Solicitation Attachment 1_Laboratory Services Pricing List.xls
XLS spreadsheet 80 KB Posted
- Attached to
- Environmental Laboratory Services for USAG
- Solicitation number
- W564KV23Q0016
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W564KV23Q0016 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Soil+Soil Gas+Water Testing
| OFFERED PRICING | FOR EVALUATION PURPOSES ONLY The Government will evaluate based on the total overall price based on the estimated annual quantities for Ordering Period Year 1. | |||||||||||||||
| Ordering Period (OP) Year 1 | OP Year 2 | OP Year 3 | OP Year 4 | OP Year 5 | Ordering Period Year 1 | |||||||||||
| ITEM | ||||||||||||||||
| NO. | SCHEDULE OF SUPPLIES/SERVICES | QUANTITY | UNIT | UNIT PRICE EURO | Annual Escalation Rate (in Percentage) | Annual Escalation Rate (in Percentage) | Annual Escalation Rate (in Percentage) | Annual Escalation Rate (in Percentage) | ITEM | |||||||
| NO. | SCHEDULE OF SUPPLIES/SERVICES | Estimated Annual Quantity | UNIT | UNIT PRICE EURO | TOTAL PRICE | |||||||||||
| CLIN 0001: Soil/Soil Gas/Groundwater Investigations and Building Structure Testing | CLIN 0001: Soil/Soil Gas/Groundwater Investigations and Building Structure Testing | |||||||||||||||
| 1 | Representative sampling of soil from sondier boring, including all necessary equipment and materials | 1 | each | 1 | Representative sampling of soil from sondier boring, including all necessary equipment and materials | 100 | each | € 0.00 | € 0.00 | |||||||
| (Entnahme von repraesentativen Bodenproben aus Sondierung, einschliesslich aller erforderlichen Geraete u. Materialien) | (Entnahme von repraesentativen Bodenproben aus Sondierung, einschliesslich aller erforderlichen Geraete u. Materialien) | |||||||||||||||
| 2 | Preparation of samples (break, sieve) of construction debris, stones etc. with cheek breaker grain size > 2 mm - < 22 mm, homogenisation and subset sampling | 1 | each | 2 | Preparation of samples (break, sieve) of construction debris, stones etc. with cheek breaker grain size > 2 mm - < 22 mm, homogenisation and subset sampling | 10 | each | € 0.00 | € 0.00 | |||||||
| (Probenvorbereitung (Brechen, Sieben) von Bauschutt, Steinen etc. mit einem Backenbrecher auf eine Korngroesse > 2 mm - < 22 mm, Homogenisierung und Entnahme von Teilproben fuer weitere Untersuchungen) | (Probenvorbereitung (Brechen, Sieben) von Bauschutt, Steinen etc. mit einem Backenbrecher auf eine Korngroesse > 2 mm - < 22 mm, Homogenisierung und Entnahme von Teilproben fuer weitere Untersuchungen) | |||||||||||||||
| 3 | Preparation of a mixed sample from individual samples | 1 | each | 3 | Preparation of a mixed sample from individual samples | 20 | each | € 0.00 | € 0.00 | |||||||
| (Herstellung einer Mischprobe aus Einzelproben) | (Herstellung einer Mischprobe aus Einzelproben) | |||||||||||||||
| 4 | Sampling in accordance with LAGA information 32: LAGA PN 98; mixed sampling of stockpiles; including provision of sample containers, and preparation of sampling protocol according to LAGA PN98 and Landfill Ordinance DepV | 1 | each | 4 | Sampling in accordance with LAGA information 32: LAGA PN 98; mixed sampling of stockpiles; including provision of sample containers, and preparation of sampling protocol according to LAGA PN98 and Landfill Ordinance DepV | 5 | each | € 0.00 | € 0.00 | |||||||
| (Probenahme nach LAGA Mitteilung 32: LAGA PN 98, Entnahme von Mischproben aus Haufwerken, inkl. Bereitstellung von Probengefaessen u. Erstellung des Probennahmeprotokolls nach Formblatt LAGA PN98 und Deponieverordnung DepV) | (Probenahme nach LAGA Mitteilung 32: LAGA PN 98, Entnahme von Mischproben aus Haufwerken, inkl. Bereitstellung von Probengefaessen u. Erstellung des Probennahmeprotokolls nach Formblatt LAGA PN98 und Deponieverordnung DepV) | |||||||||||||||
| 5 | Sampling of walls, floors, tiles, window frames, wooden beams/joints, insulation materials etc. for the preparation of a demolition concept. The sampling points should be shown on a ground plan and photographic documentation provided. | 1 | each | 5 | Sampling of walls, floors, tiles, window frames, wooden beams/joints, insulation materials etc. for the preparation of a demolition concept. The sampling points should be shown on a ground plan and photographic documentation provided. | 10 | each | € 0.00 | € 0.00 | |||||||
| (Probenahme aus Waenden, Fussboeden, Fliessen, Fensterrahmen, Holzbalken, Daemmstoffen usw zur Erstellung eines Gebauderueckbaukonzeptes. Darstellung der Probenahmepunkte in einem Lageplan, sowie Erstellung einer Photodokumentation) | (Probenahme aus Waenden, Fussboeden, Fliessen, Fensterrahmen, Holzbalken, Daemmstoffen usw zur Erstellung eines Gebauderueckbaukonzeptes. Darstellung der Probenahmepunkte in einem Lageplan, sowie Erstellung einer Photodokumentation) | |||||||||||||||
| 6 | Sampling of top soil (mixed sampling) according to BBodSchV up to a depth of 0.35 m | 1 | each | 6 | Sampling of top soil (mixed sampling) according to BBodSchV up to a depth of 0.35 m | 5 | each | € 0.00 | € 0.00 | |||||||
| (Oberbodenprobenahme (Mischprobe) gemaess BBodSchV bis zu einer Tiefe von 0.35 m) | (Oberbodenprobenahme (Mischprobe) gemaess BBodSchV bis zu einer Tiefe von 0.35 m) | |||||||||||||||
| 7 | Soil vapor sampling to include all equipment and materials | 1 | each | 7 | Soil vapor sampling to include all equipment and materials | 25 | each | € 0.00 | € 0.00 | |||||||
