Amendment 0002 to SeaPort-NxG Task Order Solicitation N6449826R3107

This document is Amendment 0002 (effective June 11, 2026) to a competitive Naval Surface Warfare Center Philadelphia Division (NSWCPD) task order solicitation for engineering and technical support services under the SeaPort-NxG indefinite delivery indefinite quantity (IDIQ) contract vehicle. The task order is restricted to SeaPort MAC holders only and is not a small business set-aside. The requirement supports NSWCPD Code 71 Land Based Engineering Sites (LBES) and Land Based Test Sites (LBTS) programs with an estimated 305,900 total labor hours across five years (base year plus four option years) if all options are exercised. The estimated award date is October 30, 2026, with performance commencing the same date.

The solicitation requires comprehensive engineering, technical, programmatic, logistical, and systems support across multiple disciplines including electrical power systems, propulsion motors, machinery shafting, HVAC systems, piping systems, and control networks. Key deliverables include engineering/technical reports, test procedures, vibration analysis per MIL-STD-167, configuration control documentation, Integrated Master Schedules using Oracle Primavera P6, risk management reporting, life cycle support documentation, training curricula, and financial/program management support. The base year labor requirement is 61,180 hours (with 2,100 government-site overtime hours and 1,000 contractor-site overtime hours); estimated Other Direct Costs (ODCs) are $83,556.68 for the base year. Proposals are valid for 180 calendar days and must demonstrate 40 percent small business participation. Key personnel include a Program/Project Manager II and Integrated Master Scheduler II. A Confidential security clearance and Facility Security Clearance are required; Cybersecurity Maturity Model Certification (CMMC) Level 2 Self-assessment is required for awards on or before November 9, 2026, with CMMC Level 2 C3PAO required for awards after that date. Amendment 0002 clarified conflicting information regarding small business participation (40 percent), proposal validity (180 days), fee table labor hours (61,180), ODC amounts ($83,556.68), education requirements for Analyst Operations III positions, Management and Support labor category qualifications, and installation analyst qualifications.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section A - Solicitation/Contract Form

The following changes have been made:

Miscellaneous text in this section has been modified to:

This requirement is being solicited only to Seaport MAC Holders. Any proposals submitted from Non-Seaport MAC Holders will not be considered for award.

Specify any location requiremetns upfront, in the first two (2) sentences, to enable offerors to isolate opportunities fitting both their corporate experience and their physical location.

This is a competitive procurement. If the solicitation should result in a single offer the Government reserves the right to re-solicit this procurement in order to enhance competition.

Based on the results of the sources sought notice published on 14 April 2025 in Seaport, in concurrence the NSWCPD Deputy of Small Business this procurement is not a small business set-aside.

Q&A as of 10 June 2026:

1. In what volume and section should offerors present Attachment_03__List_of_Key_Personnel?

Answer: Attachment 03 should be provided in Volume I.

2. Page 112 of 117 - L-216-H001 (d) says the small business participation requirement is 40%. However, page 113 of 117 duplicates this Clause and states the small business participation requirement is 30%-40%. Would the Government please confirm the minimum small business requirement is 30%?

Answer: See Amendment 0002. The small business participation requirement is 40%. The duplicative clause has been deleted.

3. Page 112 of 117 - L-216-H001 (f) says proposals shall be valid for a period of 180 days. However, page 113 of 117 duplicates this Clause and states proposals shall be valid for 60 calendar days. Which one prevails?

Answer: See Amendment 0002. Proposals shall be valid for a period of 180 days. Conflicting information has been corrected and the duplicative clause has been deleted.

4. RFP Page 106 of 117, states: "(b)(1) Cybersecurity Maturity Model Certification (CMMC) level. The CMMC level required by this solicitation is:

____ [Contracting Officer insert: CMMC Level 1 (Self); CMMC Level 2 (Self); CMMC Level 2 (C3PAO); or CMMC Level 3 (DIBCAC)]. This CMMC level, or higher (see 32 CFR part 170), is required prior to award for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract." This fill-in has not been completed by the Contracting Officer. Would the Government please confirm that CMMC Level 2 (Self) is required at the time of award?

Answer: See Amendment 0002. CMMC requirements have been clarified. CMMC Level 2 (Self) is required for awards and options awarded on or before 09 November 2026; CMMC Level 2 (C3PAO) is required for awards and options awarded on or after 10 November 2026.

5. RFP page 99 of 117, Section L, 3.1.1, states: "Offeror shall describe its specific understanding, capability, experience, and technical approach with regards to the following requirements: Section C, Paragraphs 3.1 (specific) and how it relates to Land Based Test Sites." Can the Government please clarify what "3.1 (specific)" means/entails? Are offerors being asked to write to all of SOW 3.1 (including all 26 sub-tasks/sections)? If so, why does Section L call out "3.1.2.6" as the next SOW paragraph that offerors are to address in their technical response, as that would already be covered under 3.1.?

Answer: Section 3.1 specifically refers to the language contained in SOW paragraph 3.1; "The contractor shall provide engineering and technical support to ensure the LBES/LBTS Programs are able to maintain the overall schedule and meet testing requirements." Additionally, the Offeror should provide a response specific to SOW paragraph 3.1.2.6.

