Sole Source Justification VERSALINK P-1000_Redacted.pdf

PDF 357 KB Posted

Attached to
Versalink P1000
Solicitation number
N0016721Q0079
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLE SOURCE JUSTIFICATION FOR SIMPLIFIED ACQUISITIONS

From: , Code 7220

To: Code 02 Simplified Acquisition Branch (SAP)

Subj: SOLE SOURCE JUSTIFICATION

1. DESCRIPTION OF REQUIRED SUPPLIES/SERVICES, ESTIMATED VALUE, AND

DELIVERY REQUIREMENTS

This is a Sole Source Justification for the acquisition of 9,000 lbs of Versalink P-1000 oligomeric adhesive in twenty drums with an option for 2250 lbs in five drums.

- 9,000 pounds (144,000 oz) of Versalink at

- 2,250 pounds (36,000 oz) of Versalink at

- Estimated Shipping = included in the price per pound

The estimated total value is . The material should be delivered and stored in drums, and the material must pass the material procurement specifications defined in NAVSEA Drawing(s):

-Unclassified Portion of the Two-Part Polyurea Material Procurement Specification, Excerpted from NAVSEA Dwg. No. 690-6726597

-Also summarized in VERSALINK P1000 Specifications

MANUFACTURER:

Evonik Corporation

7201 Hamilton Ave, Allentown, PA, 18195

David Borowski, 224-358-7478

The requested delivery date is 4/15/2021.

2. SUPPORTING DOCUMENTATION FOR SOLE SOURCE BASED ON

CONTRACTOR’S UNIQUE QUALIFICATIONS OR NATURE OF THE ACQUISITION

These materials are required to maintain construction schedules of various Research, Development, Test, and Evaluation (RDT&E) products (such as polymer molds/components, surface treatment components, etc.) for various Navy projects such as Conformal Acoustic

Velocity Sensor (CAVES), COLUMBIA Class Program, and VIRGINIA Class Program. A lapse of the material will create a stop work situation for CAVES, COLUMBIA, and VIRGINIA.

Identifying a new material to satisfy performance and material integrity specifications would require a solicitation to identify potential vendors, resulting in a 12 month impact to schedule.

Completing the necessary testing listed in NSWCCD-72-TR—2010/103 “Polymer Test

Procedures for Naval Applications” would result in an additional 5 years in testing.

File details come from the government source that posted it. Updated .