Sole Source Justification (Signed).pdf
PDF 3 MB Posted
- Attached to
- Remotely Operated Underwater Vehicles (ROV's) CBP Ports of Jacksonville, Miami, FL and Newark, NJ
- Solicitation number
- 70B03C25P00000236
About this file
This Sole Source Determination document justifies a direct procurement of Oceanbotics SRV-8 remotely operated underwater vehicles (ROVs) for U.S. Customs and Border Protection (CBP). The procurement covers ROVs and related accessories for the Ports of Jacksonville and Miami, Florida, and Newark, New Jersey, with an anticipated total cost of $235,740.00. CBP selected the Oceanbotics SRV-8 as the sole source due to its unique technical capabilities, including 8 large brushless DC thrusters (compared to 6 in most market ROVs) and 2 high-intensity lights with up to 1,500 lumens, which are specifically suited for ports with challenging conditions like high currents, low clarity, and high turbidity. The pricing was determined fair and reasonable through a comparison with a similar Deep Trekker Pivot ROV system priced at $50,251.23. The procurement was awarded to RJE OCEANBOTICS, INC. on 2025-05-12 under contract 70B03C25P00000236.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 2 U.S. Customs and Border Protection
Sole Source Determination For actions above the micro-purchase threshold but not exceeding the SAT
Version 2.0 October 2020
Date: _5/5/2025_________ PR Number: __20150634______
1. Nature and/or description of the item/service being procured and anticipated cost:
The Department of Homeland Security, Customs and Border Protection, Office of Field Operations, prepared this justification for an exception to fair opportunity. The items being procured are Oceanbotics SRV-8 remotely operated underwater vehicles (ROV) and related accessories for the Ports of Jacksonville and Miami, Florida and Newark, New Jersey. The anticipated cost is $235,740.00.
2. Sole Source Determination Rationale in accordance with FAR 13.106-1(b)(1)(i) and (ii).
___X_____ Only one source reasonably available.
_________ Urgent and compelling circumstances exists.
_________ Exclusive licensing agreement exists.
_________ Brand name. If the brand name requirement applies to a portion of the procurement, please identify that portion.
_________ Industrial Mobilization _________ Other. Explain:
Only the Oceanbotics SRV-8 underwater ROV can meet the unique requirements demanded by CBP’s operating areas including Ports with high currents, low clarity , and high turbidity. These conditions require a heavy platform, powerful thrusters, high intensity light, and high-end sonar.
The SRV-8 has 8 large brushless DC thrusters when most ROVs on the market only have 6. The SRV-8 has 2 lights with max lumens of up to 1500 which is brighter than competitor ROVs in the marketplace.
3. The anticipated price will be determined fair and reasonable based on one or more of the price analysis techniques described below in accordance with FAR Part 13.106-3(a)(2).:
_________ Market Research.
_________ Comparison of the proposed price with prices found reasonable on previous purchases.
_________ Current price List.
____X___ Comparison with similar items in a related industry.
_________ Comparison to IGCE.
_________ Contracting Officer’s personal knowledge.
_________ Other. Explain:
Attachment 2 U.S. Customs and Border Protection
Sole Source Determination For actions above the micro-purchase threshold but not exceeding the SAT
Version 2.0 October 2020
The pricing for the SRV-8 underwater ROV + the sonar system is $71,990, a quote obtained by the service for a similar system, the Deep Trekker Pivot ROV, shows similar pricing of $50,251.23 for the ROV and Sonar System.
4. Technical/Requirements Personnel Certification:
I certify that this requirement meets the Government’s minimum need and that the supporting data, which forms a basis for the Sole Source Determination, is accurate and complete.
Date
Julianne Chavis Technical Representative/COR
5. Contracting Officer Certification/Approval:
I hereby determine that the circumstances described herein exist and that the information is accurate and complete to the best of my knowledge:
Robert Kay Date Contracting Officer
| Urgent and compelling circumstances exists: | |
| Exclusive licensing agreement exists: | |
| Brand name If the brand name requirement applies to a portion of the procurement: | |
| Industrial Mobilization: | |
| Other Explain: | |
| Market Research: | |
| Comparison of the proposed price with prices found reasonable on previous: | |
| Current price List: | |
| Comparison to IGCE: | |
| Contracting Officers personal knowledge: | |
| Other Explain_2: | |
| Julianne Chavis: | |
| Date: 5.9.25 | |
| Robert Kay: | |
| Date_2: | |
| 2025-05-09T08:16:00-0400 | |
| ROBERT J KAY |