment, maintenance/repairs (with 8-hour response time), liability for disassembly damage, and final professional engineer inspection; the Government provides crane service if requested, utilities (water, compressed air up to 200 amps at 480 volts), and lighting. Contractor employees require security clearance through RAPIDGate or TWIC card, and must comply with OSHA requirements, COVID safety practices, and Coast Guard facility security regulations.

View the file

Other files for this federal contract opportunity

Other files attached to SCAFFOLD AND CONTAINMENT, newest first.
File Type Posted
SOLICITATION ATTACHMENT- FAR CLAUSES.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK P/R: 2126406Y6176J96005

POC: Paint Shop Foreman Keith Jordan

Cell: (410) 829-6103 Email: keith.a.jordan@uscg.mil

Ship Superintendent POC: LT Anthony Sayward

Cell: (410) 320-0927 Email: anthony.e.sayward@uscg.mil

Location: USCG Yard, 2401 Hawkins Point Rd, Baltimore, MD 21226

Performance Work Statement Scaffolding/Containment Services for Eagle Mizzen Mast

1. GENERAL REQUIREMENTS: The contractor shall provide all personnel, equipment, tools, supervision, and other necessary items to perform Scaffolding/Containment Services, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order. If there are no specified standards, then standards will be set at the commercial standard.

Contractor shall comply with OSHA Shipyard standards contained in 29 CFR 1915 in the erection, modification, repair, transportation, and disassembly of all scaffolds, ladders and working surfaces while performing at the USCG Yard.

2. COMMENCEMENT OF WORK: Upon award of contract, the Contractor shall provide Scaffolding/Containment Services in 7 calendar days with a start date on or around 09/28/26 and complete by 10/05/26.

3. SCOPE OF WORK:

Overall Structure: The Contractor must provide 100% containment around the vessel with fireproof shrink wrap material, including the sides to the ship lift floor, a fireproof membrane/ plastic bottom, and a roof top. The Contractor is to supply all labor and materials to erect scaffolding and containment around the mast and appendages. The scaffolding must be of safway systems type or compatible. Scaffolds must be erected, moved, dismantled, or altered under the supervision of a competent scaffolding person. All scaffolds and their support must be capable of supporting the load they are designed to carry with a safety factor of no less than four. The scaffolding system must meet OSHA regulation 29 CFR 1915 SUB PART E. The purpose of the containment system is to maintain a constant environment, contain blast media, dust, and paint overspray and to keep out rain, snow, animals, and other foreign objects. The structure should be sufficiently constructed to prevent moisture or precipitation intrusion into the structure from surrounding environment.

The staging system shall allow complete access to the entire mast and appendages for tasked yard work. The staging system should include work platforms with appropriate access (i.e.

ladders). The deck boards shall not be solid so that grit and other particles may fall through.

When erecting staging, the Contractor must place substantial wooden pads where each part of the staging contacts the vessel’s decks to distribute the weight of the staging over at least a four square foot area to protect the deck. The four-foot area must include at least three transverse structural frames. Ensure that the erected staging and scaffolding do not prevent access to or chafe the mast.

The structure shall be secured to the dock floor using weights or another non-destructive method. The contractor shall provide the weights for securing the structure. The structure cannot be secured to any ship mounts or ship foundations.

Structure Survivability: The contractor shall provide an engineering drawing stamped by a Professional Engineer ensuring the containment will be able to sustain wind gusts up to 60MPH, and a load of six inches of wet snow (during the assembly, final construction, and entire period of performance). The shrink wrap roof must include a slope to prevent water accumulation. The shrink wrap containment shall not let any water in through the roof or sides.

Grit blasting will occur inside the enclosure; grit shall remain dry for timely vacuum removal. Painting will also occur inside the enclosure; therefore, paint overspray will occur.

The structure shall be designed to sustain and contain the byproducts of these processes without repair or modification.

The government reserves the right to modify the shrink wrap enclosure to run temporary service ducts such as dust collection hoses, air conditioning hoses, water, sewage, power, etc.

Structure Inspection: The Contractor shall provide final inspection by Professional Engineer. The designated Government representative(s) will be present at this inspection to provide formal acceptance of completion on behalf of the Government. The Contractor shall provide weekly safety inspection and repair of the enclosure, at no additional cost to the government.

Structure Access: Ladder will be needed for access to stages of scaffolding. Access to the interior of enclosure without compromising containment.

Site Visit: A site visit can be held when required by contractor.

Period of Performance: The start date is September 28th, 2026, and must be completed in Seven calendar days. The removal of the containment will start on or about January 5th, 2027 unless the option to extend it weekly is invoked.

Build Plan: The Government will continue to have access to the ship during building and removal of the structure unless requested by the contractor 72 hours in advance.

Lighting: Lights will be provided and mounted by the Government to the scaffolding.

4. COMPLETION OF WORK: The Contractor shall remove Scaffolding / Containment Services iaw POP.

Structure Disassembly: The contractor will be held liable for any damage caused during disassembly of the structure.

Disposal and Removal: The Contractor is responsible for removal of all equipment and debris generated under this contract.

5. MAINTENANCE AND REPAIR: The contractor must be able to provide maintenance/repairs if needed for the structure at no additional cost to the Government. If maintenance or repairs are needed the contractor must be able to be on site within 8 hours to handle the maintenance or repairs.

6. GOVERNMENT FURNISHED ITEMS AND SERVICES:

Services: The Government will provide crane service if requested by contractor to install roof components of the structure. The Coast Guard Yard will give an effort in providing timely assistance as requested by the Contractor. The Contractor shall provide 24-hour notice to the Government when there is a need for material handling services.

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work. The Government shall advise the Contractor of all planned air or power outages, for planning purposes, but in the event of unplanned outages during the Period of Performance, the Contractor is required to provide as required to maintain schedule.

Compressed Air: The Government shall provide a source of compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

Smoking Area: The Government will designate a smoking area if requested by contractor.

Smoking is not permitted in the ship handling area, onboard any vessels, in any buildings, or outside of any designated smoking area.

7. CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this Performance Work Statement, other than those explicitly addressed in government furnished services.

Services: The Contractor shall provide material handling services to load and unload Contractor machinery and for the setup of equipment (forklift, manlift, etc.).

Period of Performance: The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order.

No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. All work must be completed within the Period of Performance (POP). If weather or other delays require more time, the contractor is required to notify the Contracting Officer or Contracting Officer Representative via e-mail the same day that work could not be performed. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the timeframe and quantity specified.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work.

8. Safety Equipment

Safety: The area where this work is taking place requires hard hats, safety harnesses and safety glasses always. The Contractor is to follow all applicable OSHA guidelines and regulations. It is also required that all COVID safety practices are followed.

Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements.

9. Security Requirements: The U.S. Coast Guard Yard, Baltimore, MD is a controlled access area. All contractors and subcontractors performing work on this contract are recommended to use RAPIDGate or TWIC card access. RAPIDGate manages the non-Common Access Credential (CAC) eligible vendor/contractor companies and their employees who require access to Coast Guard Yard, Baltimore. Vendor/contractor CAC eligibility has been restricted to only those who require physical access to Coast Guard yard and logical access to a DoD or DHS network or system.

a. Contractor employees shall not enter restricted areas in accordance with Yard security regulations or policies. Before contractor employees can work at the Coast Guard Yard Facility, the contractor shall complete a security investigation of all contractor employees in connection to this contract. Any contractor employee with a criminal background must get prior authorization before they can gain access to Coast Guard Yard Facility. Contractor shall provide for each employee to the Contracting Officer, the full name and any alias, address, city and state, and date of birth.

File details come from the government source that posted it. Updated .