Solicitation 36C24223Q0307_1.pdf

PDF 657 KB Posted

Attached to
J044--Boiler Safety Device Inspection, Testing, Calibration, and Combustion Analysis Service
Solicitation number
36C24223Q0307
Issued by

View the file

Other files

File Type Posted
Amendment 36C24223Q0307 0001.pdf PDF
1810 D 2023-01-04.pdf PDF
B.2 REVISED SOW.pdf PDF
B.3 REVISED PRICE COST SCHEDULE.pdf PDF
Wage Determination 2015-4211.pdf PDF
Wage Determination 2015-4209.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF 1. REQUISITION NO.

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NO. 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

a. NAME b. TELEPHONE NO. (No Collect Calls) 8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

17a. CONTRACTOR/OFFEROR CODE FACILITY CODE 18a. PAYMENT WILL BE MADE BY CODE

TELEPHONE NO. UEI: EFT:

PHONE: FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19. 20. 21. 22. 23. 24.

ITEM NO. SCHEDULE OF SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________ 29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION (REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

36C24223Q0307 02/07/2023

Jacob.Burg@VA.gov 716-862-7461 x21464 02/17/2023

NOON EST

Department of Veterans Affairs

Network Contracting Office (NCO) 2

2875 Union Road

Suite 3500

Cheektowaga NY 14227

X 100

X

238220

$16.5 Million

N/A

X

New Jersey Healthcare System

East Orange and Lyons campuses

Network Contracting Office (NCO) 2

2875 Union Road

Suite 3500

Cheektowaga NY 14227

Tungsten Network https://www.tungsten-network.com/ customer-campaigns/veteransaffairs/

See CONTINUATION Page

Boiler Safety Device Inspection, Testing, Calibration, Combustion Analysis, and Emergency Response Service at

VANJHCS per Statement of Work Section B.2.

See Instructions to Offerors and Evaluation Factors E.1,2,5

Service Contract Labor Standards Wage Determinations apply and are attached.

See CONTINUATION Page

X X

X 01

Jacob Burg

Contracting Officer

36C24223Q0307

Table of Contents

SECTION A

A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

B.2 STATEMENT OF WORK (SOW)

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS

AND COMMERCIAL SERVICES (DEC 2022)

C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000) ... 29

C.4 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

C.5 VAAR 852.212-70 PROVISIONS AND CLAUSES APPLICABLE TO VA

ACQUISITION OF COMMERCIAL ITEMS (APR 2020)

C.6 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) ... 31

C.7 SUPPLEMENTAL INSURANCE REQUIREMENTS

C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT

STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (DEC 2022)

SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS

SECTION E - SOLICITATION PROVISIONS

E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND

COMMERCIAL SERVICES (NOV 2021)

E.2 ADDENDUM to FAR 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

E.3 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

E.4 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

E.5 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL

SERVICES (NOV 2021)

E.6 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C242 Jacob.Burg@VA.gov

Network Contracting Office (NCO) 2

2875 Union Road

Suite 3500

Cheektowaga NY 14227

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X] 52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or

[] 52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly []

b. Semi-Annually [X]

c. Other []

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment

Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO DATE

B.2 STATEMENT OF WORK (SOW)

BOILER PLANT SAFETY DEVICE TESTING, CALIBRATION, COMBUSTION ANALYSIS,

AND EMERGENCY REPAIR SERVICE

1. BACKGROUND:

The VANJ HealthCare System (VANJHCS) requires an annual service contract to calibrate all pressure gauges, boiler and plant controls and instrumentation (recorders and transmitters).

Boiler Plant Safety Device maintenance, inspection, testing and calibration. Boiler Combustion /

Emissions testing and tuning and Emergency Repair Service on nine (9) Cleaver Brooks Fire

Tube Boilers and Auxiliary Equipment that provide steam to the East Orange and the Lyons VA

Medical Center.