| (Entnahme von Bodenluftproben einschliesslich aller erforderlichen Geraete u. Materialien) | (Entnahme von Bodenluftproben einschliesslich aller erforderlichen Geraete u. Materialien) | |||||||||||||||
| 8 | PID Measurement in the hole of the sondier borings | 1 | each | 8 | PID Measurement in the hole of the sondier borings | 25 | each | € 0.00 | € 0.00 | |||||||
| (PID Messung an den Bohrloechern der Sondierungen) | (PID Messung an den Bohrloechern der Sondierungen) | |||||||||||||||
| 9 | Mobilization and demobilization of drilling equipment at drilling locations within USAG Rheinland-Pfalz | 1 | each | 9 | Mobilization and demobilization of drilling equipment at drilling locations within USAG Rheinland-Pfalz | 25 | each | € 0.00 | € 0.00 | |||||||
| (Auf- und Abbau des Bohrgeraetes an Bohransatzpunkten innerhalb der USAG Rheinland-Pfalz) | (Auf- und Abbau des Bohrgeraetes an Bohransatzpunkten innerhalb der USAG Rheinland-Pfalz) | |||||||||||||||
| 10 | Sondier boring in soil; execution with an automated sondier device or manual sondier borings; diameter 50 mm, for investigation of ground profile and soil sampling. Classification and description of soil type according to DIN 4022 & 4023. Description of material with reference to color, odor and consistency. Boring maximum 8 m deep. | 10 | Sondier boring in soil; execution with an automated sondier device or manual sondier borings; diameter 50 mm, for investigation of ground profile and soil sampling. Classification and description of soil type according to DIN 4022 & 4023. Description of material with reference to color, odor and consistency. Boring maximum 8 m deep. | |||||||||||||
| (Rammkernbohrungen in Boden; Ausfuehrung mit maschinellem Geraet oder handgefuehrte Bohrungen; Durchmesser 50 mm, zur Ermittlung des Bodenprofils sowie zur Bodenprobenahme. Benennung u. Beschreibung der Bodenart nach DIN 4022 u. 4023, Ansprache des Materials nach Faerbung, Geruch u. Konsistenz. Bohrungen max. 8 m tief.) | (Rammkernbohrungen in Boden; Ausfuehrung mit maschinellem Geraet oder handgefuehrte Bohrungen; Durchmesser 50 mm, zur Ermittlung des Bodenprofils sowie zur Bodenprobenahme. Benennung u. Beschreibung der Bodenart nach DIN 4022 u. 4023, Ansprache des Materials nach Faerbung, Geruch u. Konsistenz. Bohrungen max. 8 m tief.) | |||||||||||||||
| 10.1 | Sondier boring < 4 m depth | 1 | meters | 10.1 | Sondier boring < 4 m depth | 50 | meters | € 0.00 | € 0.00 | |||||||
| (Rammkernbohrung < 4 m Tiefe) | (Rammkernbohrung < 4 m Tiefe) | |||||||||||||||
| 10.2 | Sondier boring > 4 m depth | 1 | meters | 10.2 | Sondier boring > 4 m depth | 10 | meters | € 0.00 | € 0.00 | |||||||
| (Rammkernbohrung > 4 m Tiefe ) | (Rammkernbohrung > 4 m Tiefe ) | |||||||||||||||
| 11 | Installation of Groundwater monitoring wells | 11 | Installation of Groundwater monitoring wells | |||||||||||||
| (Herstellung von Grundwassermessstellen) | (Herstellung von Grundwassermessstellen) | |||||||||||||||
| 11.1 | Installation of a Groundwater monitoring well DN 50 in soil class 1-5; max. depth: 10 m; sondier boring / drilling DN 100 mm; installation of filter screens and blanc pipe DN 50 mm according to on-site conditions; installation of filter material and clay sealing. | 1 | meters | 11.1 | Installation of a Groundwater monitoring well DN 50 in soil class 1-5; max. depth: 10 m; sondier boring / drilling DN 100 mm; installation of filter screens and blanc pipe DN 50 mm according to on-site conditions; installation of filter material and clay sealing. | 10 | meters | € 0.00 | € 0.00 | |||||||
| (Herstellung Grundwassermessstelle DN 50 in Bodenklasse 1-5; max. Tiefe: 10 m; Sondierung/Bohrung DN 100 mm; Ausbau mit Filter-/ Vollwandrohr DN 50 mm entsprechend vor-Ort-Gegebenheiten; Einbau Filterkies bzw. Tondichtung.) | (Herstellung Grundwassermessstelle DN 50 in Bodenklasse 1-5; max. Tiefe: 10 m; Sondierung/Bohrung DN 100 mm; Ausbau mit Filter-/ Vollwandrohr DN 50 mm entsprechend vor-Ort-Gegebenheiten; Einbau Filterkies bzw. Tondichtung.) | |||||||||||||||
| 11.2 | Above ground installation of groundwater wells: protection with concrete pipes/stones with diameter about 40 cm, depth about 40 cm bgs and height about 50 cm above ground surface (ags); blanc pipe with lockable well cap (SEBA) up to one meter ags; space between concrete stone/pipe and well pipe shall be filled with concrete. | 1 | ea | 11.2 | Above ground installation of groundwater wells: protection with concrete pipes/stones with diameter about 40 cm, depth about 40 cm bgs and height about 50 cm above ground surface (ags); blanc pipe with lockable well cap (SEBA) up to one meter ags; space between concrete stone/pipe and well pipe shall be filled with concrete. | 1 | ea | € 0.00 | € 0.00 | |||||||
| (Oberflurausbau von Grundwassermesstellen: Anfahrschutz aus Betonrohren/-steinen mit Durchmesser ca. 40 cm, Tiefe ca. 40 cm unterflur und Hoehe ca. 50 cm ueberflur; Vollwandrohr mit abschliessbarer Seba-Kappe bis ca. 1 m u. GOK; Hohlraum zwischen Vollwandrohr und Betonrohr/-stein ist mit Beton zu vergiessen) | (Oberflurausbau von Grundwassermesstellen: Anfahrschutz aus Betonrohren/-steinen mit Durchmesser ca. 40 cm, Tiefe ca. 40 cm unterflur und Hoehe ca. 50 cm ueberflur; Vollwandrohr mit abschliessbarer Seba-Kappe bis ca. 1 m u. GOK; Hohlraum zwischen Vollwandrohr und Betonrohr/-stein ist mit Beton zu vergiessen) | |||||||||||||||