6. Page 100 of 117: RFP Section L, 3.2 instructs offerors to present past performance "that demonstrates experience relevant to the solicitation's PWS /SOW." Should offeror past performance address/cover the full PWS/SOW? Or should offeror past performance only address/cover the sampling of SOW tasks called out in L.3.1.1? In other words, will offeror past performance references be evaluated based on coverage of the full SOW, or just the sampling of SOW tasks called out in L.3.1.1?

Answer: Past Performance should demonstrate experience relevant to the full SOW. The tasks identified in L.3.1.1 are specific to Element A - Technical Approach.

N6449826R31070002

7. Attachment 04 - Staffing Plan: With regard to Column L, "% of Total Time Dedicated to the Contract," please confirm this value should be calculated based on the Base Year hours proposed (Column G)?

Answer: Column L shall indicate the percentage of each employee's overall time dedicated to the Contract. For some requirements, certain Contractor personnel may split time across multiple unrelated contracts.

8. Attachment 04 - Staffing Plan: How should offerors factor OT hours into the formula for Column L, "% of Total Time Dedicated to the Contract"?

Will percentages of greater than 100% be acceptable for labor categories that include OT?

Answer: The column should be calculated based on the employee's total time. The percentage cannot exceed 100%.

9. Attachment 04 - Staffing Plan: How should offerors present OT hours in the Excel spreadsheet? Should we add/combine OT hours with the straight hours? Or should offerors present OT hours in a separate row or column?

Answer: Hours should be broken out in separate rows for Straight Time (ST) and Overtime (OT).

10. Attachment 04 - Staffing Plan: The "NOTES" section at the bottom of the Staffing Plan template instructs offerors to sort first by "Task Area" (Column E) and then by "Labor Category" (Column C). Is this a mandatory instruction? Would it be easier for evaluators to review the staffing plan if sorted first by "Labor Category" (Column C)?

Answer: All offerors should follow the instructions provided within Attachment 04 - Staffing Plan.

11. On page 21 of 117, the Labor Table lists a total of 61,180 hours per year. However, the Fee Table on page 5 of 117, states the hours per year are as 61,800. Can the Government please clarify which number reflects the correct labor hours?

Answer: See Amendment 0002. The table in clause B-216-H006 has been updated to reflect 61,180 hours for all years.

12. Request clarification regarding the total ODCs in support of CLIN 7000 listed in the RFP. On page 4, the total is stated as $83,556.68, while the ODC table on page 102 of 117 lists $83,557.68. Could the Government please clarify which total is correct?

Answer: See Amendment 0002. The ODC Not-to-Exceed (NTE) amounts have been updated to $83,556.68.

13. On Page 23 of 117 under Analyst, Operations III - Minimum Education requires a Bachelor's level degree in an Engineering discipline, Physics or Mathematics and a Master's level degree in Operations Research or Mathematics. Would the Government also accept a Master's level degree in an Engineering discipline?

Answer: See Amendment 0002 for revised Minimum Education requirement.

14. Whether this requirement is new or if there is an incumbent contractor currently supporting it?

Answer: This is a new requirement.

15. Could you please provide guidance to offerors on the proper procedure for submitting questions? According to the RFP, it mentions that questions should be submitted via the SeaPort portal.

Answer: Amendment 0001, issued 20 May 2026, incorporated clause L-216-H001 which provides instructions for the submission of questions.

16. The contract language states that CMMC Level 2 self-assessment is acceptable through November 9, 2026. However, the contract also requires CMMC Level 2 (C3PAO) for Options under CLINs 6000-7400. Given that the C3PAO assessment phase of the CMMC rollout is not scheduled to take effect until after the self-assessment period expires on November 9, 2026, can you please clarify how CLINs that fall within the current period of performance -- where self-assessment is the accepted standard -- can be subject to the C3PAO requirement? Specifically:

a) If the contract is awarded prior to the C3PAO rollout date, how does the C3PAO requirement apply?

b) Are the option CLINs (6000-7400) anticipated to be exercised after November 9, 2026, and is that the basis for the C3PAO requirement?

c) If options are not exercised or fall within the self-assessment window, is the Level 2 self-assessment sufficient for compliance?

We want to ensure we are flowing down the correct CMMC requirements to our subcontractors and need clarification on the applicable standard for the current and anticipated periods of performance.

Answer: See question and answer 4.

17. Section B CLINs 6000AA through 6400AA each specify 61,180 labor hours per year, while the Fee Table in Clause B-216-H006 lists 61,800 hours per CLIN -- a difference of 620 hours per year (3,100 hours over 5 years). Additionally, Section L (L-216-H001) states the total requirement is 305,900 hours, which is consistent with 61,180 5 years, but the Fee Table yields 309,000 hours. Will the government please confirm the 61,180 labor hours per year are correct based on the level of effort table in Section C 11.3 and revise the Fee Table in Clause B-216-H006?

Answer: See question and answer 11.

18. There is a $1.00 discrepancy in the Base Year ODC NTE amount: Section B (CLIN 7000AA) states $83,556.68, while the Section L cost proposal instructions ODC table states $83,557.68. Will the government please confirm which total is correct and validate the breakout between travel and materials in Section B is accurate?

Answer: See question and answer 12.