1. Both VAMC’s have a central boiler plant to provide steam for heating and air conditioning, domestic hot water, kitchens, and sterilization.

2. Boiler plant safety, reliability, efficiency, and equipment longevity are paramount concerns of Veterans Affairs Medical Center (VAMC) management. Boilers are extremely dangerous if not maintained properly. Malfunctioning burners or controls can cause catastrophic events resulting in injuries and death as well as massive property damage. Inaccurate or inadequate data management and monitoring systems can fail to warn of unsafe or inefficient performance. Regular inspections, testing and calibration by expert technicians are an essential part of a program to address these concerns.

3. This statement of work describes the requirements for the inspection, testing and calibration of the boiler plant burners, controls, instruments, and safety devices by qualified technicians in accordance with VHA Directive 1810 and the VHA Boiler Safety

Device Testing Manual (6th Edition).

4. VHA Directive 1810 requires annual and semi-annual Boiler and associated plant safety device inspection, testing, calibration, and semi-annual combustion / emissions adjustments / tuning, VHA Directive 1810 requires these services to be performed by a qualified professional third party that has documented knowledge and experience in the design and construction and VA’s standards for construction and testing of safety devices. In addition, the individual shall have demonstrated experience in conducting equipment assessments and performing testing in compliance with the VA safety device testing manual on at least 5 sites within the past 3 years.

2. OBJECTIVE:

This service contract is an annual maintenance contract on the Boilers and associated plant equipment at the East Orange VA Medical Center and the Lyons VA Medical Center to meet the requirements for the inspection, testing, tuning and calibration of the boiler plant burners, controls, all instrumentation including pressure gauges, transmitters, and safety devices by qualified technicians in accordance with VHA Directive 1810 and the VHA Boiler Safety Device

Testing Manual (6th Edition).

3. LOCATION OF SERVICES:

East Orange VA Medical Center

385 Tremont Avenue

East Orange, NJ 07018

Lyons VA Medical Center

151 Knollcroft Road

Lyons, NJ 07939

4. PERIOD OF PERFORMANCE:

Estimated BASE period 3/1/2023 to 02/29/2024 with three (3) annual option periods.

5. EQUIPMENT:

A. East Orange VA Medical Center campus:

1. Boiler #1 Cleaver Brooks Model CB 200X-600 Serial# OLO88369 SWP 200 20700 lbs/hr. Input 25,106,000 BTU/HR Nat Gas

2. Boiler #2 Cleaver Brooks Model CB 200X-600 Serial# OLO88368 SWP 200 20700 lbs/hr. Input 25,106,000 BTU/HR Nat Gas

3. Boiler #3 Cleaver Brooks Model CB 200X-600 Serial# OLO88367 SWP 200 20700 lbs/hr. Input 25,106,000 BTU/HR Nat Gas

4. Boiler #4 Cleaver Brooks Model CB 200X-600 Serial# L99715 SWP 200 20700 lbs/hr. Input 25,106,000 BTU/HR Nat Gas

5. D.A. Tank Cleaver Brooks Model# BM-42 Serial# DG-5941 50,000 lbs/hr

6. Condensate Tank Wendland Manuf. Corp NB-5452 Serial# 36616

B. Lyons VA Medical Center campus:

1. Boiler #1 Cleaver Brooks Model CB 200-700 Serial# OLO94344 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil

2. Boiler #2 Cleaver Brooks Model CB 200-700 Serial# L-90891 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil

3. Boiler #3 Cleaver Brooks Model CB 200-700 Serial# L-90892 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil

4. Boiler #4 Cleaver Brooks Model CB 200-700 Serial# L-90890 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil

5. Boiler #5 Cleaver Brooks Model CB 200-700 Serial# OLO94345 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil

6. D.A. Tank East Fabricators Serial# 12774 Vessel# NB 3807 Manufactures Rating

3400-Gal Design pressure 30 PSI Safety valve setting 15/20 PSI Shell thickness

.3125”

7. Condensate/Surge Tank East Fabricators Serial# 12783 Vessel# NB 3783

Manufactures Rating 3100-Gal Design pressure 25 PSI Vented 3” Line

6. SCOPE OF WORK:

The contractor will furnish all labor, materials, supplies, equipment, and transportation necessary to accomplish the services contained within this contract. The selected contractor will perform annual and semi-annual calibration of all pressure gauges, boiler and plant controls, controllers, transmitters, recorders, and all other instrumentation contained within the Boiler

Plant IAW VA Directive 1810. The selected contractor will perform annual and semi-annual

Boiler and Plant Safety Device testing on all nine (9) of the boilers and associated plant equipment at the VANJHCS Lyons and East Orange Campuses. Ensuring that all safety devices are plumbed correctly and in its correct place, safety device set point is correct, safety device activates at the correct set point and the safety device produces the required effect.

Safety device identification and labeling including set point and normal operating range is to be determined and set prior to test. Calibration/test sticker shall be affixed to each equipment and device after completion of tests. The selected contractor will also perform semi-annual Boiler

Combustion Emissions Tuning of all nine (9) of the boilers. All testing will be as specified in VHA

Directive 1810 and the VHA Boiler Safety Device Testing Manual (6th Edition) and where not defined will be IAW good engineering and proven past practice accepted by industry standards and equipment manufactures.

A. SEMI-ANNUAL BOILER SAFETY DEVICE TESTING INSPECTIONS

Perform the required semiannual maintenance specified by VHA Directive 1810 on Boiler Plant

Safety Devices. The VHA Boiler Plant Safety Device Testing Manual (6th Edition) will be used as the only procedure to test all Boiler Safety Devices. All Boiler Safety Device Inspections must be scheduled with the COR. Boiler Safety Devices will be tested every 6 months and must not interfere with Boiler cleanings and inspections. A detailed report of inspection for each safety device tested must be supplied to the COR. All failures must be immediately reported to the

COR and the Boiler Plant Operator. Replace any device that fails and is not able to be repaired or calibrated following the guidelines of unscheduled maintenance. Any new device must be calibrated to its proper set point and tested. If a test procedure will not achieve the desired results due to a fault in the written test procedure or configuration of the device the contractor will devise a new procedure that will accomplish the same end results and submit the procedure to the COR for approval. The contractor will then be provided written direction on how to proceed.

NOTE: Prior to the semi-annual and annual services, contractor shall ensure the following is performed:

• Verify the following boiler safety devices are in the correct locations and plumbed correctly.

• Verify the safety device set points are correct in relation to normal operating values.

• Verify the safety device activates and resets at the correct set points.

• Verify the safety device produces the required flame safeguard shutdown and audible/ visual annunciation.

Inspection, Testing, and Calibration Requirements:

1. Technicians shall provide all tools and labor necessary to perform inspection, tuning, testing, calibrating, and adjustments of burners and boiler and boiler plant controls as specified below. This shall be completed every 6 months in accordance with a schedule provided by VAMC. VAMC may extend the schedule for burners in limited service.

2. Instrumentation, monitoring, and data management systems as listed below shall be calibrated every 6 months.

3. Provide at least 2-weeks-notice to the Contracting Officer’s Representative (COR) prior to performing the work. Work cannot be scheduled during heavy steam load periods.

Only one boiler at a time can be out of service for the inspection, testing, and calibration procedures. Work must be conducted when the COR or his/her designate is available on site to monitor the work.

4. The VA Medical Center (VAMC) will have the boilers that are to be serviced prepared for the technicians upon their scheduled arrival. This includes having the boilers fully warmed and at normal steam pressure; steam exhaust silencer system operable; all boiler, burner, and fuel train pressure gauges and thermometers calibrated; fuel meters in accurate operation; boiler steam flow, stack temperature, and flue gas oxygen instruments operating.