| 11.3 | Underground installation of a groundwater well cap: lockable metal street cap; diameter about 30-40 cm; blanc pipe with lockable well cap (SEBA); installation of the street cap appropriate for POV and truck traffic; space between the street cap and the surrounding pavement shall be filled with concrete. | 1 | ea | 11.3 | Underground installation of a groundwater well cap: lockable metal street cap; diameter about 30-40 cm; blanc pipe with lockable well cap (SEBA); installation of the street cap appropriate for POV and truck traffic; space between the street cap and the surrounding pavement shall be filled with concrete. | 1 | ea | € 0.00 | € 0.00 | |||||||
| (Unterflurausbau von Grundwassermesstellen: abschliessbare Metall-Strassenkappe; DN ca. 30-40 cm; Vollwandrohr mit abschliessbarer Seba-Kappe; Einbau der Strassenkappe geeignet fuer PKW und LKW-Verkehr; Hohlraum zwischen Strassenkappe und angrenzender Fahrbahn ist ist mit Beton zu vergiessen) | (Unterflurausbau von Grundwassermesstellen: abschliessbare Metall-Strassenkappe; DN ca. 30-40 cm; Vollwandrohr mit abschliessbarer Seba-Kappe; Einbau der Strassenkappe geeignet fuer PKW und LKW-Verkehr; Hohlraum zwischen Strassenkappe und angrenzender Fahrbahn ist ist mit Beton zu vergiessen) | |||||||||||||||
| 12 | Excavation and core drilling work as follows: | 12 | Excavation and core drilling work as follows: | |||||||||||||
| (Aufbruch- und Kernbohrarbeiten wie folgt:) | (Aufbruch- und Kernbohrarbeiten wie folgt:) | |||||||||||||||
| 12.1 | Interlocking pavement and blacktop, reseal pavement | 1 | each | 12.1 | Interlocking pavement and blacktop, reseal pavement | 10 | each | € 0.00 | € 0.00 | |||||||
| (Verbundsteinpflaster und Schwarzdecke, inkl. Wiederversiegelung) | (Verbundsteinpflaster und Schwarzdecke, inkl. Wiederversiegelung) | |||||||||||||||
| 12.2 | Base course (e.g. crushed stone layer under blacktop; only for manual excavation) | 1 | each | 12.2 | Base course (e.g. crushed stone layer under blacktop; only for manual excavation) | 10 | each | € 0.00 | € 0.00 | |||||||
| (Unterbau (z.B. Schotterschicht unter Schwarzdecke; nur fuer manuellen Aufbruch)) | (Unterbau (z.B. Schotterschicht unter Schwarzdecke; nur fuer manuellen Aufbruch)) | |||||||||||||||
| 12.3 | Core drilling using diamond-tipped rotary barrel, diameter > 50 mm, in pavement or wall (conrete, asphalt, brick etc.) depth: ≤ 30 cm; fill and reseal pavement or wall | 1 | each | 12.3 | Core drilling using diamond-tipped rotary barrel, diameter > 50 mm, in pavement or wall (conrete, asphalt, brick etc.) depth: ≤ 30 cm; fill and reseal pavement or wall | 10 | each | € 0.00 | € 0.00 | |||||||
| (Kernbohrung mit Diamantkernbohrgeraet, Durchmesser > 50 mm in Oberflaechenbefestigung oder Wand (Beton, Asphalt, Mauerwerk etc.) Staerke: ≤ 30 cm; inkl. Wiederverschliessen und Versiegeln) | (Kernbohrung mit Diamantkernbohrgeraet, Durchmesser > 50 mm in Oberflaechenbefestigung oder Wand (Beton, Asphalt, Mauerwerk etc.) Staerke: ≤ 30 cm; inkl. Wiederverschliessen und Versiegeln) | |||||||||||||||
| 12.4 | Core drilling using diamond-tipped rotary barrel, diameter > 50 mm, in pavement or wall (conrete, asphalt, brick etc.) depth: > 30-100 cm; fill and reseal pavement or wall | 1 | each | 12.4 | Core drilling using diamond-tipped rotary barrel, diameter > 50 mm, in pavement or wall (conrete, asphalt, brick etc.) depth: > 30-100 cm; fill and reseal pavement or wall | 5 | each | € 0.00 | € 0.00 | |||||||
| (Kernbohrung mit Diamantkernbohrgeraet, Durchmesser > 50 mm in Oberflaechenbefestigung oder Wand (Beton, Asphalt, Mauerwerk etc.) Staerke: > 30-100 cm; inkl. Wiederverschliessen und Versiegeln) | (Kernbohrung mit Diamantkernbohrgeraet, Durchmesser > 50 mm in Oberflaechenbefestigung oder Wand (Beton, Asphalt, Mauerwerk etc.) Staerke: > 30-100 cm; inkl. Wiederverschliessen und Versiegeln) | |||||||||||||||
| 13 | Surveying/Measuring | 13 | Surveying/Measuring | |||||||||||||
| Einmessung | Einmessung | |||||||||||||||
| 13.1 | Horizontal measurement of drilling points or sampling points | 1 | each | 13.1 | Horizontal measurement of drilling points or sampling points | 20 | each | € 0.00 | € 0.00 | |||||||
| (Lageeinmessung eines Bohransatzpunktes oder Probenahmepunktes) | (Lageeinmessung eines Bohransatzpunktes oder Probenahmepunktes) | |||||||||||||||
| 13.2 | Measurement of drilling points according to location and height of entry points | 1 | each | 13.2 | Measurement of drilling points according to location and height of entry points | 5 | each | € 0.00 | € 0.00 | |||||||
| (Einmessen der Bohrpunkte nach Lage und Hoehe der Bohransatzpunkte) | (Einmessen der Bohrpunkte nach Lage und Hoehe der Bohransatzpunkte) | |||||||||||||||
| 14 | Provide horizontal measurement of drilling points or sampling points in the UTM-coordinate system (WGS84) and height with GPS | 1 | each | 14 | Provide horizontal measurement of drilling points or sampling points in the UTM-coordinate system (WGS84) and height with GPS | 5 | each | € 0.00 | € 0.00 | |||||||
| (Angabe der Koordinaten fuer Lageeinmessung von Bohransatzpunkten im UTM-Koordinatensystem (WGS84) sowie der Hoehe mit GPS | (Angabe der Koordinaten fuer Lageeinmessung von Bohransatzpunkten im UTM-Koordinatensystem (WGS84) sowie der Hoehe mit GPS | |||||||||||||||
| 15 | Well development of new groundwater wells DN50 | 1 | each | 15 | Well development of new groundwater wells DN50 | 1 | each | € 0.00 | € 0.00 | |||||||
| Klarspuelen neu hergestellter Grundwassermessstellen DN50 | Klarspuelen neu hergestellter Grundwassermessstellen DN50 | |||||||||||||||