19. For CLIN 7300AA (Option Year 3), the sum of the Travel estimate ($53,067.68) and Materials estimate ($16,567.61) equals $69,635.29, which is $0.01 more than the stated NTE of $69,635.28. This rounding discrepancy also propagates to the 5-year ODC total ($359,315.04 calculated vs.

$359,315.03 stated). Will the government please confirm which total is correct and validate the breakout between travel and materials in Section B is accurate?

Answer: See Amendment 0002. The ODC NTE amounts have been updated. The Government confirms there is a $0.01 discrepancy in Option Year 3.

The corrected breakout for CLIN 7300AA (Option Year 3) will be:

Travel Estimate: $53,067.68

Materials Estimate: $16,567.60 (Adjusted down by $0.01)

Total CLIN 7300AA NTE: $69,635.28

This adjustment maintains the stated 5-year ODC total of $359,315.03. Offerors shall use these corrected figures in their cost proposals.

20. The Base Year materials estimate ($34,173.68) is approximately double the option year estimates (approximately $16,315-$16,748), representing a 52% decrease from Base Year to Option Year 1. Will the government please confirm the elevated Base Year materials estimate is correct?

Answer: The Base Year materials estimate is correct.

21. The solicitation contains two versions of Clause L-216-H001 with conflicting small business participation requirements: one version states the requirement is 40%, while the other states 30-40%. Will the Government please confirm the minimum small business participation should read as 30%, given this exceeds DoD and Seaport small business participation goals?

Answer: See question and answer 2.

22. The solicitation contains conflicting proposal validity periods: one instance of Clause L-216-H001 states 180 calendar days, while another states 60 calendar days. Section L, Paragraph 3.4.1 independently states 180 days. Will the government please confirm the required proposal validity period?

Answer: See question and answer 3.

23. FAR Clause 52.222-42 (Statement of Equivalent Rates for Federal Hires) identifies the Installation Analyst II as being a class of service employee to be employed under the contract and states the minimum wages payable at $33.73. However, Installation Analyst II is identified as a Professional Category under eCRAFT category (INS2) without an SCA Occupational Code and should be proposed as a professional exempt labor category in support of this opportunity. Would the Government please remove this category from the FAR Clause 52.222-42 table found within Section I on page 58-59 of the RFP?

Answer: See Amendment 0002. Installation Analyst II has been removed from the clause. Note: Clause 52.222-42 does not set minimum wages payable. It expressly states, "This Statement is for Information Only: It is not a Wage Determination."

24. The Engineering Technician V labor category is the only proposed labor category that has an SCA Occupational Code, 30085. This labor category represents only 6.9% of the total annual level of effort. All other categories are performing similar technical and engineering support tasks under the same SOW paragraphs and are deemed professional exempt personnel. Given that the Engineering Technician V labor category constitutes such a minor portion of the total LOE and performs substantive technical work alongside categories performing within the same SOW tasks, will the government please remove the WD table and confirm that the SCA is not applicable to this task order?

Answer: SCLS (Service Contract Labor Standards) is applicable. The Wage Determination will not be removed.

25. Section L estimates a contract award date of 12 July 2026, yet the Section F period of performance start date is 30 October 2026 -- approximately

3.5 months after the estimated award date. Will the government please clarify the correct start date offerors should assume for proposal purposes?

Answer: See Amendment 0002. The estimated award date has been updated to 30 October 2026.

26. The level of effort table in Section C, Paragraph 11.3 illustrates 480 annual hours for Management and Support, however, Section C, Paragraph

11.5 does not provide requisite education and experience qualification minimums. Will the government please provide specific qualifications for this labor category?

Answer: See Amendment 0002. The education and experience minimum requirements have been added.

27. Section C, Paragraph 11.5.15 states that the minimum education requirement for Analyst, Operations III (ANP3) is a Bachelor's level degree in an Engineering discipline, Physics, or Mathematics and a Master's level degree in Operations Research or Mathematics. Will the government please expand the acceptable degree areas of a Master's to allow for Engineering, Physics, Mathematics or Operations Research to align with the acceptable degree areas of a Bachelor's degree, as the Attachment 04 Staffing Plan template would not allow offerors to show both a Bachelor's degree and Master's degree without altering the spreadsheet?

Answer: See Amendment 0002 for revised Minimum Education requirement.

28. Will the government please clarify the basis for the calculation of the small business participation to include only total labor costs and exclude non-labor costs from the denominator in the calculation of the small business participation requirement?

Answer: Section L, paragraph 3.4.3 states "Offeror shall demonstrate how it will provide at least 40% of the proposed total estimated amount of the task order to small business concerns. Offeror shall provide sufficient information to demonstrate that the tasks assigned to the selected small business subcontractors are meaningful in the overall success of the program. The approach shall address use of Small Business Concerns, Small Disadvantaged Business Concerns, Women- Owned Small Business Concerns, Hub Zone Small Business Concerns, Veteran-Owned Small Business Concerns, and Service-Disabled Veteran- Owned Small Business Concerns." No additional information will be provided.

29. We do not have a DCAA or DCMA approved accounting system. However, our accounting system has been audited by a third-party CPA, who certified that it is DCAA compatible. Will this certification be sufficient, or will the lack of a DCAA/DCMA audited system prevent us from being eligible for this opportunity?

