Sole Source Justification VERSALINK P-1000_Redacted.pdf
PDF 357 KB Posted
- Attached to
- Versalink P1000
- Solicitation number
- N0016721Q0079
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N0016721Q0079-0001 Versalink P1000 Solicitation.pdf | ||
| N0016721Q0079 Versalink Adhesive Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLE SOURCE JUSTIFICATION FOR SIMPLIFIED ACQUISITIONS
From: , Code 7220
To: Code 02 Simplified Acquisition Branch (SAP)
Subj: SOLE SOURCE JUSTIFICATION
1. DESCRIPTION OF REQUIRED SUPPLIES/SERVICES, ESTIMATED VALUE, AND
DELIVERY REQUIREMENTS
This is a Sole Source Justification for the acquisition of 9,000 lbs of Versalink P-1000 oligomeric adhesive in twenty drums with an option for 2250 lbs in five drums.
- 9,000 pounds (144,000 oz) of Versalink at
- 2,250 pounds (36,000 oz) of Versalink at
- Estimated Shipping = included in the price per pound
The estimated total value is . The material should be delivered and stored in drums, and the material must pass the material procurement specifications defined in NAVSEA Drawing(s):
-Unclassified Portion of the Two-Part Polyurea Material Procurement Specification, Excerpted from NAVSEA Dwg. No. 690-6726597
-Also summarized in VERSALINK P1000 Specifications
MANUFACTURER:
Evonik Corporation
7201 Hamilton Ave, Allentown, PA, 18195
David Borowski, 224-358-7478
The requested delivery date is 4/15/2021.
2. SUPPORTING DOCUMENTATION FOR SOLE SOURCE BASED ON
CONTRACTOR’S UNIQUE QUALIFICATIONS OR NATURE OF THE ACQUISITION
These materials are required to maintain construction schedules of various Research, Development, Test, and Evaluation (RDT&E) products (such as polymer molds/components, surface treatment components, etc.) for various Navy projects such as Conformal Acoustic
Velocity Sensor (CAVES), COLUMBIA Class Program, and VIRGINIA Class Program. A lapse of the material will create a stop work situation for CAVES, COLUMBIA, and VIRGINIA.
Identifying a new material to satisfy performance and material integrity specifications would require a solicitation to identify potential vendors, resulting in a 12 month impact to schedule.
Completing the necessary testing listed in NSWCCD-72-TR—2010/103 “Polymer Test
Procedures for Naval Applications” would result in an additional 5 years in testing.
File details come from the government source that posted it. Updated .