| 16 | Groundwater Sampling | 16 | Groundwater Sampling | |||||||||||||
| (Grundwasserbeprobung) | (Grundwasserbeprobung) | |||||||||||||||
| 16.1 | Sampling of groundwater monitoring wells or groundwater control shaft (pump samples) including measuring of ground water level, pumping, well development, sampling containers, all required devices and materials and documentation of sampling (diameter DN 50 - 300, depth of the wells max. 20 m bgs). | 1 | each | 16.1 | Sampling of groundwater monitoring wells or groundwater control shaft (pump samples) including measuring of ground water level, pumping, well development, sampling containers, all required devices and materials and documentation of sampling (diameter DN 50 - 300, depth of the wells max. 20 m bgs). | 15 | each | € 0.00 | € 0.00 | |||||||
| (Beprobung Grundwassermessstellen oder Grundwasserkontrollschacht (Pumpproben), einschliesslich Messung Grundwasserstand, Klarpumpen, Probenahmegefaessen, aller erforderlichen Geraete u. Materialien und Dokumentation der Probenahme; Durchmesser der Messstellen: DN 50 - 300 mm ; Tiefe der Messstellen max. 20 m u. GOK; ) | (Beprobung Grundwassermessstellen oder Grundwasserkontrollschacht (Pumpproben), einschliesslich Messung Grundwasserstand, Klarpumpen, Probenahmegefaessen, aller erforderlichen Geraete u. Materialien und Dokumentation der Probenahme; Durchmesser der Messstellen: DN 50 - 300 mm ; Tiefe der Messstellen max. 20 m u. GOK; ) | |||||||||||||||
| 16.2 | Sampling of groundwater monitoring wells (pump samples) for PFT analyses including measuring of ground water level, pumping, well development, sampling containers, all required devices and materials and documentation of sampling (diameter DN 50 - 300, depth of the wells max. 20 m bgs). | 1 | each | 16.2 | Sampling of groundwater monitoring wells (pump samples) for PFT analyses including measuring of ground water level, pumping, well development, sampling containers, all required devices and materials and documentation of sampling (diameter DN 50 - 300, depth of the wells max. 20 m bgs). | 5 | each | € 0.00 | € 0.00 | |||||||
| (Beprobung Grundwassermessstellen (Pumpproben) fuer PFT-Analytik , einschliesslich Messung Grundwasserstand, Klarpumpen, Probenahmegefaessen, aller erforderlichen Geraete u. Materialien und Dokumentation der Probenahme; Durchmesser der Messstellen: DN 50 - 300 mm ; Tiefe der Messstellen max. 20 m u. GOK; ) | (Beprobung Grundwassermessstellen (Pumpproben) fuer PFT-Analytik , einschliesslich Messung Grundwasserstand, Klarpumpen, Probenahmegefaessen, aller erforderlichen Geraete u. Materialien und Dokumentation der Probenahme; Durchmesser der Messstellen: DN 50 - 300 mm ; Tiefe der Messstellen max. 20 m u. GOK; ) | |||||||||||||||
| 16.3 | Sampling and testing of drinking water for legionella according to Drinkwater Ordinance (including laboratory analyses) | 1 | each | 16.3 | Sampling and testing of drinking water for legionella according to Drinkwater Ordinance (including laboratory analyses) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Beprobung und Untersuchung von Trinkwasser auf Legionellen nach Trinkwasserverordnung (inklusive Laborauswertung)) | (Beprobung und Untersuchung von Trinkwasser auf Legionellen nach Trinkwasserverordnung (inklusive Laborauswertung)) | |||||||||||||||
| 17 | Analysis of soil vapor samples | 17 | Analysis of soil vapor samples | |||||||||||||
| (Analyse von Bodenluftproben) | (Analyse von Bodenluftproben) | |||||||||||||||
| 17.1 | CHC (mg/m3) | 1 | each | 17.1 | CHC (mg/m3) | 20 | each | € 0.00 | € 0.00 | |||||||
| (LHKW (mg/m3)) | (LHKW (mg/m3)) | |||||||||||||||
| 17.2 | BTX/AHC (mg/m3) | 1 | each | 17.2 | BTX/AHC (mg/m3) | 20 | each | € 0.00 | € 0.00 | |||||||
| (BTEX/AKW (mg/m3)) | (BTEX/AKW (mg/m3)) | |||||||||||||||
| 17.3 | MTBE (mg/m3) | 1 | each | 17.3 | MTBE (mg/m3) | 5 | each | € 0.00 | € 0.00 | |||||||
| (MTBE (mg/m3)) | (MTBE (mg/m3)) | |||||||||||||||
| 18 | Analysis of soil and solid matter samples | 18 | Analysis of soil and solid matter samples | |||||||||||||
| (Analyse von Boden- und Feststoffproben) | (Analyse von Boden- und Feststoffproben) | |||||||||||||||
| 18.1 | Hydrocarbons (TPH-GC) according to ISO 16703 (mg/kg) | 1 | each | 18.1 | Hydrocarbons (TPH-GC) according to ISO 16703 (mg/kg) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Kohlenwasserstoffe (KW-GC) nach ISO 16703 (mg/kg)) | (Kohlenwasserstoffe (KW-GC) nach ISO 16703 (mg/kg)) | |||||||||||||||
| 18.2 | BTX/AHC (mg/kg) | 1 | each | 18.2 | BTX/AHC (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (BTEX/AKW (mg/kg)) | (BTEX/AKW (mg/kg)) | |||||||||||||||
| 18.3 | CHC (mg/kg) | 1 | each | 18.3 | CHC (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Gesamt LHKW (mg/kg)) | (Gesamt LHKW (mg/kg)) | |||||||||||||||
| 18.4 | Preparation of samples according to DIN 38414-S7 (Koenigswasserextrakt) | 1 | each | 18.4 | Preparation of samples according to DIN 38414-S7 (Koenigswasserextrakt) | 20 | each | € 0.00 | € 0.00 | |||||||
| Probenvorbereitung nach DIN 38414-S7 (Koenigswasserextract) | Probenvorbereitung nach DIN 38414-S7 (Koenigswasserextract) | |||||||||||||||
| 18.5 | Lead (mg/kg) | 1 | each | 18.5 | Lead (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Blei (mg/kg)) | (Blei (mg/kg)) | |||||||||||||||
| 18.6 | Cadmium (mg/kg). | 1 | each | 18.6 | Cadmium (mg/kg). | 5 | each | € 0.00 | € 0.00 | |||||||
| (Cadmium (mg/kg)) | (Cadmium (mg/kg)) | |||||||||||||||
| 18.7 | Arsenic (mg/kg) | 1 | each | 18.7 | Arsenic (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Arsen (mg/kg)) | (Arsen (mg/kg)) | |||||||||||||||
| 18.8 | Heavy metals (arsen, lead, cadmium, total chromium, copper, nickel, mercury, zinc) (mg/kg) | 1 | each | 18.8 | Heavy metals (arsen, lead, cadmium, total chromium, copper, nickel, mercury, zinc) (mg/kg) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Schwermetalle (Arsen, Blei, Cadmium, Chrom-gesamt, Kupfer, Nickel, Quecksilber, Zink) (mg/kg)) | (Schwermetalle (Arsen, Blei, Cadmium, Chrom-gesamt, Kupfer, Nickel, Quecksilber, Zink) (mg/kg)) | |||||||||||||||
| 18.9 | PAH (16 individual substances according EPA-List mg/kg)) | 1 | each | 18.9 | PAH (16 individual substances according EPA-List mg/kg)) | 20 | each | € 0.00 | € 0.00 | |||||||
| (PAK (16 Einzelsubstanzen nach EPA-Liste mg/kg)) | (PAK (16 Einzelsubstanzen nach EPA-Liste mg/kg)) | |||||||||||||||
| 18.10 | EOX in solid material according to DIN 38409 H8 (mg/kg). | 1 | each | 18.10 | EOX in solid material according to DIN 38409 H8 (mg/kg). | 5 | each | € 0.00 | € 0.00 | |||||||
| (EOX in Feststoffen nach DIN 38409 H8 (mg/kg)) | (EOX in Feststoffen nach DIN 38409 H8 (mg/kg)) | |||||||||||||||
| 18.11 | Analysis of wood in accordance with the Ordinance for disposal of waste wood" (As, Pb, Cd, Cr, Cu, Hg, Cl, F, PCP, PCB mg/kg) | 1 | each | 18.11 | Analysis of wood in accordance with the Ordinance for disposal of waste wood" (As, Pb, Cd, Cr, Cu, Hg, Cl, F, PCP, PCB mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Analyse von Holz gemaess Altholzverordnung (As, Pb, Cd, Cr, Cu, Hg, Cl, F, PCP, PCB mg/kg)) | (Analyse von Holz gemaess Altholzverordnung (As, Pb, Cd, Cr, Cu, Hg, Cl, F, PCP, PCB mg/kg)) | |||||||||||||||
| 18.12 | Polychlorobiphenyl PCB (mg/kg) | 1 | each | 18.12 | Polychlorobiphenyl PCB (mg/kg) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Polychlorierte Biphenyle PCB (mg/kg)) | (Polychlorierte Biphenyle PCB (mg/kg)) | |||||||||||||||
| 18.13 | Pentachlorophenole PCP (mg/kg) | 1 | each | 18.13 | Pentachlorophenole PCP (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Pentachlorphenol PCP (mg/kg)) | (Pentachlorphenol PCP (mg/kg)) | |||||||||||||||
| 18.14 | Dichlorodiphenyltrichlorethene DDT (mg/kg) | 1 | each | 18.14 | Dichlorodiphenyltrichlorethene DDT (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| (Dichlordiphenyltrichlorethan DDT (mg/kg)) | (Dichlordiphenyltrichlorethan DDT (mg/kg)) | |||||||||||||||
| 18.15 | Lindan (mg/kg) | 1 | each | 18.15 | Lindan (mg/kg) | 5 | each | € 0.00 | € 0.00 | |||||||
| Lindane (mg/kg)) | Lindane (mg/kg)) | |||||||||||||||
| 18.16 | PFC in accordance with PFAS Guidance of the Federal Environmental Ministery of Germany | 1 | each | 18.16 | PFC in accordance with PFAS Guidance of the Federal Environmental Ministery of Germany | 10 | each | € 0.00 | € 0.00 | |||||||
| (PFC gemäß PFAS-Leitfaden des Bundes-Umweltministeriums) | (PFC gemäß PFAS-Leitfaden des Bundes-Umweltministeriums) | |||||||||||||||
| 19 | Leachate tests | 19 | Leachate tests | |||||||||||||
| (Eluatuntersuchungen) | (Eluatuntersuchungen) | |||||||||||||||
| 19.1 | Leachate test for anorganic contaminants according BBodSchV | 1 | each | 19.1 | Leachate test for anorganic contaminants according BBodSchV | 20 | each | € 0.00 | € 0.00 | |||||||
| (Bodensaettigungsextract nach Bundesbodenschutzverordnug (BBodSchV)) | (Bodensaettigungsextract nach Bundesbodenschutzverordnug (BBodSchV)) | |||||||||||||||
| 19.2 | Preparation of samples according to DIN 38414, part 4 (Preparation of leachate) | 1 | each | 19.2 | Preparation of samples according to DIN 38414, part 4 (Preparation of leachate) | 10 | each | € 0.00 | € 0.00 | |||||||
| (Probenvorbereitung nach DIN 38414, Teil 4 (S4-Eluat-Herstellung)) | (Probenvorbereitung nach DIN 38414, Teil 4 (S4-Eluat-Herstellung)) | |||||||||||||||
| 19.3 | Leachate test for organic contaminants according BBodSchV | 1 | each | 19.3 | Leachate test for organic contaminants according BBodSchV | 10 | each | € 0.00 | € 0.00 | |||||||
| (Bodensaeulenversuch nach (BBodSchV)) | (Bodensaeulenversuch nach (BBodSchV)) | |||||||||||||||
| 19.4 | TPH (GC) according to ISO 9377-2 (mg/l) | 1 | each | 19.4 | TPH (GC) according to ISO 9377-2 (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Kohlenwasserstoffe (GC) nach ISO 9377-2 (mg/l)) | (Kohlenwasserstoffe (GC) nach ISO 9377-2 (mg/l)) | |||||||||||||||
| 19.5 | Heavy metals (arsen, lead, cadmium, total chromium, copper, nikel, mercury, zinc) (mg/l) | 1 | each | 19.5 | Heavy metals (arsen, lead, cadmium, total chromium, copper, nikel, mercury, zinc) (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Schwermetalle (Arsen, Blei, Cadmium, Chrom-gesamt, Kupfer, Nickel, Quecksilber, Zink) (mg/l) | (Schwermetalle (Arsen, Blei, Cadmium, Chrom-gesamt, Kupfer, Nickel, Quecksilber, Zink) (mg/l) | |||||||||||||||
| 19.6 | Polycyclic aromatic Hydrocarbons (PAH) n. EPA (mg/l) | 1 | each | 19.6 | Polycyclic aromatic Hydrocarbons (PAH) n. EPA (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Polyzyklische aromatische Kohlenwasserstoffe (PAK) n. EPA (mg/l)) | (Polyzyklische aromatische Kohlenwasserstoffe (PAK) n. EPA (mg/l)) | |||||||||||||||
| 19.7 | PFC in accordance with PFAS Guidance of the Federal Environmental Ministery of Germany | 1 | each | 19.7 | PFC in accordance with PFAS Guidance of the Federal Environmental Ministery of Germany | 10 | each | € 0.00 | € 0.00 | |||||||
| (PFC gemäß PFAS-Leitfaden des Bundes-Umweltministeriums) | (PFC gemäß PFAS-Leitfaden des Bundes-Umweltministeriums) | |||||||||||||||
| 20 | Analysis of groundwater samples | 20 | Analysis of groundwater samples | |||||||||||||
| (Analyse von Grundwasserproben) | (Analyse von Grundwasserproben) | |||||||||||||||
| 20.1 | TPH (GC) according to ISO 9377-2 (mg/l) | 1 | each | 20.1 | TPH (GC) according to ISO 9377-2 (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Kohlenwasserstoffe (GC) nach ISO 9377-2 (mg/l)) | (Kohlenwasserstoffe (GC) nach ISO 9377-2 (mg/l)) | |||||||||||||||
| 20.2 | BTX/AHC (mg/l) | 1 | each | 20.2 | BTX/AHC (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (BTEX/AKW (mg/l)) | (BTEX/AKW (mg/l)) | |||||||||||||||
| 20.3 | MTBE (mg/l) | 1 | each | 20.3 | MTBE (mg/l) | 5 | each | € 0.00 | € 0.00 | |||||||
| (MTBE (mg/l) | (MTBE (mg/l) | |||||||||||||||
| 20.4 | CHC/TOX, total (mg/l) | 1 | each | 20.4 | CHC/TOX, total (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Gesamt LHKW (mg/l)) | (Gesamt LHKW (mg/l)) | |||||||||||||||
| 20.5 | Heavy metals (arsen, lead, cadmium, total chromium, copper, nikel, mercury, zinc) (mg/l) | 1 | each | 20.5 | Heavy metals (arsen, lead, cadmium, total chromium, copper, nikel, mercury, zinc) (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Schwermetalle (Arsen, Blei, Cadmium, Chrom-gesamt, Kupfer, Nickel, Quecksilber, Zink) (mg/l)) | (Schwermetalle (Arsen, Blei, Cadmium, Chrom-gesamt, Kupfer, Nickel, Quecksilber, Zink) (mg/l)) | |||||||||||||||
| 20.6 | Polycyclic aromatic Hydrocarbons (PAH) n. EPA (mg/l) | 1 | each | 20.6 | Polycyclic aromatic Hydrocarbons (PAH) n. EPA (mg/l) | 20 | each | € 0.00 | € 0.00 | |||||||
| (Polyzyklische aromatische Kohlenwasserstoffe (PAK) n. EPA (mg/l)) | (Polyzyklische aromatische Kohlenwasserstoffe (PAK) n. EPA (mg/l)) | |||||||||||||||
| 20.7 | PFC in accordance with PFAS Guidance of the Federal Environmental Ministery of Germany | 1 | each | 20.7 | PFC in accordance with PFAS Guidance of the Federal Environmental Ministery of Germany | 10 | each | € 0.00 | € 0.00 | |||||||
| (PFC gemäß PFAS-Leitfaden des Bundes-Umweltministeriums) | (PFC gemäß PFAS-Leitfaden des Bundes-Umweltministeriums) | |||||||||||||||
| 21 | Soil analysis according to LAGA TR Boden, Nov 2004, Table II 1.2-4 and 1.2-5, parameters for solid material: HC, EOX, 16 PAH, TOC, BTEX, LHKW, CN, PCB, As, Pb, Cd, Cr(total), Cu, Ni, Hg, Tl, Zn, (mg/kg), parameters for eluate: pH, specific conductivity, Cl, SO4, CN(total), phenol index, As, Pb, Cd, Cr(total), Cu, Ni, Hg, Tl, Zn | 1 | each | 21 | Soil analysis according to LAGA TR Boden, Nov 2004, Table II 1.2-4 and 1.2-5, parameters for solid material: HC, EOX, 16 PAH, TOC, BTEX, LHKW, CN, PCB, As, Pb, Cd, Cr(total), Cu, Ni, Hg, Tl, Zn, (mg/kg), parameters for eluate: pH, specific conductivity, Cl, SO4, CN(total), phenol index, As, Pb, Cd, Cr(total), Cu, Ni, Hg, Tl, Zn | 5 | each | € 0.00 | € 0.00 | |||||||
| (Bodenuntersuchung nach LAGA TR Boden, Nov 2004, Tabelle II.1.2.-4 and 1.2-5, Parameter im Feststoff: KW, EOX, 16 PAK, TOC, BTEX, LHKW, CN, PCB, As, Pb, Cd, Cr(ges), Cu, Ni, Hg, Tl, Zn, (mg/kg), Parameter aus dem Eluat: pH, Leitfaehigkeit, Cl, SO4, CN(ges), Phenolindex, As, Pb, Cd, Cr(ges), Cu, Ni, Hg, Tl, Zn (mg/l)) | (Bodenuntersuchung nach LAGA TR Boden, Nov 2004, Tabelle II.1.2.-4 and 1.2-5, Parameter im Feststoff: KW, EOX, 16 PAK, TOC, BTEX, LHKW, CN, PCB, As, Pb, Cd, Cr(ges), Cu, Ni, Hg, Tl, Zn, (mg/kg), Parameter aus dem Eluat: pH, Leitfaehigkeit, Cl, SO4, CN(ges), Phenolindex, As, Pb, Cd, Cr(ges), Cu, Ni, Hg, Tl, Zn (mg/l)) | |||||||||||||||
| 22 | Analysis of mixed samples (debris) accordinging LAGA 20 Nov. 1997, Table II 1.4.1, 20 parameters for solid material: appearance, color, odor, As, Pb, Cd, Cr, Cu, Ni, Hg, Zn, HC, PAK, EOX (mg/kg) and parameters for eluate (color, deterioration, odor, pH value, conductivity, Cl, SO4, As, Pb, Cd, Cr, Cu, Ni, Hg, Zn, phenol index | 1 | each | 22 | Analysis of mixed samples (debris) accordinging LAGA 20 Nov. 1997, Table II 1.4.1, 20 parameters for solid material: appearance, color, odor, As, Pb, Cd, Cr, Cu, Ni, Hg, Zn, HC, PAK, EOX (mg/kg) and parameters for eluate (color, deterioration, odor, pH value, conductivity, Cl, SO4, As, Pb, Cd, Cr, Cu, Ni, Hg, Zn, phenol index | 5 | each | € 0.00 | € 0.00 | |||||||
| (Analyse von Mischproben (Bauschutt) nach LAGA 20 Nov. 1997 auf Tabelle II 1.4.1, 20 Parameter im Feststoff: (Aussehen, Farbe, Geruch, Az, Pb, Cd, Cr, Cu, Ni, Hg, Zn, KW, PAK, EOX (mg/kg) sowie Parameter im Eluat (Farbe, Truebung, Geruch, pH, el. Leitfaehigkeit, Cl, SO4, As, Pb, Cd, Cr, Cu, Ni, Hg, Zn, Phenolindex) | (Analyse von Mischproben (Bauschutt) nach LAGA 20 Nov. 1997 auf Tabelle II 1.4.1, 20 Parameter im Feststoff: (Aussehen, Farbe, Geruch, Az, Pb, Cd, Cr, Cu, Ni, Hg, Zn, KW, PAK, EOX (mg/kg) sowie Parameter im Eluat (Farbe, Truebung, Geruch, pH, el. Leitfaehigkeit, Cl, SO4, As, Pb, Cd, Cr, Cu, Ni, Hg, Zn, Phenolindex) | |||||||||||||||
| 23 | Soil analysis according to Landfill Ordinance (DepV) | 23 | Soil analysis according to Landfill Ordinance (DepV) | |||||||||||||
| (Bodenuntersuchungen nach Deponieverordnung (DepV)) | (Bodenuntersuchungen nach Deponieverordnung (DepV)) | |||||||||||||||
| 23.1 | Soil analysis according to DepV, Appendix 3, Table 2: All Parameters according to DepV, appendix 3, table 2 without number 3.18b (Antimon Co-content). | 1 | each | 23.1 | Soil analysis according to DepV, Appendix 3, Table 2: All Parameters according to DepV, appendix 3, table 2 without number 3.18b (Antimon Co-content). | 5 | each | € 0.00 | € 0.00 | |||||||
| (Bodenuntersuchung nach DepV, Anhang 3, Tabelle 2: Alle Parameter nach DepV, Anhang 3, Tabelle 2 ohne Nr. 3.18b (Antimon Co-Wert)) | (Bodenuntersuchung nach DepV, Anhang 3, Tabelle 2: Alle Parameter nach DepV, Anhang 3, Tabelle 2 ohne Nr. 3.18b (Antimon Co-Wert)) | |||||||||||||||
| 23.2 | Analysis of AT4 and calorific value (H0) and biodegradability (AT4) at soil samples | 1 | each | 23.2 | Analysis of AT4 and calorific value (H0) and biodegradability (AT4) at soil samples | 2 | each | € 0.00 | € 0.00 | |||||||
| (Bestimmung des biologischen Abbaurate AT4 und des Brennwertes (HO) n. DepV an Bodenproben) | (Bestimmung des biologischen Abbaurate AT4 und des Brennwertes (HO) n. DepV an Bodenproben) | |||||||||||||||
| 24 | Short reports | 24 | Short reports | |||||||||||||
| (Kurzbberichte) | (Kurzbberichte) | |||||||||||||||
| 24.1 | Evaluation of analysis data and preparation of letter reports for waste classification or assessment of contaminated materials (2 hardcopies +1 electronic copy - German) | 1 | each | 24.1 | Evaluation of analysis data and preparation of letter reports for waste classification or assessment of contaminated materials (2 hardcopies +1 electronic copy - German) | 3 | each | € 0.00 | € 0.00 | |||||||
| (Auswertung der Analysendaten und Anfertigung von Kurzstellungnahme fuer die Abfalldeklaration oder die Bewertung von von kontaminierten Materialen (2-fache Ausfertigung + 1 digitale Ausfertigung- deutsch) | (Auswertung der Analysendaten und Anfertigung von Kurzstellungnahme fuer die Abfalldeklaration oder die Bewertung von von kontaminierten Materialen (2-fache Ausfertigung + 1 digitale Ausfertigung- deutsch) | |||||||||||||||
| 24.2 | Evaluation of analysis data and preparation of short reports for survey and investigation of contaminated sites or contaminated construction material (2 hardcopies +1 electronic copy - German) | 1 | each | 24.2 | Evaluation of analysis data and preparation of short reports for survey and investigation of contaminated sites or contaminated construction material (2 hardcopies +1 electronic copy - German) | 6 | each | € 0.00 | € 0.00 | |||||||
| (Auswertung der Analysendaten und Anfertigung von Kurzgutachten fuer die Begehung und Untersuchung von Altlasten oder von Gebaeudeschadstoffen (2-fache Ausfertigung + 1 digitale Ausfertigung- deutsch) | (Auswertung der Analysendaten und Anfertigung von Kurzgutachten fuer die Begehung und Untersuchung von Altlasten oder von Gebaeudeschadstoffen (2-fache Ausfertigung + 1 digitale Ausfertigung- deutsch) | |||||||||||||||
| 24.3 | Provision of reports for investigation of contaminated sites or contaminated construction material (2 copies in German and 2 copies of the summary in English and in computerized form ms word/excel/.jpg-pictures) to include site description (utilization, geology, hydrogeology, etc.) with site plans and photographs; evaluation of site conditions and analytical results with assessment of site conditions in respect of limits and guidelines ( BBodSchG, BBodSchV, ALEX, LAGA, TRGS 519 etc.); description and maping of drilling points, drilling profile, analysis data, etc., in site plans, drawings, tabels and diagrams; risk evaluation, remedial action, and if necessary, recommendations for further investigation. This item includes obtaining all necessary supply line plans and incorporating them into existing documents as well as a site inspection. | 1 | each | 24.3 | Provision of reports for investigation of contaminated sites or contaminated construction material (2 copies in German and 2 copies of the summary in English and in computerized form ms word/excel/.jpg-pictures) to include site description (utilization, geology, hydrogeology, etc.) with site plans and photographs; evaluation of site conditions and analytical results with assessment of site conditions in respect of limits and guidelines ( BBodSchG, BBodSchV, ALEX, LAGA, TRGS 519 etc.); description and maping of drilling points, drilling profile, analysis data, etc., in site plans, drawings, tabels and diagrams; risk evaluation, remedial action, and if necessary, recommendations for further investigation. This item includes obtaining all necessary supply line plans and incorporating them into existing documents as well as a site inspection. | 1 | each | € 0.00 | € 0.00 | |||||||
| (Anfertigen von Gutachten fuer die Untersuchung von Altlasten oder von Gebaeudeschadstoffen (2 Kopien auf Deutsch u. 2 Kopien der Zusammenfassung auf Englisch und in digitaler form ms word/excel/.jpg-Bilder), einschliesslich Standortbeschreibung (Nutzung, Geologie, Hydrogeologie) mit Lageplan und Photographien; Bewertung der Standortgegebenheiten und Analysen unter Beruecksichtigung von Grenz- und Richtwerten (BBodSchG, BBodSchV, ALEX, LAGA, TRGS 519 etc.). Darstellung der Bohrpunkte, Sondierprofile, Analysendaten usw in Lagerplaenen, Zeichnungen, Tabellen und Diagrammen; Gefaehrdungsabschaetzung, Sanierungsvorschlaege und falls erforderlich, Emfehlungen fuer weitere Untersuchungen. Diese Position beinhaltetdie Beschaffung aller notwendigen Leitungsplaene, die Einarbeitung in vorhandene Unterlagen und Besichtigung der Standorte.) | (Anfertigen von Gutachten fuer die Untersuchung von Altlasten oder von Gebaeudeschadstoffen (2 Kopien auf Deutsch u. 2 Kopien der Zusammenfassung auf Englisch und in digitaler form ms word/excel/.jpg-Bilder), einschliesslich Standortbeschreibung (Nutzung, Geologie, Hydrogeologie) mit Lageplan und Photographien; Bewertung der Standortgegebenheiten und Analysen unter Beruecksichtigung von Grenz- und Richtwerten (BBodSchG, BBodSchV, ALEX, LAGA, TRGS 519 etc.). Darstellung der Bohrpunkte, Sondierprofile, Analysendaten usw in Lagerplaenen, Zeichnungen, Tabellen und Diagrammen; Gefaehrdungsabschaetzung, Sanierungsvorschlaege und falls erforderlich, Emfehlungen fuer weitere Untersuchungen. Diese Position beinhaltetdie Beschaffung aller notwendigen Leitungsplaene, die Einarbeitung in vorhandene Unterlagen und Besichtigung der Standorte.) | |||||||||||||||
| 25 | Consulting services for additional meetings, site inspections and site investigation | 1 | hour | 25 | Consulting services for additional meetings, site inspections and site investigation | 4 | hour | € 0.00 | € 0.00 | |||||||
| (Beratung zu gesonderten Terminen, Ortsbegehungen sowie Standortrecherchen) | (Beratung zu gesonderten Terminen, Ortsbegehungen sowie Standortrecherchen) | |||||||||||||||
| 26 | Extra cost for emergency work. Sampling and analyses must be started within 8 working hours. | 1 | each | 26 | Extra cost for emergency work. Sampling and analyses must be started within 8 working hours. | 1 | each | € 0.00 | € 0.00 | |||||||
| (Aufpreis fuer Dringlichkeitsleistungen. Probenahme und Analysen muessen innerhalb von 8 Arbeitsstunden begonnen werden.) | (Aufpreis fuer Dringlichkeitsleistungen. Probenahme und Analysen muessen innerhalb von 8 Arbeitsstunden begonnen werden.) | |||||||||||||||
| 27 | Instruction and supervision of various field work/sampling and surveys by an engineer, geologist or scientist | 1 | each | 27 | Instruction and supervision of various field work/sampling and surveys by an engineer, geologist or scientist | 5 | each | € 0.00 | € 0.00 | |||||||
| (Anleitung und Ueberwachung verschiedener Feldarbeiten/ Probenahmen und Begehungen durch einen Ingenieur, Geologen oder Naturwissenschaftler) | (Anleitung und Ueberwachung verschiedener Feldarbeiten/ Probenahmen und Begehungen durch einen Ingenieur, Geologen oder Naturwissenschaftler) | |||||||||||||||
| 28 | Instruction and supervision of soil investigationson-site by an engineer, geologist or scientist; This item includes obtaining all necessary supply line plans (digging permit) and incorporating them into existing documents as well as a site inspection, coordination of UXO inspections and all other required coordination work with USAG organizations or site occupants. | 1 | each | 28 | Instruction and supervision of soil investigationson-site by an engineer, geologist or scientist; This item includes obtaining all necessary supply line plans (digging permit) and incorporating them into existing documents as well as a site inspection, coordination of UXO inspections and all other required coordination work with USAG organizations or site occupants. | 5 | each | € 0.00 | € 0.00 | |||||||
| (Anleitung und ueberwachung von Bodenuntersuchungen vor Ort durch einen Ingenieur, Geologen oder Naturwissenschaftler; Diese Position beinhaltet die Beschaffung aller notwendigen Leitungsplaene (Grabgenehmigung), die Einarbeitung in vorhandene Unterlagen und Besichtigung der Standorte sowie die Koordination der UXO-Ueberpruefungen und die alle erforderlichen Abstimmungen mit USAG Organisationen und Flaechennutzern.) | (Anleitung und ueberwachung von Bodenuntersuchungen vor Ort durch einen Ingenieur, Geologen oder Naturwissenschaftler; Diese Position beinhaltet die Beschaffung aller notwendigen Leitungsplaene (Grabgenehmigung), die Einarbeitung in vorhandene Unterlagen und Besichtigung der Standorte sowie die Koordination der UXO-Ueberpruefungen und die alle erforderlichen Abstimmungen mit USAG Organisationen und Flaechennutzern.) | |||||||||||||||
| 29 | Hourly rates | 29 | Hourly rates | |||||||||||||
| (Stundensaetze) | (Stundensaetze) | |||||||||||||||
| 29.1 | On-site inspection of potential boring locations for UXO by an pyrotechnician/certified expert according to Paragraph 20 SprengG and a company according to Paragraph 7 SprengG | 1 | hrs | 29.1 | On-site inspection of potential boring locations for UXO by an pyrotechnician/certified expert according to Paragraph 20 SprengG and a company according to Paragraph 7 SprengG | hrs | € 0.00 | € 0.00 | ||||||||
| (Vor-Ort Pruefung von Bohransatzpunkten auf UXO (Blindgaenger) durch einen Feuerwerker/Befaehigten nach Paragraph 20 SprengG und einer Firma nach Paragraph 7 SprengG) | (Vor-Ort Pruefung von Bohransatzpunkten auf UXO (Blindgaenger) durch einen Feuerwerker/Befaehigten nach Paragraph 20 SprengG und einer Firma nach Paragraph 7 SprengG) | |||||||||||||||
| 29.2 | Hourly rates scientific employee (e.g. engineer, scientist or geologist) | 1 | hrs | 29.2 | Hourly rates scientific employee (e.g. engineer, scientist or geologist) | hrs | € 0.00 | € 0.00 | ||||||||
| (Stundensatz wissenschaftlicher Mitarbeiter (z.B. Ingenieur, Naturwissenschaftler oder Geologe)) | (Stundensatz wissenschaftlicher Mitarbeiter (z.B. Ingenieur, Naturwissenschaftler oder Geologe)) | |||||||||||||||
| 29.3 | Hourly rates field troop | 1 | hrs | 29.3 | Hourly rates field troop | hrs | € 0.00 | € 0.00 | ||||||||
| (Stundensatz Feldarbeitstrupp) | (Stundensatz Feldarbeitstrupp) |
&C1. Cost Estimate Soil / Building Structure Testing and Soil Investigations &CPage &P/&N&R&9&F
File details come from the government source that posted it. Updated .