Answer: If an offeror is planning to submit a proposal in response to this Solicitation without having a DCAA or DCMA approved accounting system, that they shall submit a completed SF1408 Pre-Award Survey as soon as possible at the attention of David Torres (david.torres22.civ@us.navy.mil) prior to and separate from their proposal submission.

30. CPFF-LOE & 50-Percent Rule Enforcement, N6449826R3107, Solicitation, Page 20

This is a Level of Effort (LOE) contract estimated at ~61,180 direct labor hours annually. Under SeaPort-NxG and CPFF-LOE rules, managing the exact delivery of hours could be a contractual compliance risk.

"Will the Government clarify the contractual variance threshold for the Level of Effort? If the contractor falls short of the exact 61,180 hours due to unforeseen delays or slow onboarding, will the Fixed Fee be pro-rated strictly under the FAR 52.216-10 LOE clause, or is there a permissible variance percentage (e.g., +/- 5%) before fee adjustment occurs?"

Answer: See B-232-H005. Fee is paid on an hourly basis.

31. Flow-Downs & Subcontracting Privity, N6449826R3107, Solicitation, 3.3.3, page 101

"Does the Government require separate, fully unredacted cost proposals and cost realism data for all proposed subcontractors to be uploaded directly into PIEE, or are subcontractors permitted to submit their proprietary cost data directly to the Contracting Officer to maintain confidentiality?"

"Will the Government require signed Teaming Agreements or Letters of Intent (LOIs) for all key personnel/subcontractors at the time of proposal submission?"

Answer: (a) Section L, paragraph 3.3.3 provides instructions for the information required in Subcontractors' proposals. Section L paragraph 1.0 provides instructions for the submission of proposals.

(b) The solicitation does not include an express requirement for Teaming Agreements. Providing such signed agreements is at the Offeror's discretion.

Section L paragraph 3.1.3 provides requirements for Letters of Intent.

32. Period of Performance & Transition Mechanics, N6449826R3107, Solicitation, 3.1.2, page 99

"Is there a designated, contractually recognized 'Transition-In' period (e.g., 30 days) built into the Base Year, or is the awardee expected to provide the full 61,180 hour run-rate on Day 1 of the POP?"

Answer: Section L, paragraph 3.1.2, provides instructions for the Offerors to propose a transition plan and provide a POAM to support the proposed plan.

33. FARS 252.225-7048 "Export-Controlled Items", N6449826R3107, Solicitation, page 51 is included in Section I (Contract Clauses). This clause requires the contractor to comply with all U.S. export control laws and regulations, including ITAR and EAR (Export Administration Regulations).

Section I of Solicitation N6449826R3107 includes DFARS 252.225-7048, "Export-Controlled Items," which requires compliance with all applicable U.S. export control laws and regulations, including the International Traffic in Arms Regulations (ITAR) and the Export Administration Regulations (EAR). However, the solicitation and Statement of Work do not explicitly state whether any of the work, deliverables, or technical data to be provided under this contract are subject to ITAR controls.

Request:

Can the Government please clarify whether any aspect of the work, deliverables, or technical data required by this solicitation is subject to ITAR (International Traffic in Arms Regulations) controls? If so, please specify which portions of the requirement are ITAR-controlled and whether the contractor is required to be registered with the Directorate of Defense Trade Controls (DDTC) for performance of this contract.

Answer: Per DFARS 252.225-7048(c), the Contractor's responsibility to identify and comply with all applicable export control laws (including ITAR and EAR) exists independently of any information provided by the Government.

It is the Contractor's sole responsibility to self-classify its deliverables, determine the applicability of ITAR, and maintain any necessary registration with the Directorate of Defense Trade Controls (DDTC). Questions regarding export eligibility must be directed to the Department of State or Department of Commerce.

34. G-216-H001 FIXED FEE WITHHOLD--FAR 52.216-8 CLARIFICATION (NAVSEA) (OCT 2018) (Oct 2018), N6449826R3107, Solicitation, page 41The Government will withhold 15% of each fixed fee payment starting with the first invoice submitted until a total of $100,000 of fixed fee has been withheld. Withheld amounts will be released in accordance with FAR 52.216-8, Fixed Fee.

How long can and does the government withhold the fee for before it is returned to the prime?

Answer: The duration of the fee withhold is not tied to a specific calendar timeframe, but rather to contract completion and closeout milestones as defined in FAR 52.216-8(b). Please see FAR 52.216-8 for additional information.

35. Scope of Work, N6449826R3107, Solicitation, page 8. Are there any anticipated changes to the Statement of Work or deliverables prior to award?

Answer: No.

36. Deliverables, N6449826R3107, Solicitation, page 99: Can the Government clarify which deliverables, if any, are considered critical path for schedule purposes?

Answer: As priorities change throughout performance, the Government cannot identify critical path deliveries at this time.

37. Government Furnished Property, N6449826R3107, Solicitation, page 103: Are there any Government Furnished Property (GFP) items that may not be available at contract start?

Answer: No.

38. Performance Metrics: Are there any specific performance metrics or KPIs that will be used to evaluate contractor performance?

Answer: There are no specific performance metrics or KPIs identified in the solicitation.

39. Flowdowns: Are there any additional flow-down clauses or agency-specific requirements not listed in the solicitation?

Answer: No.

