Statement of Work Summary

This Statement of Work (SOW) is for an electrical and lighting systems upgrade project at United States Coast Guard (USCG) Station Lorain – Boat House located at 110 Alabama Ave, Lorain, OH 44052, under Solicitation Number 70Z03026QCLEV0056. The project objective is to procure and install new interior and exterior lighting fixtures, associated electrical wiring, and provide electrical modifications to support new fan systems while decommissioning legacy electrical components. The work must be performed by qualified and licensed electricians in compliance with the National Electrical Code (NEC), Federal Acquisition Regulation (FAR), Department of Homeland Security (DHS) procurement requirements, prevailing wage laws, and all applicable federal, state, and local building and safety codes.

The interior lighting scope requires decommissioning existing high-bay and wall-mounted fixtures, furnishing and installing a minimum of 10 new Metalux UHBS2 Selectable High Bay LED fixtures (or equivalent), running branch wiring and conduit connections, and installing two 3-way light switches. The exterior lighting scope includes furnishing and installing four to six Lumark AP Wall Pack WPS/WPM/WPL Series LED fixtures (or equivalent), with specific placements at the gate entrance, north drive (two fixtures), and west side facing the river, plus installation of a time clock for automated control. The contractor must also install two government-furnished Big Ass Fan POWERFOIL 6 HVLS fans (12-foot, single-phase) with dedicated 200-240V AC, 20A-30A electrical circuits and CAT-5 conduit drops to a control station. Additionally, the contractor shall decommission one 220V lift breaker/outlet and remove the shore plug from the electrical panel. The period of performance requires work to commence within five calendar days and be completed within fifteen calendar days after award. The contractor is responsible for providing all labor, materials, tools, permits, equipment (including scissor lifts or aerial work platforms), and site cleanup, with the government furnishing two HVLS fans and CAT-5 communication cable.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Updated: 12 June 2026 Page 1 of 5

Statement of Work (SOW) Project Title: Electrical and Lighting Systems Upgrade Project Location: United States Coast Guard (USCG) Station Lorain – Boat House 110 Alabama Ave, Lorain, OH 44052 Solicitation Number: 70Z03026QCLEV0056

1.0 BACKGROUND

The USCG Station in Lorain, OH requires a comprehensive upgrade of its interior and exterior electrical and lighting systems within the Boat House. The existing systems are outdated, and the upgrade is necessary to enhance energy efficiency, improve safety and security through better illumination, and support the installation of new government-furnished equipment. This project requires adherence to all applicable federal, state, and local regulations, including but not limited to the Federal Acquisition Regulation (FAR), Department of Homeland Security (DHS) procurement requirements, and prevailing wage laws.

2.0 OBJECTIVE

The objective of this project is to procure and install new interior and exterior lighting fixtures, associated electrical wiring, and provide the necessary electrical modifications to support new fan systems and decommission legacy electrical components.

3.0 SCOPE OF WORK

The contractor shall provide all necessary labor, materials, tools, permits and supervision to perform the work as described in the following sections. All work shall be performed in a professional manner by qualified and licensed electricians.

3.1 INTERIOR LIGHTING SYSTEM

The contractor shall:

• Decommission, demolish, and dispose of all existing interior high-bay and wall-mounted lighting fixtures and associated conduit/wiring as required.

• Furnish and install vendor recommended amount (or at least 10) new high-bay LED light fixtures. Fixtures must be of the Metalux UHBS2 Selectable High Bay type or an equivalent model that meets or exceeds its specifications.

• Run all necessary branch wiring, conduit, and junction boxes to connect the new fixtures to the existing electrical panel.

• Install two (2) new 3-way light switches to provide adequate control over the new lighting zones.

3.2 EXTERIOR LIGHTING SYSTEM

The contractor shall:

• Decommission, demolish, and dispose of existing exterior floodlights/wall packs as required.

Updated: 12 June 2026 Page 2 of 5

• Furnish and install four (4) to six (6) new LED floodlight/wall pack fixtures on the boathouse building's exterior and adjacent building’s exterior. Fixtures must be of the Lumark AP Wall Pack WPS/WPM/WPL Series or an equivalent model that meets or exceeds its specifications.

• Two (2) of these fixtures will replace existing lights, and two (2) to four (4) will be new installations to increase illumination on the side of the building.

• Install one (1) new fixture at the gate entrance, two (2) along the north drive, and one

(1) on the west side of the building facing the river.

• Run new circuit extensions and all necessary branch wiring and conduit for the two

(2) new fixture locations.

• Install a time clock for automated control of all exterior lighting.

3.3 FAN INSTALLATION & ELECTRICAL SUPPORT

• Install two (2) Government-Furnished "Big Ass Fans" with the following specifications:

• Big Ass Fan

• POWERFOIL® 6 HVLS FAN

• 12’

• Single Phase

• Run two (2) new dedicated 200-240V AC, single-phase, 20A-30A electrical circuits and breakers for the fans.

• Install a CAT-5 conduit and cable drop for each fan to the designated control station location, running down the wall opposite the main electrical feed.

3.4 ELECTRICAL SYSTEM MODIFICATIONS

• Decommission, remove, and make safe one (1) 220V lift breaker/outlet and all associated conduit.

• Decommission and remove the shore plug from the electrical panel.

4.0 GENERAL REQUIREMENTS

• Compliance: All work must comply with the National Electrical Code (NEC), FAR, DHS procurement regulations, and all applicable federal, state, and local building and safety codes.

• Prevailing Wages: The contractor must adhere to all prevailing wage requirements as mandated by law for this location.

• Equipment: The contractor is responsible for providing all necessary equipment, including scissor lifts or other aerial work platforms, to safely access all work areas.

• Workmanship: All exposed electrical feeders, homeruns, and circuits shall be run in electrical metallic tubing (EMT) or other approved conduit.

• Site Cleanup: The contractor shall maintain a clean and safe work environment, performing daily cleanup of all trade-related debris and disposing of it in a dumpster provided by others.

Updated: 12 June 2026 Page 3 of 5

5.0 GOVERNMENT-FURNISHED PROPERTY

• Two (2) HVLS Fans ("Big Ass Fans").

• CAT-5 communication cable for fan controls.

6.0 PERIOD OF PERFORMANCE

The work shall commence within five (5) calendar days and be completed within fifteen

(15) calendar days after receiving the award.

7.0 PLACE OF PERFORMANCE

USCG Station Lorain – Boat House 110 Alabama Ave Lorain, OH 44052

8.0 POINTS OF CONTACT

Technical Point of Contact (Site Visit Coordinator) CWO Mary E. Ludlow Mary.E.Ludlow@uscg.mil

(410) 487-2033

Contracting Officer Mr. Timothy G. Arnold Timothy.G.Arnold@uscg.mil

(571) 607-6564

Contracting Specialist CPO George A. Bermeo George.A.Bermeo@uscg.mil

(571) 610-3240

9.0 APPLICABLE DOCUMENTS

mailto:Mary.E.Ludlow@uscg.mil mailto:Timothy.G.Arnold@uscg.mil mailto:George.A.Bermeo@uscg.mil

Updated: 12 June 2026 Page 4 of 5

Updated: 12 June 2026 Page 5 of 5

File details come from the government source that posted it. Updated .