This document is a Statement of Work (SOW) for the demolition and disposal of a 132-foot command center tower located at the United States Coast Guard (USCG) Station in Kenosha, Wisconsin. The project requires a qualified contractor to completely remove the tower, which is no longer in use and has become a nesting area for birds causing significant sanitation issues. The contractor will be responsible for providing all necessary supervision, labor, equipment, materials, and must submit a demolition plan for Coast Guard approval prior to beginning work.
Key requirements include: performing the work between 7:00 am and 3:00 pm Monday through Friday, ensuring all contractor personnel are U.S. citizens or legal residents, implementing a comprehensive safety program, complying with local VOC regulations, and removing all debris immediately from government property in accordance with local, state, and federal regulations. Electrical power will be available on-site, and the project's onsite representative will be Chief Robert Verhalen, who will handle inspection and acceptance of the work. The solicitation is estimated to be under $25,000 and falls under NAICS code 238910 with a small business size standard of $19.0 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work and Specifications for
Removal and Disposal of 132ft Command Center Tower.
Located at 5036 4th Ave Kenosha WI 53140
262-657-4620
07/03/2025
Commanding Officer United States Coast Guard
Station Kenosha 5036 4th Ave Kenosha, WI
1. GENERAL:
The United States Coast Guard (USCG) is seeking a qualified contractor to demolish and dispose of the
132ft command center tower (radio tower) located at USCG Station Kenosha. Bidders are responsible for visiting the site to field verify existing conditions and determine actual dimensions and the nature of the work required. Failure to visit the site does not relinquish the bidder from determining the extent and scope of the work required and estimating the difficulty and cost to complete the project.
The USCG Station Kenosha Engineering Petty Officer, Chief Verhalen, will be the USCG’s Onsite
Representative for this project. Arrange pre-bid site visits to verify existing conditions by sending an email to: robert.s.verhalen@uscg.mil
2. BACKROUND: The tower located at USCG Station Kenosha is no longer in use and provides a resting area for birds. The birds’ droppings cover the entirety of the station grounds, including members vehicles, and both RBSII assets. Station Kenosha does not have the time, personnel or resources to maintain this issue and this poses a significant health and sanitation concern.
3. SCOPE:
3.1. Contractor shall provide all supervision, labor, equipment, parts and materials necessary to demolish and dispose of the tower
3.2. Contractor shall provide demolition plan to CG for approval prior to demolition.
3.3. Upon completion, all debris shall be removed and disposed of immediately from government property at the contractor’s expense in accordance with all local, State and Federal regulations.
4. GOVERNMENT FACILITIES AND UTILITIES: Electrical power is available on the site. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded. Telephone services will not be available for use by the contractor.
5. MATERIALS AND LOCATIONS:
5.1. Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturer’s recommendations in a clean, dry, well-ventilated area. Stored materials shall be protected from sunlight and kept away from excessive heat. The contractor shall not store any highly flammable materials in the work area. Sufficient area for staging is available on site.
mailto:robert.s.verhalen@uscg.mil
5.2. The Contractor is required to comply with local VOC (Volatile Organic Compounds) laws and regulations. All applicable Material Safety Data Sheets shall be available upon request.
4. EXISTING CONDITIONS:
The contractor is expected to satisfy themselves as to the existing conditions and the work to be performed. The contractor shall verify all dimensions and equipment data prior to ordering materials and commencement of work.
5. SITE VISIT: Contractors shall coordinate access to USCG Station Kenosha for the purpose of a Site Visit through the Officer of the Day (8476268328)
6. LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the COR (MKC Robert Verhalen)
7. CONTRACTOR PERSONNEL:
8.1 The Contractor shall provide personnel with the following minimum capability:
The on-site supervisor must have the ability to read, write, clearly speak, and understand English.
8.2 All Contractor personnel shall be citizens of the United States (U.S.) or legal residents who have been lawfully admitted for permanent residence into the U.S. The Contractor shall obtain signed statements from all employees and potential employees to be assigned work under this contract attesting they have been informed of these restrictions.
8.3 All Contractor personnel shall be in good health and free of any communicable disease while performing work at this facility.
8.4 Any necessary medical certificates, exams, and treatments are at the expense of the Contractor.
8. INSPECTION AND ACCEPTANCE: The COR (MKC Robert Verhalen) will accomplish inspection and acceptance of work.
9. LABOR LAWS: For any questions, please contact Procurement/Contracting.
10. SAFETY: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the maintenance area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signs, signal lights, etc. as well as complying with the requirements of all Federal, State and Local safety laws, rules and regulations.
11. GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base/ Unit regulations. All personnel employed on the project shall keep within the limits of the work area and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Coast Guard
Building.
12. CONTRACTING OFFICER’S REPRESENTATIVE: The Contracting Officer’s Representative (MKC
Robert Verhalen) will be designated at the notice to proceed.
13. TECHNICAL REQUIREMENTS:
GENERAL: Contractor shall provide all supervision, labor, equipment, parts and materials necessary to perform the replacement of the Safe Edge System.
14. GOVERNMENT ACCEPTANCE PERIOD:
15.1.The Onsite Representative will review deliverables prior to acceptance and provide the Contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the Onsite Representative will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
15.2.The Onsite Representative will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal.
In the event of a rejected deliverable, the Contractor will be notified in writing by the Onsite
Representative of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
15.3.The Contractor shall have 10 business days to make corrections and redeliver.
15. HOURS OF OPERATION: Contractor employees shall generally perform all work between the hours of
7:00 am and 3:00 pm, Monday through Friday (except Federal holidays) unless otherwise approved by the
Coast Guard.