40. Revolutionary FAR Overhaul: Will any of the Revolutionary FAR overhaul changes be implemented for this solicitation.

Answer: The clauses in the solicitation are the clauses that will be included in the award.

41. Overtime premium is undefined while the LOE table requires OT hours, N6449826R3107, Solicitation, page 20. Clause 52.222-2 (Section I) sets the approved overtime premium cap at "*TBD," yet the LOE table (Section C, para 11.3, p.20) bakes in 2,100 Gov-site OT hours + 1,000 Ktr-site OT hours per year (3,100 OT hrs/yr).

Question: Will the Government specify the approved overtime premium dollar amount? Should offerors price the LOE's OT hours at straight time only, or include an OT premium -- and if premium is not approved (zero), should it be excluded from proposed cost?

Answer: The overtime premium amount in Clause 52.222-2 will be populated based on the overtime premium proposed by the awardee.

42. Escalation table lists only four rates for five years, N6449826R3107, Solicitation, page 102. Section L, para 3.3.3 (Escalation, p.101) shows columns for Base Year + OY1-OY4 but only four percentages (2.55%, 2.14%, 2.25%, 2.35%).

Question: Which performance years do these four rates map to? Is the Base Year assumed at 0% (rates apply to OY1-OY4), or do they apply to Base- OY3 with the OY4 rate omitted? Please provide the missing rate or confirm the mapping.

Answer: The minimum escalation for the base year is 0%. Minimum escalation rates are provided for OY1-OY4.

43. ODC travel/material breakout, N6449826R3107, Solicitation, page 3. Section B's ODC CLINs give separate travel and material estimates inside each year's NTE, but Attachment 06 has a single ODC line plus burden adders.

Question: Must offerors constrain travel and material to their individual sub-estimates, or only to the total annual ODC NTE? Should the cost spreadsheet show travel and material separately to match Section B?

Answer: The separate travel and material estimates are provided within the ODC CLINs to accommodate differing indirect rate structures among Offerors. Offerors must use the individual sub-estimates provided in Section B as the baseline values for their cost proposals. If an Offeror applies distinct indirect rates to travel versus material, they may edit Attachment 06 to break out these categories separately, ensuring the appropriate burdens are applied accurately to the respective Section B values.

44. Small Business participation basis and template placeholder, N6449826R3107, Solicitation, Section L, para 3.4.3 (p.102) requires 40% of "the proposed total estimated amount of the task order" to small business, but Attachment 07 (SBPCD) computes the percentage against a fixed TCV of $50,000,000 and is pre-filled with example figures ($5M/$2M/$10M rows). Question: Is the 40% MQR measured against the offeror's proposed total task-order value or the $50M shown in Attachment 07? Are the TCV and example dollar rows placeholders to be replaced? Also, given this is not a set-aside (Section A, p.2) and Attachment 07 still references "SeaPort-e," please confirm Attachment 07 is the required SB participation template for this SeaPort-NxG order.

Answer: The values provided in the template are examples. The 40% MQR is measured against the Offerors proposal. The attachment is correct.

45. Fee Table labor-hours typo, N6449826R3107, Solicitation, Section G, page 41. The B-216-H006 Fee Table lists 61,800 labor hours per CLIN, whereas the Section B CLINs and the Section C LOE table list 61,180 hours. Please confirm the Fee Table quantity should read 61,180 to match the CLINs and LOE table.

Answer: See question and answer 11.

46. Attachment_02_DD_254_LBES_BIZOPS_ENG_R2__002____OPSEC_signed Is the attachment uploaded in PIEE the correct DD-254 for this solicitation?

Please could you confirm that classification is in fact Confidential for the program including personnel?

Answer: The Government has received this question and is investigating. A subsequent amendment will be released to either update the DD254 or confirm it is correct.

47. Technical Write Up and Section L. N6449826R3107, Solicitation, page 98. Is the 40 Page technical write-up only limited to the 4 items referenced in section L Section C3.1; 3.1.2.6, 3.6.2.7 and 3.6.3 "Land based testing, Torsion, Risk, Microsoft project) or does it need to expand beyond this scope?

Answer: The technical approach - Element A, will be evaluated solely on the technical approach criteria stated in the solicitation. Information provided outside of this scope will not be considered.

48. Can you please tell me:

Under what contract number is the LBES work currently performed?

Answer: See question and answer 14.

49. Would the Government be willing to consider granting a one-week extension, moving the deadline to June 24, 2026?

Answer: The solicitation will not be extended at this time.

50. Could you please confirm whether there is an incumbent contractor? If yes, please provide the contractor number.

Answer: See question and answer 14.

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) / ELIN(s) were modified:

Option Line Item 7300

INFORMATION FROM TO

Description

Other Direct Costs (ODCs) in support of CLIN 6300.

This is a non-fee bearing CLIN. The estimated costs that will be incurred over Option Year 3 period is $69,635.28 (travel estimated at $53,067.68, material $16,567.61). This is a Not To Exceed (NTE) amount.

Other Direct Costs (ODCs) in support of CLIN 6300.

This is a non-fee bearing CLIN. The estimated costs that will be incurred over Option Year 3 period is $69,635.28 (travel estimated at $53,067.68, material $16,567.60). This is a Not To Exceed (NTE) amount.

