Solicitation 70Z03024QCLEV0121 - Statement of Work.pdf
PDF 2 MB Posted
- Attached to
- 70Z03024QCLEV0121 - Sewage Lift Pump(s) Replacement Project for U. S. Coast Guard Station Portage
- Solicitation number
- 70Z03024QCLEV0121
About this file
This document is a Statement of Work (SOW) for the replacement of sewage lift pumps at the U.S. Coast Guard (USCG) Station Portage in Dollar Bay, Michigan. The SOW outlines the requirements for the base bid to replace one failed 5 hp, 200V, 21.6-amp, 1750 rpm 3-phase lift pump, including furnishing and installing a new pump, control panel repairs, and providing a one-year warranty. It also includes an option to replace the second pump with the same specifications. The period of performance is not to exceed 60 calendar days from the date of award. The applicable NAICS code is 237110 (Water and Sewage Line and Related Structure Construction) with a small business size standard of $45.0M. The procurement is estimated to be less than $25,000. Interested parties should register on SAM.gov under the solicitation number 70Z03024QCLEV0121 to receive any amendments.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation 70Z03024QCLEV0121 - USCG Station Portage Sewage Lift Pump(s) Replacement Project.doc | DOC document | |
| Reference Information Sheet.docx | DOCX document | |
| Request for Information.docx | DOCX document | |
| Solicitation 70Z03024QCLEV0121 - SF1442.pdf | ||
| Solicitation 70Z03024QCLEV0121 - Wage Determination.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 70Z03024QCLEV0121 Replacement Sewage Lift Pump(s) at USCG Station Portage
PAGE 1/8
STATEMENT OF WORK (SOW)
FOR
Replacement of Sewage Lift Pump(s) at USCG Station Portage MI
1.0 GENERAL
United States Coast Guard (USCG) Station Portage in Dollar Bay MI is planning to enter negotiations with a contractor. The USCG is seeking a contractor to replace the sewage lift pump(s) on the property. Prior to submitting a quote, it is mandatory to examine the SOW and it is highly recommended to visit the facility to take field evaluations and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Portage MI.
1.1 BACKGROUND
During a recent inspection, one of the two existing sewage lift pumps failed and caused an overload which tripped the breaker. The pump needs replacement. The source of failure was noted as sludge build up as well as a malfunction of the alternating relay. In addition to pump replacement, the control panel needs replacement of the interior heater, alternating relay. The panel also needs the alarm upgraded to a combination visual/audible alarm from existing visual only. This statement of work includes a base bid the replacement of one lift pump and control panel repairs but includes the option of replacing the second pump with the same pump supplied in the base bid.
1.2 SCOPE
Base Bid:
• Remove one failed 5hp, 200v, 21.6-amp, 1750 rpm 3 phase lift pump.
• Furnish and install new pump that meets existing capabilities (data plate shown in enclosed pictures). Contractor to submit pump specifications to COR for review and approval.
• Furnish and install all hardware and chains for mounting.
• Make all connections to include piping and electrical.
• Furnish and install replacement control panel heater.
file://hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc file://hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc file://hqnas/SHARED/G-A/G-ACS/CAAT%20Team/TOOLBOX/SCOPE%20PARAGRAPHS.doc
PAGE 2/8
• Furnish and install replacement alternating relay in control panel.
• Furnish and install combination visible/audible alarm to replace existing visual only alarm.
• Make all electrical connections and test operation.
• Perform a startup on the equipment.
• Verify proper operation.
• Provide all equipment needed to access the heater locations.
• Provide training to on-site representative on controls.
• Provide a one-year warranty on labor and materials.
Option Bid:
• Remove second 5hp lift pump and furnish/install replacement that matches pump in base bid.
• Furnish and install all hardware and chains for mounting.
• Make all connections to include piping and electrical.
• Furnish and install two 6” risers for lift station access.
• Furnish soil and grass seed needed to level soil surrounding new covers to existing area.
• Make all electrical connections and test operation.
• Perform a startup on the equipment.
• Verify proper operation.
• Provide all equipment needed to access the heater locations.
• Provide training to on-site representative on controls.
• Provide a one-year warranty on labor and materials.
1.3 OBJECTIVE
The goal is to restore full functionality of the sewage lift stations and improve the monitoring and access of the site.
1.4 APPLICABLE DOCUMENTS
Enclosures of existing lift stations attached to show current configuration and conditions contractors may expect.
2.0 SPECIFIC REQUIREMENTS/TASKS
Please see the Scope of the SOW
3.0 CONTRACTOR PERSONNEL
Contractor personnel will have the appropriate certifications for working on wastewater and sewage systems.
PAGE 3/8
3.1 QUALIFIED PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
3.2 CONTINUITY OF SUPPORT
The Contractor shall ensure that the contractually required level of support for this requirement is always maintained. The Contractor shall ensure that all contract support personnel are present for all hours of the workday. If for any reason the Contractor staffing levels are not maintained due to vacation, leave, appointments, etc., and replacement personnel will not be provided, the Contractor shall provide e-mail notification to the Contracting Officer’s Representative (COR) prior to employee absence. Otherwise, the Contractor shall provide a fully qualified replacement.
3.43 EMPLOYEE CONDUCT
Contractor’s employees shall comply with all applicable Government regulations, policies, and procedures (e.g., fire, safety, sanitation, environmental protection, security, “off limits” areas, wearing of parts of DHS uniforms, and possession of weapons) when visiting or working at Government facilities. The Contractor shall ensure Contractor employees always present a professional appearance and that their conduct shall not reflect discredit on the United States or the Department of Homeland Security. The Project Manager shall ensure Contractor employees understand and abide by Department of Homeland Security established rules, regulations and policies concerning safety and security.
3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS
The Government may, at its sole discretion (via the Contracting Officer*), direct the Contractor to remove any Contractor employee from DHS facilities for misconduct or security reasons. Removal does not relieve the Contractor of the responsibility to continue providing the services required under the contract. The Contracting Officer will provide the Contractor with a written explanation to support any request to remove an employee.
4.1 PERIOD OF PERFORMANCE
The period of performance for this contract shall not exceed 60 calendar days from the date of award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be the United States Coast Guard Station Portage at 22911 Chippewa Trail, Dollar Bay MI 49922.
PAGE 4/8
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0800 and 1700 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. For such occasions, approval shall be granted by the on-site representative.
4.4 TRAVEL
Contractor travel shall not be required for this requirement.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will provide typical electricity via a standard 110/120v outlet for operating power tools and water via garden hose connection as needed in support of this contract.
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all facilities, materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in SOW
2.0 and SOW 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the COR will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
7.1 The COR will have the right to reject or require correction of any deficiencies found in the deliverables that are contrary to the information contained in the Contractor’s accepted proposal. In the event of a rejected deliverable, the Contractor will be notified in writing by the COR of the specific reasons for rejection. The Contractor may have an opportunity to correct the rejected deliverable and return it per delivery instructions.
7.3 The Contractor shall have 30 business days to make corrections and redeliver.
7.4 Enclosures
Photos of site and equipment, additional available from unit POC: MK1 Daniel Langley Daniel.J.Langley@uscg.mil, (906)482-1520 mailto:Daniel.J.Langley@uscg.mil
PAGE 5/8
PAGE 6/8
PAGE 7/8
PAGE 8/8
| 1.1 BACKGROUND |
| 1.2 SCOPE |
| 1.4 APPLICABLE DOCUMENTS |
| 2.0 SPECIFIC REQUIREMENTS/TASKS |
| 3.0 CONTRACTOR PERSONNEL |
| 3.1 QUALIFIED PERSONNEL |
| 3.2 CONTINUITY OF SUPPORT |
| 3.43 EMPLOYEE CONDUCT |
| 3.4 REMOVING EMPLOYEES FOR MISCONDUCT OR SECURITY REASONS |
| 4.1 PERIOD OF PERFORMANCE |
| 4.2 PLACE OF PERFORMANCE |
| 4.3 HOURS OF OPERATION |
| 6.0 CONTRACTOR FURNISHED PROPERTY |
| 7.0 GOVERNMENT ACCEPTANCE PERIOD |
File details come from the government source that posted it. Updated .