SOLICITATION ATTACHMENT- STATEMENT OF WORK.docx

DOCX document 32 KB Posted

Attached to
GRIT REMOVAL Federal contract opportunity
Solicitation number
70Z04026Q60552Y00
Issued by
Department of Homeland Security US Coast Guard

About this file

This is a Statement of Work (SOW) for grit removal services at the USCG Yard in Baltimore, Maryland, under Purchase Request 2126406Y61K6597004. The contractor shall provide all personnel, equipment, tools, and supervision necessary to remove up to 160 tons of non-hazardous grit from designated areas including the interior of an enclosure with scaffolding, ship cradle, walkways, vessel deck, and surrounding areas, with capability to remove 15 tons daily. The performance period is two consecutive weeks between June 15, 2026 and June 28, 2026, with final completion determined by the Ship Superintendent. The contractor must attend a kickoff meeting within five business days of award and present written manifests and weight tickets from certified commercial scales for each truckload prior to removal, with final adjusted weight tickets and signed non-regulated waste manifests submitted to Robert.hilte@uscg.mil by the next business day after disposal.

The Government will furnish material handling services for loading and unloading contractor machinery, water, compressed air (compatible with Yard sources), and up to 200 amps of electrical service at 480 volts. The contractor is responsible for all equipment, safety gear, two trucks with 200 feet of hose each, grit transportation, and disposal at authorized non-hazardous disposal sites meeting all local, state, and federal standards. If hazardous materials are suspected, work must cease immediately and POCs Jann Blevins and Carl Weiland notified. All contractor personnel require visitors' passes and security clearance with 24-hour advance notice to the Yard POC, providing full names, valid picture identification, and dates of birth. On the final performance day, the contractor shall vacuum clean all designated areas to a "broom swept" condition, defined as free of all visible dirt, dust, and debris.

View the file

Other files for this federal contract opportunity

Other files attached to GRIT REMOVAL, newest first.
File Type Posted
SOLICITATION ATTACHMENT- FAR CLAUSES.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK P/R:2126406Y61K6597004

POC: Paint Shop Foreman Jann Blevins Cell: (410) 636-3256 Email: jann.a.blevins@uscg.mil Ship Superintendent Carl Weiland Cell: (410) 636-3272 Email: carl.h.weiland@uscg.mil Location: USCG Yard, 2401 Hawkins Point Rd, Baltimore, MD 21226

1. GENERAL REQUIREMENTS: The Contractor shall provide all personnel, equipment, tools, supervision, and other items necessary to perform Grit Removal Services, except for those items specified as government furnished property and services. The contractor shall perform to the standards in this order, if no standards are specified then to a commercially reasonable standard.

1.1 The Contractor must attend a Kickoff Meeting with the Contracting Officer and the COR, no later than 5 business days after the date of award. The purpose of the Kickoff Meeting, which will be chaired by the Contracting Officer, is to discuss the technical and contracting objectives of this contract and provide a draft quality assurance plan. The Kickoff Meeting will be held via teleconference. The Government has the option to waive Kick Off Meeting.

1.2 Up to 160 tons (by weight) of non-hazardous grit to be removed. Option for additional grit removal priced per ton. The contractor must have the capability of removing 15 tons a day. Designated areas are but not limited to, interior of enclosure including scaffolding, ship cradle and walkways. Deck of the vessel, surrounding areas and dust collector dust drums. All grit shall be removed regardless of condition; including wet and compacted grit which might require the use of shovels and other removal methods beyond vacuuming.

1.3 Removing grit should be stored in a Vacuum Box or a similar temporary containment, and not in the way of Yard operations. The container must remain in a position to be transported daily with reasonable effort. No more than one container is to be left on site at the same time, per contract. If a Vacuum Box or a similar temporary containment is not used for storing the removed grit, the contractor must transport all removed grit from the property for disposal by the end of the shift.

2. The period of performance will be 2 consecutive weeks between 06/15/26 to 06/28/26. Final period of performance will be determined by the Ship Superintendent Carl Weiland, or Yard POC Jann Blevins.

2.1 On the last day of the performance period, and after removal of all sand blasting grit from designated areas, the contractor shall vacuum clean the scaffolding to a “broom swept” condition. “Broom swept” is defined as free of all visible dirt, dust, and debris.

Disposal and Measurement: The Contractor must present a written manifest/bill of lading indicating the type and quantity of waste to be removed for each truck load prior to removing blast media from the Yard. The Yard POC will sign the Non-Hazardous BOL and retain a copy for Yard records. If copies of the manifest/bill of lading are NOT given to the Yard POC, the removals will be considered non-compliant, and the contractor may be fined or cited.

The Contractor will provide a weight ticket showing TARE weight and GROSS loaded weight from a certified commercial scale approved by the Contracting Officer. Contractor selected disposal sites must be an authorized Non-Hazardous Grit disposal site.

Final adjusted weight tickets and signed non-regulated waste manifests shall be submitted to Robert.hilte@uscg.mil on the next business day after disposal with the contract number and delivery order number for services clearly marked on the weight ticket and invoices.

Disposal of the sandblast grit shall meet all local, state, and federal standards and regulations. The Contractor shall be solely responsible for the transportation and proper disposal of the grit. If Contractor elects to use dumpsters for holding or transportation of grit, dumpsters must be covered to prevent grit from getting wet and becoming airborne.

The Coast Guard Yard has no control over landfill rates and cannot guarantee either the cost or the availability of disposal sites. The Contractor shall be responsible for locating primary & alternative disposal sites.

Written notification must be provided to the Environmental Protection Specialist Brandace Timbers 410-636-3775, brandace.t.timbers@uscg.mil of any activity that could potentially cause an environmental violation. Some examples of these activities are- any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

GOVERNMENT FURNISHED ITEMS AND SERVICES:

Services: The Government shall provide material handling services to load and unload Contractor machinery and for the set-up of equipment. The Coast Guard Yard shall endeavor to provide timely assistance as requested by the Contractor. The Contractor shall provide 48-hour notice to the Government when there is a need for material handling services.

Utilities: The Government will provide water, compressed air, and electricity for the Contractor as defined herein. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating in such a manner that precludes the waste of utilities, for example turning off the water faucets or valves after using the required amount to accomplish assigned work.

Compressed Air: The Government shall provide a source of compressed air for Contractor machinery. The Contractor shall be responsible for ensuring that their compressed air hookup connections are compatible with the Yard’s compressed air sources.

Electricity: The Government shall provide up to 200 amps and up to 480 volts of electrical services.

Hazardous Materials and Waste: If it comes to the Contractors attention that the coating materials requiring removal are suspected hazardous material and would produce hazardous waste (Code of Maryland Regulations, Title 26, Subtitle 13 and 40 CFR 260-267), the Contractor must cease work immediately and notify the POC’s Jann Blevins & Carl Weiland. If the surface coating being removed contains lead, cadmium, chromium or Polychlorinated Biphenyl or PCB’s, the Contractor will notify the Yard POC immediately. The Government will have the responsibility to dispose of any hazardous materials and waste. The Contractor will have the responsibility to provide its full cooperation with the removal and disposal process.

CONTRACTOR FURNISHED ITEMS, SERVICES AND RESPONSIBILITIES:

General: The Contractor shall furnish all equipment and services required to perform work under this SOW, other than those explicitly addressed in government furnished services.

The Contractor shall report to the designated work site on the date specified on the written notification by the Contracting Officer in the form of a signed order. No other individual has the authority to direct the Contractor to begin work, other than a warranted Contracting Officer. Pending Coast Guard Yard production schedules, services may be required on an intermittent basis within the period and quantity specified.

Nonhazardous Grit Removal and Disposal: The Contractor shall perform all services, management, planning, supervision, personnel, labor, materials, transportation, and equipment necessary required by the task order to a commercially reasonable standard and in accordance with this SOW.

Equipment: The Contractor shall, throughout the performance of this contract, be in possession of fully functioning equipment and tools to complete assigned work. The following tools and equipment are required:

a. Safety Equipment

b. Trucks – Two trucks are required with two hundred (200) feet of hose for each truck.

Equipment Standards: Contractor’s trucks and equipment shall be maintained in an operable condition that meets all Federal, State of Maryland, and local safety requirements. All equipment must meet the permissible noise limits in accordance with this SOW.

Base Access: Access to the Yard during the contract period is coordinated through the Yard POC. All personnel shall receive visitors’ passes and clearance from USCG Coast Guard Yard Security located at the Main Gate. List of personnel requiring access shall be provided to the Yard POC twenty-four (24) hours prior to requiring access. Personnel will be required to provide full name, picture I.D. (valid driver’s license preferred), and date of birth. For non-US citizens, a passport will be required. The following forms of IDS are authorized: CAC, Foreign Passport containing appropriate visas, TWIC, Green Cards, US Passport, or MOST state IDs.

File details come from the government source that posted it. Updated .