Additional Information/Notes

The following clauses were modified:

B-216-H006 FEE TABLE (NAVSEA) (MAR2019) Mar 2019 hereby reads as follows:

Labor CLIN Labor Hours Cost Per Hour* Fee Rate Per Hour* Loaded Hourly Rate

6000 61,180

6100 61,180

6200 61,180

6300 61,180

6400 61,180

*The offeror shall divide the proposed fee for each CLIN by the quantity of labor hours indicated to complete the table. Fee is calculated based on cost less FCCOM; if FCCOM is proposed, necessary columns may be added.

In the event of any inconsistency between the above table and the CLIN pricing, the CLIN pricing shall take precedence.

(End of Text)

Section C - Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

Statement of Work (SOW) forLBES BIZOPS/ENG SUPPORT

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy's ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 71, which is responsible for Major Programs and multiple Land Based Engineering Sites (LBES) / Land Based Test Sites (LBTS).

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this Task Order are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Task Order between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this Task Order shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this Task Order do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This Task Order does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Task Order activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct;

identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,

(ii) Countermand any communication regarded as a violation,

(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

1.1.1 NSWCPD Code 71 provides Programmatic, Engineering, On-Site Technical, Requirements Development, and Logistics Support for Major Programs, DDG-51 Land Based Engineering Site (LBES), current DDG(X) test sites, and future FFG-62 test sites. To execute its responsibilities, Code 71 requires program and project contractor support with a focus on technical/engineering requirements and planning, schedule, cost, resourcing and risk management support for all life cycle phases of integrated HM&E ship and ship systems.

1.2 SCOPE OF WORK

1.2.1 The contractor shall provide Engineering, Technical (Maintenance/Installation/Alteration), Programmatic, Logistical, Life Cycle Management, and Systems Services in support of the Department 70 Major Test Programs and Industrial Support, and other Test/Engineering Sites at the Naval Surface Warfare Center Philadelphia Division (NSWCPD). Tasks will include technical support, equipment life cycle management, data collection and analysis, metrics, system development and testing support, engineering development models, system operability testing and logistic product development. Services will be rendered as required in Philadelphia, PA.

1.2.2 As programs and projects are identified in support of program office(s) objectives, contractor support will be required to accomplish this undertaking. The contractor shall provide program/project management standards and industry best practices support. The contractor shall provide workflow, resource requirements and scheduling, configuration management, and re-engineering consultation support to meet program requirements and improve the security of existing applications.

1.2.3 The Government will utilize Technical Instructions (TIs) to define specific efforts in support of one or more Programs supported by NSWCPD Test/Engineering Sites. The contractor shall be responsible for the full conformance to the requirements in this SOW and the awarded TIs.

1.2.4 The contractor must be capable of providing Technical Support for the following representative systems and equipment:

1.2.4.1 Electrical Power Systems: Switchboards, motor-generator sets, transformers, distribution equipment, power converters and cabling for systems up to 50MW and 13.8 KV, electrical generation, electrical distribution and electrical storage systems, such as medium voltage, low voltage, generators, switchgears, cable (low voltage and medium voltage), energy storage, batteries, battery chargers, Uninterruptable Power Supply (UPS), power electronic conversion equipment, microprocessor protection relays, ground detection, electrical power monitoring systems

1.2.4.2 Gas and Steam Turbine Engines and Generators

1.2.4.3 Diesel Engines and Generators

1.2.4.4 Shipboard Propulsion Motors and similarly rated Load Generators, Load Banks, and Water Breaks (includes the ability to perform torsional, axial, and lateral vibration analysis of propulsion systems)

1.2.4.5 Control networks with cabling, including control consoles, control interface units, system instrumentation, networking switches, fiber optic cable systems, video camera systems, communication systems, building automation systems, fire alarm systems and data acquisition systems

1.2.4.6 Machinery Shafting and Transmission Systems: Reduction gears, speed increasing gears, clutches, bearings, shafting, machinery couplings and alignment systems

1.2.4.7 Machinery Foundations: Welded plate structures, concrete-filled steel structures, precisely machined mounting surfaces, and shock and vibration mount systems

1.2.4.8 Structures: equipment platforms, access platforms and walkways, engine intake and exhaust ducting, auxiliary equipment foundations, and piping and electrical system support structures

1.2.4.9 Piping Systems: fuel oil, lube oil, hydraulic oil, cooling water, sea water, fresh water, deionized water, domestic water, drains, compressed air, start air, FM 200, and engine bleed air systems (systems with pressures up to 6500 PSI and temperatures as high as 1200 degrees)

1.2.4.10 Water Chillers and Chilled Water Systems

1.2.4.11 Heating, Ventilation and Air Conditioning (HVAC) Systems: centrifugal chiller systems, packaged systems, split systems, air-handling units, direct-expansion (DX) equipment, chilled-water (CW) systems, duct work, etc.

1.2.4.12 Outfitting Systems: equipment foundation pads, piles, bricks, blocks, roof systems, walls, flooring, etc. that support test facility systems and are not permanent structures

1.2.4.13 Auxiliary Equipment: pumps, compressors, blowers, fans, heat exchangers, etc.

1.2.4.14 Fuel Systems

1.2.4.15 Acoustic Systems and Associated Equipment

1.2.4.16 Enclosures, Damping Tiles, Seals and Associated Auxiliary Equipment

1.2.4.17 Fire Detections, Fire Protection and Recoverability Systems related to test facility systems/equipment protection

2.0 APPLICABLE DOCUMENTS

2.1 ENGINEERING/TECHNICAL:

2.1.1 AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) STANDARDS

https://www.astm.org/

2.1.2 ENVIRONMENTAL PROTECTION AGENCY (EPA)

www.epa.gov

2.1.3 MIL-STD-167 MECHANICAL VIBRATIONS OF SHIPBOARD EQUIPMENT

"ASSIST" (https://quicksearch.dla.mil/qsSearch.aspx)

2.1.4 NATIONAL ELECTRIC CODE (NEC)

http://catalognfpa.org

2.1.5 NATIONAL ELECTRICAL INSTALLATION STANDARDS (NEIS)

http://www.neca-neis/org

2.1.6 NATIONAL ELECTRICAL TESTING ASSOCIATION INC. (NETA)

https://www.netaworld.org/home

2.1.7 NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

www.nfpa.org

2.1.8 OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION (OSHA)

https://www.osha.gov

2.1.9 OPNAV INSTRUCTION 9200.3B ENGINEERING OPERATIONAL SEQUENCING SYSTEMS (EOSS) https://www.secnav.navy.mil

2.2 GENERAL:

2.2.1 DEPARTMENT OF DEFENSE

www.defense.gov

2.2.2 DEPARTMENT OF ENERGY

www.energy.gov

2.3 LOGISTICS:

2.3.1 MIL-M-38784 MANUALS, TECHNICAL - GENERAL STYLE AND FORMAT REQUIREMENTS

"ASSIST" (https://quicksearch.dla.mil/qsSearch.aspx)

2.3.2 NAVSEA 4790.8B SHIP'S MAINTENANCE AND MATERIAL MANAGEMENT (3-M) SYSTEM POLICY http://everyspec.com

2.4 PROGRAMMATIC:

2.4.1 GAO COST ESTIMATING AND ASSESSMENT GUIDE (GA-09-3SP)

https://www.gao.gov/products/gao-09-3sp

2.4.2 MIL-STD-881E WBS FOR DEFENSE MATERIAL ITEMS

"ASSIST" (https://quicksearch.dla.mil/qsSearch.aspx)

2.4.3 MIL-STD-482 CONFIGURATIONS STATUS ACCOUNTING DATA ELEMENTS AND RELATED FEATURES "ASSIST" (https://quicksearch.dla.mil/qsSearch.aspx)

2.4.4 OPNAV INST 5210.20 NAVAL RECORDS MANAGEMENT PROGRAM

https://www.secnav.navy.mil

2.5 RISK:

2.5.1 DEPARTMENT OF DEFENSE RISK, ISSUE, AND OPPORTUNITY (RIO) MANAGEMENT GUIDE FOR DEFENSE ACQUISITION

PROGRAMS

(can be provided upon request)

2.5.2 NAVAL SYSCOM RISK MANAGEMENT POLICY

(can be provided upon request)

2.6 TRAINING:

2.6.1 MIL-HDBK-29612-3 DEVELOPMENT OF INTERACTIVE MULTIMEDIA INSTRUCTION (IMI)

"ASSIST" (https://quicksearch.dla.mil/qsSearch.aspx)

2.6.2 NETCINST 1510.4 JOB DUTY ANALYSIS POLICY

https://www.netc.navy.mil

2.7 Navy Issuances

https://www.secnav.navy.mil/doni/default.aspx

2.8 DOD Issuances

https://www.defense.gov/Resources/Forms-Directives-Instructions/

2.9 NAVSEAINST Library

https://www.navsea.navy.mil/Resources/Instructions/

The Contractor shall reference and utilize the latest version available when performing tasks within this PWS.

3.0 REQUIREMENTS

3.1 to ensure the LBES/LBTS Programs are able to maintain overall schedule and The contractor provide engineering and technical supportshall meet testing requirements.

3.1.1 The contractor shall provide engineering/technical support reviewing developed / "in-process" drawings, conducting market research, and inspecting Program installation/outfitting efforts based on the following details and submitting an "Engineering/Technical Report" (CDRL A005).

3.1.1.1 Review developed / "in-process" conceptual, preliminary, and detailed design drawings making recommendations for improvements and/or to resolve issues.

3.1.1.1.1 The contractor shall assist the Government by providing technical support for design agent questions/comments.

3.1.1.1.2 The contractor shall review System Data Requirements List (SDRLs), recommend responses to design agent questions and perform technical information research during the detailed design process.

3.1.1.2 Conduct Market Research to provide recommendations on obsolescence, engineering deficiency, and new capabilities to support technical concerns.

3.1.1.3 Identify, research, and analyze emerging technologies and/or new metals/alloys which may resolve issues, improve performance, and/or reduce risk.

3.1.1.4 Perform "Independent Third Party" quality assurance reviews and pre/post installation checks to verify the accuracy of the drawings, identify interferences/discrepancies between the drawings and actual test site configuration, and ensure correct equipment and logistic configuration for verification and technical accuracy review.

3.1.1.5 Provide system/equipment technical analysis to define an issue and/or make recommendations for correction associated with system /equipment inspections, repairs, operation, maintenance, and design.

3.1.2 The contractor shall review, draft, update, and/or make recommendations to solve technical issues or make test site alterations associated with system/equipment specifications, technical documents, or other program efforts in the following areas:

3.1.2.1 Deficiency Reports (CDRL A007)

3.1.2.2 Test Site Work Orders (TSWOs) (CDRL A008)

3.1.2.3 Alterations (CDRL A009)

3.1.2.4 Systems Engineering Processes (SEP) (CDRL A005 "Engineering/Technical Report")

3.1.2.5 Provide SCD Support updating and managing technical changes via the Configuration Control Board (CCB). (CDRL A006 "Configuration Control Board (CCB)")

3.1.2.6 Perform Torsional, Axial, and Lateral Vibration Analysis of propulsion system(s) in accordance with MIL-STD-167 MECHANICAL VIBRATIONS OF SHIPBOARD EQUIPMENT. (CDRL A005 - "Engineering/Technical Report")

3.1.3 The contractor shall provide test and evaluation support for programs, projects and/or special studies being conducted using approved processes that focus on validating requirements and developing impartial test and evaluation products.

3.1.3.1 The contractor shall develop, review, and update Test Plans/Procedures associated with systems/equipment associated with the LBES/LBTS Programs. (CDRL A010 "Test Procedure")

3.1.3.2 Provide assistance with conducting testing for equipment/systems, recording data, and developing test reports. (CDRL A011 "Test/Inspection Report")

3.1.3.3 The contractor shall coordinate, support, and/or conduct onsite instrumentation electromagnetic, environmental, and other testing required by the LBES/LBTS Programs. (CDRL A012 "Test Report")

3.1.4 The contractor shall provide system/equipment life cycle engineering support. (CDRL A013 "Life Cycle Report")

3.1.4.1 Identify inefficient and problematic areas related to system life cycle management and develop streamlined procedures and solutions to address the problems.

3.1.4.2 The contractor shall provide technical and engineering services in support of configuration management, provide technical support to identify the functional and physical characteristics of an item during its life cycle, controlling changes to those characteristics and provide information on the status of change actions.

3.1.5 The contractor shall support Mission Readiness Panels (MRP), system/equipment troubleshooting, assessments, system configuration/integration/development, modeling, testing, etc. (CDRL A005 "Engineering/Technical Report")

3.1.6 The contractor shall provide support for Programmable Logic Controllers (PLC), Power Management Control Systems (PMCS), and other process control equipment including Fairmount Automation, Allen-Bradley, and Siemens as well as other commercial PLCs. (CDRL A005 "Engineering/Technical Report")

3.1.7 The contractor shall review certification documentation and Objective Quality Evidence (OQE) in preparation of certification letters to meet Sponsor requirements. (CDRL A014 "OQE Certification")3.1.8 Provide engineering support services for programs, projects and/or special studies being conducted, such as: scoping document development; operational performance capabilities evaluations;

hazard assessments; and risk analysis efforts for HM&E systems, subsystems, and equipment, including machinery control systems and fire suppression. (CDRL A005 "Engineering/Technical Report")

3.1.8 Provide engineering support services for programs, projects and/or special studies being conducted, such as: scoping document development;

operational performance capabilities evaluations; hazard assessments; and risk analysis efforts for HM&E systems, subsystems, and equipment, including machinery control systems and fire suppression. (CDRL A005 "Engineering/Technical Report")

3.2 The contractor shall provide engineering/technical support in the areas of material, maintenance, and logistics.

3.2.1 Evaluate systems/equipment recommending spares, consumables, long-lead materials, supplies, special purpose tools, and test equipment that should be considered for Preventative/Corrective Maintenance, Testing, etc. (CDRL A005 "Engineering/Technical Report")

3.2.2 The contractor shall provide evaluation, assessment and recommendations for Integrated Logistics Support (ILS) plans and products for completeness and adherence to specifications for systems and equipment as directed from the applicable Program Office.

3.2.2.1 ILS elements may include: Supply Support, Technical Data and Publications, Computer / Information Technology (IT) Resource Support, Facilities, Maintenance Planning, and Personnel Training.

3.2.3 Draft/Review/Update Technical Manuals (CDRL A015), Maintenance Requirement Cards (MRCs) (CDRL A016), Maintenance Index Pages (MIPs) (CDRL A017), and other system verifications ensuring the Integrated Logistics Support (ILS) documentation for both technical and supply is accurate.

3.2.4 Review/Draft/Update material specification information and logistics. (CDRL A005 "Engineering/Technical Report")

3.2.5 Coordinate with NSWCPD technical codes for resolution of all Class Maintenance Plan (CMP) tasks and assessment procedure Technical Feedback Reports (TFBRs). (CDRL A005 "Engineering/Technical Report")

3.3 The contractor shall provide training support. (CDRL A018 "Training Curriculum")

3.3.1 Develop/Review/Update training curriculum/documentation, utilizing COTS tools, for system/equipment: installation, operation, maintenance /repair, technical analysis, inspection, and troubleshooting.

3.3.2 Develop/Review/Update graphics modeling, utilizing COTS tools, for Onboard Training Systems, Condition Assessment Systems, Front End Analysis (FEA), training gap analysis, and Job Duty Task Analysis (JDTA) to include…