Embassy of the United States of America Riyadh, Saudi Arabia

June 10, 2026

Dear Prospective Quoter:

Subject: Request for Quotations number 19SA7026Q0009

Enclosed is a Request for Quotations (RFQ) for Roof Repairs and Insulation at DOW Annex Offices. If you would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on Standard Form 1449 that follows this letter.

The U.S. Government intends to award a contract to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

The Embassy intends to conduct a pre-proposal conference at the site, The pre-proposal conference will be held on June 24, 2026, 1000h (local time) at the Annex, Riyadh. Prospective offerors should contact RiyadhContracting@state.gov by June 15, 2026, 1700h for additional information or to arrange entry to the building.

Quotations are due by July 12, 2026, 1700h Saudi Arabian Time. No quotations will be accepted after this time. Quotations must be in English and incomplete quotations will not be accepted.

Direct any questions regarding this solicitation by email to: RiyadhContracting@state.gov.

Questions should be submitted on or before 1700 hours Sunday, June 29, 2026.

Your quotation must be submitted electronically to RiyadhContracting@state.gov. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS- Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30 MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1449

2. Section I, Pricing

3. Section 5 Representations and Certifications

4. Additional information as required in Section 3

5. Proof of SAM Registration

Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102.

Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

Sincerely, William R. Barker Contracting Officer

06/09/2026 08:43 GMT

Barker, William (BarkerWR@state.gov) https://maps.app.goo.gl/Er43V7RVSVVvUxe1A mailto:RiyadhContracting@state.gov mailto:RiyadhContracting@state.gov mailto:RiyadhContracting@state.gov https://www.sam.gov/

Roof Repairs and Insulation at DOW Annex Offices For the U.S. Embassy Riyadh, Saudi Arabia

Solicitation No. 19SA7026Q0009

SOLICITATION

DOCUMENT

Roof Repairs and Insulation at DOW Annex Offices

Solicitation No. 19SA7026Q0009

Embassy of the United States of America P.O. Box 94309 Riyadh 11693

SAUDI ARABIA

TABLE OF CONTENTS

SECTION 1 - THE SCHEDULE

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19SA7026R0009, Prices, Block 23

• Continuation To SF-1449, RFQ Number 19SA7026R0009, Schedule Of

Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Preventing Trafficking In Person

SECTION 2 - CONTRACT CLAUSES

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

SECTION 3 - SOLICITATION PROVISIONS

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 4 - EVALUATION FACTORS

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

SECTION 5 - REPRESENTATIONS AND CERTIFICATIONS

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR15972436

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION

NUMBER

19SA7026Q0009

6. SOLICITATION ISSUE

DATE

June 10, 2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME William R. Barker

b. TELEPHONE NUMBER (No collect calls) +966-11-835-4000

8. OFFER DUE DATE/

LOCAL TIME 1700 hours July 12, 2026

9. ISSUED BY

CODE

19SA70 10. THIS

ACQUISITION IS

UNRESTRICTED

OR

SET ASIDE: ____ %

FOR:

Contracting Officer Embassy of the United States of America Diplomatic Quarter, Riyadh, Saudi Arabia Tel: +966-11-835-4000 RiyadhContracting@state.gov

SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

HUBZONE

SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-

OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-

DISABLED

VETERAN-

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB

DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER

UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 19SA70 16. ADMINISTERED BY CODE 19SA70

Embassy Of The United States Of America, Riyadh Diplomatic Quarters, Makkah Ring Road P.O. Box 94309, Attn: GSO/Procurement Riyadh 11693 Saudi Arabia

Contracting Officer Embassy of the United States of America Diplomatic Quarter, Riyadh, Saudi Arabia Tel: +966-11-835-4000 RiyadhContracting@state.gov

17a. CONTRACTOR/

OFFERER

COD

E

19SA70 FACILIT

Y CODE

18a. PAYMENT WILL BE MADE BY Financial Management Center Embassy of the United States of America Riyadh, Saudi Arabia RiyadhDBO@state.gov

CODE 19SA70

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS

BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTIT

Y

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

The United States Embassy in Riyadh requires professional services and contractor cost proposals to repair the freedom Hall roofs and AC Duct at Annex as per the SOW.

01 Lot

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt.