5. The VAMC will comply with any other requirements of the test personnel that are considered reasonable by VAMC and have been presented in writing at least 2 weeks prior to the scheduled testing.

6. The inspections, testing and calibrations shall comply with:

a. The recommendations and requirements of VHA Boiler Plant Safety Devices

Testing Manual, (6th Edition).

b. The written recommendations of the equipment manufacturers.

c. The requirements and recommendations of NFPA® 85: Boiler and Combustion

Systems Hazards Code including applicable appendices.

d. Burner performance requirements from the burner manufacturer.

7. A summary of the work is as follows:

a. Review boiler plant log sheets.

b. Review records that show combustion performance (flue gas oxygen and carbon monoxide).

c. Perform overall visual inspection of systems. Verify that systems comply with referenced codes and VAMC requirements stated in this contract.

d. Test and record the operation and set points of all burner/boiler safety interlock devices. Verify that the set points and operating points are within approximately

20 percent of normal operating parameters. Adjust as necessary and record the new settings. The operation of a device must result in burner shutdown and/or proper alarm operation.

e. Operate burner(s) on each fuel from low fire to high fire and back to low fire in at least six increments and record combustion performance (flue gas oxygen, carbon monoxide, nitrous oxide, where applicable), fuel train pressures, atomizing train pressures, burner pressures, stack temperatures, boiler steam output.

f. Compare the combustion performance data with VAMC requirements and previous readings. If necessary, adjust the fuel flow and combustion air controllers, control valves and dampers to obtain the required performance.

Record the new performance data.

g. Verify accuracy of instrumentation. Verify that all devices are properly selected for the application in terms of type, size, set point range, performance, and code approval. Calibrate all instruments that are not within manufacturer specifications for accuracy.

h. Immediately inform the COR of any recommended repairs or modifications.

8. All interlocks and safety devices to be inspected and tested on each boiler/burner/equipment are contained in the VHA Boiler Plant Safety Devices Testing

Manual, (4th Edition), along with testing procedures.

9. Required burner performance (natural gas and fuel oil):

a. Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1

(Refer to original burner specification).

b. Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.

c. Maximum carbon monoxide: 200 parts per million (ppm).

d. Maximum nitrous oxide: refer to original burner specification.

e. Flue gas oxygen: 2.5-4.2 percent (Up to 5.2 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate, oxygen can be one percentage point higher on oil firing on single-point positioning systems).

f. Flue gas oxygen (low excess air burners): 1.0-2.0 percent (Up to 2.5 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate: oxygen can be one percentage point higher on oil firing on single point positioning systems).

g. No visible smoke.

h. Flames shall be stable with no pulsations, shall be retained near burner, no blow off or flashbacks, no constant flame impingement on refractory.

10. List of instrumentation and controls to be inspected and calibrated:

a. Steam flow transmitters (all).

b. Steam flow recorders/computer readout.

c. Flue gas oxygen sampling, analyzing, and recorder/computer readout.

d. Boiler and economizer stack temperature transmitters and recorder/computer readout.

e. Master steam pressure and combustion controllers.

f. Boiler water level controllers.

g. Feedwater deaerator and condensate storage tank water level controllers including overflow.

h. All pressure and temperature devices, sensors, and transmitters.

i. All signal processing and readout devices.

B. SEMI-ANNUAL BOILER TUNE UPS

All nine Boilers must be tuned at least once every six months. A qualified person will be used to tune the boilers and a report of the results of the tuning will be submitted to the COR. The tuning performed will be on Natural Gas and on Fuel Oil. The Boilers will be tuned at a minimum of six points through the entire range of 0-100% Boiler Firing Rate.

C. SAFETY DEVICES TO BE TESTED

High Water Alarm on Condensate Tank (HWACT)

Low Water Alarm on Condensate Tank (LWACT)

High Water Alarm on Deaerator Tank (HWADT)

Low Water Alarm on Deaerator Tank (LWADT)

Deaerator Overflow Drain System (DAODS)

Deaerator Safety Valve (DASV)

Safety Valve Following DA PRV (SVFPRV) – Steam

Safety Valve Following PRV (SVFPRV)-Other

Liquid Relief Valve on Oil Pump Set (LRVOPS)

Liquid Relief Valve on Economizer (LRVE)

Propane Pilot Backup System

Carbon Monoxide and Combustible Gas Alarms in the Boiler Plant

High Gas Pressure Alarm

Outside Air Damper Interlock (OADI)

Low Water Alarm and Cutoffs on Boiler (LWA/LWCO/ALWCO)

High Water Alarm on Boiler (HWAB)

Recycle and Non-Recycle Boiler Steam Pressure Limit Switches (RBSPLS & NRBPLS)

Steam Safety Valves on Boiler (SVB)

Low Fuel Gas Pressure Cutoff Switch (LFGPCS)

High Fuel Gas Pressure Cutoff Switch (HFGPCS)

Automatic Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (AFGSOV &

AFGSVV) - Main Gas

Automatic Pilot Fuel Gas Shutoff Valves and Solenoid Vent Valve Seat Leakage (APFGSOV &

APFGSVV) - Pilot Line

Proof of Closure on Automatic Fuel Shutoff Valves (POC-AFGSOV) -Natural Gas

Flame Scanner-for main flame out (FSMFO)

Flame Scanner Not Sensing Igniter Spark (FSNSIS)

Igniter Timing (IT)

Main Flame Ignition Timing (MFIT)

Pre-Purge and Post-Purge Timing (PPT)

Low-Fire Proving Switch (LFPS)

Forced Draft Damper Wide-Open Pre-Purge Proving Switch (FDDWOPS)

Combustion Air Pressure Switch (CAPS)-Constant Speed or Variable Speed Fan

Purge Airflow Proving Switch (PAPS)

Forced Draft Motor Interlock Switches (FDMIS)

Outlet Stack Damper Position Interlock Switch (OSDPI)

Furnace Pressure Interlock (FPI)

Low Pilot Fuel Gas Pressure Cutoff Switch (LPFGPCS)

Flue Gas Recirculation Damper Interlock (FGRDI)

Low Flue Gas Oxygen Level Interlock (LFGOLI)

Low Fuel Oil Pressure Cutoff Switch (LFOPCS)

High Fuel Oil Pressure Cutoff Switch (HFOPCS)

Low Atomizing Media Pressure Switch (LAMPS)

Low Atomizing Media Differential Pressure Switch (LAMDPS)

Low Atomizing Media Flow Switch (LAMFS)

Automatic Fuel Oil Shutoff Valves (AFOSV) - for Seat Leakage

Proof of Closure on Automatic Fuel Oil Shutoff Valves (POC-AFOSV)

Oil Burner Position Switch (OBPS)

Emergency Stop/Panic Buttons (ESPB)

7. REPORTING REQUIREMENTS:

A. Provide complete written report of the inspection fully describing all tests performed, all findings, and recommendations. At a minimum the following information will be delivered to the COR in a table (Excel or Word):

a. The first column, labeled “Function,” did the device pass or fail.

b. The second column, labeled “Device,” list the device number and description in accordance with the VHA Boiler Plant Safety Devices Testing Manual, (4th

Edition).

c. The third column, labeled “Deficiencies-Recommendations.”

d. The fourth column, labeled “Corrective Actions,” lists any corrective actions taken during the inspection.

e. The fifth column with the date tested.

f. The sixth column with person performing the test.

g. The seventh column will be for comments.

B. Furnish report within 1 week of each facility inspection in Microsoft Word format by email to the COR. Provide hard copies of data sheets and flue gas analyzer strip printouts to the COR within 1 week of visit.

C. All safety-related deficiencies shall be immediately reported to the COR, Boiler Plant

Supervisor and/or Assistant Chief Engineer during the inspection visit.

8. QUALIFICATIONS / CERTIFICATIONS:

Technicians must have electrical safety training to meet the requirements of NFPA 70e.

Technicians must have taken the OSHA Certified 10-hour construction safety course.

Technicians must complete at least a 1 year of trade school and have 5 years of successful experience in this field. The experience shall be largely with institutional and industrial boiler plants similar in design to the VAMC plant. The VAMC facility manager/engineer may define and accept equivalent qualifications.

Technicians must demonstrate familiarity with and ready access to the current versions of the following references:

• National Fire Protection Association (NFPA) 85

• Boiler and Combustion Systems Hazards Code

• VHA Boiler Plant Safety Device Testing Manual, 6th Edition

Technicians must be equipped with portable electronic flue gas analyzers and other test instruments necessary for the required tests and calibrations, all calibrated within 1 month of the site visits. At facilities with programmable digital controls, the technicians must be capable of programming the controls and have the appropriate hardware and software for this.

9. SAFETY REGULATIONS:

• All applicable safety regulations shall be observed during all work of this contract.

• VA Police will issue identification badges to contractors, employees and subcontractors which must be always worn when on VA property

• Contractor shall keep the area cleaned daily and haul away all debris to a designated container

• The VA Safety Officer shall have full authority to see that the contractor obeys all safety rules and regulations relative to the fulfillment of this contract.

• Provide the necessary barricades/signage where required.

Contractor shall comply with all applicable Federal, State, and local requirements regarding workers health and safety. The requirements include, but are not limited to, those found in

Federal and State Occupational Safety and Health Act (OSHA) statutes and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR), Parts 1910 and 1926, NFPA 70E, Article 130.7 29 CFR 1910.132(d)(1)(iii), 29CFR1910.1372.K.4

10. SCHEDULING AND HOURS OF WORK:

• All work in areas involved shall be scheduled with the VA Chief of Operations

Supervisor.

• Work shall be scheduled for proper execution to completion of this contract.

• Hours of work. The work will be conducted during normal working hours 0800-1630

Monday – Friday excluding 11 Federal Holidays.

• Emergency service shall be provided 24 hours, 7 days a week. During this period, corrective maintenance will be initiated by VANHCS Personnel by telephone to the service center, which must be acknowledged within 2 hours.

• A fully qualified service technician must be on-site within 8 hours of acknowledgement of the service call. The equipment shall be restored to full service within 48 hours of arriving on the job site, barring extenuating circumstances. Full service means that defective parts have been replaced with parts that meets or exceeds the manufactures original specifications and that the equipment meets or exceeds the manufactures original performance specifications.

11. INSPECTION:

Upon completion of the service, the COR/POC will perform the inspection in the presence of the contractor personnel, prior to the contractor personnel leaving the facility. This inspection will ensure that all equipment is returned to full functioning condition No invoices will be processed for payment prior to the completion of COR/POC inspection.

12. UNSCHEDULED SUPPLEMENTAL REPAIR SERVICES:

The VA may, during the term of this Contract, request that the Contractor perform unscheduled supplemental services which are outside the requirements of the Base Services in support of the efficient operation and repair of the Boilers and associated equipment. The Contractor must not invoice or perform any work unless a modification to the contract has been issued. VA shall incur no obligation for work that is not authorized in advance. The Contractor must provide the

COR a detailed total cost estimate including an itemized breakdown for all labor, parts and materials and shipping.

Supplemental Service includes unscheduled repairs and services found to be reasonably priced on the following items:

• boiler housing, doors, and access cover plates

• internal boiler, vessel, shell

• fire eyes, gaskets, bolts & nuts, piping and supports

• sensing pipelines, vents

• all valves, hand wheels, valve stems, valve plugs, and collars

• gauges, temperature and pressure sensors and indicators

• steam traps, pipe nipples, drains

• safety valves, O.S.& Y. valves

• floats, damper vanes, linkages

• purge controls, fire / combustion controls and instrumentation

• automation panels and control electronics

• boiler safeties

• fuel devices, (both natural gas and #2 fuel oil) and their controllers, fuel regulators and valves, pumps

• fans, motors, bearing housings, shafts and dampers, pumps, and couplings

• stack assemblies, roof bonnets and penetration sleeves

• equipment alignment, balancing, and vibration analysis

• other mechanical components, as necessary

• electronic diagnostics and repair or re-calibration of instruments, installation of insulation, welding (Code R certified for ASME work), refractory repairs.

The contractor will provide to the COR complete pricing and list of repairs and/or parts required to review and Contracting Officer approval before any performance is made at the Lyons or East

Orange campus. If any submitted supplemental pricing is determined not to be reasonable or can be performed by VA employees, then this complete or even partial repair will not be performed under this contract and other means of remedy/solution will be explored.

13. OTHER RELATED SERVICES (Not Included in the Scope of Work)

Any services not expressly stated in this statement of work are not authorized. Services such as repair vital to the continued functioning of the systems may be added only after written modification from the contracting officer unless they are inclusive to the requested services. No other person, including the COR or any other VA personnel are authorized to request additional work be performed by the contractor. Any additional services performed that are not authorized by the contracting officer will be considered inclusive.

14. MISCELLANEOUS

VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety

Protocols for Federal Contractors (Amended October 25, 2021)

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, must show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the

COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated and granted a medical or religious exception, must show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

3) Documentation cited in this section must be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer

Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors must, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19

Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients must self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors must, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA

Facilities.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.va.gov%2Fcovid19screen%2F&data=04%7C01%7C%7Ceec8cc99f2614e1aab4308d9a9cca3f1%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637727518649295198%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=GLWrOOZGrMLVt0CEYuyd6LJJ9dRCExcqjWMwlYBXWAE%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.va.gov%2Fcovid19screen%2F&data=04%7C01%7C%7Ceec8cc99f2614e1aab4308d9a9cca3f1%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637727518649295198%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=GLWrOOZGrMLVt0CEYuyd6LJJ9dRCExcqjWMwlYBXWAE%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.va.gov%2Fcovid19screen%2F&data=04%7C01%7C%7Ceec8cc99f2614e1aab4308d9a9cca3f1%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C637727518649305152%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000&sdata=Twzm3QsLo2mujjy9oS8s240pPamF80aMyh3mRwL9wg8%3D&reserved=0

B.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBE

R

DESCRIPTION OF

SUPPLIES/SERVICE

S

QUANTIT

Y UNIT UNIT PRICE AMOUNT

2.00 JB

X2

SEMI-ANNUAL BOILER PLANT SAFETY DEVICE TESTING,

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

EAST ORANGE CAMPUS

Contract Period: Base POP Begin: 03-01-2023 POP End: 02-29-2024

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

LYONS CAMPUS

Contract Period: Base

1.00 JB Not Separately

Priced (NSP)

$0.00

EMERGENCY/UNSCHEDULED REPAIR SERVICE PER

SOW

EAST ORANGE CAMPUS

Contract Period: Base

1.00 JB NSP $0.00

EMERGENCY/UNSCHEDULED REPAIR SERVICE PER

SOW

LYONS CAMPUS

Contract Period: Base

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

EAST ORANGE CAMPUS

Contract Period: Option 1 POP Begin: 03-01-2024 POP End: 02-28-2025

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

LYONS CAMPUS

Contract Period: Option 1

SOW

EAST ORANGE CAMPUS

Contract Period: Option 1

SOW

LYONS CAMPUS

Contract Period: Option 1

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

EAST ORANGE CAMPUS

Contract Period: Option 2 POP Begin: 03-01-2025 POP End: 02-28-2026

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

LYONS CAMPUS

Contract Period: Option 2

SOW

EAST ORANGE CAMPUS

Contract Period: Option 2

SOW

LYONS CAMPUS

Contract Period: Option 2

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

EAST ORANGE CAMPUS

Contract Period: Option 3 POP Begin: 03-01-2026 POP End: 02-28-2027

CALIBRATION, COMBUSTION ANALYSIS PER SOW.

LYONS CAMPUS

Contract Period: Option 3

SOW

EAST ORANGE CAMPUS

Contract Period: Option 3

SOW

LYONS CAMPUS

Contract Period: Option 3

GRAND

TOTAL

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES (DEC 2022)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The

Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered;

and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims

Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the

Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the

Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the

Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by

Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt

Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-

5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting

Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the

Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on—

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in FAR 32.608-2 in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the

Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor's records. The

Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

(m) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for any amount for supplies or services not accepted, and the

Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

(n) Title. Unless specified elsewhere in this contract, title to items furnished under this contract shall pass to the Government upon acceptance, regardless of when or where the Government takes physical possession.

(o) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.

(p) Limitation of liability. Except as otherwise provided by an express warranty, the Contractor will not be liable to the Government for consequential damages resulting from any defect or deficiencies in accepted items.

(q) Other compliances. The Contractor shall comply with all applicable Federal, State and local laws, executive orders, rules and regulations applicable to its performance under this contract.

(r) Compliance with laws unique to Government contracts. The Contractor agrees to comply with 31 U.S.C. 1352 relating to limitations on the use of appropriated funds to influence certain

Federal contracts; 18 U.S.C. 431 relating to officials not to benefit; 40 U.S.C. chapter 37, Contract Work Hours and Safety Standards; 41 U.S.C. chapter 87, Kickbacks; 41 U.S.C. 4712 and 10 U.S.C. 4701 relating to whistleblower protections; 49 U.S.C. 40118, Fly American; and

41 U.S.C. chapter 21 relating to procurement integrity.

(s) Order of precedence. Any inconsistencies in this solicitation or contract shall be resolved by giving precedence in the following order:

(1) The schedule of supplies/services.

(2) The Assignments, Disputes, Payments, Invoice, Other Compliances, Compliance with

Laws Unique to Government Contracts, and Unauthorized Obligations paragraphs of this clause;

(3) The clause at 52.212-5.

(4) Addenda to this solicitation or contract, including any license agreements for computer software.

(5) Solicitation provisions if this is a solicitation.

(6) Other paragraphs of this clause.

(7) The Standard Form 1449.

(8) Other documents, exhibits, and attachments

(9) The specification.

(t) [Reserved]

(u) Unauthorized Obligations.

(1) Except as stated in paragraph (u)(2) of this clause, when any supply or service acquired under this contract is subject to any End User License Agreement (EULA), Terms of Service

(TOS), or similar legal instrument or agreement, that includes any clause requiring the

Government to indemnify the Contractor or any person or entity for damages, costs, fees, or any other loss or liability that would create an Anti-Deficiency Act violation (31 U.S.C. 1341), the following shall govern:

(i) Any such clause is unenforceable against the Government.

(ii) Neither the Government nor any Government authorized end user shall be deemed to have agreed to such clause by virtue of it appearing in the EULA, TOS, or similar legal instrument or agreement. If the EULA, TOS, or similar legal instrument or agreement is invoked through an “I agree” click box or other comparable mechanism (e.g., “click-wrap” or “browse-wrap” agreements), execution does not bind the Government or any Government authorized end user to such clause.

(iii) Any such clause is deemed to be stricken from the EULA, TOS, or similar legal instrument or agreement.

(2) Paragraph (u)(1) of this clause does not apply to indemnification by the Government that is expressly authorized by statute and specifically authorized under applicable agency regulations and procedures.

(v) Incorporation by reference. The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of Clause)

ADDENDUM to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

Clauses that are incorporated by reference (by Citation Number, Title, and Date), have the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.

The following clauses are incorporated into 52.212-4 as an addendum to this contract:

C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract.