This is a Request for Quotations (RFQ) for preventive maintenance services on air-cooled Multistack Chillers and associated equipment at the U.S. Embassy in Maputo, Mozambique. The U.S. Department of State seeks a firm fixed price Indefinite Delivery, Indefinite Quantity (IDIQ) contract for a one-year base period with four one-year optional periods. The solicitation number is 19MZ5026Q0011, issued September 14, 2026, with a quotation deadline of October 14, 2026 at 17:30 local time. All quotations must be submitted electronically to maputogsoprocurement@state.gov in MS-Word, MS-Excel, or PDF format (maximum 30MB). Award will be made to the responsible offeror representing best value using lowest price technically acceptable source selection. All offerors must be registered in the System for Award Management (SAM) database at time of submission.

The contract requires annual preventive maintenance services for one Airstack Modular Chiller (Model ASF030XM with 3 compressor modules, 1 pump module, and 1 control unit), associated motor starters/variable frequency drives (5-100 HP), and electronic control panels. Services must include 35+ specific maintenance tasks including refrigerant checks, oil analysis, electrical inspections, coil cleaning, compressor evaluation, and operational testing. The contractor must provide all labor, materials, tools, supplies, and properly dispose of hazardous substances. Work is performed Monday-Friday, 8:00 AM to 4:30 PM, excluding U.S. and local holidays. Pricing must include technical check reports and permits, with Value Added Tax priced separately as a distinct line item. The contractor must maintain minimum liability insurance of $1,000,000 per occurrence for bodily injury and property damage, provide worker's compensation coverage, submit personnel security clearances within 30 days of award, and comply with extensive security protocols regarding access to the embassy compound and handling of sensitive but unclassified information. Payment is made 30 days after confirmed service delivery. The contracting officer is Ellison Craft-Koutsouris, reachable at +258 84 095 8000.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date: September 14, 2026 U.S. Embassy Maputo, Mozambique Avenida Marginal nr 5467 Sommerschield, Distrito Municipal de KaMpfumo Maputo, Mozambique

Dear : Prospective Quoters

Subject: Solicitation Number 19MZ5026Q0011 for Multistack Chillers (Air Cooled) , Associated Motor Starters/VFD’s & Electronic Panels maintenance Services.

Enclosed is a Request for Quotations (RFQ) for the New US Embassy Compound (NEC) - Multistack Chillers (Air Cooled), Associated Motor Starters/VFD’s & Electronic Panels maintenance Services, located at Avenida Marginal No 5467, Maputo, Mozambique.

If you would like to submit quotation, follow the instructions in Section 3 of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1449 that follows this letter.

The U.S. Government intends to award a firm fixed price IDIQ (Indefinite Delivery, Indefinite Quantity) contract/purchase order to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract/purchase order based on initial quotations, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.

Please submit your quotation electronically marked "Quotation Enclosed" to maputogsoprocurement@state.gov . The deadline for receipt of quotations is on or before 17:30 local time on October 14 ,2026. No quotation will be accepted after this time.

It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed the 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.

In order for a quotation to be considered, you must also complete and submit the following:

1. SF-1449

2. Section I, Pricing

3. Section 5 Representations and Certifications

4. Additional information as required in Section 3

5. Proof of SAM Registration

All offerors must be registered in the SAM (System for Award Management) Database upon submission of their proposal, any offeror not registered in SAM at the time of submission may immediately be deemed non-responsible with no further consideration of their proposal mailto:maputogsoprocurement@state.gov pursuant to FAR 52.204-7. See https://www.sam.gov for instructions. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.

The U.S. Government intends to award a contract to the responsible offeror representing best value using Lowest price technically acceptable source selection process pursuant to FAR 15.101-2.

Prospective offers must still meet basic standards for responsibility at FAR 9.104 and solicitation compliance to be eligible for award. We intend to award a contract based on initial quotations, without holding discussions, although we may hold discussions with companies if there is a need to do so.

Direct any questions regarding this solicitation to the Contracting Officer/GS, - Ellison Craft- Koutsouris by letter or by telephone during regular business hours at +258 84 095 8000.

Questions must be written in English and may be sent by e-mail to maputogsoprocurement@state.gov.

Sincerely, Ellison Craft-Koutsouris Contracting Officer https://www.sam.gov/

TABLE OF CONTENTS

Section 1 - The Schedule

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19MZ5026Q0011 , Prices, Block 23

• Continuation To SF-1449, RFQ Number 19MZ5026Q0011, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement

• Attachment 1 to Description/Specifications/Performance Work Statement, Government Furnished Property

Section 2 - Contract Clauses

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

Section 3 - Solicitation Provisions

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in Part

Section 4 - Evaluation

• Evaluation

• Addendum to Evaluation - FAR and DOSAR Provisions not Prescribed in Part 12

Section 5 - Representations and Certifications

• Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR Provisions not Prescribed in Part 12

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

PR15973046

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

19MZ5026Q0011

6. SOLICITATION ISSUE DATE

September 14 2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Ellison Craft-Koutsouris

b. TELEPHONE NUMBER(No collect calls)

+258 84 095 8000

8. OFFER DUE DATE/

October 14 ,2026 17:30 a.m

LOCAL TIME

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:____ % FOR:

U.S. Embassy Maputo, Avenida Marginal nr 5467 Sommerschield, Distrito Municipal de KaMpfumo Maputo, Mozambique

ATTN: GSO/PROCUREMENT

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

U.S. Embassy Maputo, Avenida Marginal nr 5467 Sommerschield, Distrito Municipal de KaMpfumo

ATTN: GSO/PROCUREMENT

17a. CONTRACTOR/

OFFERER

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY U.S. Embassy Maputo, Avenida Marginal nr 5467 Sommerschield, Distrito Municipal de KaMpfumo

ATTN: MaputoDBO@state.gov

CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Multistack Chillers ( Air Cooled) Services – See the SF1449 Continuation Sheets attached – Section 2, Prices.

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO ISSUING

OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER DATED ____________. YOUR

OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

Ellison Craft-Koutsouris

31c. DATE SIGNED https://ilmsariba.state.sbu/Buyer/Main/aw?awh=r&awssk=IzOY&dard=1

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIAL FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NO.

39. S/R VOUCHER NO. 40. PAID BY

41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41C. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449 ,RFQ NUMBER S- 19MZ5026Q0011 PRICES, BLOCK 23

PERFORMANCE WORK STATEMENT

A. The purpose of this firm fixed price purchase order is to for the U.S Embassy Chiller in accordance with Attachment A.

B. The contract will be for a one-year period from the date of the contract award, with four

(04) years options.

QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The

QASP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the

Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work Paragraphs

Performance Threshold

Services.

Performs all preventive maintenance services of the four Facility’s Standby Generator System services set forth in the scope of work.

Refer to the Statement of Work & Attachment 1

All required services are performed and no more than one (1)] customer complaint is received per month.

II. PRICING

Advance payments are not authorized under this contract. Instead, the Embassy shall issue Task Orders for the execution of works. Payment shall be made 30 days after the Contracting Officer Representative (COR) has confirmed that services were rendered in a satisfactory manner.

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT; this percentage is multiplied only against that portion.

It is reflected for each performance period. The portions of the solicitation subject to VAT are:

i. Base Year. The Contractor shall provide the services shown below for the base period of the contract and continuing for a period of 12 months.

* Tech. check reports & Permits included in Annual Inspection

ii. Option Year 1. The Contractor shall provide the services shown below for Option Year 1 of the contract and continuing for a period of 12 months.

iii. Option Year 2. The Contractor shall provide the services shown below for Option Year 2

* Tech. check reports & Permits included in Annual Inspection

CLIN Description Quantity of Equipment

Type of services

No. of service

Unit price / service ($)

Total per year ($)

001 Airstack Chiller 1 Annual 1

Total Base Year

CLIN Description Quantity of Equipment

Type of services

No. of service

Unit price / service ($)

Total per

101 Airstack Chiller 1 Annual 1

Total Option Year 1

Quantity of Equipment

Type of services

No. of service

Unit price / service ($)

Total per

201 Airstack Chiller 1 Annual 1

Total Option Year 2

iv. Option Year 3. The Contractor shall provide the services shown below for Option Year 3

v. Option Year 4. The Contractor shall provide the services shown below for Option Year 4 of the contract, and continuing for a period of 12 months

* Tech. check reports & Permits included in Annual Inspection

TOTALS

Total for Base Year

Total for Option Year 1

Total for Option Year 2

Total for Option Year 3

Total for Option Year 4

GRAND TOTAL

Repair option. Repairs are NOT included under this agreement (see 7.1.3) and are to be done outside this contract. However, we would like to have current labor rates in the event that there is an issue discovered during the preventive maintenance of the specified equipment.

Please provide your current labor rates in the Repair Option fields below. As stated in 7.1.3 any necessary repairs or parts will be submitted for approval and then billed against a separate PO.

The Contractor is not approved to do any additional work without approval.

Repair Labor Rates Base Year $/hr Option Year 1 $/hr Option Year 2 $/hr Option Year 3 $/hr Option Year 4 $/hr

CLIN Description Quantity of Equipment

Type of services

No. of service

Unit price / service ($)

Total per

301 Airstack Chiller 1 Annual 1

Total Option Year 3

Quantity of Equipment

Type of services

No. of service

Unit price / service ($)

Total per

401 Airstack Chiller 1 Annual 1

Total Option Year 4

CONTINUATION TO SF-1449

RFQ NUMBER 19MZ5026Q0011

INDEFINITE DELIVERY/INDEFINITE QUANTITY CONTRACT

SCHEDULE OF SERVICES, BLOCK 20

1.0 DESCRIPTION

The American Embassy in Maputo requires preventive maintenance services for Airstack Modular Chiller. These services shall result in all systems being serviced under this agreement being in good operational condition when activated. This work is to be performed on systems accessing the Chiller Yard areas of the building. Please see section 6.2.3 for security requirements.

1.1. TYPE OF CONTRACT

This is a firm fixed price contract payable entirely in United States Dollars. Prices for all Contract Line Item Numbers (CLIN) shall include proper disposal of toxic substances as per Item 8.3 where applicable. No additional sums will be payable for any escalation in the cost of materials, equipment or labor, or because of the contractor's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required. The contract price will not be adjusted due to fluctuations in currency exchange rates.

1.2. PERIOD OF PERFORMANCE

The contract will be for a period of one-year, with a maximum of four one-year optional periods of performance. The contract period will begin based upon construction completion. The Contracting officer will notify the contractor of the exact date.

3.0 NOTICE TO PROCEED

After Contract award and submission of acceptable insurance certificates and copies of all applicable licenses and permits, the Contracting Officer will issue a Notice to Proceed. The Notice to Proceed will establish a date (a minimum of ten (10) days from date of Contract award unless the Contractor agrees to an earlier date) on which performance shall start.

DESCRIPTION/SPECIFICATION/WORK STATEMENT

4.0 EQUIPMENT AND PERFORMANCE REQUIREMENTS

4.1. The American Embassy in Maputo requires the Contractor to maintain the following systems in a safe, reliable and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.

1) Airstack Modular Chiller. Model: ASF030XM, BMP57.58, HX, O

4.2. The Contractor shall provide all necessary managerial, administrative and direct labor personnel, as well as all transportation, equipment, tools, supplies and materials required to perform inspection, maintenance, and component replacement as required to maintain the systems in accordance with this work statement. Under this Contract the Contractor shall provide:

• The services of trained and qualified technicians to inspect, adjust, and perform scheduled preventive maintenance.

Performance Standards

The chillers should be clean and in good operating condition upon completion of the service.

The preventive maintenance service should result in the parts of the system serviced being in a condition to operate efficiently and effectively.

5 HOURS OF PERFORMANCE

5.1. The Contractor shall maintain work schedules. The schedules shall take into consideration the hours that the staff can effectively perform their services without placing a burden on the security personnel of the Post. The Contractor shall deliver standard services between the hours of 8:00AM and 4:30 PM Monday through Friday. No work shall be performed on US Government and local holidays. Below is a list of holidays

ACCESS TO GOVERNMENT BUILDINGS AND STANDARDS OF CONDUCT

6.1 General. The Contractor shall designate a representative who shall supervise the Contractor’s technicians and be the Contractor’s liaison with the American Embassy. The Contractor’s employees shall be on-site only for contractual duties and not for any other business or purpose. Contractor employees shall have access to the equipment and equipment areas and will be escorted by Embassy personnel.

6.2 Personnel Security. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual. The Contractor shall provide the names, biographic data and police clearance on all Contractor personnel who shall be used on this Contract prior to their utilization. Submission of information shall be made within 30 days of award of contract. No technician will be allowed on site without prior authorization. Note:

this may include cleared personnel if advance notice of visit is not given at least one week before the scheduled visit.

6.2.1 Vehicles. Contractor vehicles will not be permitted inside the embassy compound without prior approval. If you need to have vehicle access please submit your vehicle information (Make, Model, License Plate #) along with a written justification as to why access is necessary. This should be submitted to the Facility Manager at least one (1) week prior to the visit.

6.2.2 Government shall issue identity cards to Contractor personnel, after they are approved.

Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The Contractor is responsible for their return at the end of the contract, when an employee leaves Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

6. 3 Security Clearances. Security clearances are not a requirement for performance on this contract, as there will be no access to classified information or areas.

6.3.1 The Contractor must comply with all of the following requirements relating to the protection of U.S. Embassy in Maputo, Mozambique Diplomatic personnel, property and compound project information and cooperate fully in all security matters Sensitive But Unclassified (SBU) and information that may arise relating to this contract.

Contractor personnel may also be exposed to various documents and signs, including Post notices, event schedules, DoS regulations and conversations or announcements relating to the operation of the U. S. Embassy Maputo and diplomatic personnel. This information should not be shared with anyone not employed by or falling under the protection of the Embassy.

Contractor personnel may be exposed to various documents, such as blueprints, drawings, sketches, notes, surveys, reports, photographs, and specifications, received or generated in conjunction with this contract. These documents contain information associated with diplomatic facilities for the U.S. Department of State. These documents have been marked with the handling designations “Unclassified” or “Sensitive But Unclassified” and US Government warnings against reproduction and distribution. These documents require special handling and dissemination restrictions. All handling designations and warnings on original documents must be reproduced on subsequent copies.

The loss, compromise, or suspected compromise or loss of any SBU information, contract related information (personnel files, payroll information, etc.), any post or diplomatic facility related information (documents, notes, drawings, sketches, surveys, reports, exposed film, negatives, or photographs), or ANY information which may adversely affect the security interests of the United States, must be immediately brought to the attention of the Contracting Officer (CO) and Contracting Officer’s Representative (COR).

Photographs of any diplomatic overseas building or facility must be authorized in advance by the COR and Regional Security Officer (RSO), who will establish any controls, limits, and/or restrictions as necessary. Exposed film depicting any Controlled Access Area and/or sensitive equipment must be developed in a U.S.- controlled environment by appropriately cleared personnel. No further dissemination, publication, duplication, or other use beyond that which was requested and approved is authorized without specific, advance approval from DS. DS reserves the right to demand retention of all copies of said photographs and/or negatives, following fulfillment of the previously authorized usage.

Transmission of any information marked Sensitive But Unclassified (SBU) or contract/personnel sensitive information, via the Internet, is prohibited. SBU information can be transmitted via ProjNet, mail, FedEx (or other commercial carrier) or fax, or hand carried by authorized contractor personnel.

Discussion of U.S. Diplomatic post activities while not on post, to include in homes, hotel rooms, restaurants and all other public places, is prohibited. Any contact with host or third country nationals that seems suspicious (such as undue curiosity in the project or project personnel) shall be reported immediately to the COR and RSO.

The Contractor and its employees shall exercise utmost discretion in regard to all matters relating to their duties and functions. They shall not communicate to any person any information known to them by reason of their performance of services under this contract which has not been made public, except to the extent necessary to perform their required duties in the performance of the contract requirements or as provided by written authorization of the Contracting Officer. All documents and records (including photographs) generated during the performance of work under this contract shall be for sole use of and shall become the exclusive property of the U.S. Government. No article, book, pamphlet, recording, broadcast, speech, television appearance, film or photograph concerning any aspect of the work performed under this contract shall be published or disseminated through any media, to include company or personal websites, without the prior written authorization of the Contracting Officer. These obligations do not cease upon the expiration or termination of this contract or at any other point in time. The Contract shall include the substance of this provision in all subcontracts hereunder.

6.4 Standards of Conduct

6.4.1 General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance, and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each Contractor employee shall adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct.

The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.

6.4.2 (Unused)

6.4.3 Neglect of Duties. Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

6.4.4 Disorderly Conduct. The Contractor shall not condone disorderly conduct, use of abusive or offensive language, quarreling, and intimidation by words, actions, or fighting. Also included is participation in disruptive activities that interfere with normal and efficient Government operations.

6.4.5 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.

6.4.6 Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These circumstances include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.

6.4.7 Key Control. The Contractor will not be issued any keys. The keys will checked out from Post 1 by a “Cleared American” on the day of service requirements.

6.4.8 Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.

7.0 SCHEDULED PREVENTIVE MAINTENANCE

7.1. General

7.1.1. The Contractor shall perform preventive maintenance as outlined in Exhibit A - STATEMENT OF WORK. The objective of scheduled preventive maintenance is to eliminate system malfunction, breakdown and deterioration when units are activated/running.

7.1.2. The Contractor shall inventory, supply and replace expendable parts as recommended in the scope of work that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site.

7.1.3. Exclusion. This contract does NOT include repairing equipment and replacement of hardware (e.g. bearings, pistons, piston rings, crankshaft, gears.) Hardware replacements will be separately priced out by the Contractor for the Government’s approval and acceptance.

The Government has the option to accept or reject the Contractor’s quote for parts and reserves the right to obtain similar spare parts from other competitive sources. If required by the Government, the Contractor shall utilize Government-purchased spare parts, if awarded the work. Such repairs/replacements will be accomplished by a separate purchase order.

However, this exclusion does not apply if the repair is to correct damage caused by Contractor negligence.

7.1.4. Replacement/repair of any electronic or electrical parts must be approved by the COR prior to installation of the part. If the Contractor proceeds to replace any electronic or electrical parts without COR approval, the Contractor shall de-install the parts at no cost to the Government.

7.2 Checklist Approval

The Contractor shall submit to the COR a schedule and description of preventive maintenance tasks which the Contractor plans to provide. The Contractor shall prepare this schedule and task description in a checklist format for the COR’s approval prior to contract work commencement.

7.2.1. The Contractor shall provide trained technicians to perform the service at frequencies stated in Exhibit A and on the equipment called out in this SOW. The technician shall sign off on every item on the checklist and leave a copy of this signed checklist with the COR or the COR's designate after the maintenance visit.

7.2.2. It is the responsibility of the Contractor to perform all manufacturers recommended preventive maintenance as well as preventive maintenance recommended by the manufacture technical manuals for the respective equipment.

8.0 PERSONNEL, TOOLS, CONSUMABLE MATERIALS AND SUPPLIES

The Contractor shall provide trained technicians with the appropriate tools and testing equipment for scheduled maintenance, safety inspection, and safety testing as required by this Contract. The Contractor shall provide all the necessary materials and supplies to maintain, service, inspect and test all the systems to be maintained.

8.1 Contractor furnished materials will include but not limited to appropriate tools, testing equipment, safety shoes and apparel for technicians, hands, hearing and eye protection, MSDS, cleaning material and oil spill containment kit. Expendable/consumable items (e.g. hoses, belts, oil, chemicals, coolants, filters (Air, Fuel, Oil), generator starting batteries, grease, sealant, thermostat, fuse), will be maintained in the onsite inventory. See 7.1.2.

8.2 Repairs. Repairs are not included in this contract. See Item 7.1.3. Exclusions.

8.3 Disposal of used oil, fuel, battery and other toxic substances. The Contractor is responsible for proper disposal of toxic/hazardous substances. All material shall be disposed of according to Government and Local law. After proper disposal the contractor must show proof of authorized disposal of these toxic/hazardous substances.

9.0 Software, Licenses and Passwords. Copies of all software and licenses needed to control or to adjust the communications module shall be given to the post upon completion of the work.

10. DELIVERABLES

Provide a typewritten report for Post Facilities Manager containing following:

a) System information (make, model, all device types)

b) Pass/Fail of each feature and type of component tested. If a device fails, note device type, address, and location within Post

c) Any comments on system (or device) condition pertaining to service life and dependability.

d) Full printout of test from system printer

e) Testing of exhaust gas by Gas Analyzer

The following items shall be delivered under this contract:

Description QTY Delivery Date Deliver to

Names, biographic data, police clearance on Contractor personnel (6.2)

1 30 days after contract award COR

Certificate of Insurance (11.2) 1 30 days after contract award CO

PM Checklist signed by Contractor’s employee (7.2.1)

1 After completion of each maintenance service

COR

Invoice (15) 1 After completion of each maintenance service

COR

11.0 INSURANCE REQUIREMENTS

11.1 Personal Injury, Property Loss or Damage (Liability). The Contractor assumes absolute responsibility and liability for all personal injuries or death and property damage or losses suffered due to negligence of the Contractor’s personnel in the performance of this Contract

The Contractor’s assumption of absolute liability is independent of any insurance policies.

11.2 Insurance. The Contractor, at its own expense, shall provide and maintain during the entire period of performance of this Contract, whatever insurance is legally necessary. The Contractor shall carry the following minimum insurance:

Public Liability Insurance

Bodily Injury $1,000,000 per occurrence $1,000,000 Cumulative Property Damage $1,000,000 per occurrence $1,000,000 Cumulative

Workers’ Compensation and Employer’s Liability

11.3 Worker's Compensation Insurance. The Contractor agrees to provide all employees with worker's compensation benefits as required under local laws (see FAR 52.228-4 “Worker’s Compensation and War-Hazard Insurance Overseas”).

12.0 LOCAL LAW REGISTRATION

If the local law or decree requires that one or both parties to the contract register the contract with the designated authorities to ensure compliance with this law or decree, the entire burden of this registration shall rest upon the Contractor. Any local or other taxes which may be assessed against the Contract shall be payable by the Contractor without Government reimbursement.

13.0 QUALITY ASSURANCE PLAN (QAP).

13.1 Plan. This plan is designed to provide an effective surveillance method to promote effective Contractor performance. The QAP provides a method for the Contracting Officer's Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the Contract. The role of the Government is to conduct quality assurance to ensure that Contract standards are achieved.

Performance Objective SOW Para Performance Threshold

Services.

Performs all services set forth in the Statement of Work (SOW)

1 thru 12 & Exhibit A All required services are performed and no more than one (1) customer complaint is received per month

13.2 Surveillance. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

13.3 Standard. The performance standard is that the Government receives no more than one

(1) customer complaint per month. The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212-4, Contract Terms and Conditions-Commercial Items), if any of the services exceed the standard.

13.4. Procedures.

13.4.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed, they should immediately contact the COR.

13.4.2 The COR will complete appropriate documentation to record the complaint.

13.4.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

13.4.4 If the COR determines whether the complaint is valid, the COR will inform the Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

13.4.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

13.4.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

13.4.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.

13.4.8. Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the COR will contact the Contracting Officer for appropriate action under the Inspection clause.

14. TRANSITIONS/CONTACTS

Within 30 days after contract award, the Contracting Officer may ask the contractor to develop a plan for preparing the contractor to assume all responsibilities for preventive maintenance services. The plan shall establish the projected period for completion of all clearances of contractor personnel, and the projected start date for performance of all services required under this contract. The plan shall assign priority to the selection of all supervisors to be used under the contract.

14.1 On site contact. The following are the designated contact personnel between the US Embassy and the Contractor

COR

DJ Heroux - Facility Manager herouxdj@state.gov

The Post Control Officer (PCO) will be the contractor’s point of contact at the U.S. Embassy, Maputo, Mozambique. All questions concerning coordination of service activities while at post shall be directed to the Post Control Officer, with weekly reporting to the COR:

PCO-Carlos Matos -Post Control Officer (PCO) matosc@state.gov

15. SUBMISSION OF INVOICES

The Contractor shall submit an invoice after each preventive maintenance service has been performed. Invoices must be accompanied by a signed copy of the Maintenance Checklist for the work performed including parts replacement and break down calls, if any. No invoice for preventive maintenance services will be considered for payment unless accompanied by the relevant documentation.

The Contractor should expect payment 30 days after completion of service or 30 days after receipt of invoice at the Embassy's payment office, whichever is later. Invoices shall be sent to:

U.S. Embassy Maputo Attn: Finance Management Office Task Order Number* Av. Marginal nr. 5467 Maputo mailto:herouxdj@state.gov mailto:matosc@state.gov

EXHIBIT A

DESCRIPTION OF EQUIPMENT:

Equipment Make Model Job # Location Info

Chiller Airstack ASF030XM, BMP57.58, HX, O

202-5009 Chiller Yard 3 Compressor modules, 1 Pump module, and 1 control unit. Pumps and Compressors are 380V, 3 phase, 50 Hz.

STATEMENT OF WORK

GENERAL INFORMATION:

The United States Embassy in Maputo requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Airstack Chiller systems.

GENERAL REQUIREMENTS:

The Contractor under this SOW will be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. Embassy staff has service manuals for all.

SCOPE OF WORK - - CHILLER PREVENTIVE MAINTENANCE

Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Material Safety Data Sheets (MSDS) shall be provided by the Contractor for all HAZMAT materials. Copies will be provided to the COR for approval.

If any discrepancies are found with the generator system that are not covered under this scope of work then the contractor must provide the following:

1. Detailed report noting the discrepancy found.

2. Bill of Materials (BOM) to include component name, quantity, part #, and price for any repair material required and material lead time.

3. Price quote for repair labor.

The Contractor shall inventory, supply, and replace expendable parts (e.g., filters, belts, hoses, gaskets) that have become worn down due to wear and tear. The Contractor shall maintain a supply of expendable and common parts on site so that these are readily available for normal maintenance to include: hoses, belts, oil, chemicals, coolant, filters (Air, Fuel, Oil), grease, sealant, thermostat, fuses; in addition to the appropriate tools, testing equipment, safety shoes and apparel for technicians, personal protective equipment (hands, hearing, eye protection), MSDS, cleaning material and oil spill containment kits. The contractor should inventory the supply after each visit and order replacement supplies and have them delivered on site.

Maintenance materials shall be unused and are to be industry standard and intended for the task to be performed. Parts are to be OEM approved. Refrigerants are to meet the AHRI_Standard_700-2015 or most recent AHRI Standards.

Refrigerants, parts, and maintenance materials delivered to the post are to be new and unused.

Reclaimed refrigerants are not to be delivered to posts. Reclaimed refrigerants within post compounds are to be retained and stored and may be used if not contaminated. Refrigerants shall be stored in containers clearly indicating the refrigerant type.

SAFETY AND SPECIAL INSTRUCTIONS:

1. Follow site safety procedures and supervisor’s instructions.

2. Schedule outage with operating personnel.

3. Use extreme caution when climbing access ladders.

4. Perform applicable lockout/tag out steps of site safety procedures.

5. Lockout and disconnect the main power before tightening the main supply lugs in order to avoid the hazard of electrical shock, which could result in serious personal injury or death.

6. Record and report equipment damage or deficiencies.

7. Review and follow the manufacturer’s O&M instructions.

8. Record results in the equipment history log.

9. Allow only qualified personnel to do maintenance work on this equipment.

10. Record results in the equipment history log.

11. Check manufacturer’s specifications for the maximum number of plugged tubes.

12. Allow only qualified personnel to do maintenance work on this equipment.

CHILLERS

MAINTENANCE PROCEDURES:

The manufacturer’s maintenance recommendations are to be considered the minimum tasks to be provided and these tasks may be altered or increased depending upon the location of the post.

Additionally, it may be required the maintenance contractor shall obtain and keep at the post O&M binders provided by the manufacturers. These binders will be placed in a location accessible to post personnel to review as needed.

Modular Chiller: [3 modules total]

Annually

1. Check chiller controls communications module to the overall embassy building HVAC automated controls for functionality. Replace, -- or install controls communications parts as needed--. Copies of any and all software and licenses needed to control or to adjust the communications module shall be given to the post.

2. Calibrate chiller control system, load limiting system, and safety controls.

3. Disconnect power source and lock out. Check electrical wiring and connections; tighten loose connections.

4. Inspect all electrical connections to check that they are not damaged, and terminals are tight and re-amp all electrical connections. Inspect all contactors for pitting and corrosion replace as necessary.

5. Inspect all cabinet screws nuts and bolts, fan motor mount bolts, fan blade set screws, shell and tube evaporator mounting, end cap bolts and connection bolts, brazed plate evaporator mounting bolts as well as compressor and pump mounting bolts for tightness as well as anti-vibration and isolator pads.

6. Check all fuses to make sure that they are sized correctly with proper amp rating.

7. Check all refrigerant pressures and inspect compressor in operation and tubes – look for signs of overheating, oil leaks or refrigerant leaks. Repair and clean all as needed.

8. Check compressor superheat on evaporator and economizer TXVs. Adjust as required.

9. Check condenser and economizer sub-cooling. Adjust as required.

10. Conduct “sniffer” leak check of entire refrigerant piping system. Inspect compressor terminals when powered down for pitting, corrosion, and loose connections.

11. Check that pressure switches and thermostats have correct cut-in and cut-out settings.

12. Check that the oil level is visible in each compressor and not discolored or bubbled. Take oil sample and analyze for destructive acids, corrosive materials, and metal deposits.

13. Take oil samples and provide to COR to submit for analysis.

14. Check that the pump(s) overload settings match the nameplate(s) and that they work properly.

15. Ensure that the condensing unit is clean and clear of surrounding debris and that panels are clear. Remove debris from air screen and clean underneath unit. Clear drain line and pan from sludge or debris. Power wash as needed. Note any signs of corrosion.

16. Inspect system for signs of corrosion. Remove corrosion, prime with corrosion inhibitor, paint to match original condition. Carefully inspect all fasteners to ensure integrity and replace any which have corroded. All replacement components, parts, and materials should be of corrosion resistant manufacture.

17. Pressure wash coil with coil cleaning solution. Straighten fin tubes with fin comb.

18. Check and record the compressor amperage draws and voltage.

19. Check and clean fan motors, pumps, sensors, and solenoids.

20. Cycle all valves at least two times.

21. Check and record the fan motor amp draws and voltage. Make sure of proper rotation and lubricate if required.

22. Check and record amp draw of the pumps and voltage. Check for signs of leakage at pump seal and suction and discharge connections.

23. Record G.P.M. water flow and compare to design specifications.

24. Check the glycol level of the chilled water.

25. Check that there is a sufficient Glycol level in feeder tank and check for proper operation.

26. Tighten all Rota-Lock nuts at the Compressors, Receivers, and accumulators. Torque is per manufacturer’s recommendations.

27. Inspect all control capillary tubing to ensure that the lines are separated and not vibrating against each other or any part of the frame or housing.

28. Inspect all other refrigeration lines for secure mountings. Take corrective measures necessary to prevent piping from rubbing the frame etc.

29. Inspect all insulation on piping and control sensors. Repair and replace as necessary.

Inspect entire plumbing system for leaks and clean tubes and any strainers on the system. Replace as necessary.

30. Check crank case heaters to verify proper operation. Keep spares in stock.

31. Take a refrigerant sample and analyze for moisture, acid, and rust.

32. Check operating pressures and temperatures, evaluate whether the system has a full refrigerant charge and replenish as necessary. Contractor shall supply all materials.

33. Review logged alarms and look for repeat trends.

34. Perform operational test and return to service.

35. Document the preventive maintenance task that have been completed and submit to the Government.

Motor Starter /Variable Frequency Drive (5 HP to Less Than 100 HP):

MAINTENANCE PROCEDURES:

Annually:

1. Vacuum dust and dirt from heat sink fins

2. Check ventilation fans for proper operation and clean as needed.

3. Check line voltage, motor & output phase balance

4. Complete RCM Procedure CM-0002 (Qualitative Infrared Testing).

5. Visually inspect for broken parts, contact arcing, or any evidence of overheating.

6. Check motor nameplate for current rating and controller manufacturer’s recommended heater size (report discrepancy to supervisor).

7. Check line and load connections for tightness (check manufacturer’s instructions for torque specifications).

8. Check heater mounting screws for tightness.

9. Check all control wiring connections for tightness.

10. On units equipped with motor reversing capacity, check mechanical interlock.

11. On units equipped with two-stage starting, check dash pots and timing controls for proper operation. Adjust as required.

12. On units equipped with variable speed starters:

a. Record the VFD parameter settings using MCT-10

b. Confirm the VFD doors and covers are in place and properly closed.

c. Check tightness of connections to resistor bank.

d. Check resistor coils and plates for cracking, broken wires, mounting and signs of overheating. Clean as required.

e. Check tightness of connections to drum controller.

f. Check contacts of drum controller for arcing and overheating. Apply a thin film of lubricant to drum controller contacts and to rotating surfaces.

13. Check starter contact connections by applying a thin film of black contact grease to line and load stabs, operate contacts and check surface contact.

14. Lubricate all moving parts with proper lubricant.

15. Clean interior of cabinet.

16. Clean exterior of cabinet.

17. Energize circuit and check operation of starter and any pilot lights. Replace as required.

Panel, Electronic Controls:

Annually

1. Clean panel interior.

2. Verify functionality of supported devices.

3. Clean ventilation filter and fan (if applicable).

4. Record and report equipment damage or deficiencies.

5. Record results in the equipment history log

Spare Parts and Expendables Inventory. Contractor shall supply all necessary parts, materials, diagnostic tools, etc. necessary to complete the work. Any spare parts used from embassy stock must be replaced by contractor.

Equipment List:

Equipment Make Model Job # Location Info

Chiller MultiStack ASF030XNE&GB-

F2I--DJN--A-BB---

B-R410A

202- S009

CAA

Chiller Yard

3 Compressor modules, 1 Pump module, and 1 control unit. Pumps and Compressors are 380V, 3 phase, 50 Hz, 1 master controller, 2 slave controllers, glycol feeder, heat exchanger module, condenser fans, tank and accessories.

Equipment Type Manufacturer Model Serial Number Location

CHILLER – Module 1 MultiStack AirStack AI 07-018 Chiller Yard

CHILLER – Module 2 MultiStack AirStack AI 07-019 Chiller Yard

CHILLER – Module 3 MultiStack AirStack AI 07-017 Chiller Yard

At a minimum, the following work must be done:

Annual Schedule

1. Check chiller controls communications module to the overall embassy building HVAC automated controls for functionality. Replace, -- or install controls communications parts as needed--. Copies of any and all software and licenses needed to control or to adjust the communications module shall be given to the post.

2. Check compressor superheat on evaporator and economizer TXVs. Adjust as required.

3. Check condenser and economizer sub-cooling. Adjust as required.

4. Check the chiller for leaks. Submit work order to find and repair leaks.

5. Test tubes for leakage.

6. Clean compressor tubes.

7. Replace oil filter, clean oil line strainer. Contractor shall supply all materials.

8. Calibrate chiller control system, load limiting system, and safety controls.

9. Check compressor oil on semi-hermetic compressors. Take oil samples and submit for analysis.

10. Clean the condensing unit. Remove debris from air screen and clean underneath unit.

Clear drain line and pan from sludge or debris. Note any signs of corrosion.

11. Inspect system for signs of corrosion. Remove corrosion, prime with corrosion inhibitor, paint to match original condition. Carefully inspect all fasteners to ensure integrity and replace any which have corroded. All replacement components, parts, and materials should be of corrosion resistant manufacture.

12. Pressure wash coil with coil cleaning solution. Straighten fin tubes with fin comb.

13. Check and clean fan motors, pumps, sensors and solenoids.

14. Clean strainers.

15. Check all refrigerant and replenish as necessary. Contractor shall supply all materials.

16. Cycle all valves at least two times.

17. Check controller for proper operation. Check all electrical connections for tightness. Re-amp as necessary.

18. Inspect condition of electrical contacts on motor starters and controls. Check electrical connections for tightness.

19. Perform operational test and return to service.

V. SPARE PARTS AND MATERIALS:

Contractor shall supply all necessary parts, materials, diagnostic tools, etc. necessary to complete the work.