Solicitation 15A00026Q00000035.pdf

PDF 118 KB Posted

Attached to
Explosives and Explosive Supplies Federal contract opportunity
Solicitation number
15A00026Q00000035
Issued by
Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives

About this file

Solicitation Summary

This is a Request for Quote (RFQ) for commercial explosives and explosive supplies issued by the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF), Acquisitions Management Division. The solicitation number is 15A00026Q00000035, with an offer due date of March 20, 2026, at 5:00 PM EST. The contract is set aside 100% for small businesses and is a firm fixed-price award. Delivery is required by April 30, 2026, to Huntsville, AL 35898 on an FOB Destination basis. Offerors must submit electronically signed quotes in Microsoft Word or Adobe PDF format to Brian.Wilkins@atf.gov, including pricing for each of 13 contract line items (CLINs 0001-0013) and any applicable discounts.

The supplies required include various explosive products: Donavan Durablock (90 each), EZ Drifter 400/8000 20ft detonators (1,800 each), Nonel EZTL 9ms 20ft detonators (300 each), Nonel MS delay detonators in 500ms and 1,000ms variants (60 and 120 each), M81 Fuse Igniters (300 each), Dyno Spartan 200G Boosters (504 each), Austin Rock Crusher detonators (128 each), Primacord 10 at 50gr/ft (26,000 feet), Primaline 21 at 100gr/ft (20,800 feet), ANFO (300 pounds), Unimax TT detonators (176 each), and C2 Sheet Explosive (160 pounds). All items carry Product Service Code 1375 and a line performance period of March 23, 2026, through April 30, 2026. Evaluation will be based on technical acceptability (quote meets RFQ requirements) and price fairness and reasonableness. Offerors must complete and submit FAR certifications regarding telecommunications equipment, responsibility matters, tax liability, and felony convictions.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15A00026Q00000035 Page 1 of 35

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 AND 30.

1. REQUISITION NUMBER

DJA-26-AEET-PR-0219

PAGE 1 OF

5. SOLICITATION NUMBER

15A00026Q00000035

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

03/11/2026

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

Brian.Wilkins@ATF.gov

b. TELEPHONE NUMBER (No collect calls)

(O) 2026489120 (F) 2026489654

8. OFFER DUE DATE / LOCAL

TIME

03/20/2026 05:00 ET

CODE 15A000

ATF - ACQUISITIONS MANAGEMENT DIVISION

Brian Wilkins

99 NEW YORK AVE. NE

WASHINGTON, DC 20226

9. ISSUED BY UNRESTRICTED OR X SET ASIDE:100.00 % FOR

X SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

8(A)

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

325920

SIZE STANDARD:

750 Employees

10. THE ACQUISITION IS

SEE SCHEDULE

11. DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER THE

DEFENSE PRIORITIES AND

ALLOCATIONS SYSTEM -

DPAS (15 CFR 700)

13b. RATING

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

14. METHOD OF SOLICITATION

CODE15. DELIVER TO CODE 15A00016. ADMINISTERED BY

Acquisition Management Division (AMD) 99 New York Ave NE

WASHINGTON, DC 20226

FACILITY

CODE

CODE

TELEPHONE NUMBER

17a. CONTRACTOR/

OFFEROR

A404040CODE18a. PAYMENT WILL BE MADE BY

ATF - FINANCE BRANCH

99 New York Ave. NE, #4.S-288 Washington, DC 20226

(O) (202) 648-7860 Finance.Branch@ATF.gov

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

Delivery Date: 04/30/2026

Explosives and Explosive Supplies Firm Fixed Price

See Continuation Sheet(s) (Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

X 27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

ARE X ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN ____ COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REFERENCE _____________________________

OFFER DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK

5) INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (Type or print)

Brian K. Wilkins

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

15A00026Q00000035 Page 2 of 35

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: _________________________________

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

PARTIAL FINAL

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

COMPLETE PARTIAL FINAL

36. PAYMENT 37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 42a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 11/2021) BACK

15A00026Q00000035 Page 3 of 35

Table of Contents

Section Description Page Number

Solicitation/Contract Form 1 Commodity or Services Schedule 2 Contract Clauses

52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.212-4 (DEV) Terms and Conditions-Commercial Products and Commercial Services (Nov

2023) (DEVIATION NOV 2025)

52.204-13 (DEV) System for Award Management-Maintenance (Oct 2018) (DEVIATION NOV 2025) ATF-14 Electronic Invoicing & Release of Residual Funds (DECEMBER 2025) ATF-17 Notice to the Government of Delays (APRIL 2025) ATF-19 Authority to Obligate the Government (APRIL 2025) ATF-21 All Items To Become The Property Of The Government (APRIL 2025) ATF-22 Confidentiality of Information and Disclosure (APRIL 2025) ATF-52 Indemnification Clause (MAY 2021) DOJ-02 Contractor Privacy Requirements (JAN 2022) DOJ-05 Security of Department Information and Systems (OCT 2023) 52.212-5 Alt I Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Products and Commercial Services (Oct 2025) - Alternate I (Feb 2000)

3 List of Attachments 4 Solicitation Provisions

52.212-1 (DEV) Instructions to Offerors-Commercial Products and Commercial Services (Sep

2023) (DEVIATION NOV 2025)

52.204-7 (DEV) System for Award Management-Registration (Nov 2024) (DEVIATION NOV 2025) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) 52.209-5 (DEV) Certification Regarding Responsibility Matters (Aug 2020) (DEVIATION NOV 2025) 52.209-7 (DEV) Information Regarding Responsibility Matters (Oct 2018) (DEVIATION NOV 2025) 52.209-11 (DEV) Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) (DEVIATION NOV 2025) 52.212-2 (DEV) Evaluation-Commercial Products and Commercial Services (Nov 2021)

(DEVIATION NOV 2025)

15A00026Q00000035 Page 4 of 35

Section 1 - Commodity or Services Schedule

SCHEDULE OF SUPPLIES/SERVICES

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 Donovan Durablock, 1.25 lb/ea 32/case

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

90 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 EZ Drifter 400/8000 20ft

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

1,800 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 Nonel EZTL 9ms 20ft

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

300 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0004 Nonel MS 500ms delay 16ft

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

60 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 Nonel Ms 1000ms dealy 20ft

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

120 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0006 M81 Fuse Igniters

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

300 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0007 Dyno Spartan 200G Boster

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

504 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0008 Austin Rock Crusher

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

128 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0009 Primacord 10 (50gr/ft)

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

26,000 FT $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

15A00026Q00000035 Page 5 of 35

0010 Primaline 21 (100gr/ft)

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

20,800 FT $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0011 ANFO

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

300 LB $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0012 Unimax TT

PSC: 75

Line Period of Performance: 03/23/2026 - 04/30/2026

176 EA $________ $_________________

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0013 C2 Sheet Explosive

PSC: 1375

Line Period of Performance: 03/23/2026 - 04/30/2026

160 LB $________ $_________________

15A00026Q00000035 Page 6 of 35

Section 2 - Contract Clauses

A.1 ADDENDUM TO FAR 52.212-4, Terms and Conditions-Commercial Products and Commercial Services (Nov

2023) (DEVIATION NOV 2025)

The terms and conditions for the following clauses are hereby incorporated into this solicitation and resulting contract as an addendum to FAR clause 52.212-4.

Clauses By Reference

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov

Clause Title Fill-ins (if applicable)

52.204-25 Prohibition on Contracting for Certain

Telecommunications and Video Surveillance Services or

Equipment (Nov 2021)

52.212-4 (DEV) Terms and Conditions-Commercial Products and

Commercial Services (Nov 2023) (DEVIATION NOV

2025)

52.204-13 (DEV) System for Award Management-Maintenance (Oct 2018)

(DEVIATION NOV 2025)

Clauses By Full Text

ATF-14 Electronic Invoicing & Release of Residual Funds (DECEMBER 2025)

(a) The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) requires contractors to submit invoices electronically through the United States’ Department of the Treasury's Invoice Processing Platform (IPP) – www.IPP.gov. Invoicing electronically saves time, money, and physical storage space for both the Government and the contractor.

(b) After the Department of Justice/ATF enrolls the Contractor in IPP, the Contractor’s Electronic Business (EB) POC per the System for Award System (www.SAM.gov) will receive a link. The Contractor’s EB POC, hereafter Administrator, must use that link to log into IPP, using an existing or new account. The Contractor Administrator and/or the Users that person adds will gain access to IPP’s Collector module (upon login) where they can view actions, submit invoices and access payment information. For assistance with IPP, contact its Customer Support Desk via email, IPPCustomerSupport@Fiscal.Treasury.gov, or phone, 866.973.3131.

15A00026Q00000035 Page 7 of 35

(c) Each invoice must be a proper invoice in accordance with the Federal Acquisition Regulation (FAR) subpart 32.905(b) and comply with IPP’s requirements. If contractors submit an invoice with multiple contract-line-item numbers (CLINs) or line numbers for a particular contract-/purchasing-vehicle number, the contractor must clearly identify the specific amounts and activity applicable to each line. Additionally, the contractor must clearly label the final invoice as "Final."

(d) ATF may closeout residual funds without a modification when the total value of the obligation does not exceed the simplified-acquisition threshold AND the total does not exceed $1,000.

(End of Clause)

ATF-17 Notice to the Government of Delays (APRIL 2025)

In the event the Contractor: 1) encounters difficulty in meeting performance requirements; 2) anticipates difficulty in complying with the contract-delivery schedule or completion date; or 3) has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of the contract, the Contractor shall immediately notify the Contracting Officer and the CO's Representative(s), in writing, giving pertinent details. However, this notice shall not be construed as a waiver by the Government of any required contractual-delivery schedule or date or any rights or remedies provided by law or under this contract; instead, this notice shall be information only in character.

(End of Clause)

ATF-19 Authority to Obligate the Government (APRIL 2025)

The Contracting Officer (CO) is the only individual who can legally commit or obligate the Government to the expenditure of public funds. No cost chargeable to the contract can be incurred before receipt of a fully signed and awarded contract unless specific authorization from the CO is provided.

(End of Clause)

ATF-21 All Items To Become The Property Of The Government (APRIL 2025)

Title to all source data and materials furnished by the Government, together with all related plans, designs, reports, materials, programs, and documentation submitted by the Contractor in performance of the contract and all other items pertaining to the Contractor's work and services to be performed under orders pursuant to this solicitation and contract shall become and remain the sole property of the Government upon contract completion. The Government will have the full right to use these materials and data for its purpose without further compensation or approval on the part of the Contractor. The Government shall have access to and the right to make copies of the above-mentioned items. All proprietary information, programs, etc. shall be indicated as such in the Contractor's proposal. The identification of information, programs, etc. as proprietary or confidential is subject to investigation and proof, as outlined in FAR clause 52.227-14, upon request by the Government. The Contractor is advised that information may be subject to release upon request pursuant to the Freedom of Information Act (5 U.S.C. 552).

(End of Clause)

ATF-22 Confidentiality of Information and Disclosure (APRIL 2025)

(a) The Contractor agrees, in the performance of this contract, to keep all information contained in source documents or other media furnished by the Government in the strictest confidence. The Contractor also agrees not to publish or otherwise divulge such information in whole or in part, in any manner or form, nor to authorize or permit others to do so, taking such reasonable measures as are necessary to restrict access to such information while in the Contractor's possession, to those employees needing such information to perform the work provided herein, e.g., on a need-to-know basis. There shall be no dissemination or publication, except within and between the Contractor and any subcontractors, of information developed under this contract or contained in the reports to be furnished pursuant to this contract without prior written approval from the Contracting Officer (CO). No news release (including photographs and films, public announcements, denial, or confirmation of same) on any part of the subject matter of this contract or any phase of any program hereunder shall be made without the prior written approval of the CO. The Contractor is prohibited from releasing to any source, other than the sponsoring activity, any interim, draft, and final reports or information pertaining to services performed under this contract until report approval or official review has been obtained.

15A00026Q00000035 Page 8 of 35

(b) The Contractor agrees to immediately notify in writing the CO if the Contractor determines or has reason to suspect a breach of this clause. The Contractor agrees to insert the substance of this clause in any consultant agreement or subcontract hereunder.

1. Confidential information, as used in this clause, means:

i. information or data of a personal nature;

ii. proprietary information about an individual;

iii. information or data submitted by or about an institution or organization; or

iv. information or data pertaining to a law enforcement investigation or operation.

2. In addition to the types of confidential information described in (1) above, information which requires special consideration regarding the timing of its disclosure such as draft budget and strategic plans, studies or research, audits, etc. are also considered to be confidential information.

3. The CO and the Contractor may identify elsewhere in this contract specific information and/or categories of information which the Government will furnish to the Contractor or that the Contractor is expected to generate which is confidential. Similarly, the CO and the Contractor may identify such confidential information from time to time during the performance of the contract. Any disagreement as to what constitutes confidential information will be settled pursuant to the Disputes clause.

4. If it is established that information to be utilized under this contract is subject to the Privacy Act, the Contractor will follow the rules and procedures of the disclosure set forth in the Privacy Act of 1974, 5 U.S.C. 552a, and implementing regulations and policies, with respect to systems of records determined to be subject to the Privacy Act.

5. Confidential information, as defined above, shall not be disclosed without the prior written consent of the CO, and the individual(s), institution(s), or organization(s) affected. Confidential information, as defined in above shall not be disclosed without the prior written consent of the Bureau of Alcohol, Tobacco, Firearms & Explosives (ATF).

6. Whenever the Contractor is uncertain regarding the proper handling of material under the contract, or if the material in question is subject to the Privacy Act or is confidential information subject to the information contained in this clause, the Contractor shall obtain a written determination from the CO prior to any release, disclosure, dissemination, or publication.

(End of Clause)

ATF-52 Indemnification Clause (MAY 2021)

Each Party shall assume the responsibility and liability for the acts and omissions of its own employees or agents in connection with the performance of their obligations under this contract that are executed within the scope of their employment, including claims for injury, loss or damage to personal property or death, except in the case of the federal Government, liability shall be determined pursuant to the Federal Tort Claim Act (FTCA - 28 U.S.C. § 1346). Contractor hereby agrees to indemnify, defend and hold the federal Government harmless from any loss, liability, costs or damages arising from actual or threatened claims or causes of action resulting from breach of any of its representations, warranties or covenants herein or the negligence, gross negligence or intentional misconduct of Contractor's respective officers, directors, employees, agents, contractors, members or participants etc. (as applicable).

(End of Clause)

DOJ-02 Contractor Privacy Requirements (JAN 2022)

A. Limiting Access to Privacy Act and Other Sensitive Information

(1) Privacy Act Information

In accordance with FAR 52.224-1 Privacy Act Notification (APR 1984) and FAR 52.224-2 Privacy Act (APR 1984), if this contract requires Contractor personnel to have access to information protected by the Privacy Act of 1974, the contractor is advised that the relevant DOJ system of records notices (SORNs) applicable to this Privacy Act information may be found at https://www.justice.gov/opcl/doj-systems-records.[1] Applicable SORNs published by other agencies may be accessed through those agencies’ websites or by searching the Federal Digital System (FDsys) available at http://www.gpo.gov/fdsys/. SORNs may be updated at any time.

(2) Prohibition on Performing Work Outside a Government Facility/Network/Equipment

15A00026Q00000035 Page 9 of 35

Except where use of Contractor networks, IT, other equipment, or Workplace as a Service (WaaS) is specifically authorized within this contract, the Contractor shall perform all tasks on authorized Government networks, using Government-furnished IT and other equipment and/or WaaS and Government information shall remain within the confines of authorized Government networks at all times. Any handling of Government information on Contractor networks or IT must be approved by the Senior Component Official for Privacy of the component entering into this contract. Except where remote work is specifically authorized within this contract, the Contractor shall perform all tasks described in this document at authorized Government facilities; the Contractor is prohibited from performing these tasks at or removing Government-furnished information to any other facility; and Government information shall remain within the confines of authorized Government facilities at all times. Contractors may only access classified materials on government furnished equipment in authorized government owned facilities regardless of remote work authorizations.

(3) Prior Approval Required to Hire Subcontractors

The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (Subcontractor) in support of this contract requiring the disclosure of information, documentary material and/or records generated under or relating to this contract. The Contractor (and any Subcontractor) is required to abide by Government and Agency guidance for protecting sensitive and proprietary information.

(4) Separation Checklist for Contractor Employees

The Contractor shall complete and submit an appropriate separation checklist to the Contracting Officer before any employee or Subcontractor employee terminates working on the contract. The Contractor must submit the separation checklist on or before the last day of employment or work on the contract. The separation checklist must verify: (1) return of any Government-furnished equipment; (2) return or proper disposition of personally identifiable information (PII)[2], in paper or electronic form, in the custody of the employee or Subcontractor employee including the sanitization of data on any computer systems or media as appropriate; and (3) termination of any technological access to the Contractor’s facilities or systems that would permit the terminated employee’s access to PII or other sensitive information.

In the event of adverse job actions resulting in the dismissal of a Contractor or Subcontractor employee before the separation checklist can be completed, the Prime Contractor must notify the Contracting Officer within 24 hours and confirm receipt of the notification. In the case the Contractor is unable to notify the Contracting Officer, then the Contractor should notify the Contract Officer’s Representative (COR).

Contractors must complete the separation checklist with the Contracting Officer or COR by returning all Government-furnished property including, but not limited to, computer equipment, media, credentials and passports, smart cards, mobile devices, Personal Identity Verification (PIV) cards, calling cards, and keys and terminating access to all user accounts and systems. Unless the Contracting Officer requests otherwise, the relevant Program Manager or other Key Personnel designated by the Contracting Officer or COR may facilitate the return of equipment.

B. Privacy Training, Safeguarding, and Remediation

(1) Required Security and Privacy Training for Contractors

The Contractor must ensure that all employees take appropriate privacy training, including Subcontractors who have access to PII as well as the creation, use, dissemination and/or destruction of PII at the outset of the employee’s work on the contract and every year thereafter. Training must include procedures on how to properly handle PII, including heightened security requirements for the transporting or transmission of sensitive PII, and reporting requirements for a suspected breach or loss of PII. These courses, along with more information about DOJ security and training requirements for Contractors, are available at https://www.justice.gov/jmd/learndoj.

The Federal Information Security Modernization Act of 2014 (FISMA) requires all individuals accessing DOJ information to complete training on records management, cybersecurity awareness, and information system privacy awareness. Contractor employees are required to sign the “Privacy Rules of Behavior,” acknowledging and agreeing to abide by privacy law, policy, and certain privacy safeguards, prior to accessing DOJ information. These Rules of Behavior are made available to all new users of DOJ’s computer network and to trainees at the conclusion of DOJ-OPCL-CS-0005.

15A00026Q00000035 Page 10 of 35

The Contractor should maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required privacy and cybersecurity training.

(2) Safeguarding PII Requirements

Contractor employees must comply with DOJ Order 0904 and other guidance published to the publicly-available Office of Privacy and Civil Liberties (OPCL) Resources page[3] relating to the safeguarding of PII, including the use of additional controls to safeguard sensitive PII (e.g., the encryption of sensitive PII). This requirement flows down from the Prime Contractor to all Subcontractors and lower tiered subcontracts.

(3) Non-Disclosure Agreement Requirement

Prior to commencing work, all Contractor personnel that may have access to PII or other sensitive information shall be required to sign a Non-Disclosure Agreement (NDA) and the DOJ IT Rules of Behavior. The Non-Disclosure Agreement:

(a) prohibits the Contractor from retaining or divulging any PII or other sensitive information, or derivatives therefrom, furnished by the Government or to which they may otherwise come in contact as a result of their performance of work under the contract/task order that is otherwise not publicly available, whether or not such information has been reduced to writing; and

(b) requires the Contractor to report any loss of control, compromise, unauthorized disclosure, or unauthorized acquisition of PII or other sensitive information to the component-level or headquarters Security Operations Center within one (1) hour of discovery.

The Contractor should maintain signed copies of the NDA for all employees as a record of compliance. The Contractor should also provide copies of each employee’s signed NDA to the Contracting Officer before the employee may commence work under the contract/task order.

(4) Prohibition on Use of PII in Vendor Billing and Administrative Records

The Contractor’s invoicing, billing, and other financial or administrative records or databases is not authorized to regularly store or include any sensitive PII or other confidential government information that is created, obtained, or provided during the performance of the contract without the written permission of the Senior Component Official for Privacy (SCOP). It is acceptable to list the names, titles and contact information for the Contracting Officer, COR, or other personnel associated with the administration of the contract in the invoices as needed.

(5) Reporting Actual or Suspected Data Breach

Contractors must report any actual or suspected breach of PII within one hour of discovery.[4] A “breach” is an incident or occurrence that involves the loss of control, compromise, unauthorized disclosure, unauthorized acquisition, or any similar occurrence where: (1) a person other than an authorized user accesses or potentially accesses PII or (2) an authorized user accesses or potentially accesses PII for an other than authorized purpose.

The report of a breach must be made to DOJ. The Contractor must cooperate with DOJ’s inquiry into the incident and efforts to minimize risks to DOJ or individuals, including remediating any harm to potential victims.

(a) The Contractor must develop and maintain an internal process by which its employees and Subcontractors are trained to identify and report the breach, consistent with DOJ Instruction 0900.00.01[5], Reporting and Response Procedures for a Breach of Personally Identifiable Information.

(b) The Contractor must report any such breach by its employees or Subcontractors to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000); Component-level Security Operations Center and Component-level Management Team, where appropriate; the COR; and the Contracting Officer within one (1) hour of the initial discovery.

(c) The Contractor must provide a written report to the DOJ Security Operations Center (dojcert@usdoj.gov, 202-357-7000) within 24 hours of discovery of the breach by its employees or Subcontractors. The report must contain the following information:

15A00026Q00000035 Page 11 of 35

(i) Narrative or detailed description of the events surrounding the suspected loss or compromise of information.[6] Date, time, and location of the incident.

(ii) Amount, type, and sensitivity of information that may have been lost or compromised, accessed without authorization, etc.

(iii) Contractor’s assessment of the likelihood that the information was compromised or lost and the reasons behind the assessment.[7]

(iv) Names and classification of person(s) involved, including victim, Contractor employee/Subcontractor and any witnesses.

(v) Cause of the incident and whether the company’s security plan was followed and, if not, which specific provisions were not followed.[8]

(vi) Actions that have been or will be taken to minimize damage and/or mitigate further compromise.

(vii) Recommendations to prevent similar situations in the future, including whether the security plan needs to be modified in any way and whether additional training may be required.

(d) The Contractor shall provide full access and cooperation for all activities determined by the Government to be required to ensure an effective incident response, including providing all requested images, log files, and event information to facilitate rapid resolution of sensitive information incidents.

(e) At the Government’s discretion, Contractor employees or Subcontractor employees may be identified as no longer eligible to access PII or to work on that contract based on their actions related to the loss or compromise of PII.

(6) Victim Remediation

At DOJ’s request, the Contractor is responsible for notifying victims and providing victim remediation services in the event of a breach of PII held by the Contractor, its agents, or its Subcontractors, under this contract. Victim remediation services shall include at least 18 months of credit monitoring and, for serious or large incidents as determined by the Government, call center help desk services for the individuals whose PII was lost or compromised. When DOJ requests notification, the Department Chief Privacy and Civil Liberties Officer and SCOP will direct the Contractor on the method and content of such notification to be sent to individuals whose PII was breached. By performing this work, the Contractor agrees to full cooperation in the event of a breach.

The Contractor should be self-insured to the extent necessary to handle any reasonably foreseeable breach, with another source of income, to fully cover the costs of breach response, including but not limited to victim remediation.

C. Government Records Training, Ownership, and Management

(1) Records Management Training and Compliance

(a) The Contractor must ensure that all employees and Subcontractors that have access to PII as well as to those involved in the creation, use, dissemination and/or destruction of PII take the DOJ Records and Information Training for New Employees (RIM) training course or another training approved by the Contracting Officer or COR.

This training will be provided at the outset of the Subcontractor’s/employee’s work on the contract and every year thereafter. The Contractor shall maintain copies of certificates as a record of compliance and must submit an email notification annually to the COR verifying that all employees working under this contract have completed the required records management training.

(b) The Contractor agrees to comply with Federal and Agency records management policies, including those policies associated with the safeguarding of records containing PII and those covered by the Privacy Act of 1974. These policies include the preservation of all records created or received regardless of format, mode of transmission, or state of completion.

(2) Records Creation, Ownership, and Disposition

(a) The Contractor shall not create or maintain any records not specifically tied to or authorized by the contract using Government IT equipment and/or Government records or that contain Government Agency information.

The Contractor shall certify, in writing, the appropriate disposition or return of all Government information at the conclusion of the contract or at a time otherwise specified in the contract. In accordance with 36 CFR 1222.32, the Contractor shall maintain and manage all Federal records created in the course of performing the contract in

15A00026Q00000035 Page 12 of 35 accordance with Federal law. Records may not be removed from the legal custody of DOJ or destroyed except in accordance with the provisions of the agency records schedules.

(b) Except as stated in the Performance Work Statement and, where applicable, the Contractor’s Commercial License Agreement, the Government Agency owns the rights to all electronic information (electronic data, electronic information systems or electronic databases and all supporting documentation and associated metadata created as part of this contract. All deliverables (including all data and records) under the contract are the property of the U.S. Government and may be considered federal records, for which the Agency shall have unlimited rights to use, dispose of, or disclose such data contained therein. The Contractor must deliver sufficient technical documentation with all data deliverables to permit the agency to use the data.

(c) The Contractor shall not retain, use, sell, disseminate, or dispose of any government data/records or deliverables without the express written permission of the Contracting Officer or Contracting Officer’s Representative. The Agency and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Willful and unlawful destruction, damage or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. § 2701. Records may not be removed from the legal custody of the Agency or destroyed without regard to the provisions of the Agency records schedules.

D. Data Privacy and Oversight

(1) Restrictions on Testing or Training Using Real Data Containing PII

The use of real data containing PII from any source for testing or training purposes is generally prohibited. The Contractor shall use synthetic or de-identified real data for testing or training whenever feasible.

(2) Requirements for Contractor IT Systems Hosting Government Data

The Contractor is required to obtain an Authority To Operate (ATO) for any IT environment owned or controlled by the Contractor or any Subcontractor on which Government data shall reside for the purposes of IT system development, design, data migration, testing, training, maintenance, use, or disposal.

(3) Requirement to Support Privacy Compliance

(a) If this contract requires the development, maintenance or administration of information technology[9], the Contractor shall support the completion of the Initial Privacy Assessment (IPA) document, if requested by Department personnel. An IPA is the first step in a process to identify potential privacy issues and mitigate privacy risks. The IPA asks basic questions to help components assess whether additional privacy protections may be needed in designing or implementing a project[10] to mitigate privacy risks, and whether compliance work may be needed. Upon review of the IPA, the OPCL determines whether a Privacy Impact Assessment (PIA) document and/or SORN, or modifications thereto, are required. The Contractor shall provide adequate support to complete the applicable risk assessment and PIA document in a timely manner, and shall ensure that project management plans and schedules include the IPA, PIA, and SORN (to the extent required) as milestones. Additional information on the privacy compliance process at DOJ, including IPAs, PIAs, and SORNs, is located on the DOJ OPCL website (https://dojnet.doj.gov/privacy/), including DOJ Order 0601, Privacy and Civil Liberties. The Privacy Impact Assessment Guidance and Template outline the requirements and format for the PIA.

(b) If the contract involves an IT system build or substantial development or changes to an IT system that may require privacy risk assessment and documentation, the Contractor shall provide adequate support to DOJ to ensure DOJ can complete any required assessment, and IPA, PIA, SORN, or other supporting documentation to support privacy compliance. The Contractor shall work with personnel from the program office, OPCL, the Office of the Chief Information Officer (OCIO), and the Office of Records Management and Policy to ensure that the privacy assessments and documentation are kept on schedule, that the answers to questions in the documents are thorough and complete, and that questions asked by the OPCL and other offices are answered in a timely fashion.

The Contractor must ensure the completion of required PIAs and documentation of privacy controls consistent with federal law and standards, e.g. NIST 800-53, Rev. 5; and compliance with the Privacy Act of 1974, E-Government Act of 2002, Federal Information Security Modernization Act of 2014, and key OMB guidelines, e.g., OMB Circular A-130.

15A00026Q00000035 Page 13 of 35

[1] “[T]he term ‘record’ means any item, collection, or grouping of information about an individual that is maintained by an agency, including, but not limited to, his education, financial transactions, medical history, and criminal or employment history and that contains his name, or the identifying number, symbol, or other identifying particular assigned to the individual, such as a finger or voice print or a photograph.” 5 U.S.C. § 552a(a)(4). “[T]he term ‘system of records’ means a group of any records under the control of any agency from which information is retrieved by the name of the individual or by some identifying number, symbol, or other identifying particular assigned to the individual.” 5 U.S.C. § 552a(a)(5).

[2] As stated in FAR 52.224-3 and Office of Management and Budget (OMB) Circular A-130, Managing Federal Information as a Strategic Resource (2016), “’personally identifiable information’ means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual.” Regarding “sensitive PII,” “[t]he sensitivity level of the PII will depend on the context, including the purpose for which the PII is created, collected, used, processed, stored, maintained, disseminated, disclosed, or disposed. For example, the sensitivity level of a list of individuals’ names may depend on the source of the information, the other information associated with the list, the intended use of the information, the ways in which the information will be processed and shared, and the ability to access the information.” OMB Circular A-130, at App. II-2.

[3] The DOJ OPCL Resources page is available at https://www.justice.gov/opcl/resources.

[4] As stated in DOJ Instruction 0900, “Contractors must notify the Contracting Officer, the Contracting Officer’s Representative, and JSOC (or component-level SOC) within 1 hour of discovering any incidents, including breaches, consistent with this Instruction, guidance issued by the CPCLO, NIST standards and guidelines, and the US-CERT notification guidelines.”

[5] https://www.justice.gov/file/4336/download [6] As stated in DOJ Instruction 0900, the description should include the type of information that constitutes PII; purpose for which PII is collected, maintained, and used; extent to which PII identifies a peculiarly vulnerable population; the determination of whether the information was properly encrypted or rendered partially or completely inaccessible by other means; format of PII (e.g., whether PII was structured or unstructured); length of time PII was exposed; any evidence confirming that PII is being misused or that it was never accessed.

[7] As stated in DOJ Instruction 0900, the report should include the nature of the cyber threat (e.g., Advanced Persistent Threat, Zero Day Threat, data exfiltration) for cyber incidents.

[8] As stated in DOJ Instruction 0900, the report should include analysis on whether the data is accessible, usable, and intentionally targeted.

[9] As defined in 40 U.S.C. § 11101, the term “information technology” means any equipment or interconnected system or subsystem of equipment, used in the automatic acquisition, storage, analysis, evaluation, manipulation, management, movement, control, display, switching, interchange, transmission, or reception of data or information by the executive agency, if the equipment is used by the executive agency directly or is used by a contractor under a contract with the executive agency that requires the use (i) of that equipment or (ii) of that equipment to a significant extent in the performance of a service or the furnishing of a product; includes computers, ancillary equipment (including imaging peripherals, input, output, and storage devices necessary for security and surveillance), peripheral equipment designed to be controlled by the central processing unit of a computer, software, firmware and similar procedures, services (including support services), and related resources; but does not include any equipment acquired by a federal contractor incidental to a federal contract.

[10] In this instance, the term “project” is used to scope the activities (e.g., creating, collecting, using, processing, storing, maintaining, disseminating, disclosing, or disposing of information) covered by an IPA. A project is intended to be technology-neutral, and may include an information system, a digital service, an information technology, a combination thereof, or some other activity that may create potential privacy issues or privacy risks that would benefit from an IPA. The scope of a project covered by an IPA is discretionary, but components should work with their SCOP and OPCL.

(End of Clause)

DOJ-05 Security of Department Information and Systems (OCT 2023)

I. Applicability to Contractors and Subcontractors Section 2839.102 of the Justice Acquisition Regulation (JAR), (48 C.F.R. § 2839.102), applies to this contract. Accordingly, all contractors are obligated to comply with all applicable DOJ security policies, directives, or guidance documents, including the security requirements in the provisions in this contract clause. This contract clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of the contractors and subcontractors (hereinafter collectively, “Contractor”) that may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information. The security requirements set forth herein are in addition to those required by the Federal Acquisition Regulation (“FAR”), and any other applicable laws, mandates, contract clauses, DOJ policies, directives or guidance documents and Executive Orders pertaining to the development and operation of Information Systems and/or the

15A00026Q00000035 Page 14 of 35 protection of Government Information. This clause does not alter or diminish any existing rights, obligations, or liability under any other civil and/or criminal law, rule, regulation, or mandate.

II. General Definitions The following general definitions apply to this clause. Specific definitions also apply as set forth in other paragraphs.

A. Authorization to Operate (“ATO”), as defined in National Institute of Standards and Technology (“NIST”) Special Publication (“SP”) 800-37 Revision 2, is the official management decision given by a senior Federal official or officials to authorize operation of an information system and to explicitly accept the risk to agency operations (including mission, functions, image, or reputation), agency assets, individuals, other organizations, and the Nation based on the implementation of an agreed-upon set of security and privacy controls.

B. Cloud Computing, as defined in DOJ Order 0904 Cybersecurity Program, is a model for enabling ubiquitous, convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal management effort or service provider interaction. This cloud model is composed of five essential characteristics, three service models, and four deployment models in accordance with NIST SP 800-145.

C. Covered Contract is any contract, order or other agreement under which the contractor, or a subcontractor at any tier, including a cloud service provider, may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information (as defined below) in the course of providing a product or service to the Department, with the exception of acquisitions under the micro-purchase threshold.

D. Covered Information System means any information system used for, involved with, or allowing, the processing, storing, or transmitting of DOJ Information under a Covered Contract.

E. Data means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data, computer software, and personally identifiable information (PII) (defined below). The term does not include information incidental to contract administration, such as financial, administrative, cost or pricing, or management information.

F. DOJ Information, as defined in DOJ Order 0904, means any Information that is owned, produced, controlled, protected by, or otherwise within the custody or responsibility of the DOJ, including, without limitation, information related to DOJ programs or personnel. It includes, without limitation, Information (1) provided by or generated for the DOJ, (2) managed or acquired by the Contractor for the DOJ in connection with the performance of the contract, and/or (3) acquired to perform the contract.

G. Information, as defined in DOJ Order 0904, is any communication or representation of knowledge such as facts, data, or opinions, in any form or medium, including textual, numerical, graphic, cartographic, narrative, or audiovisual. This includes any communication or representation of knowledge in an electronic format that allows it to be stored, retrieved, or transmitted.

H. Information System, means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502(8)).

I. Personally Identifiable Information (“PII”), as defined in the FAR 24.101, means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual. It includes but is not limited to common data elements such as names, addresses, dates of birth, and places of employment, to identity documents, Social Security numbers or other government-issued identifiers, precise location information, medical history, and biometric records.

This definition covers all PII that is created by or becomes available to the contractor, including its employees, subcontractors, or affiliates, as a result of performing under this contract. PII, as supplementally defined in DOJ Order 0904, also includes information about an individual maintained by an agency, including, but not limited to, information related to education, financial transactions, medical history, and criminal or employment history and information, which can be used to distinguish or trace an individual’s identity.

J. Private Cloud, as defined in NIST SP 800-145, is the deployment model for cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the organization, a third party, or some combination of them, and it may exist on or off premises.

15A00026Q00000035 Page 15 of 35

K. Security Breach means any security incident (as defined below) that directly relates to the loss of control, compromise, exfiltration, manipulation, unauthorized disclosure, unauthorized acquisition, unauthorized exposure or unauthorized access or any similar occurrence of any Covered Information System or any DOJ Information or any PII accessed by, retrievable from, processed by, stored on, or transmitted within, to or from any such system. This includes incidents where (1) a person other than an authorized user accesses or potentially accesses PII or DOJ Information or (2) an authorized user accesses or potentially accesses PII or DOJ Information for an unauthorized purpose.

a. Potential Security Breach (hereinafter, “Potential Breach”) means any suspected, but unconfirmed security breach (as defined above).

b. Confirmed Security Breach (hereinafter, “Confirmed Breach”) means any confirmed security breach (as defined above).

L. Security Incident means any occurrence that (1) may actually or imminently jeopardize, without lawful authority, the availability, integrity, authentication, confidentiality, or nonrepudiation of DOJ Information or a Covered Information System; or (2) may constitute a violation or imminent threat of violation of law, security policies, security procedures, or acceptable…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .