This Statement of Work (SOW) details the United States Coast Guard Station Bayfield's requirement for shower replacements in berthing areas. The project involves removing three existing showers (two shower/tub combinations and one standing shower) and installing three new standing showers in separate bathrooms. The contractor must furnish all labor, materials, equipment, and services to complete the demolition and installation, with specific requirements including white-toned showers, stainless steel fixtures, reinforced solid surface shower walls, fiberglass/plastic composite shower pans, and shower curtain rods.
Key project specifications include working on one shower at a time to minimize disruption to the 8-person crew, ensuring all materials are new and from nationally recognized manufacturers, and completing the work within 45 calendar days of contract award. The contractor must coordinate closely with the Contracting Officer's Technical Representative (COTR), maintain safety standards, provide a qualified English-speaking supervisor, and offer a minimum one-year warranty on all work. The project is located at USCG Station Bayfield, WI, with an estimated value under $25,000 and a North American Industry Classification System (NAICS) code of 238220 for Plumbing, Heating, and Air-Conditioning Contractors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PAGE 1/10
STATEMENT OF WORK (SOW)
FOR
USCG Station Bayfield, WI Berthing shower replacements.
GENERAL
United States Coast Guard (USCG) Station Bayfield requires the removal of three existing three showers and installation of three new standing showers in separate bathrooms. The work includes demolition, plumbing updates, installation of new fixtures, and finishing repairs to surrounding areas as necessary. The Current configuration is 02 shower/tub combinations and 1 standing shower. Prior to submitting a quote, it is mandatory to examine the SOW, and it is highly recommended to visit the facility to take field evaluations and become familiar with existing conditions under which the work will be performed. Prior to beginning work, the contractor shall coordinate a brief meeting or site chin-in with the Coast Guard point of contact to review project expectations, access, and scheduling.
1.1 BACKGROUND
Station Bayfield currently has 02 shower/tub combinations and 01 walk in shower each located in a different berthing room. Showers and tub combinations are old and will be replaced with walk in showers. New shower pans, solid shower wall panels, water mixing valves, drains, shower nozzles, and repairs to walls, structure, and trim as necessary to complete the project once new showers are installed.
1.2 SCOPE
- Contractor shall furnish all labor, materials, equipment, appliances, and dumpsters as necessary to demolish old showers and tub assemblies and install / retrofit 03 standing showers in each location. The contractor is responsible for disposing of all waste generated from the project.
- All materials shall be new; used materials shall not be used. Materials shall be produced by a nationally recognized manufacturer.
- Shower/ tub combination #1 is located in a bathtub alcove that measures 93”h x 35” w x 59” l. Shower/ tub combination #2 is located in a bathtub bay that measures 93”h x 33 ½” w x 59” l, Standing shower #3 is located in a shower alcove that measures 93”h x 39 ½”w x 30”l. (pictures attached below)
- The contractor shall replace all associated components to update drains, valves, nozzles, shower walls, shower pans and seal all components to prevent water leakage and repair any damage to walls if needed once demolition is complete.
The contractor shall work on one shower at a time minimize impact to the unit 08 person crews standing 48-hour watches.
PAGE 2/10
- New showers shall utilize curtains instead of doors. Contractor will install shower rod currents.
- New plumbing fixtures shall be stainless steel.
- Water supply valves shall be single mixing type.
- Shower walls and base shall be reinforced solid surface. Shower walls will have one shelf sized to hold a bottle of body wash, shampoo and conditioner.
- Showers shall be a white tone.
- Shower heads shall be stainless, adjustable angle.
- Shower pans will be Fiberglass/plastic composite. One shower pan will be left hand drain, one shower pan will be a right-hand drain, one shower pan is a center drain.
- The contractor shall closely coordinate all work with the Contracting Officer’s Technical Representative (COTR) to keep disturbances to personnel and operation to a minimum.
- The contractor is required to always have a qualified supervisor on the job any time work is being performed. The qualified supervisor must service as a point of contact for the COTR in maintaining the work specification requirements, scheduling, inspections, and maintaining safety standards. The supervisor must be able to speak and understand English.
- The Contractor must ensure Government employees have access to all egress routes in the building in the event of emergency egress. If at any point a egress route will be blocked due to the nature of the work, the contractor will coordinate with station OOD for timeline on egress route availability.
- Government personnel are not expected to interfere with Contractor’s work or halt work unless a specifically unsafe condition is found or observed by a member at the unit. If an unsafe condition is found, COTR shall notify Contracting personnel’s supervisor, and the unsafe condition must be corrected before work resumes. Unsafe conditions include but are not limited to- not using proper PPE as defined by OSHA Regulations, utilizing tools not in good working condition with all guards and safeties in place as designed by manufacture, or not abiding by safe work practices set forth in OSHA regulations.
- The Contractor shall give the COTR a 72 hour advance prior notice to the completion of the above SOW so that the COTR may conduct the final inspection.
- The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris. The Contractor is expected to remove all debris and waste
PAGE 3/10
in a timely fashion as to not impact either Government operations or unit’s public image.
- Contractor is responsible for all plumbing work required to establish connection to water lines and valves. In the event utilities are required to be secured to install any new components the contractor will notify the COTR with 48-hour advance notice. The contractor will ensure no water leaks are present after any plumbing work is completed.
1.3 OBJECTIVE
Unit requires the removal of aging showers and tub assemblies, procurement and installation of 03 stand up showers with all associated components to update drains, mixing valves, shower pans, shower wall panels, and shower nozzles.
WARRANTY
Unit requires a warranty on all work for a minimum period of one (1) year.
1.4 SUBMITTALS
Contractor is required to submit all safety data sheets (SDS) to the COTR for any chemicals brought onto the facility.
Contractor is required to provide documentation of intended plan to demolish old showers, remove waste, install and update new showers and all associated components to Unit’s POC upon arrival.
2.0 CONTRACTOR PERSONNEL
Contractor shall provide a list of names to the Coast Guard POC for access to the base. Contractor may alter list of names as needed but must provide updated list to Unit’s POC before beginning of work as required.
All Contractor personnel shall present ID to the OOD/JOOD at the entrance to the base. All contractor personnel must always keep their form of ID with them while on base.
2.1 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
2.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement is maintained at all times. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the
PAGE 4/10
Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
2.3 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees present a professional appearance at all times and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
2.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
3.0 PERIOD OF PERFORMANCE
The period of performance for this contract shall not exceed 45 calendar days from the date of award, unless otherwise approved by the contracting officer.
3.1 PLACE OF PERFORMANCE
The primary place of performance will be:
U. S. Coast Guard STATION BAYFIELD
209 S. 1ST ST
BAYFIELD, WI 54814
3.2 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 7:00 am and 6:00 pm CST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. In the event Contractor personnel must work outside of the above specified work hours, the contractor will coordinate with onsite Coast Guard Rep.
PAGE 5/10
4.0 GOVERNMENT FURNISHED RESOURCES
The Government will supply 120v AC power and onsite cold water via a residential style water spigot.
5.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract.
6.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
The Contractor shall have 10 business days to make corrections and redeliver.
7.0 Project Pictures
Shower tub combination #1
PAGE 6/10
PAGE 7/10
PAGE 8/10
Shower Tub combination #2
PAGE 9/10
PAGE 10/10
Walk in shower #3