U O l ) 27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5

ARE ATTACHED. ADDENDA

ARE ARE NOT

ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS

ATTACHED. ADDENDA

ARE ARE NOT

ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND

RETURN ____ COPIES TO ISSUING OFFICE. CONTRACTOR AGREES

TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT

TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER

DATED ____________. YOUR OFFER ON SOLICITATION (BLOCK

5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING

OFFICER)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER William R. Barker

31c. DATE SIGNED

AUTHORIZED FOR LOCAL

REPRODUCTIO

Computer Generated STANDARD FORM 1449 (REV. 02/2012) Prescribed by GSA - FAR (48 CFR) 53.212 mailto:RiyadhContracting@state.gov mailto:RiyadhDBO@state.gov

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER 19SA7026Q0009

PRICES, BLOCK 23

I. PERFORMANCE WORK STATEMENT

A. The purpose of this firm fixed price contract is for roof repairs and insulation at DOW Annex offices in accordance with the Statement of Work (SOW).

B. The contract will be for a one-time project and notice to proceed (NTP) will be issued.

C. This is a firm, fixed- price contract payable entirely in the currency indicated in the SF-1449.

No additional sums will be payable for any escalation in the cost of materials, equipment, or labor, or because of the Contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The Government will not adjust the contract price due to fluctuations in currency exchange rates. The Government will only make changes in the contract price or time to complete due to changes made by the Government in the work to be performed, or by delays caused by the Government.

D. The contractor must complete all work, including furnishing all labor, material, equipment, including supply and installation of roof repairs and insulation at DOW Annex offices of the U.S. Embassy, Riyadh, Saudi Arabia.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work

Paragraphs Performance Threshold

Services.

Performs all roof repairs and insulation at DOW Annex offices services set forth in the scope of work.

I thru II

All required services are performed and no more than one

(1) customer complaint is received per month.

JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT OF

2010 NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES, PAYMENTS

SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO AN EXCISE

TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.

https://maps.app.goo.gl/Er43V7RVSVVvUxe1A

1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

2. STANDARD. The performance standard is that the Government receives no more than one

(1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and Conditions - Commercial Products and Commercial Services (NOV 2023), if any of the services exceed the standard.

3. PROCEDURES.

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

https://www.acquisition.gov/far/52.212-4

II. PRICING

III. VALUE ADDED TAX (VAT)

Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion. It is reflected for each performance period. The portions of the solicitation subject to VAT are:

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

01 The United States Embassy in Riyadh requires professional services and contractor cost proposals to repair the freedom Hall roofs and AC Duct at Annex as per the SOW.

1 Lot

VAT 15%

Grand Total

NOTE: Please include DBA insurance in line-item price (not in separate line) and awardee will provide DBA insurance certificate within 15 days of award. U.S. based offerors are not applicable for 15% Value Added Tax.

CONTINUATION TO SF-1449,

RFQ NUMBER 19SA7026Q0009

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

WATERPROOF COATING AND SPRAY POLYURETHANE FOAM (SPF)

INSULATION FOR FREEDOM HALL ROOF OF US EMBASSY – Annex

I. GENERAL INFORMATION:

The United States Embassy in Riyadh requires professional services and contractor cost proposals to repair the Freedom Hall roofs and AC Duct at Annex by applying Spray Polyurethane Foam (SPF) insulation and waterproof coating.

II. PROJECT REQUIREMENTS:

The Freedom Hall has a metal corrugated roofing, covered with waterproofing membrane.

This roof is leaking from multiple locations and needs to be repaired externally. The Contractor shall remove old membrane, repair the metal roofing, apply SPF insulation and waterproof coating to repair them. The AC duct requires replacement of insulation.

DESCRIPTION:

S. No. Location Approx. QTY

1. Coating and Repairs Freedom Hall 2,000 Sq. M.

2. Gutters and Downspouts 185 LM

3. AC Duct Repairs 20 M3

III. GENERAL REQUIREMENTS

• The contractor shall furnish and provide the labor, tools and materials required to carry out all services as outlined in this SOW. These items shall be in good working condition and the staff shall be qualified enough to operate them.

• The Contractor shall be responsible for quality control. The Contractor shall perform inspection visits to the work site on a regular basis. The Contractor shall coordinate these visits with the COR. These visits shall be surprise inspections to those working on the contract.

• All Material, labor work and service shall include a minimum warranty of two years or manufacturer’s warranty.

• The total period of performance for the services shall be 25 working days. Work shall be scheduled with COR. To avoid disruption of services, the work may need to be scheduled on Weekends.

• Desired contractor will conduct a site inspection to check work requirements, nature of work to be done, and to submit their proposal. The proposal must include technical proposal, price quote and duration of the work.

• The contractor shall be responsible for the protection of furniture and property and will be responsible for any damages to furniture or property caused by the work.

• Work shall be performed during regular business hours on Sunday through Thursday between 8:00 AM and 5:00 PM, with a 1-hour break. Actual days will be scheduled by the COR.

• The Contractor shall have limited escorted entry to the property where work will be performed.

• The Contractor shall have a valid vehicle registration and insurance for access to the Post.

IV. SCOPE OF WORK and DELIVERABLES:

• Roof Repairs o Surface Preparation: Remove old, dilapidated waterproofing membrane.

Replace damaged metal sheeting, secure all metal sheets by tightening or replacing loose fasteners using self-tapping screws with gaskets. All roofing shall be secured and ensure for a tight pull down of the roofing structure.

o Cleaning: Remove loose paint, dirt, and debris. Power wash and prepare the metal roof surface. After cleaning and preparation, the contractor must ensure the metal substrate is free of all adhesive residue. A primer specifically approved by the SPF manufacturer must be applied to the metal to ensure maximum adhesion.

o Utilities: Raise existing conduits and junction boxes higher than the final insulation height; ensure they remain uncovered and secured.

o Sealing: Seal large gaps (vents, flashing) with weatherproof seam tape.

Repair smaller gaps and cracks using evenly spread polyurethane sealant.

o Drainage Channels: Fabricate and provide a channel draining directly to the gutters for any vents or skylights requiring them.

o Insulation: Apply closed-cell SPF (45 kg/m³) insulation to a minimum cured thickness of 5 cm.

o Finishing: Trim and cut insulation to maintain a level surface. Perform a water test to ensure no "birdbaths" or depressions exist.

o Coating: Apply a UV-resistant, elastomeric waterproof coating (or approved alternate) over the insulation via brush or spray. The waterproof coating shall be applied in two contrasting colors (e.g., a gray base coat and a white top coat).

o Traction: While the top coat is still 'tack-free' or wet, the contractor shall broadcast ceramic roofing granules into the coating at a rate of

1.5 to 2 kg per m².

o Protection: Protect adjacent items (skylights, antennas, fans) from overspray.

• AC Duct Insulation & Repair:

o Removal: The contractor shall remove all old, damaged, or wet insulation from the exterior AC ductwork. The metal surface of the ducts must be cleaned and inspected for corrosion or holes.

o Repair: Any leaks, gaps, or loose joints in the ductwork must be repaired and sealed using same material, high-temperature aluminum mastic tape or approved duct sealant before applying new insulation.

o SPF Application: Apply a minimum of 3 cm closed-cell spray foam insulation around the entire circumference of the ductwork.

o Finishing: Trim and cut insulation to maintain a level surface. Perform a water test to ensure no "birdbaths" or depressions exist.

o Coating: Apply a UV-resistant, elastomeric waterproof coating (or approved alternate) over the insulation via brush or spray. The waterproof coating shall be applied in two contrasting colors (e.g., a gray base coat and a white top coat).

• Gutter System: * Dismantle and remove old gutters/downspouts for off-site disposal.

o Fabricate and install Box Gutters (minimum 0.7 mm thickness

Galvanized metal).

o Install 4-inch diameter downspouts every 12–13 meters.

o Maintain proper roof slope toward the new gutter system.

• Submittals: Datasheets for all items must be submitted for approval.

V. LOGISTICS

• Logistics:

1. Staging/storage areas available on Embassy grounds.

2. Contractor shall provide all equipment needed for material handling.

3. The contractor is responsible for all transportation of material, equipment, and labor to execute the project.

• Removals:

1. Any Items that affect the workspace and need to be removed either temporarily and reinstated; or need to be removed all together and reinstated with new shall be accounted for by the contractor and identified and agreed prior to commencement of any work.

• Finishing & Clean-up

1. Clean up and proper storage of tools at allocated storage at the end of the day.

2. Clean area of work and restore all items to their existing conditions at the end of the project.

VI. RESPONSIBILITY OF THE CONTRACTOR

• The Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all services furnished under this contract.

The Contractor shall, without additional compensation, correct or revise any errors or deficiencies in the services.

• The Contractor shall identify a Project Site Manager who shall be responsible for the overall management of the project and shall represent the Contractor on the site. The Project Site Manager shall speak English.

• The Contractor is responsible for safety and shall comply with all local labor laws, regulations, customs, and practices pertaining to labor, safety, and similar matters. The Contractor shall promptly report all accidents resulting in lost time, disabling, or fatal injuries to the Embassy.

• The Contractor employees shall utilize the safety PPEs for the project and broken electrical cables, sockets, cable drums, etc. will not be allowed at site. Available voltage on site is 110/208V. The contractor shall be responsible to provide its own voltage transformer if it needs other voltages than what is available. Use of American-type three-prong electrical plug is recommended and required.

Sticking bare wire into the electrical wall receptacle is strictly prohibited.

• The Contractor shall be and remain liable to the Embassy in accordance with applicable law for all damages to the Embassy caused by the Contractor's negligent performance of any of the services furnished under this SOW.

• The Contractor shall always keep the work area free from accumulation of waste materials. Upon completing services, the Contractor shall remove all temporary facilities and leave the project site in a clean and orderly condition acceptable to the Embassy.

VII. Deliverable Schedule

• The Contractor shall commence work under this contract promptly, execute the work diligently, and achieve final completion and acceptance of the project including final cleanup of the premises within the period specified.

VIII. Safety, Health, and Environment The contractor shall be solely responsible for risk assessments, managing health, and safety issues associated with the work order. The contractor must provide water to all workers at the job sites. Based on hazard assessments, contractors shall provide or afford each affected employee personal protective equipment (PPE) that will protect the employee from hazards.

PPE must be provided at the contractor’s expense. Workers may use discretion if they feel unsafe in using the equipment in a hostile environment. Any worker at an elevated location above 6 feet, except for a 6 feet portable ladder, must be provided fall protection.

(FAR 52.236-13 Accident Prevention)

The contractor shall provide and maintain work environments and procedures, which will:

• Safeguard the public and Embassy personnel, property, materials, supplies, and equipment exposed to contractor operations and activities.

• Comply with the standards issued by the Secretary of Labor at 29 CFR part 1926 and 29 CFR part 1910.

• Contractor shall comply with all pertinent provisions of the latest version of U. S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in effect on the date of the solicitation.

• Whenever the COR becomes aware of any noncompliance with these requirements or any condition, which poses a serious or imminent danger to the health or safety of the public or Embassy personnel, the COR shall notify the contractor orally, with written confirmation, and request immediate initiation of corrective action. This notice, when delivered to the contractor or the contractor's representative at the work site, shall be deemed sufficient notice of the noncompliance and that corrective action is required.

After receiving the notice, the contractor shall immediately take corrective action. If the contractor fails or refuses to promptly take corrective action, the COR may issue an order stopping all or part of the work until satisfactory corrective action has been taken.

The contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.

• Contractor shall conduct daily inspections to determine that safe working conditions and equipment exist, and safe practices are observed, and accepts sole responsibility for providing a safe workplace for its employees and all subcontractors and material suppliers.

• Contractor shall immediately notify the COR of any unsafe conditions or practices observed on the work site. The Contractor shall immediately notify the COR of any job-related accidents or injuries on the work site.

Job Safety Analysis (JSA)

• Ensure that all the access means scaffolding, or ladders are of good quality and strength.

Do not use weak or broken scaffolding or ladders.

• Wear goggles of adequate visibility do not use goggles with starched glasses or of poor visibility.

• Wear Body harness when working at heights exceeding 6ft and secure to a strong anchor point.

• All necessary PPE and safety gears shall be always worn during the execution of work i.e., Safety Helmets, shoes, vest, hand gloves etc.

• Avoid standing right below to elevated work area.

• Scaffolding installation must be strictly checked and observed prior to use. Ensure that all scaffoldings and horizontal platforms were properly passed on proper tagging.

• All equipment/power tools should have safety feature and proper cord and plugs.

• Hand tools must be in good shape and appropriate for each specific job.

• Lock out Tag Out should be used for applicable work at site.

• Ensure protection from electrocution i.e., keep all connections dry and off the ground.

Do not touch the plug with wet hand.

• Ensure that the emergency response plan is in place and has adequate sources in case of accident occur at any rate.

• Contractor shall solely be responsible to provide first aid and medical aid in case of accident. Also, to report any mishap to POSHO immediately in writing.

In addition to JSA and the safety/accident prevention requirements of FAR 52.236-13, the contractor shall comply with the following safety measures.

A. If the project contains any of the following high-risk activities, the contractor shall follow the section in the latest edition, as of the date of the solicitation, of the U.S.

Army Corps of Engineers Safety and Health manual, EM 385-1-1, that corresponds to the high-risk activity. Before work may proceed, the contractor must obtain approval from the COR of the written safety plan required by FAR 52.236-13, Accident Prevention Alternate I.

(1) Scaffolding

(2) Work at heights above 1.8 meters

(3) Trenching or other excavation greater than one (1) meter in depth

(4) Earth-moving equipment and other large vehicles

(5) Cranes/lifting and rigging

(6) Welding or cutting and other hot work

(7) Partial or total demolition of a structure

(8) Temporary wiring, use of portable electric tools, or other recognized electrical hazards. Temporary wiring and portable electric tools require the use of a ground fault circuit interrupter (GFCI) in the affected circuits, other electrical hazards may also require the use of a GFCI.

(9) Work in confined spaces (limited exits, potential for oxygen less than 19.5 percent or combustible atmosphere, potential for solid or liquid engulfment, or other hazards considered to be immediately dangerous to life or health such as water tanks, transformer vaults, sewers, cisterns, etc.)

(10) Hazardous materials - a material with a physical or health hazard including but not limited to, flammable, explosive, corrosive, toxic, reactive, or unstable, or any operations, which creates any kind of contamination inside an occupied building such as dust from demolition activities, paints, solvents, etc.

(11) Hazardous noise levels as required in EM 385-1 Section 5B or

B. Mishap Reporting. The contractor is required to report immediately all mishaps to the

COR and the contracting officer. A "mishap" is any event causing injury, disease or illness, death, material loss or property damage, or incident causing environmental contamination. The mishap reporting requirement shall include fires, explosions, hazardous materials contamination, and other similar incidents that may threaten people, property, and equipment.

C. Records. The contractor shall maintain an accurate record on all mishaps incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft of property, materials, supplies, or equipment. The contractor shall report this data in the manner prescribed by the COR.

D. Subcontracts. The contractor shall insert this clause with appropriate changes in the designation of the parties, in subcontracts.

The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its employees, or any other person, arising from, and incidental to, the Contractor's performance.

IX. TESTING, INSPECTION, AND QUALITY ASSURANCE

The Contractor shall provide all necessary tools and access for the COR to perform inspections. Work found to be non-compliant shall be corrected at the Contractor’s expense before the next phase of work begins.

1. Substrate Preparation & Adhesion

• Adhesion Pull Test: Before full application of SPF, the contractor shall perform a "pull test" on a 1 m² primed area of the metal roof to ensure the primer and foam bond correctly to the cleaned substrate.

• Dew Point Verification: The contractor must measure and record the substrate temperature and dew point every morning. No spray shall occur if the substrate is within 3°C of the dew point.

2. Spray Polyurethane Foam (SPF) Inspection

• Thickness Verification (Depth Gauges): During application, the contractor shall use a graduated probe (depth gauge) to verify a minimum thickness of 5 cm across the entire roof surface.

• Surface Texture: The cured foam must have a "smooth-to-orange-peel" texture.

Any areas with "popcorn" or "tree bark" texture (indicating poor mix or temperature) must be removed and resprayed.

• Core Samples: The COR reserves the right to take a 2-inch diameter core sample for every 500 m² to verify foam density, cell structure, and total thickness.

3. Waterproof Coating Thickness

• Wet Film Thickness (WFT): The contractor shall use a notched WFT gauge during application to ensure the coating meets the manufacturer's required "mils" for each coat.

• Material Consumption Log: The contractor shall maintain a daily tally of empty coating pails. The total number of pails used must match the theoretical coverage required for 1,500 m² as per the manufacturer’s datasheet.

• Contrasting Color Check: Total opacity must be achieved. If any of the base-coat color (Gray) is visible through the top-coat (White), an additional layer shall be applied at no cost to the Embassy.

4. Gutter and Drainage Testing

• Flood/Flow Test: After the gutter installation and before final acceptance, the contractor shall perform a water flow test using a high-volume hose.

o Success Criteria: Water must flow freely to downspouts with zero "birdbaths" or standing water (ponding) in the gutters or on the roof surface.

• Downspout Clearance: Verify that all 185 LM of gutters and their 4-inch downspouts are clear of debris, foam overspray, or construction waste.

5. HVAC/Ductwork Integrity

• Visual Seam Inspection: Before foaming ducts, the COR must inspect the mastic/tape seals on all duct joints.

Expansion Clearance: Verify that duct supports have not been "bridged" by foam in a way that will cause the foam to crack when the AC turns on/off and the metal moves.

SECTION 2 - CONTRACT CLAUSES

52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS

(NOV 2023) IS INCORPORATED BY REFERENCE. (SEE SF-1449,

BLOCK 27A)

52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive

Orders—Commercial Products and Commercial Services (JAN 2025)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

__ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

_X_ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (6) [Reserved].

__ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

https://www.acquisition.gov/far/52.203-19#FAR_52_203_19 https://www.acquisition.gov/far/52.204-23#FAR_52_204_23 https://www.acquisition.gov/far/52.204-25#FAR_52_204_25 https://www.acquisition.gov/far/52.209-10#FAR_52_209_10 https://www.acquisition.gov/far/52.232-40#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/52.233-3#FAR_52_233_3 https://www.acquisition.gov/far/52.233-4#FAR_52_233_4 https://www.acquisition.gov/far/52.203-6#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/52.203-13#FAR_52_203_13 https://www.acquisition.gov/far/52.203-15#FAR_52_203_15 https://www.acquisition.gov/far/52.203-17#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/3.900#FAR_3_900 https://www.acquisition.gov/far/52.204-10#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/52.204-14#FAR_52_204_14

__ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

_X_ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

_X_ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L. 115–390, title II).

_X_ (11)

(i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

__ (ii) Alternate I (Dec 2023) of 52.204-30.

_X_ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C. 6101 note).

__ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

__ (14) [Reserved].

__ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C. 657a).

__ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).

__ (17) [Reserved] __ (18)

(i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-6.

__ (19)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

__ (ii) Alternate I (Mar 2020) of 52.219-7.

__ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).

__ (21)

(i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (Nov 2016) of 52.219-9.

__ (iii) Alternate II (Nov 2016) of 52.219-9.

__ (iv) Alternate III (Jun 2020) of 52.219-9.

__ (v) Alternate IV (Jan 2025) of 52.219-9.

__ (22)

(i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (Mar 2020) of 52.219-13.

__ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

__ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled Veteran- Owned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

__ (26) https://www.acquisition.gov/far/52.204-15#FAR_52_204_15 https://www.acquisition.gov/far/52.204-27#FAR_52_204_27 https://www.acquisition.gov/far/52.204-28#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/52.204-30#FAR_52_204_30 https://www.acquisition.gov/far/52.209-6#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/52.209-9#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/52.219-3#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/52.219-4#FAR_52_219_4 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-6#FAR_52_219_6 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-7#FAR_52_219_7 https://www.acquisition.gov/far/52.219-8#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-9#FAR_52_219_9 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-13#FAR_52_219_13 https://www.acquisition.gov/far/52.219-14#FAR_52_219_14 https://www.acquisition.gov/far/52.219-16#FAR_52_219_16 https://www.acquisition.gov/far/52.219-27#FAR_52_219_27

(i) 52.219-28, Postaward Small Business Program Representation (Jan 2025) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (Mar 2020) of 52.219-28.

__ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

__ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

__ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C. 644(r)).

__ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

__ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

_X_ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.

13126).

__ (33) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

__ (34)

(i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

__ (ii) Alternate I (Feb 1999) of 52.222-26.

__ (35)

(i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (ii) Alternate I (Jul 2014) of 52.222-35.

__ (36)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

__ (ii) Alternate I (Jul 2014) of 52.222-36.

__ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

__ (38) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).

_X_ (39)

(i) 52.222-50, Combating Trafficking in Persons (Nov 2021) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (Mar 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).

__ (40) 52.222-54, Employment Eligibility Verification (Jan 2025) ( Executive Order 12989).

(Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)

__ (41)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (42) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (43) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (44) 52.223-20, Aerosols (May 2024) ( 42 U.S.C. 7671, et seq.).

__ (45) 52.223-21, Foams (May 2024) ( 42 U.S.C. 7671, et seq.).

https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-28#FAR_52_219_28 https://www.acquisition.gov/far/52.219-29#FAR_52_219_29 https://www.acquisition.gov/far/52.219-30#FAR_52_219_30 https://www.acquisition.gov/far/52.219-32#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/52.219-33#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/52.222-3#FAR_52_222_3 https://www.acquisition.gov/far/52.222-19#FAR_52_222_19 https://www.federalregister.gov/executive-order/13126 https://www.federalregister.gov/executive-order/13126 https://www.acquisition.gov/far/52.222-21#FAR_52_222_21 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-26#FAR_52_222_26 https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-35#FAR_52_222_35 https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/52.222-36#FAR_52_222_36 https://www.acquisition.gov/far/52.222-37#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/52.222-40#FAR_52_222_40 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-50#FAR_52_222_50 https://www.acquisition.gov/far/52.222-54#FAR_52_222_54 https://www.federalregister.gov/executive-order/12989 https://www.acquisition.gov/far/22.1803#FAR_22_1803 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-9#FAR_52_223_9 https://www.acquisition.gov/far/52.223-11#FAR_52_223_11 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-12#FAR_52_223_12 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-20#FAR_52_223_20 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.223-21#FAR_52_223_21 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim

_X_ (46) 52.223-23, Sustainable Products and Services (May 2024) ( E.O. 14057, 7 U.S.C.

8102, 42 U.S.C. 6962, 42 U.S.C. 8259b, and 42 U.S.C. 7671l).

__ (47)

(i) 52.224-3 Privacy Training (Jan 2017) ( 5 U.S.C. 552 a).

__ (ii) Alternate I (Jan 2017) of 52.224-3.

__ (48)

(i) 52.225-1, Buy American-Supplies (Oct 2022) (41 U.S.C. chapter 83).

__ (ii) Alternate I (Oct 2022) of 52.225-1.

__ (49)

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act (NOV 2023) ( 19 U.S.C.

3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, 19 U.S.C. chapter 29 (sections 4501-4732), Public Law 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109- 169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I [Reserved].

__ (iii) Alternate II (Jan 2025) of 52.225-3.

__ (iv) Alternate III (Feb 2024) of 52.225-3.

__ (v) Alternate IV (Oct 2022) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (NOV 2023) ( 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_X_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. Subtitle A, Part V, Subpart G Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C. 5150).

_X_ (55) 52.226-8, Encouraging Contractor Policies to Ban Text Messaging While Driving (May 2024) ( E.O. 13513).

__ (56) 52.229-12, Tax on Certain Foreign Procurements (Feb 2021).

_X_ (57) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

__ (58) 52.232-30, Installment Payments for Commercial Products and Commercial Services (Nov 2021) (41 U.S.C. 4505, 10 U.S.C. 3805).

_X_ (59) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct2018) ( 31 U.S.C. 3332).

_X_ (60) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (31 U.S.C. 3332).

__ (61) 52.232-36, Payment by Third Party (May 2014) (31 U.S.C. 3332).

__ (62) 52.239-1, Privacy or Security Safeguards (Aug 1996) ( 5 U.S.C. 552a).

_X_ (63) 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) (Sections 1821-1826, Pub. L.

118-31, 41 U.S.C. 3901 note prec.).

__ (64) 52.242-5, Payments to Small Business Subcontractors (Jan 2017) (15 U.S.C. 637(d)(13)).

__ (65) https://www.acquisition.gov/far/52.223-23#FAR_52_223_23 https://www.federalregister.gov/executive-order/14057 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title7-section8102&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section6962&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section8259&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title42-section7671&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552&num=0&edition=prelim https://www.acquisition.gov/far/52.224-3#FAR_52_224_3 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-1#FAR_52_225_1 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2112&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3805&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section4001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title19-chapter29&saved=%7CZ3JhbnVsZWlkOlVTQy1wcmVsaW0tdGl0bGU0MC1jaGFwdGVyMzctZnJvbnQ%3D%7C%7C%7C0%7Cfalse%7Cprelim&edition=prelim https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-3#FAR_52_225_3 https://www.acquisition.gov/far/52.225-5#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/52.225-13#FAR_52_225_13 https://www.acquisition.gov/far/52.225-26#FAR_52_225_26 https://www.acquisition.gov/far/52.226-4#FAR_52_226_4 https://www.acquisition.gov/far/52.226-5#FAR_52_226_5 https://www.acquisition.gov/far/52.226-8#FAR_52_226_8 https://www.federalregister.gov/executive-order/13513 https://www.acquisition.gov/far/52.229-12#FAR_52_229_12 https://www.acquisition.gov/far/52.232-29#FAR_52_232_29…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .