Solicitation 1240LN25R0004_Bent Creek Storm Debris Cleanup and Drainage.pdf

PDF 8 MB Posted

Attached to
Bent Creek Storm Debris Cleanup and Drainage
Solicitation number
1240LN25R0004
Issued by

About this file

This is a Request for Proposal (RFP) from the USDA Forest Service for storm debris cleanup and hazard tree removal at the Bent Creek Experimental Forest Administrative Site in Asheville, North Carolina. The solicitation seeks a contractor to remove fallen trees, woody debris, and hazard trees across approximately 0.37 acres, including falling approximately 72 hazard trees ranging from 8"-30" in diameter. The contract will be a firm-fixed-price (FFP) type with a 60-day period of performance after notice to proceed. The procurement is set aside 100% for small businesses, with a North American Industry Classification System (NAICS) code of 561730 and a small business size standard of $9.5 million.

Key response dates include: questions due by 1:00 PM Eastern on August 20, 2025, with government responses posted by August 22, 2025, and final proposals due by September 8, 2025 at 1:00 PM Eastern. The government will utilize a comparative evaluation methodology to select a single awardee, assessing offers based on technical capability, past performance, and price. Contractors must be registered in the System for Award Management (SAM) and submit a completed proposal including technical capability documentation, past performance information, and pricing details. Payment will be processed through the U.S. Department of the Treasury's Invoice Processing Platform (IPP) System.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

40LN

OGDEN UT 84401-2310

324 25TH ST

USDA-FS CSA INTERMOUNTAIN 3

4568 CODE 16. ADMINISTERED BYCODE

X

X

X

561730

SIZE STANDARD:

100.00 % FOR:SET ASIDE:UNRESTRICTED OR40LN

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

09/12/2025 1300 ET

08/12/2025

931-378-8014GILBERT CHONJE

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

1240LN25R0004

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 80 1150543OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

See Schedule

15. DELIVER TO

OGDEN UT 84401-2310

324 25TH ST

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$9.5

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULE

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

USDA-FS CSA INTERMOUNTAIN 3

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

DELIVER TO:

SOUTHERN RESEACH STN - HQ ASHEVILL

USDA FOREST SERVICE

SOUTHERN RESEARCH STATION

200 WT WEAVER BLVD

ASHEVILLE NC 28804 US

Delivery: 60 Days After Notice to Proceed

0001 Removal of Fallen Trees, and Woody Debris

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

XX

DATED

GILBERT C. CHONJE

. YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

0002 Removal of Hazard Trees

0003 Demolish and remove all debris for Oil Storage

Shed, Nursery Shed, and Planting Beds

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

80 2 of

Solicitation 1240LN25R0004_Bent Creek Storm Debris Cleanup and

SECTION B – CONTINUATION OF SF-1449

B-1 GENERAL INFORMATION/OVERVIEW

The United States Department of Agriculture (USDA) Forest Service is in need of contractors to provide services to remove hazard trees, fallen trees, and woody debris from across the administrative site in the areas identified in statement of work and maps.

The government will utilize comparative evaluation to select a single awardee resulting from this solicitation.

This combined synopsis/solicitation acquisition is subject to the Federal Acquisition Regulation (FAR) Part 12, Acquisition of Commercial Products and Commercial Services, and the Simplified Acquisition Procedures set forth in FAR Part 13. The resulting contract will be a Firm-Fixed-Price (FFP) contract.

The applicable North American Industry Classification System (NAICS) code to be assigned to this procurement is anticipated to be 561730. The product service code is anticipated to be S208.

The awarded contract shall be for a 60-day Period of Performance after issuance of Notice to Proceed.

Work Location: Bent Creek Experimental Forest Administrative Site, 1577 Brevard Road, Asheville, NC 28806

Solicitation Questions

All questions are due by 1PM Eastern Time on 22 August 2025. All received questions will be compiled and respective government responses posted to sam.gov approximately on 24 August 2025.

All final solicitation proposals are due on 12 September 2025 at 1PM Eastern.

All questions and final proposals shall be submitted to gilbert.chonje@usda.gov at or before the above stated date and time.

Invoicing

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform (IPP) System.

“Payment request” means any request for contractual or invoice payment by the Vendor. To constitute a proper invoice, the payment request shall comply with the requirements identified in the applicable Prompt Payment clause included in this BPA, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items. The IPP website address is: https://www.ipp.gov.

The Vendor must use the IPP website to register access and use IPP for submitting requests for payment per the following website: https://www.ipp.gov. Vendor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

mailto:gilbert.chonje@usda.gov https://www.ipp.gov/ https://www.ipp.gov/ https://www.ipp.gov/ https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

PAY ITEM

NO.

DESCRIPTION

METHOD

OF

PAY

UNIT

EST.

QTY.

Removal of Fallen Trees, and Woody Debris, as indicated in project drawings (Rough Order of Magnitude debris removal. Payment will be for actual cubic yard removed..)

AQ CY 500 -$

Removal of Hazard Trees, as indicated in project drawings (Includes falling and removal of approximately 72 hazard trees)

AQ CY 250 -$

Demolish and remove all debris for Oil Storage Shed, Nursery Shed, and Planting Beds

AQ CF 8910 -$ -$

Bent Creek Experimental Forest Administrative Site Debris Clearing

TOTAL PRICE -- FOR BASE BID PAY ITEMS

Southern Research Station

BASE BID SCHEDULE - Bent Creek Experimental Forest Administrative Site

National Forests in North Carolina U.S. Forest Service Confidential 8/1/2025 Page 1 of 1

COVER

SOUTHERN RESEARCH STATION

BENT CREEK EXPERIMENTAL FOREST

STATEMENT OF WORK AND PROJECT SPECIFICATIONS

FOR

BENT CREEK ADMINISTRATIVE SITE STORM DEBRIS CLEARING AND HAZARD

TREE REMOVAL

August 25

SPECIFICATION INDEX i

SPECIFICATION INDEX

DIVISION 1 – GENERAL

SECTION 010000 – GENERAL REQUIREMENTS & SUMMARY OF WORK

SECTION 013300 - SUBMITTALS

SECTION 014000 - QUALITY CONTROL

SECTION 017700 - CLOSEOUT PROCEDURES

SECTION 02540 - EROSION AND SEDIMENTATION CONTROL

SECTION 02821 - SEEDING, FERTILIZING, AND MULCHING

SECTION 311000 - SITE CLEARING

GENERAL 1

SECTION 010000 – GENERAL REQUIREMENTS & SUMMARY OF WORK

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Project information.

2. Summary of Work.

3. Contractor's use of site and premises.

4. Storage and Protection of Materials

5. Progress Cleaning

6. Inspections

7. Closeout Procedures

1.2 PROJECT INFORMATION

A. Project Identification: Bent Creek Experimental Forest Storm Debris Removal

B. Project Location:

1. Bent Creek Experimental Forest Administrative Site, 1577 Brevard Road, Asheville, NC

C. Project Background:

1. As a result of intense rain, flooding and wind associated from Hurricane Helene, several trees were downed or weakened across the administrative site and now pose an increased threat of wildfire or structural damage to nearby facilities.

1.3 SUMMARY OF WORK

A. The Work of Project consists of the following tasks:

1. Remove hazard trees, fallen trees, and woody debris from across the administrative site in the areas generally indicated per Section 311000 Site Clearing.

a. Includes the falling of approximately 72 hazard trees ranging from 8”-30” DBH, as marked by COR.

1.4 PERIOD OF PERFORMANCE

A. Complete all work specified herein within 30 days of Notice to Proceed.

1.5 CONTRACTOR'S USE OF SITE AND PREMISES

A. The Administrative Site is expected to remain largely operational during the execution fo work under this contract. Contract shall provide advanced notice of a minimum of 3 business

GENERAL 2

days if access to any area on the campus will need to be restricted. Daily work progress and plans for upcoming work must be coordinated through the onsite POC to minimize interruption to the progress of work and protect site employees from potential hazards associated with the work considered under this contract.

B. Limits on Use of Site: Limit use of Project site to areas within the Contract limits. Do not disturb portions of Project site beyond areas in which the Work is indicated.

C. Condition of Existing Grounds: Maintain portions of existing grounds, landscaping, and hardscaping affected by construction operations throughout construction period. Repair damage caused by construction operations.

1.6 STORAGE AND PROTECTION OF MATERIALS

A. The Contractor may store materials and equipment at the work site at their own risk. All materials must be kept in an area designated by the COR and be neat and orderly.

B. Deliver materials in undamaged condition, in manufacturer's original containers or packaging, with identifying labels intact and legible.

C. Store materials in accordance with manufacturer's instructions, with seals and labels accessible for inspection.

D. Protection After Installation: Provide adequate coverings as necessary to protect installed materials from damage resulting from natural elements, traffic, and subsequent construction.

Remove when no longer needed.

1.7 PROGRESS CLEANING

A. Site: Maintain Project site free of waste materials and debris. Dispose of materials lawfully.

B. Work Areas: Clean areas where Work is in progress to the level of cleanliness necessary for proper execution of the Work.

1.8 INSPECTIONS

A. The COR or inspector may inspect any and all work at any time during this project.

B. Any work that does not meet contract specifications shall be corrected by the contractor with no additional pay.

C. The COR shall inspect connections to existing pipe prior to backfilling.

D. The COR shall perform a final inspection when all the work is complete.

GENERAL 3

1.9 CLOSEOUT PROCEDURES

A. At substantial completion, submit a request to the COR for a pre-final inspection. The COR will provide a punch list of items to be completed.

B. Prior to final completion, submit a request to the COR for a final inspection.

C. Perform a final cleaning. Leave the site clean and ensure no trash or debris is left behind. No dumpster is available, contractor must dispose of all materials offsite.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 010000

SUBMITTALS 4

SECTION 013300 - SUBMITTALS

PART 1 - GENERAL

1.1 SUMMARY

A. The work of this section consists of submittal requirements before and during construction.

B. The contractor shall submit the following informational submittals to the COR.

1. Schedule of Activities, showing beginning and completion of major tasks.

1.2 SUBMITTAL FORMATS

A. All submittals shall be submitted via email in electronic Microsoft Word or PDF format.

B. Options: Identify options requiring selection by COR.

1.3 SUBMITTAL PROCEDURES

A. Processing Time: Allow time for submittal review, including time for resubmittals, as follows.

1. Initial Review: Allow 1 day for initial review of each submittal.

2. Resubmittal Review: Allow 1 days for review of each resubmittal.

3. Resubmit submittals until they are approved.

B. All submittals will be evaluated by the COR and returned marked either approved, approved with notations, or rejected.

1.4 PRODUCT SUBMITTAL REQUIREMENTS

A. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. Mark each submittal to show which products and options are applicable.

2. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

B. COR will not accept submittals received from sources other than Contractor.

SUBMITTALS 5

1.5 SUBSTITUTIONS:

A. If the Contractor intends to provide or install an item that is an "or equal" or differs from that which is specified, he/she shall submit all product data and information to the COR for review prior to ordering/purchase.

B. The contractor shall submit one digital copy of the manufacturer's description of all "or equals" proposed in lieu of name brands specified. This description shall include:

1. Product name and model number

2. Manufacturer

3. Product description

4. Technical data

5. Samples, as required by COR

C. A request for approval of “equals” constitutes a representation that Contractor:

1. Has investigated the proposed item and determined that it is equal or superior in all respects to that specified.

2. Will provide the same warranties for the proposed item as for the item specified.

3. Has determined that the proposed item is compatible with interfacing items.

4. Will coordinate the installation of an approved item and make all changes required in other elements of the work because of the substitution.

5. Waives all claims for additional expenses that may be incurred as a result of the substitution.

PART 2 - PRODUCTS (Not Used)

END OF SECTION 013300

QUALITY CONTROL 6

SECTION 014000 - QUALITY CONTROL

1.1 SUMMARY

A. Section includes administrative and procedural requirements for quality assurance and quality control.

1.2 EXISTING CONDITIONS

A. Verification: Contractor shall verify location and material of existing waterline at points of connection prior to beginning construction.

B. Previous construction plans are provided for reference only. The Forest Service makes no guarantees as to completeness or accuracy of the documents provided.

1.3 QUALITY ASSURANCE

A. See Quality Assurance of individual Specifications Sections for QA requirements specific to each component of work.

B. Manufacturer's Installation Instructions: Obtain for review by the COR at their request: written recommendations and instructions for installation of specified products and equipment.

1.4 QUALITY CONTROL

A. This work shall consist of providing quality control to ensure conformance with contract and manufacturer specifications. The Contractor shall provide all personnel, equipment, tests, and reports to meet the requirements of this specification.

B. The Contractor shall provide and maintain a quality control system that will ensure that all services, supplies, and construction required under this contract conform to the contract requirements. The Contractor shall perform, or cause to be performed, any sampling, inspection, and testing required to substantiate that all supplies, services, and construction conform to the contract requirements.

C. The Contractor shall furnish certificates or labels executed by the manufacturer, supplier, or vendor, stipulating that all products incorporated into the work meet the applicable requirements as shown on the drawings or specifications.

D. Quality Control shall be considered incidental to the bid items and no additional payment will be made.

QUALITY CONTROL 7

PART 2 - PRODUCTS (Not Used)

END OF SECTION 014000

CLOSEOUT PROCEDURES 8

SECTION 017700 - CLOSEOUT PROCEDURES

1.1 SUMMARY

A. Section includes administrative and procedural requirements for Contract closeout, including, but not limited to, the following:

1. Final completion procedures.

2. Final cleaning.

1.2 FINAL COMPLETION PROCEDURES

A. Inspection: Submit a written request for final inspection to determine acceptance a minimum of 2 days prior to date the Work will be completed and ready for final inspection. On receipt of request, COR will either proceed with inspection or notify Contractor of unfulfilled requirements.

1. Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

PART 2 - EXECUTION

2.1 FINAL CLEANING

A. General: Perform final cleaning. Conduct cleaning and waste-removal operations.

1. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a designated portion of Project:

a. Clean Project site of rubbish, waste material, litter, and other foreign substances.

b. Replace all signage removed for construction.

c. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

d. Rake grounds that are not planted, mulched, or paved to a smooth, even-textured surface. Fine grade, seed and mulch disturbed areas.

e. Remove tools, construction equipment, machinery, and surplus material from

Project site.

END OF SECTION 01770

EROSION AND SEDIMENT CONTROL

SECTION 024116 – BUILDING DEMOLITION

PART 3 - GENERAL

3.1 MATERIAL OWNERSHIP

A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site. Contractor is responsible for lawfully disposing of materials.

3.2 FIELD CONDITIONS

A. Buildings and structures to be demolished shall be vacated and all contents removed by Forest Service personnel.

B. Contractor shall ensure that all utility services are to the buildings are identified and have been disconnected. All electrical services shall be disconnected at the panel, disconnect, or transformer from which the service originates. Water lines shall be permanently capped and nearest isolation valves closed. Yard hydrants at the Nursery Shed and Planting Beds shall remain operational.

PART 4 - PRODUCTS – NOT USED

PART 5 - EXECUTION

5.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Protect existing site improvements and vegetation to remain from damage during construction.

Restore damaged improvements to their original condition, as acceptable to Owner.

5.2 DEMOLITION

A. Demolish indicated buildings (Fuel Shed, Nursery Shed, Planting Beds) and site improvements completely. Use methods required to complete the work within limitations of governing regulations and accepted construction practices.

B. Uniformly rough grade area of demolished construction to a smooth surface, free from irregular surface changes. Provide a smooth transition between adjacent existing grades and new grades.

Apply seed, mulch, and fertilizer in accordance with Section 02821.

5.3 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove all materials and legally dispose of them off Forest Service property.

EROSION AND SEDIMENT CONTROL

END OF SECTION 024116

SECTION 02540 - EROSION AND SEDIMENTATION CONTROL

A. This work consists of temporary and permanent measures as specified herein, to prevent and control soil erosion and sedimentation.

PART 2 - PRODUCTS

A. Silt fences shall be prefabricated with 1-1/2" square, hardwood posts, Mirafi Silt Fence, or approved equal.

PART 3 - EXECUTION

A. Prior to the start of construction, the Contractor shall submit to the C.O. for approval, a schedule for necessary temporary and permanent control work for each phase of work.

B. The Contractor shall monitor the performance of all erosion and sediment control practices and make minor adjustments as needed on a day-to-day basis. Silt fences shall be inspected after each rainfall and sediments deposits must be removed when they reach a maximum of 1/3 the height of the fence. Deteriorated or damaged fabrics must be replaced immediately.

C. Temporary controls shall be dismantled and disposed of after the disturbed soil has been stabilized.

SEEDING, FERTILIZING AND MULCHING

SECTION 02821 - SEEDING, FERTILIZING, AND MULCHING

A. This section covers the seeding of all established grassy areas that are disturbed within the construction limits. The work shall include fine grading of the areas, soil preparation, and application of lime, fertilizer, seed, and mulch.

PART 2 - PRODUCTS

A. Fertilizers shall be spread on the ground surface at the following rates.

1. Grade 18/46/0 600 lbs /acre

B. All dates shown are guidelines. If weather conditions are abnormal, the CO shall consult with the Forest Service Soil Scientist and/or Botanist for additional seeding times.

1. Permanent Seeding for established grassy areas – Spring (2/1 to 5/1):

Virginia Wild Rye: 10 lbs/acre Creeping Red Fescue: 10 lbs/acre Rye (cereal small grain): 30 lbs/acre Little Bluestem: 10 lbs/acre Partridge Pea: 6 lbs/acre Rye (Cereal small grain): 30 lbs./acre (Temporary Seeding)

C. Assure that mulch used on the project is certified noxious weed free by the appropriate authority in the jurisdiction of use.

D. Moisten seeding areas before seeding and maintain the moisture until 3 days after germination.

E. Apply fertilizer by the following methods:

1. Dry method. Incorporate the fertilizer into the upper portion of the seedbed before seeding.

2. Apply seed and fertilizer at rates specified.

3. Apply seed by Dry Method: Apply the seed with approved power driven seeders, drills, or other mechanical equipment. Hand-operated seeding methods are satisfactory on areas inaccessible to mechanical equipment.

4. Apply mulch within 48 hours after seeding by Dry Method: Spread all mulch material, except wood and grass cellulose fibers, by a mulch spreader utilizing forced air to blow the mulch material onto the seeded area. Apply straw mulch at designated rate. Apply wood fiber or grass straw cellulose fiber mulch at the designated rate.

SEEDING, FERTILIZING AND MULCHING

a. Mulch by hand areas inaccessible to mulching equipment.

5. Protect and care for seeded areas including watering when needed until final acceptance.

Repair all damage to seeded areas by re-seeding, re-fertilizing, and re-mulching. Apply supplemental applications of seed, mulch, fertilizer, lime, or ammonium nitrate.

PART 3 - EXECUTION

A. Seeding operations shall be carried out in a timely manner following any and all backfill completion as directed by the COR.

B. All disturbed areas to be seeded shall be graded, leveled, and prepared to receive the grass seed.

C. Application of Lime and Fertilizer - following the grading and leveling operation, lime and fertilizer shall be spread uniformly over the area to be seeded.

D. Seed shall be uniformly sown over the area at the rate specified by hand sowing. The Contractor may use a hydro-seeding method if approved by the COR.

E. Straw or pine needles shall be uniformly spread over the area at the rate specified.

SITE CLEARING 13

SECTION 311000 - SITE CLEARING

PART 1 - GENERAL

1.1 MATERIAL OWNERSHIP

A. Except for materials indicated to be stockpiled or otherwise remain Owner's property, cleared materials shall become Contractor's property and shall be removed from Project site.

1.2 FIELD CONDITIONS

A. Traffic: Minimize interference with adjoining roads, streets, walks, and other adjacent occupied or used facilities during site-clearing operations.

1. Do not close or obstruct streets, walks, or other adjacent occupied or used facilities other than those being actively worked on.

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION

3.1 PREPARATION

A. Protect and maintain benchmarks and survey control points from disturbance during construction.

B. Protect existing site improvements and vegetation to remain from damage during construction.

1. Restore damaged improvements to their original condition, as acceptable to Owner.

3.2 CLEARING

A. Remove all fallen trees, designated hazard trees, uprooted stumps, brush, and woody debris within the Bent Creek Experimental Forest Administrative Site in the areas generally indicated in Project Drawings. Continue clearing operations until all material has been removed.

Designated hazard trees should be cut prior to clearing. See Appendix B for location and description of hazard trees. Hazard trees will be designated on the site by double-wrapped pink flagging.

1. Cut stumps to 6” above ground.

2. Clear all fallen trees and designated hazard trees, stumps and woody debris within 20 feet of roadways, structures, and improvements.

SITE CLEARING 14

3. Live trees within the 20-foot clearing limit can remain in place. Fallen trees, debris, and stumps outside the 20-foot limit can remain in place. Ensure hazard trees felled by this contract do not hang or rest on live trees.

B. Cut all logs greater than 6 inches in diameter into lengths 6 feet or less before disposing offsite

C. Repair all areas that are disturbed by clearing operations to previous condition

1. If depressions are created by removal, blend surrounding soil.

2. If the area was previously grassed, seed and mulch per Section 02821.

3. If the areas was previously forested understory (no grass), apply wood chips generated by debris processing and/or rake to blend into surrounding ground cover

4. If the area is sand or gravel, fine grade to smooth surface.

3.3 DISPOSAL OF SURPLUS AND WASTE MATERIALS

A. Remove all materials and legally dispose of them off Forest Service property.

END OF SECTION 311000

SECTION B – CONTINUATION OF SF-1449

B-1 GENERAL INFORMATION/OVERVIEW

The United States Department of Agriculture (USDA) Forest Service is in need of contractors to provide services to remove hazard trees, fallen trees, and woody debris from across the administrative site in the areas identified in statement of work and maps.

The government will utilize comparative evaluation to select a single awardee resulting from this solicitation.

This combined synopsis/solicitation acquisition is subject to the Federal Acquisition Regulation (FAR) Part 12, Acquisition of Commercial Products and Commercial Services, and the Simplified Acquisition Procedures set forth in FAR Part 13. The resulting contract will be a Firm-Fixed-Price (FFP) contract.

The applicable North American Industry Classification System (NAICS) code to be assigned to this procurement is anticipated to be 561730. The product service code is anticipated to be S208.

The awarded contract will be for 60 days after issuance of Notice to Proceed.

Work Location: Bent Creek Experimental Forest Administrative Site, 1577 Brevard Road, Asheville, NC

Solicitation Questions

All questions are due by 1PM Eastern Time on 20 August 2025. All received questions will be compiled and respective government responses posted to sam.gov approximately on 22 August 2025.

All final solicitation proposals are due on 08 September 2025 at 1PM Eastern.

All questions and final proposals shall be submitted to gilbert.chonje@usda.gov at or before the above stated date and time.

Invoicing

Payment requests must be submitted electronically through the U.S. Department of the Treasury's Invoice Processing Platform (IPP) System.

“Payment request” means any request for contractual or invoice payment by the Vendor. To constitute a proper invoice, the payment request shall comply with the requirements identified in the applicable Prompt Payment clause included in this BPA, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items. The IPP website address is: https://www.ipp.gov.

The Vendor must use the IPP website to register access and use IPP for submitting requests for payment per the following website: https://www.ipp.gov. Vendor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone

(866) 973-3131.

mailto:gilbert.chonje@usda.gov https://www.ipp.gov/ https://www.ipp.gov/ https://www.ipp.gov/ https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov

SECTION C - CONTRACT CLAUSES

NOTE: In accordance with United States Department of Agriculture (USDA) memoranda effective March 14, 2025, class deviations have been issued in accordance with Federal Acquisition Regulation (FAR) Subpart 1.404 in order to implement the following Executive Orders (E.O.):

E.O. 14148 “Initial Rescissions of Harmful Executive Orders and Actions” E.O. 14173 “Ending Illegal Discrimination and Restoring Merit-Based Opportunity” E.O. 14168 “Defending Women from Gender Ideology Extremism and Restoring Biological Truth to the Federal Government” E.O. 14208, Section 2, “Ending Procurement and Forced Use of Paper Straws".

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

As prescribed in 52.107(b), insert the following clause:

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

Federal Acquisition Regulation (FAR) Clauses: https://www.acquisition.gov/browse/index/far (FAR clauses begin with 52) Department of Agriculture Acquisition Regulation (AGAR) Clauses:

https://www.acquisition.gov/agar (AGAR clauses begin with 452) FAR and AGAR Deviations to clauses may be viewed at: Policies & Regulations | USDA

52.202-1 Definitions (Jun 2020) 52.204-13 System for Award Management Maintenance (OCT 2018) 52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services (SEP 2023) 52.212-4 Contract Terms and Conditions – Commercial Products and Commercial Services (NOV

2023) 52.232-1 Payments 52.233-1 Disputes (May 2014) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim. (Oct 2004) 52.243-1 Changes 52.244-2 Subcontracts 52.246-2 Inspection and Acceptance 52.249-2 Termination for Convenience of the Government 52.249-8 Default https://www.acquisition.gov/far/1.404 https://www.acquisition.gov/far/1.404 https://www.federalregister.gov/documents/2025/01/28/2025-01901/initial-rescissions-of-harmful-executive-orders-and-actions https://www.federalregister.gov/documents/2025/01/31/2025-02097/ending-illegal-discrimination-and-restoring-merit-based-opportunity https://www.federalregister.gov/documents/2025/01/30/2025-02090/defending-women-from-gender-ideology-extremism-and-restoring-biological-truth-to-the-federal https://www.federalregister.gov/documents/2025/02/14/2025-02735/ending-procurement-and-forced-use-of-paper-straws https://www.federalregister.gov/documents/2025/02/14/2025-02735/ending-procurement-and-forced-use-of-paper-straws https://www.acquisition.gov/browse/index/far https://www.acquisition.gov/agar https://www.usda.gov/da/ocp/ppd/policies-regulations

52.212-1 Instructions to Offerors—Commercial Products and Commercial Services (SEP 2023) ADDENDUM to FAR 52.212-1(b), Submission of Offers:

(12) Offerors must have an active entity registration in the System for Award Management (https://www.sam.gov/SAM/) in order to submit an offer.

(13) Offerors shall ensure that all representations and certifications are up-to-date in SAM.gov at time of offer submission. A completed copy of the representations and certifications at FAR 52.212-3 shall be submitted with the offer.

(14) Offers submitted in response to this solicitation shall include technical capability, past performance information, and pricing.

(i) FACTOR I – TECHNICAL CAPABILITY. Provide an offer demonstrating your firm’s capability to provide the services required in Attachment 1 – Performance Work Statement (PWS). Address the following criteria:

(A) Sub-Factor #1 – Quality Control Plan (QCP). Submit with your quotation package your QCP that describes how your company will carry out the work by ensuring your company’s quality of services will be performed in accordance with the performance work statement.

(B) Sub-Factor #2 – Work Schedule. Submit a draft work schedule addressing the sequence and timeline to accomplish all the work required by the required period of performance. Include start date, sequence and timeline for each task, and completion date.

(ii) FACTOR II – PAST PERFORMANCE. The Past Performance evaluation will be accomplished by reviewing aspects of an Offeror's Relevant Past Performance, focusing on and targeting performance which is relevant to the effort as it directly relates to the services being procured under this solicitation and as defined in Addendum to FAR 52.212-2 Evaluation – Commercial Products and Commercial Services.

(A) Sub-Factor #3 – Relevant Past Performance. The offeror shall include documentation regarding their relevant past performance as it directly relates to the services and being procured under this solicitation. The offeror shall submit ongoing work or work completed within the past five years.

This past performance data shall document a successful history of past contract performance.

1. Submit a short narrative for each relevant project that is similar in nature, size, complexity, scope, and geographical conditions as required by PWS. Provide these details (as a prime / sub-contractor):

□ Contract number;

□ Project Title / Location;

□ Contract Value;

□ Period of Performance;

□ Company Role (Prime or Subcontractor); and

□ Customer Contact Info (Name/Tele/E-mail).

http://www.sam.gov/SAM/)

(B) In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance submission and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, the Contractor Performance Assessment Reporting System (CPARS) at https://www.cpars.gov, and commercial sources. Offerors are reminded that both independent data and data provided by offerors in their offers may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offerors. Offers that do not contain the information requested by this paragraph risk receiving an unacceptable performance rating by the Government. The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance. Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

(iii) FACTOR III – PRICE. Offerors shall complete and submit the Schedule of Items.

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders— Commercial Products and Commercial Services.

As prescribed in 12.301(b)(4), insert the following clause:

CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—

COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) [(DEVIATION FEB 2025)]

(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).

(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) (Section 1634 of Pub. L. 115-91).

(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Nov 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).

(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).

(5) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) ( 31 U.S.C. 3903 and 10 U.S.C. 3801).

(6) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C. 3553).

(7) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Public Laws 108-77 and 108-78 ( 19 U.S.C. 3805 note)).

(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:

[Contracting Officer check as appropriate.] http://www.cpars.gov/ https://www.acquisition.gov/far/part-12#FAR_12_301 https://www.acquisition.gov/far/part-12#FAR_12_301 https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_203_19 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_23 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_204_25 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_209_10 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://www.acquisition.gov/far/part-52#FAR_52_232_40 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title31-section3903&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section3801&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section3801&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_233_3 https://www.acquisition.gov/far/part-52#FAR_52_233_3 https://www.acquisition.gov/far/part-52#FAR_52_233_4 https://www.acquisition.gov/far/part-52#FAR_52_233_4

☐ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Jun 2020), with Alternate I (Nov 2021) (41 U.S.C. 4704 and 10 U.S.C. 4655).

☐ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Nov 2021) (41 U.S.C. 3509)).

☐ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (Jun 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)

☒ (4) 52.203-17, Contractor Employee Whistleblower Rights (Nov 2023) ( 41 U.S.C. 4712); this clause does not apply to contracts of DoD, NASA, the Coast Guard, or applicable elements of the intelligence community—see FAR 3.900(a).

☒ (5) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) (Pub. L. 109-282) ( 31 U.S.C. 6101 note).

☐ (6) [Reserved].

☐ (7) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

☐ (8) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).

☒ (9) 52.204-27, Prohibition on a ByteDance Covered Application (Jun 2023) (Section 102 of Division R of Pub. L. 117-328).

☐ (10) 52.204-28, Federal Acquisition Supply Chain Security Act Orders—Federal Supply Schedules, Governmentwide Acquisition Contracts, and Multi-Agency Contracts. (Dec 2023) ( Pub. L.

115–390, title II).

☐ (11) (i) 52.204-30, Federal Acquisition Supply Chain Security Act Orders—Prohibition. (Dec 2023) ( Pub. L. 115–390, title II).

☐ (ii) Alternate I (Dec 2023) of 52.204-30.

☒ (12) 52.209-6, Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Jan 2025) ( 31 U.S.C.

6101 note).

☐ (13) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Oct 2018) ( 41 U.S.C. 2313).

☐ (14) [Reserved].

☐ (15) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (Oct 2022) ( 15 U.S.C.

657a).

☐ (16) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Oct 2022) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C.

657a).

☐ (17) [Reserved]

☒ (18) (i) 52.219-6, Notice of Total Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

☐ (ii) Alternate I (Mar 2020) of 52.219-6.

☐ (19) (i) 52.219-7, Notice of Partial Small Business Set-Aside (Nov 2020) (15 U.S.C. 644).

☐ (ii) Alternate I (Mar 2020) of 52.219-7.

https://www.acquisition.gov/far/part-52#FAR_52_203_6 https://www.acquisition.gov/far/part-52#FAR_52_203_6 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section4655&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title10-section4655&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_203_13 https://www.acquisition.gov/far/part-52#FAR_52_203_13 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_203_15 https://www.acquisition.gov/far/part-52#FAR_52_203_17 https://www.acquisition.gov/far/part-52#FAR_52_203_17 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-section4712&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-section4712&num=0&edition=prelim https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-3#FAR_3_900 https://www.acquisition.gov/far/part-52#FAR_52_204_10 https://www.acquisition.gov/far/part-52#FAR_52_204_10 http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title31-section6101&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title31-section6101&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_14 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_15 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_204_27 https://www.acquisition.gov/far/part-52#FAR_52_204_28 https://www.acquisition.gov/far/part-52#FAR_52_204_28 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#FAR_52_204_30 https://www.acquisition.gov/far/part-52#FAR_52_204_30 https://www.govinfo.gov/link/plaw/115/public/390 https://www.govinfo.gov/link/plaw/115/public/390 https://www.acquisition.gov/far/part-52#FAR_52_204_30 https://www.acquisition.gov/far/part-52#FAR_52_204_30 https://www.acquisition.gov/far/part-52#FAR_52_209_6 https://www.acquisition.gov/far/part-52#FAR_52_209_6 https://www.govinfo.gov/link/uscode/31/6101 https://www.govinfo.gov/link/uscode/31/6101 https://www.govinfo.gov/link/uscode/31/6101 https://www.acquisition.gov/far/part-52#FAR_52_209_9 https://www.acquisition.gov/far/part-52#FAR_52_209_9 http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-section2313&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title41-section2313&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_3 https://www.acquisition.gov/far/part-52#FAR_52_219_3 http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637a&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637a&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637a&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_4 https://www.acquisition.gov/far/part-52#FAR_52_219_4 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_6 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_7 https://www.acquisition.gov/far/part-52#FAR_52_219_7

☐ (20) 52.219-8, Utilization of Small Business Concerns (Jan 2025)( 15 U.S.C. 637(d)(2) and (3)).

☐ (21) (i) 52.219-9, Small Business Subcontracting Plan (Jan 2025) ( 15 U.S.C. 637(d)(4)).

☐ (ii) Alternate I (Nov 2016) of 52.219-9.

☐ (iii) Alternate II (Nov 2016) of 52.219-9.

☐ (iv) Alternate III (Jun 2020) of 52.219-9.

☐ (v) Alternate IV (Jan 2025) of 52.219-9.

☐ (22) (i) 52.219-13, Notice of Set-Aside of Orders (Mar 2020) (15 U.S.C. 644(r)).

☐ (ii) Alternate I (Mar 2020) of 52.219-13.

☐ (23) 52.219-14, Limitations on Subcontracting (Oct 2022) (15 U.S.C. 657s).

☐ (24) 52.219-16, Liquidated Damages—Subcontracting Plan (Sep 2021) (15 U.S.C.

637(d)(4)(F)(i)).

☐ (25) 52.219-27, Notice of Set-Aside for, or Sole-Source Award to, Service-Disabled VeteranOwned Small Business (SDVOSB) Concerns Eligible Under the SDVOSB Program (Feb 2024) (15 U.S.C. 657f).

☒ (26) (i) 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) (15 U.S.C. 632(a)(2)).

☐ (ii) Alternate I (Mar 2020) of 52.219-28.

☐ (27) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women-Owned Small Business Concerns (Oct 2022) (15 U.S.C. 637(m)).

☐ (28) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (Oct 2022) (15 U.S.C. 637(m)).

☐ (29) 52.219-32, Orders Issued Directly Under Small Business Reserves (Mar 2020) ( 15 U.S.C.

644(r)).

☐ (30) 52.219-33, Nonmanufacturer Rule (Sep 2021) ( 15 U.S.C. 637(a)(17)).

☒ (31) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).

☒ (32) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (Jan 2025)( E.O.

13126).

☐ (33) [Reserved] 52.222-21, Prohibition of Segregated Facilities (Apr 2015).

☐ (34) [Reserved] (i) 52.222-26, Equal Opportunity (Sep 2016) (E.O.11246).

(ii) Alternate I (Feb 1999) of 52.222-26.

☐ (35) (i) 52.222-35, Equal Opportunity for Veterans (Jun 2020) ( 38 U.S.C. 4212).

(ii) Alternate I (Jul 2014) of 52.222-35.

☒ (36) (i) 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) ( 29 U.S.C. 793).

☐ (ii) Alternate I (Jul 2014) of 52.222-36.

☐ (37) 52.222-37, Employment Reports on Veterans (Jun 2020) ( 38 U.S.C. 4212).

https://www.acquisition.gov/far/part-52#FAR_52_219_8 https://www.acquisition.gov/far/part-52#FAR_52_219_8 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_9 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_13 https://www.acquisition.gov/far/part-52#FAR_52_219_14 https://www.acquisition.gov/far/part-52#FAR_52_219_14 https://www.acquisition.gov/far/part-52#FAR_52_219_16 https://www.acquisition.gov/far/part-52#FAR_52_219_16 https://www.acquisition.gov/far/part-52#FAR_52_219_27 https://www.acquisition.gov/far/part-52#FAR_52_219_27 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_28 https://www.acquisition.gov/far/part-52#FAR_52_219_29 https://www.acquisition.gov/far/part-52#FAR_52_219_29 https://www.acquisition.gov/far/part-52#FAR_52_219_30 https://www.acquisition.gov/far/part-52#FAR_52_219_30 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://www.acquisition.gov/far/part-52#FAR_52_219_32 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section644&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section644&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section644&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://www.acquisition.gov/far/part-52#FAR_52_219_33 https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637&num=0&edition=prelim https://uscode.house.gov/view.xhtml?req=granuleid%3AUSC-prelim-title15-section637&num=0&edition=prelim https://www.acquisition.gov/far/part-52#FAR_52_222_3 https://www.acquisition.gov/far/part-52#FAR_52_222_3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .