Solicitation 19BB2122Q0009- Replacement of Chill Water Pipe.pdf

PDF 4 MB Posted

Attached to
U. S. Embassy, Bridgetown- Chill Water Pipe Installation Service
Solicitation number
PR10423828
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Section 1 - The Schedule

• SF 1449 cover sheet

• Continuation To SF-1449, RFQ Number 19BB2122Q0009, Prices, Block 23

• Continuation To SF-1449, RFQ 19BB2122Q0009, Schedule Of Supplies/Services, Block 20 Description/Specifications/Work Statement

• Exhibit A Drawings

Section 2 - Contract Clauses

• Contract Clauses

• Addendum to Contract Clauses - FAR and DOSAR Clauses not Prescribed in Part 12

Section 3 - Solicitation Provisions

• Solicitation Provisions

• Addendum to Solicitation Provisions - FAR and DOSAR Provisions not Prescribed in

Part 12

Section 4 - Evaluation Factors

• Evaluation Factors

• Addendum to Evaluation Factors - FAR and DOSAR Provisions not Prescribed in

Part 12

Section 5 - Representations and Certifications

• Offeror Representations and Certifications

• Addendum to Offeror Representations and Certifications - FAR and DOSAR

Provisions not Prescribed in Part 12

SENSITIVE BUT UNCLASSIFIED

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

19BB2122Q0009

6. SOLICITATION ISSUE DATE

01-10-2022

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

James Coddington, Contracting Officer

b. TELEPHONE NUMBER(No collect calls)

246-227-4000

8. OFFER DUE DATE/ LOCAL

TIME

02-09-2022/10:00

9. ISSUED BY CODE 10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE:____ % FOR:

American Embassy Bridgetown SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

Wildey Business Park HUBZONE SMALL

BUSINESS

(WOSB) ELLIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM NAICS:

Wildey, St. Michael

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

EDWOSB

8 (A) SIZE STANDARD:

11. DELIVERY FOR FOB DESTINAT-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS 13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE 16. ADMINISTERED BY CODE

American Embassy Bridgetown

Wildey Business Park

Wildey, St. Michael

American Embassy Bridgetown

Wildey Business Park

17a. CONTRACTOR/

OFFERER

TELEPHONE NO.

CODE FACILITY

CODE

18a. PAYMENT WILL BE MADE BY

American Embassy Bridgetown

Attention: Financial Management Office

Wildey Business Park

CODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

See attached

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL

ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REF. _________________ OFFER DATED

____________. YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS

TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print)

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER (Type or print)

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV. 02/2012)

PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212

SENSITIVE BUT UNCLASSIFIED

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _______________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT 37. CHECK NUMBER

PARTIAL FINAL

COMPLETE PARTIAL FINAL

38. S/R ACCOUNT NO.

39. S/R VOUCHER NO. 40. PAID BY

41.a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41C. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

19BB2122Q0009 3

SECTION 1 - THE SCHEDULE

CONTINUATION TO SF-1449

RFQ NUMBER 19BB2122Q0009

PRICES, BLOCK 23

JAMES ZADROGA 9/11 VICTIMS HEALTH AND COMPENSATION ACT

OF 2010 NOTICE: UNLESS A WAIVER OR EXCEPTION APPLIES,

PAYMENTS SUBSEQUENT TO THIS PROCUREMENT ARE SUBJECT TO

AN EXCISE TAX OF 2% PERSUANT TO 26 U.S.C. 5000C.

I. PERFORMANCE WORK STATEMENT

U.S. Embassy Bridgetown requires services for the replacement of the chilled water supply and return piping. The Contractor shall provide services, including furnishing all labor, material and equipment. The price listed below shall include all labor, materials, insurance

(see FAR 52.228-3 and 52.228-5), overhead, and profit.

II. PRICING

Line

Description

Price

Material

Installation

VAT

GRAND TOTAL

State prices in Barbados Dollars

III. VALUE ADDED TAX

VALUE ADDED TAX. Value Added Tax (VAT) is not included in the CLIN rates. Instead, it will be priced as a separate Line Item in the contract and on Invoices. Local law dictates the portion of the contract price that is subject to VAT.

19BB2122Q0009 4

CONTINUATION TO SF-1449,

RFQ NUMBER 19BB2122Q0009

SCHEDULE OF SUPPLIES/SERVICES, BLOCK 20

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

U.S. DEPARTMENT OF STATE

Chancery Basement – Chilled Water Piping Repair by Replacement

1.1 U.S. Embassy Bridgetown requires services for the replacement of the chilled water supply and return piping in the basement mechanical room serving AHU’s 1,3,5,7 and 9 at the US Embassy Chancery Building in Bridgetown, Barbados. Installation shall be in accordance with the attached drawings

1.2 The following systems components shall be replaced with new:

1.2.1 All branch chilled water supply and return piping on the basement level of the chancery associated with AHU’s 1, 3, 5, 7, and 9. This includes all piping in the basement downstream of the 6” vertical chilled water risers. All components on the branch piping system shall be replaced with new. Components include, but are not limited to the following:

1.2.1.1 metal piping:

1.2.1.1.1 Copper piping for sizes DN 50 (2”) and smaller

1.2.1.1.2 Schedule 40 steel piping with welded joints for DN 65 and larger Flanged joints shall be used at connections to equipment, valves, and hydronic specialties.

1.2.1.1.3 Dielectric unions between dissimilar metals

1.2.1.2 Piping insulation (elastomeric closed cell) and jacketing / vapor barrier

1.2.1.3 Isolation valves

1.2.1.4 Pressure gauges

1.2.1.5 Thermometers

1.2.1.6 Strainers

1.2.1.7 Test Ports (e.g.. Pete’s Plugs)

1.2.1.8 Balancing Valves

1.2.1.9 Control Valves / Actuators

1.2.1.10 Air Bleed Valves

1.2.1.11 Drain down valves

1.2.1.12 Hangers / Seismic Supports

1.3 Building Codes. Work under this project is governed local codes and by the latest adopted version of the International Building Code (IBC), OBO Design Standards, and

19BB2122Q0009 5

OBO International Building Code Supplements, which includes the International

Mechanical Code, International Plumbing Code, and National Electric Code (NEC). If there is conflict between local and OBO or International codes, the more stringent requirement shall be followed. New work being provided shall, at a minimum, be equal to or better than the current installation.

1.4 Site Specific Security Requirements. There will be no need for Cleared Personnel or a

Construction Security Plan (CSP) as part of this effort; however, all personnel are subject to review by the RSO.

1.5 Access to Site – Hours of Operation. Normal hours of operation at the U.S. Embassy are the following:

1.5.1 0730 to 1600 hours Monday through Friday for normal operations.

1.6 Specifictaions:

1.6.1 The contractor shall only work on one section of pipe at a time

1.6.2 The work shall be executed in a diligent manner in accordance with firm fix price.

1.6.3 The contractor is required at the end of each day’s work to ensure that the repaired areas are fully insulated and functional. The contractor is not permitted to leave any unfinished section of the piping for the next day.

1.6.4 The contractor will be responsible for the security of his/her tools. Materials and equipment left on the site overnight, on weekends or holidays.

1.6.5 Upon completion of the project, the contractor shall remove all excess materials and rubbish, and shall thoroughly clean the construction areas.

1.6.6 The contractor shall guarantee all workmanship for full year after completion of the project.

1.7 Safety

1.7.1 Prior to starting a project, each contractor is required to review the work site and identify hazards that may occur while performing the job.

1.7.2 Prior to starting a project, the contractor shall contact Contracting Officer, to ensure they have received pertinent information for the project including requirements for permits, floor plans, utility information, asbestos, lead based paint, and other hazardous materials

1.7.3 Per 15 FAM 935, contractors must provide their employees with a safe and healthful condition of employment.

1.7.4 Contractors are expected to provide a ”competent person” to implement Site health and safety plan and to oversee its compliance. A competent person is an individual who, by way of training and/or experience, is knowledgeable of applicable standards, is capable of identifying workplace hazards relating to the

19BB2122Q0009 6

specific operation, is designated by the employer, and has authority to take appropriate actions.

1.7.5 The contractor shall ensure individuals working at the site are trained and are aware of potential hazards. Contractors shall ensure that these individuals are provided with proper safety equipment to prevent accidental injury in accordance with the requirements of the contract.

1.7.6 Contractors will report accidents to the Post Occupational Safety Health Officer

(POSHO)

1.7.7 For all tools used on this project, the contractor shall:

1.7.7.1 Ensure the safety of tools and equipment used by its employees.

1.7.7.2 Inspect at regular intervals and maintain in good repair all tools in accordance with the manufacturers' specification.

1.7.7.3 Ensure that all operating and moving parts operate and are clean.

1.7.7.4 Require that appropriate personal protective equipment be worn for hazards that may be encountered while using portable power tools and hand tools

1.7.7.5 Ensure that tools are used for their intended purposes.

1.7.7.6 Ensure that all employees receive instruction on regulations and the safe use of each power tool.

1.7.7.7 Provide owners’ manuals including manufacturer’s specifications and suggested work practices and make available upon request to all employees required to use the equipment.

1.7.8 For this project and Personal Protective Equipment, Contractors are required to comply with the following provisions:

1.7.8.1 Protective equipment for eyes, face, head, and extremities, protective clothing, respiratory devices, and protective shields and barriers, shall be used wherever it is necessary by reason of hazards of processes or environment, chemical hazards, radiological hazards, or mechanical irritants encountered in a manner capable of causing injury or impairment in the function of any part of the body through absorption, inhalation or physical contact.

1.7.8.2 Each affected employee shall use appropriate eye or face protection when exposed to eye or face hazards from flying particles, molten metal, liquid chemicals, acids or caustic liquids, chemical gases or vapors, or potentially injurious light radiation.

1.7.8.3 Each affected employee shall use appropriate respiratory protection when potentially exposed to air contaminated with harmful dusts, fogs, fumes, mists, gases, smokes, sprays, or vapors and when such hazards cannot be

19BB2122Q0009 7

reduced or eliminated by effective engineering controls.

1.7.8.4 Each affected employee shall wear protective helmets when working in areas where there is a potential for injury to the head from falling objects.

Protective helmets shall also be worn to reduce electrical shock hazards when near expose electrical conductors which could contact the head.

1.7.8.5 Each affected employee shall wear protective footwear when working in areas where there is a danger of foot injuries due to falling and rolling objects, or objects piercing the sole, and where such employee’s feet are exposed to electrical hazards.

1.7.8.6 Each affected employee shall wear protective ear wear whenever noise exposures equal or exceed an 8-hour time-weighted average sound level

(TWA) of 80 decibels and when engineering controls cannot reduce or eliminate the hazard.

1.7.8.7 Each affected employee shall wear protective gloves when working in areas where hands are exposed to hazards such as those from skin absorption of harmful substances; severe cuts or lacerations; severe abrasions; punctures; chemical burns; thermal burns; and harmful temperature extremes.

2. PERSONNEL REQUIREMENTS

2.1 GENERAL. The Contractor shall maintain discipline at the site and shall take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by Contractor employees at the site. The Contractor shall preserve peace and protect persons and property on site. The

Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional costs to the Government.

2.2 STANDARD OF CONDUCT

2.2.1 Uniforms and Personal Equipment. The Contractor's employees shall wear clean, neat and complete uniforms when on duty. All employees shall wear uniforms approved by the

Contracting Officer's Representative (COR).

2.2.2 Neglect of duties shall not be condoned. The Contractor shall enforce no sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.

2.2.3 Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words, actions, or fighting shall not be condoned. Also included is participation in disruptive activities, which interfere with normal and efficient Government operations.

19BB2122Q0009 8

2.2.4 Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances that produce similar effects.

Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These include but are not limited to the following actions:

Falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records;

Unauthorized use of Government property, theft, vandalism, or immoral conduct;

Unethical or improper use of official authority or credentials;

Security violations; or, Organizing or participating in gambling in any form.

3.2.5 KEY CONTROL. The Contractor shall receive, secure, issue and account for any keys issued for access to buildings, offices, equipment, gates, etc., for the purposes of this contract.

The Contractor shall not duplicate keys without the COR's approval. Where it is determined that the Contractor or its agents have duplicated a key without permission of the COR, the Contractor shall remove the individual(s) responsible from this contract. If the Contractor has lost any such keys, the Contractor shall immediately notify the COR. In either event, the Contractor shall reimburse the Government for the cost of rekeying that portion of the system.

3.3. NOTICE TO THE GOVERNMENT OF LABOR DISPUTES

The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.

3.4 PERSONNEL SECURITY

3.4.1 After award of the contract, the Contractor shall provide the following list of data on each employee who will be working under the contract. The Contractor shall include a list of workers and supervisors assigned to this project. The Government will run background checks on these individuals. It is anticipated that security checks will take [Note to Contracting Officer:

Fill in number of days] days to perform. For each individual the list shall include:

Full Name

Place and Date of Birth

Current Address

Identification number

19BB2122Q0009 9

3.4.2 Government shall issue identity cards to Contractor personnel, after they are approved.

Contractor personnel shall display identity card(s) on the uniform at all times while providing services under this contract. These identity cards are the property of the US Government. The

Contractor is responsible for their return at the end of the contract, when an employee leaves

Contractor service, or at the request of the Government. The Government reserves the right to deny access to U.S.-owned and U.S.-operated facilities to any individual.

4. INSURANCE

4.1 AMOUNT OF INSURANCE. The Contractor is required to provide whatever insurance is legally necessary. The Contractor shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:

4.2 GENERAL LIABILITY (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)

1. Public Liability Insurance stated in US Dollars:

Property damage: $100,000

Cumulative: $300,000

4.3 The types and amounts of insurance are the minimums required. The Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

4.4 For those Contractor employees assigned to this contract who are either United States citizens or direct hire in the United States or its possessions, the Contractor shall provide workers’ compensation insurance in accordance with FAR 52.228-3, or host country nationals that do not have a DOL waiver.

4.5 The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to:

any property of the Contractor, its officers, agents, servants, employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising, except in the instance of gross negligence on the part of the Government.

19BB2122Q0009 10

4.6 The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

4.7 Government as Additional Insured. The general liability policy required of the Contractor shall name "the United States of America, acting by and through the Department of State," as an additional insured with respect to operations performed under this contract.

4.8 Time for Submission of Evidence of Insurance. The Contractor shall provide evidence of the insurance required under this contract within ten (10) days after contract award. The

Government may rescind or terminate the contract if the Contractor fails to timely submit insurance certificates identified above.

5. LAWS AND REGULATIONS

5.1 Without additional expense to the Government, the Contractor shall comply with all laws, codes, ordinances, and regulations required to perform this work. If there is a conflict between the contract and requirements of local law, the Contractor shall promptly advise the Contracting

Officer of the conflict and of the Contractor's proposed course of action for resolution by the

Contracting Officer.

5.2 The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, unless they are inconsistent with the requirements of this contract.

6. QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan provides an effective method to promote satisfactory contractor performance. The

QASP provides a method for the Contracting Officer's Representative (COR) to monitor

Contractor performance, advise the Contractor of unsatisfactory performance, and notify the

Contracting Officer of continued unsatisfactory performance. The Contractor, not the

Government, is responsible for management and quality control to meet the terms of the contract.

The role of the Government is to monitor quality to ensure that contract standards are achieved.

Performance Objective Scope of Work

Paragraphs Performance Threshold

Services.

Performs all services set forth in the scope of work.

1 thru 6 and Exhibit 1

All required services are performed and no more than one

(1) customer complaint is received per month.

6.1. SURVEILLANCE. The COR will receive and document all complaints from Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

19BB2122Q0009 11

6.2. STANDARD. The performance standard is that the Government receives no more than one

(1) [Note to Contracting Officer: Insert other number if desired] customer complaint per month.

The COR shall notify the Contracting Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.212.4, Contract Terms and

Conditions-Commercial Items (May 2001), if any of the services exceed the standard.

6.3. PROCEDURES.

6.3.1 If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

6.3.2 The COR will complete appropriate documentation to record the complaint.

6.3.3 If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

6.3.4 If the COR determines the complaint is valid, the COR will inform the

Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

6.3.5 The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

6.3.6 If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

6.3.7 The COR will consider complaints as resolved unless notified otherwise by the complainant.

6.3.8 Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the

COR will contact the Contracting Officer for appropriate action under the Inspection clause.

19BB2122Q0009 12

Exhibit A

Left blank intentionally

Butterfly Valve

Gate Valve

Strainer

Control Valve

Pressure Gauge

Temperature Gauge

Butterfly Valve

3"

3"

21/2"

21/2"

6" 6"

4"

4" 3"

3"

1" 1"

2"

2"

3"

3"

Butterfly Valve

Gate Valve

Strainer

Control Valve

Pressure Gauge

Temperature Gauge

Pressure Gauge

Temperature Gauge

Pressure Gauge

Temperature Gauge

Butterfly Valve

Gate Valve

CWRCWRCWR

CWRCWRCWR

CWRCWR

CWR

C W

R C

W R

C W

R

C W

R

C W

R

C W

R

C W

R C

W R

C W

R C

W R

C W

R

C W

R

C W

S

CWS CWSCWS

CWSCWSCWS

CWSCWSCWS

C W

S C

W S

C W

S

C W

S

C W

S

C W

S

C W

S C

W S

C W

S

C W

S C

W S

Chill Water Supply And Return From Chiller On To Roof

Butterfly Valve

Gate Valve

Strainer

Control Valve

Butterfly Valve

Gate Valve

Strainer

Control Valve

Pressure Gauge

Pressure Gauge

Temperature Gauge

Temperature Gauge

Pressure Gauge

Scale

Project number

Date

Drawn by

Checked by

#35 Old Chancery Lane, Chrust Church. Tel: 547-6066 Cel: 822-6068 email:

atelierdraftingservices@gmail.com

Atelier Drafting Services Electrical,Mechanical and Architectual Drafting

3/8" = 1'-0"

/1 /2

:3

:4

M-01

Main Mechanical Room

Project Number

Relocation Of Chillers

US EMBASSY

Issue Date

Author

Checker

AHU 3

AHU 1

AHU 5AHU 7

AHU 9

Scale

Project number

Date

Drawn by

Checked by

#35 Old Chancery Lane, Chrust Church. Tel: 547-6066 Cel: 822-6068 email:

atelierdraftingservices@gmail.com

Atelier Drafting Services Electrical,Mechanical and Architectual Drafting

/1 /2

:4

:5

M-02

Mechanical Room 3D

Project Number

Relocation Of Chillers

US EMBASSY

Issue Date

Author

Checker

Butterfly Valve

Gate Valve

Strainer

Control Valve

Pressure Gauge

Temperature Gauge

Butterfly Valve

6"

21/2"

6" 6"

1"

1"

2"

2"

1"

3"

Butterfly Valve

Gate Valve

Strainer

Control Valve

Pressure Gauge

Temperature Gauge

Pressure Gauge

Temperature Gauge

Pressure Gauge

Temperature Gauge

Butterfly Valve

Gate Valve

CWR

CWR

CWR

CWR

C W

R C

W R

C W

R

C W

R

C W

R

C W

R

C W

R C

W R

C W

R C

W R

C W

R

C W

S

CWS

CWS

CWS

CWSCWS

C W

S C

W S

C W

S

C W

S

C W

S

C W

S C

W S

C W

S

C W

S C

W S

Existing Chill Water Supply And Return From Chiller On To Roof

Butterfly Valve

Gate Valve

Strainer

Control Valve

Butterfly Valve

Gate Valve

Strainer

Control Valve

Temperature Gauge

Pressure Gauge

CWR

CWS

CWR

CWS

CWR

C W

S

C W

R

6"

6" 6"

6"

6"

3" 3"

C W

R C

W R

C W

R

C W

S C

W S

C W

S

CWR CWR CWR CWR

CWS CWS CWS

3"

3"

1"

3"

3"

3"

21/2" 21/2"

21/2"

21/2" 21/2"

6" Pipes Up to New Chillers Above

Butterfly Valve

Pressure Gauge

Temperature Gauge

2"

2"

@10'-7" TOP

10'-1" BOP

@10'-7" TOP

10'-1" BOP

@13'-8" TOP

13'-2" BOP

@9'-8" TOP

9'-51/2" BOP

@9'-8" TOP

9'-51/2" BOP

@10'-5" TOP

10'-2" BOP

@10'-5" TOP

10'-2" BOP

@9'-5" TOP

9'-2" BOP

@8'-2" TOP

8'-0" BOP

@6'-7" TOP

6'-5" BOP

@8'-11" TOP

8'-8" BOP

3" 3"

@11'-1" TOP

10'-10" BOP

@8'-5" TOP

8'-4" BOP

@11'-4" TOP

11'-11/2" BOP

BMS Sensor

@10'-7" TOP

10'-41/2" BOP

New Chill Water Supply And Return To Connect To Old 6" Runs Via Tee.

New Gate Valve Place For Isolation.

New 6" Runs To New Location of Chillers.

@10'-7" TOP

10'-41/2" BOP

M-03

Gate Valve

New Butterfly Valves Added To Riser

New 6" Chill water Runs

Existing Chill Water Runs

New Tee Connection To Existing Chill Water Runs

New Gate Valve For Isolation

New Butterfly Valve On Riser Pipes.

Scale

Project number

Date

Drawn by

Checked by

#35 Old Chancery Lane, Chrust Church. Tel: 547-6066 Cel: 822-6068 email:

atelierdraftingservices@gmail.com

Atelier Drafting Services Electrical,Mechanical and Architectual Drafting

3/8" = 1'-0"

/1 /2

:5

:4

M-03

Main Mechanical Room New Chill Water Runs

Project Number

Relocation Of Chillers

US EMBASSY

Issue Date

Author

Checker

3/8" = 1'-0"

Mechanical Room New Chill Water Runs1

AHU 9 AHU 7

AHU 5

AHU 3

AHU 1

Section Of Connection From New Run To Old Run

Chill Water Pipes Will be Servered At this Point From Existing Chillers.

Supply and Return 6" Pipes Up From Main Mechanical Room.

Scale

Project number

Date

Drawn by

Checked by

#35 Old Chancery Lane, Chrust Church. Tel: 547-6066 Cel: 822-6068 email:

atelierdraftingservices@gmail.com

Atelier Drafting Services Electrical,Mechanical and Architectual Drafting

3/16" = 1'-0"

/1 /2

:5

:3

M-04

Roof Layout

Project Number

Relocation Of Chillers

US EMBASSY

Issue Date

Author

Checker

3/16" = 1'-0"

Roof Layout

19BB2122Q0009 17

SECTION 2 - CONTRACT CLAUSES

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (OCT

2018) is incorporated by reference. (see SF-1449, Block 27A)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS—COMMERCIAL ITEMS. (SEP 2021)

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or

Executive orders applicable to acquisitions of commercial items:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or

Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further

Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services

Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment. (AUG 2020) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (NOV

2015).

(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).

(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws

108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the

Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

__ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUNE 2020), with Alternate I (OCT 1995) (41 U.S.C. 4704 and 10 U.S.C. 2402).

__ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (JUN

2020) (41 U.S.C. 3509)).

__ (3) 52.203-15, Whistleblower Protections under the American Recovery and

Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

_x_ (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract

Awards (JUN 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

__ (5) [Reserved].

https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_233_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim

19BB2122Q0009 18

__ (6) 52.204-14, Service Contract Reporting Requirements (OCT 2016) (Pub. L. 111-

117, section 743 of Div. C).

__ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery

Contracts (OCT 2016) (Pub. L. 111-117, section 743 of Div. C).

__ (8) 52.209-6, Protecting the Government’s Interest When Subcontracting with

Contractors Debarred, Suspended, or Proposed for Debarment. (JUN

2020) (31 U.S.C. 6101 note).

__ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility

Matters (OCT 2018) (41 U.S.C. 2313).

__ (10) [Reserved].

__ (11)

(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP

2021) (15 U.S.C. 657a).

__ (12)

(i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business

Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer)

(15 U.S.C. 657a).

_ (13) [Reserved]

__ (14)

(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-6.

__ (15)

(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).

__ (ii) Alternate I (MAR 2020) of 52.219-7.

__ (16) 52.219-8, Utilization of Small Business Concerns (OCT

2018) (15 U.S.C. 637(d)(2) and (3)).

__ (17)

(i) 52.219-9, Small Business Subcontracting Plan (JUN 2020) (15 U.S.C. 637(d)(4)).

__ (ii) Alternate I (NOV 2016) of 52.219-9.

__ (iii) Alternate II (NOV 2016) of 52.219-9.

__ (iv) Alternate III (JUN 2020) of 52.219-9.

__ (v) Alternate IV (JUN 2020) of 52.219-9

__ (18)

(i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).

__ (ii) Alternate I (MAR 2020) of 52.219-13.

__ (19) 52.219-14, Limitations on Subcontracting (SEP 2021 (15 U.S.C. 637(a)(14)).

__ (20) 52.219-16, Liquidated Damages-Subcontracting Plan (SEP

2021) (15 U.S.C. 637(d)(4)(F)(i)).

__ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-

Aside (SEP 2021) (15 U.S.C. 657f).

__ (22)

(i) 52.219-28, Post Award Small Business Program Rerepresentation (SEP

2021) (15 U.S.C. 632(a)(2)).

__ (ii) Alternate I (MAR 2020) of 52.219-28.

__ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically

Disadvantaged Women-Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).

https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_209_6 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_8 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_16 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_27 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3

19BB2122Q0009 19

__ (24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned

Small Business Concerns Eligible Under the Women-Owned Small Business Program (SEP

2021) (15 U.S.C. 637(m)).

__ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR

2020) (15 U.S.C. 644(r)).

__ (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15U.S.C. 637(a)(17)).

__ (27) 52.222-3, Convict Labor (JUN 2003) (E.O.11755).

_x_ (28) 52.222-19, Child Labor-Cooperation with Authorities and

Remedies (JAN2020) (E.O.13126).

__ (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).

__ (30)

(i) 52.222-26, Equal Opportunity (SEP 2016) (E.O.11246).

__ (ii) Alternate I (FEB 1999) of 52.222-26.

__ (31)

(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).

__ (ii) Alternate I (JUL 2014) of 52.222-35.

__ (32)

(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).

__ (ii) Alternate I (JUL 2014) of 52.222-36.

__ (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).

__ (34) 52.222-40, Notification of Employee Rights Under the National Labor

Relations Act (DEC 2010) (E.O. 13496).

_x_ (35)

(i) 52.222-50, Combating Trafficking in Persons (OCT 2020) (22 U.S.C. chapter 78 and E.O.

13627).

__ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O.

13627).

__ (36) 52.222-54, Employment Eligibility Verification (OCT 2015). (Executive Order

12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)

__ (37)

(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated

Items (May 2008) ( 42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)

__ (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential

Hydrofluorocarbons (Jun 2016) (E.O. 13693).

__ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration

Equipment and Air Conditioners (JUN 2016) (E.O. 13693).

__ (40)

(i) 52.223-13, Acquisition of EPEAT®-Registered Imaging Equipment (JUN 2014) (E.O.s

13423 and 13514).

__ (ii) Alternate I (OCT 2015) of 52.223-13.

__ (41) https://www.acquisition.gov/far/part-52#FAR_52_219_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec644.htm https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.govinfo.gov/content/pkg/USCODE-2018-title15/html/USCODE-2018-title15-chap14A-sec637.htm https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_19 https://www.acquisition.gov/far/part-52#FAR_52_222_21 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_26 https://www.acquisition.gov/far/part-52#FAR_52_222_35 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_35 https://www.acquisition.gov/far/part-52#FAR_52_222_36 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title29-section793&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_36 https://www.acquisition.gov/far/part-52#FAR_52_222_37 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title38-section4212&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_40 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_50 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_54 https://www.acquisition.gov/far/part-22#FAR_22_1803 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_9 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_11 https://www.acquisition.gov/far/part-52#FAR_52_223_12 https://www.acquisition.gov/far/part-52#FAR_52_223_13 https://www.acquisition.gov/far/part-52#FAR_52_223_13

19BB2122Q0009 20

(i) 52.223-14, Acquisition of EPEAT®-Registered Televisions (JUN 2014) (E.O.s 13423 and

13514).

__ (ii) Alternate I (Jun2014) of 52.223-14.

__ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY

2020) (42 U.S.C. 8259b).

__ (43)

(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT

2015) (E.O.s 13423 and 13514).

__ (ii) Alternate I (JUN 2014) of 52.223-16.

_x_ (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While

Driving (JUN 2020) (E.O. 13513).

__ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).

__ (46) 52.223-21, Foams (Jun2016) (E.O. 13693).

__ (47)

(i) 52.224-3 Privacy Training (JAN 2017) (5 U.S.C. 552 a).

__ (ii) Alternate I (JAN 2017) of 52.224-3.

__ (48) 52.225-1, Buy American-Supplies (JAN2021) (41 U.S.C. chapter 83).

__ (49)

(i) 52.225-3, Buy American-Free Trade Agreements-Israeli Trade Act

(JAN 2021)(41 U.S.C.chapter83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.

__ (ii) Alternate I (JAN 2021) of 52.225-3.

__ (iii) Alternate II (JAN 2021) of 52.225-3.

__ (iv) Alternate III (JAN 2021) of 52.225-3.

__ (50) 52.225-5, Trade Agreements (OCT 2019) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).

_x_ (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the

Department of the Treasury).

__ (52) 52.225-26, Contractors Performing Private Security Functions Outside the

United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302Note).

__ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov2007)

(42 U.S.C. 5150).

__ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area

(Nov2007) (42 U.S.C. 5150).

__ (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021) .

_x_ (56) 52.232-29, Terms for Financing of Purchases of Commercial Items (FEB

2002) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).

__ (57) 52.232-30, Installment Payments for Commercial Items (Jan 2017)

(41 U.S.C. 4505, 10 U.S.C. 2307(f)).

_x_ (58) 52.232-33, Payment by Electronic Funds Transfer-System for Award

Management (OCT2018) (31 U.S.C. 3332).

__ (59) 52.232-34, Payment by Electronic Funds Transfer-Other than System for

Award Management (Jul 2013) (31 U.S.C. 3332).

https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_14 https://www.acquisition.gov/far/part-52#FAR_52_223_15 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_16 https://www.acquisition.gov/far/part-52#FAR_52_223_18 https://www.acquisition.gov/far/part-52#FAR_52_223_20 https://www.acquisition.gov/far/part-52#FAR_52_223_21 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_224_3 https://www.acquisition.gov/far/part-52#FAR_52_225_1 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_3 https://www.acquisition.gov/far/part-52#FAR_52_225_5 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section2501&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title19-section3301&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_225_13 https://www.acquisition.gov/far/part-52#FAR_52_225_26 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_226_4 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_226_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_229_12 https://www.acquisition.gov/far/part-52#FAR_52_232_29 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_30 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_232_33 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title31-section3332&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_232_34

19BB2122Q0009 21

__ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).

__ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).

__ (62) 52.242-5, Payments to Small Business Subcontractors (JAN

2017) (15 U.S.C. 637(d)(13)).

__ (63) (i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial

Vessels (FEB 2006) ( 46 U.S.C. 55305 and 10 U.S.C. 2631).

__ (ii) Alternate I (APR 2003) of 52.247-64.

__ (iii) Alternate II (FEB 2006) of 52.247-64.

(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items:

__ (1) 52.222-41, Service Contract Labor Standards (AUG

2018) (41 U.S.C. chapter67).

__ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY

2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards-

Price Adjustment (Multiple Year and Option Contracts) (AUG

2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).

__ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards-

Price Adjustment (May 2014) ( 29U.S.C.206 and 41 U.S.C. chapter 67).

__ (5) 52.222-51, Exemption from Application of the Service Contract Labor

Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment-

Requirements (May 2014) (41 U.S.C. chapter 67).

__ (6) 52.222-53, Exemption from Application of the Service Contract Labor

Standards to Contracts for Certain Services-Requirements (MAY 2014) (41 U.S.C. chapter 67).

__ (7) 52.222-55, Minimum Wages Under Executive Order 13658 (NOV 2020).

__ (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O.

13706).

__ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Jun

2020) (42 U.S.C. 1792).

(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph (d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records-Negotiation.

(1) The Comptroller General of the United States, or an authorized representative of the

Comptroller General, shall have access to and right to examine any of the Contractor’s directly pertinent records involving transactions related to this contract.

(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR subpart 4.7, Contractor

Records Retention, of the other clauses of this contract. If this contract is completely or partially https://www.acquisition.gov/far/part-52#FAR_52_232_36 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_239_1 http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section552a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_242_5 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.govinfo.gov/content/pkg/USCODE-2019-title46/html/USCODE-2019-title46-subtitleV-partD-chap553-subchapI-sec55305.htm http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_247_64 https://www.acquisition.gov/far/part-52#FAR_52_222_41 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_42 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_43 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_44 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-52#FAR_52_222_51 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .